{{#Wiki_filter:NLS2018040 Attachment Page 1 of 2 Attachment Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.11, Revision 19 Change Description Revision 19 of Emergency Plan Implementing Procedure (EPIP) 5. 7 .11 , Early Dismissal/Evacuation of Site Personnel, is a total re-write to meet new format and performance guidance provided by Cooper Nuclear Station's (CNS) procedure writer's guide. The revisions included section/step sequence changes, changing notes containing actions into procedure steps, deleting redundant steps/duplicate information, re-writing steps to improve human performance, and a change to the level of use category.
{{#Wiki_filter:NLS2018040 Attachment Page 1 of 2 Attachment Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.11, Revision 19 Change Description Revision 19 of Emergency Plan Implementing Procedure (EPIP) 5. 7.11, Early Dismissal/Evacuation of Site Personnel, is a total re-write to meet new format and performance guidance provided by Cooper Nuclear Station's (CNS) procedure writer's guide. The revisions included section/step sequence changes, changing notes containing actions into procedure steps, deleting redundant steps/duplicate information, re-writing steps to improve human performance, and a change to the level of use category.
Other major changes made to the EPIP were as follows:
Other major changes made to the EPIP were as follows:
* Established Logistics Coordinator as lead in executing dismissal/evacuation.
Established Logistics Coordinator as lead in executing dismissal/evacuation.
* Clarified Radiological Control Manager as having the responsibility of decision maker for when to terminate dismissal and begin evacuation, and for determination of evacuation routes.
Clarified Radiological Control Manager as having the responsibility of decision maker for when to terminate dismissal and begin evacuation, and for determination of evacuation routes.
* Added new Attachments l and 2, (Dismissal Flowchart and Evacuation Flowchart), and transferred instructions for dismissal/evacuation actions into a flowchart format. Also added a Caution to these attachments concerning the potential threat of exposing personnel to severe weather or hostile action during dismissal or evacuation.
Added new Attachments l and 2, (Dismissal Flowchart and Evacuation Flowchart), and transferred instructions for dismissal/evacuation actions into a flowchart format. Also added a Caution to these attachments concerning the potential threat of exposing personnel to severe weather or hostile action during dismissal or evacuation.
* Added a new Section 3 .10 to provide administrative controls for the new Dismissal and Evacuation Flowchart hard cards.
Added a new Section 3.10 to provide administrative controls for the new Dismissal and Evacuation Flowchart hard cards.
Change Summary of Analysis (10 CFR 50.54(q) evaluation)
Change Summary of Analysis (10 CFR 50.54(q) evaluation)
Licensing Basis Affected by Change:
Licensing Basis Affected by Change:
CNS Emergency Plan (E-Plan), Section 6.5, discusses actions that will be taken for on-site personnel whenever a radiological emergency has occurred which might result in concentrations of airborne activity or radiation levels in excess of pre-determined limits and other emergency situations where personnel safety is threatened.
CNS Emergency Plan (E-Plan), Section 6.5, discusses actions that will be taken for on-site personnel whenever a radiological emergency has occurred which might result in concentrations of airborne activity or radiation levels in excess of pre-determined limits and other emergency situations where personnel safety is threatened.
E-Plan, Section 6.5.4, discusses initial assembly and accountability of personnel. This section also references EPIP 5. 7 .11 for direction on site dismissal and evacuation.
E-Plan, Section 6.5.4, discusses initial assembly and accountability of personnel. This section also references EPIP 5. 7.11 for direction on site dismissal and evacuation.
E-Plan, Appendix A, describes procedures that implement the E-Plan, including EPIP 5.7.11.
E-Plan, Appendix A, describes procedures that implement the E-Plan, including EPIP 5.7.11.
How Change Complies with Regulations and Previous Commitments:
How Change Complies with Regulations and Previous Commitments:
10 CFR 50.47(b)(l0) requires, in part, that a range of protective actions are developed for the plume exposure pathway EPZ for emergency workers and the public with consideration given to
10 CFR 50.47(b)(l0) requires, in part, that a range of protective actions are developed for the plume exposure pathway EPZ for emergency workers and the public with consideration given to  


NLS2018040 Attachment Page 2 of 2 evacuation, sheltering, and, as a supplement to these, the prophylactic use of potassium iodide, as appropriate.
NLS2018040 Attachment Page 2 of 2 evacuation, sheltering, and, as a supplement to these, the prophylactic use of potassium iodide, as appropriate.
Line 36: Line 36:
Affected Emergency Planning Functions/Impact on Effectiveness of Emergency Planning Functions:
Affected Emergency Planning Functions/Impact on Effectiveness of Emergency Planning Functions:
10 CFR 50.47(b)(l0); Function - A range of protective actions is available for plant emergency workers during emergencies, including those for hostile action events.
10 CFR 50.47(b)(l0); Function - A range of protective actions is available for plant emergency workers during emergencies, including those for hostile action events.
The change made to EPIP 5. 7.11 does not affect the meaning or intent of descriptions, facilities/equipment, or the process for site dismissal or evacuation. Clarification of responsibilities and the addition of flow charts are considered enhancements to improve usability of the EPIP. The change continues to meet the above planning standard and does not constitute a decrease in effectiveness of the E-Plan.
The change made to EPIP 5. 7.11 does not affect the meaning or intent of descriptions, facilities/equipment, or the process for site dismissal or evacuation. Clarification of responsibilities and the addition of flow charts are considered enhancements to improve usability of the EPIP. The change continues to meet the above planning standard and does not constitute a decrease in effectiveness of the E-Plan.  


NLS201 8040 Enclosure Page 1 of21 Enclosure Emergency Plan Implementing Procedure 5.7.11 , Revision 19
NLS201 8040 Enclosure Page 1 of21 Enclosure Emergency Plan Implementing Procedure 5.7.11, Revision 19  


UC E S T A T I 0 N Operations Manual Em e rg e ncy Preparedness EMERGENCY PLAN IMPLEMENTING PROCEDURE 5.7.11 EARLY DISMISSAL /EVACUATION OF SITE PERSONNEL Level of Use: MULTIPLE Quality: QAPD RELATED Effective Date: 6/13/18 Approval Authority: ITR-RDM Procedure Owner:   EP ON-SITE COORD P ROCEDURE 5. 7 .1 1                          REVI SION 19 PAGE 1 OF 20
UC E S T A T I 0 N Operations Manual Em erge ncy Preparedness EMERGENCY PLAN IMPLEMENTING PROCEDURE 5.7.11 EARLY DISMISSAL/EVACUATION OF SITE PERSONNEL PROCEDURE 5. 7.1 1 Level of Use:
MULTIPLE Quality: QAPD RELATED Effective Date: 6/13/18 Approval Authority: ITR-RDM Procedure Owner:
EP ON-SITE COORD REVISION 19 PAGE 1 OF 20  


TABLE OF CONTENTS
TABLE OF CONTENTS
: 1. ENTRY CONDITIONS [REFERENCE USE] ...... ............. . ...... .... ...................... 3
: 1.
: 2. INSTRUCTIONS [REFERENCE USE] ........................ .. ............ .. ............ ....... 3 ATTACHMENT 1     DISMISSAL FLOWCHART [REFERENCE USE] .................... 4 ATTACHMENT 2     EVACUATION FLOWCHART [REFERENCE USE] ........ ........ .. 5 ATTACHMENT 3     DISMISSAL ANNOUNCEMENT [INFORMATION USE] .......... 6 ATTACHMENT 4     DISMISSAL INFORMATION SHEET [INFORMATION USE] .... 7 ATTACHMENT 5     EVACUATION ANNOUNCEMENT [INFORMATION USE] ........ 8 ATTACHMENT 6     NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP
ENTRY CONDITIONS [REFERENCE USE].................................................... 3
[INFORMATION USE] .................................................... 9 ATTACHMENT 7     SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP
: 2.
[INFORMATION USE] ............................ . .......... .... ....... 10 ATTACHMENT 8     RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION [INFORMATION USE] .............. .. ............... 11 ATTACHMENT 9     EVACUEE MONITORING DATA [INFORMATION USE] ....... 13 ATTACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA
INSTRUCTIONS [REFERENCE USE]........................................................... 3 ATTACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE].................... 4 ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE].................. 5 ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [INFORMATION USE].......... 6 ATTACHMENT 4 DISMISSAL INFORMATION SHEET [INFORMATION USE].... 7 ATTACHMENT 5 EVACUATION ANNOUNCEMENT [INFORMATION USE]........ 8 ATTACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP
[INFORMATION USE] .................................................. 14 ATTACHMENT 11 DECONTAMINATION LIMITS [INFORMATION USE] .......... 15 ATTACHMENT 12 INFORMATION SHEET [NFORMATION USE] .................... 16
[INFORMATION USE].................................................... 9 ATTACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP
.., J PROCEDURE 5 . 7 .11                       REVISION     19                 PAGE   2 OF 20
[INFORMATION USE].................................................. 10 ATTACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION [INFORMATION USE]............................... 11 ATTACHMENT 9 EVACUEE MONITORING DATA [INFORMATION USE]....... 13 ATTACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA
[INFORMATION USE].................................................. 14 ATTACHMENT 11 DECONTAMINATION LIMITS [INFORMATION USE].......... 15 ATTACHMENT 12 INFORMATION SHEET [NFORMATION USE].................... 16 J
PROCEDURE 5. 7.11 REVISION 19 PAGE 2 OF 20
: 1. ENTRY CONDITIONS [REFERENCE USE]
: 1. ENTRY CONDITIONS [REFERENCE USE]
1.1 As directed per EPIP 5.7.2.
1.1 As directed per EPIP 5.7.2.
Line 57: Line 61:
* Release of contaminated personnel for decontamination at off-site location desired.
* Release of contaminated personnel for decontamination at off-site location desired.
THEN PERFORM Step 2.3 for evacuation of non-ERO and ERO Relief Shift personnel.
THEN PERFORM Step 2.3 for evacuation of non-ERO and ERO Relief Shift personnel.
2.2 DIRECT Logistics Coordinator to coordinate dismissal of personnel per Attachment 1.
2.2 DIRECT Logistics Coordinator to coordinate dismissal of personnel per.
2.3 IF evacuation directed, THEN Logistics Coordinators PERFORM evacuation per Attachment 2.
2.3 IF evacuation directed, THEN Logistics Coordinators PERFORM evacuation per Attachment 2.
PROCEDURE 5.7.11                             REVISION 19       PAGE 3 OF 20
PROCEDURE 5.7.11 REVISION 19 PAGE 3 OF 20  


ATTACHME NT 1                           DISMISSAL FLOWCHART [REFERENCE USE]
ATTACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE]
ATIACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE]
ATIACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE]
DISMISSA L FLO W CHART DISMISS CAl/T1 OH 1   'i. .
DISMISSA L FLOW CHART NO CAl/T1 OH 1 'i..
Injury and Death may occur from hostile action or severe weather w hen personnel relocate and are exposed during eVctC1Jation or dismissa l.
Injury and Death may occur from hostile action or severe weather when personnel relocate and are exposed during eVctC1Jation or dismissal.
L CON FERENCE wrth NO
L CONFERENCE wrth
* TSC Director
* TSC Director
* EDF Director
* EDF Director
* osc supe,-,,isor
* osc supe,-,,isor
: 2. DETERMINE :
: 2. DETERMINE:
* ERO personnel tD be: retained to staff ERFs
* ERO personnel tD be: retained to staff ERFs
* ERO Personnel to be dismissed that will retum ta perform ERO relief shift: duty.
* ERO Personnel to be dismissed that will retum ta perform ERO relief shift: duty.
CONTINOUSLY EVALUATE If SAE tr GE ded:ared and Release exceeds NOUE \ Il:LEM       CON.SULT with RO"I and DETERMINE if stnp radioJogbl release rate limits                        dismissal and EVACUATION REQU]REO If EVACUATION REQUIRED                           1 IliW
CONTINOUSLY EVALUATE If SAE tr GE ded:ared and Release exceeds NOUE \\ Il:LEM radioJogbl release rate limits CON.SULT with RO"I and DETERMINE if stnp dismissal and EVACUATION REQU]REO If EVACUATION REQUIRED DIRECT OAAS-West warehouse (WW} to distribute Att-4 Dismiss-al Information sheet OAAS-WY'I C£>>4P1.ETE Step 1 Att-3 Dismissal Announcement DAAS-WW
* ANNOUNCE termination of dismissal .an d persons not dismissed to rem.tin at OAA
* MAKE dismissal announcement per S~ep 2 Att*3
* EXIT Flowchart aod GO tc Attachment 2 NOTEl DIRECT OAAS-West warehouse (WW} to distribute Att-4                                      R.adiologica4 Control Manager {RCM}
<D
Dismiss-al Information sheet                                    decision to STOP dismis.sal and begin evacuation based on:
* ST ART dismissal 2
* Point an d magn itude of release
NOTIFY EOF cfirecror and RECORD in facility log 1 IliW
* Wind direction and speed OAAS-WY'I C&#xa3;>>4P1.ETE Step 1
* ANNOUNCE termination of dismissal.and persons not dismissed to rem.tin at OAA
* TUT'le ~ft to complete dismissal Att-3 Dismissal Announcement DAAS-WW                                                                  N OTE2
* EXIT Flowchart aod GO tc Attachment 2 NOTEl R.adiologica4 Control Manager {RCM}
* MAKE dismissal announcement per S~ep 2                                        Oosest Gaitronics handset located in Att* 3      <D2 East side First Roar \"lest Warehouse Ulsida Managoment/EBS ~rea.
decision to STOP dismis.sal and begin evacuation based on:
* START dismissal NOTIFY EOF cfirecror and
* Point and magnitude of release
* RECORD in facility log PROCEDURE     5. 7 .11                                                                                   REVISIO N               19     PAGE 4 OF 20
* Wind direction and speed
* TUT'le ~ft to complete dismissal N OTE2 Oosest Gaitronics handset located in East side First Roar \\"lest Warehouse Ulsida Managoment/EBS ~rea.
PROCEDURE 5. 7.11 REVISIO N 19 DISMISS PAGE 4 OF 20  


ATTACHMENT 2                   EVACUATION FLOWC HART [REFERENCE USE]
ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE]
ATTACHMENT 2 EVACUATIO N FLOWCHART [REFERENCE USE]
ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE]
EVAC UATIO N FLOW CHA RT Coc>Pal MUO.EAR CPERATIOMS liCAMJM.
EVACUATION FLOW CHART EVAC CAUTION 1r ~
EVAC     """"""""
Injury and De~ may ocwr from hostile adK>n or sevwara weather when personnel rek>cate and are exposed durino evaoJation or dismissal PERFORM CONOJRRENTL Y TO EVA OJ ATE Logistics CoOfd Rad Control Manager CONSULT with ROt 0&#xa3;TERKINE e-,acuation route a nd instructions per Att-5 NOTIFY Security Coord in TSCo avao.,atic;n pbn DIRECT OAAS-WW to COMP1.&#xa3;TE Att-5 including:  
PROC""""'
.. Selected ev.ticuation route
fP"'S.7 .11 "TTol'ICHIIEHT 2 R&#xa3;Y; O CAUTION 1r ~
Injury and De~ may ocwr from hostile adK>n or sevwara weather when personnel rek>cate and are exposed durino evaoJation or dismissal P ERFORM CONOJRRENTL Y TO EVAOJ ATE Logistics CoOfd                               Rad Control Manager CONSULT with ROt                                       DETERMINE evawation route 0&#xa3;TERKIN E e-,acuation route                           aod instr.x:tions per Att-5 a nd instructions per Att-5 NOTIFY Security Coord in TSCo avao.,atic;n pbn DIRECT 01emist,v(RP Coordinator to provide radiological support of evacu DIRECT OAAS-WW to                                       of personnel and vfflides per COMP1.&#xa3;TE Att-5 including :                                           Att-8.
                                      .. Selected ev.ticuation route
* Precautions needed for sea,rity or weather
* Precautions needed for sea,rity or weather
* Locations or hazards to avoid NOTIF"f' Nem.iiN EOC or Sherilrs Office of:
* Locations or hazards to avoid NOTIF"f' Nem.iiN EOC or Sherilrs Office of:
Line 96: Line 99:
* LOC3tion of Off-site Deo:,n/
* LOC3tion of Off-site Deo:,n/
Assembly area
Assembly area
* The need tD deoon personneV vehides
* The need tD deoon personneV vehides DAAS-WW OISTR1BUTE sel~ evacuation route to each
* I NFORM ED e 113ruation mmplete
* RECORD in facility log DAAS-WW OISTR1BUTE sel~ evacuation route to each
* North route USE Att-6
* North route USE Att-6
* South route USE Att- 7 N DTE1 Omest Gaitrcnics handsd locatEd in Ea.st side First floor West warehouse inside Manag:ement/ESS area.
* South route USE Att-7 DETERMINE evawation route aod instr.x:tions per Att-5 DIRECT 01emist,v(RP Coordinator to provide radiological support of evacu of personnel and vfflides per Att-8.
PROCEDURE     5. 7 . 11                                                                         REVISION                 19                       PAGE         5     OF       20
* I NFORM ED e113ruation mmplete
* RECORD in facility log NDTE1 Omest Gaitrcnics handsd locatEd in Ea.st side First floor West warehouse inside Manag:ement/ESS area.
Coc>Pal MUO.EAR CPERATIOMS liCAMJM.
PROC""""'
fP"'S.7.11 "TTol'ICHIIEHT 2 R&#xa3;Y; O PROCEDURE 5. 7.11 REVISION 19 PAGE 5 OF 20  


ATTACHMENT 3                     DISMISSAL ANNOUNCEMENT [INFORMATION USE]
ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [INFORMATION USE]
ATTACHMENT 3 DISM I SSAL ANNOUNCEMENT [IN FORMATION USE]
ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [IN FORMATION USE]
: 1. U SE this attachment to announce dismissal of non-ERO and ERO Relief Shift personnel (ERO pe rsonne l being dismissed and who are to return later to perform ERO relief duty).
: 1. USE this attachment to announce dismissal of non-ERO and ERO Relief Shift personnel (ERO personnel being dismissed and who are to return later to perform ERO relief duty).
1.1 IF not all personnel to be dismissed, THEN COMPLETE blank (1) in Step 2.1.
1.1 IF not all personnel to be dismissed, THEN COMPLETE blank (1) in Step 2.1.
1.1.1 IDENTIFY those personnel to be dismissed .
1.1.1 IDENTIFY those personnel to be dismissed.
1.2 IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 2.3.
1.2 IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 2.3.
1.2.1 PROVIDE locations to be avoided, specific routes to be taken due to emergency conditions, and precautions needed for security events/severe weather conditions.
1.2.1 PROVIDE locations to be avoided, specific routes to be taken due to emergency conditions, and precautions needed for security events/severe weather conditions.
: 2. ANNOUNCE following over station gaitronics:
: 2. ANNOUNCE following over station gaitronics:
2.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO Cl) (and _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
2.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO Cl) (and _________________________ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ ) personnel be dismissed from the site.
______________ ) personnel be dismissed from the site.
2.2 Leave site immediately and proceed directly to your homes obeying all traffic laws.
2.2 Leave site immediately and proceed directly to your homes obeying all traffic laws.
2.3 Stay clear of           C 2 ) _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ __ _ _ __
2.3 Stay clear of C2) _____________________
2.4 REPEAT announcement.
2.4 REPEAT announcement.
PROCEDURE       5.7.11                               REVISIO N 19       PAGE 6 OF 20
PROCEDURE 5.7.11 REVISIO N 19 PAGE 6 OF 20  


ATIACHMENT 4                         DISMISSAL INFORMATION SHEET [INFORMATION USE]
ATIACHMENT 4 DISMISSAL INFORMATION SHEET [INFORMATION USE]
ATIACHMENT 4     DISM I SSAL INFORMATION SHEET (INFORMATION USE]
ATIACHMENT 4 DISMISSAL INFORMATION SHEET (INFORMATION USE]
: 1. You are being dism issed from CNS due to an eme rgency cond ition .
: 1. You are being dismissed from CNS due to an emergency condition.
: 2. This condition is serious enough that it warrants full attention of Operations Crew and Emergency Response Organization.
: 2. This condition is serious enough that it warrants full attention of Operations Crew and Emergency Response Organization.
: 3. Normally scheduled work is suspended.
: 3. Normally scheduled work is suspended.
: 4. Dismissal is unrestricted release of personnel from plant site . No re-assembly or radiological monitoring is required.
: 4. Dismissal is unrestricted release of personnel from plant site. No re-assembly or radiological monitoring is required.
: 5. This Protective Action is mandatory. Unless you have been specifically notified to remain on-site, you are to immediately go to your home.
: 5. This Protective Action is mandatory. Unless you have been specifically notified to remain on-site, you are to immediately go to your home.
6 . Drive your normal route home unless given other instructions.
: 6. Drive your normal route home unless given other instructions.
: 7. Obey all traffic laws and instructions given by CNS Security personnel.
: 7. Obey all traffic laws and instructions given by CNS Security personnel.
: 8. Remain fit-for-duty until your next scheduled work shift.
: 8. Remain fit-for-duty until your next scheduled work shift.  
!_ NOTE_- _Do_not contact_Control _Room _for_event_ updates.________ ___________________________________:
!_ NOTE_ - _ Do_ not contact_ Control _Room _for_ event_ updates. ___________________________________________ :
: 9. Call CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for your next scheduled shift.
: 9. Call CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for your next scheduled shift.
: 10. Report for duty                   rv 1/2 hour prior to your shift.
: 10. Report for duty rv 1/2 hour prior to your shift.
PROCEDURE             5. 7 .11                                                 REVISION     19                   PAGE     7 OF 20
PROCEDURE 5. 7.11 REVISION 19 PAGE 7 OF 20  


ATIACHMENT 5                   EVACUATION ANNOUNCEMENT [INFORMATION USE]
)
ATTACHMENT 5 EVACUATION AN NOU NCEMENT [ I NFORMATIO N USE]
./
: 1. USE this attachment to announce evacuation of non-ERO and ERO Rel ief Shift personnel (ERO personne l being evacuated and who are to return later to perform ERO relief duty).
ATIACHMENT 5 EVACUATION ANNOUNCEMENT [INFORMATION USE]
2 . Radiological Control Manager (RCM), DETERMINE evacuation route .
ATTACHMENT 5 EVACUATION AN NOUNCEMENT [I NFORMATION USE]
: 1. USE this attachment to announce evacuation of non-ERO and ERO Rel ief Shift personnel (ERO personnel being evacuated and who are to return later to perform ERO relief duty).
: 2. Radiological Control Manager (RCM), DETERMINE evacuation route.
2.1 IF wind direction from 90&deg; to 180&deg;,
2.1 IF wind direction from 90&deg; to 180&deg;,
THEN USE south route .
THEN USE south route.
2.2 IF wind direction from 0&deg; to 89&deg; or 181 &deg; to 360&deg;,
2.2 IF wind direction from 0&deg; to 89&deg; or 181 &deg; to 360&deg;,
THEN USE north route .
THEN USE north route.
2.2 .1 RCM PROVIDE evacuation route to Logistics Coordinator.
2.2.1 RCM PROVIDE evacuation route to Logistics Coordinator.
2.2.2 Logistics Coordinator DIRECT DAAS-WW to record evacuation route in blank (1) in Step 4.2.
2.2.2 Logistics Coordinator DIRECT DAAS-WW to record evacuation route in blank (1) in Step 4.2.
: 3. IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 4.3.
: 3. IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 4.3.
Line 147: Line 154:
: 4. ANNOUNCE following over station gaitronics:
: 4. ANNOUNCE following over station gaitronics:
4.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO and ERO Relief Shift personnel be evacuated from the site.
4.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO and ERO Relief Shift personnel be evacuated from the site.
4.2 Non-ERO and ERO Relief Shift personnel are being evacuated to the Off-Site Assembly Area in Auburn using the (1)                     route.
4.2 Non-ERO and ERO Relief Shift personnel are being evacuated to the Off-Site Assembly Area in Auburn using the (1) route.
Proceed directly to the Off-Site Assembly Area and remain there until released.
Proceed directly to the Off-Site Assembly Area and remain there until released.
4.3 Stay clear of (2) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
4.3 Stay clear of (2) ____________________ _
4.4 REPEAT announcement.
4.4 REPEAT announcement.
  )
PROCEDURE 5. 7.11 REVISION 19 PAGE 8 OF 20  
./
PROCEDURE     5. 7 .11                                 REVISION 19 PAGE 8 OF 20


ATTACHMENT 6                           NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP
ATTACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP
[INFORMATION USE]
[INFORMATION USE]
ATIACHM ENT 6     NORTH EVACU ATI ON INSTRUCTIONS AND RO UTE MAP [I NFO RMATIO N USE]
ATIACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP [INFORMATION USE]
: 1. North evacuation route selected by Radiological Control Manager based on wind direction and release rates.
: 1. North evacuation route selected by Radiological Control Manager based on wind direction and release rates.
: 2. EXIT CNS and T U RN right (north) at end of access road .
: 2. EXIT CNS and TU RN right (north) at end of access road.
: 3. TRAVEL north to Brownville, then T URN left (west) on Highway 136 to Auburn.
: 3. TRAVEL north to Brownville, then TURN left (west) on Highway 136 to Auburn.
: 4. At stop light (intersection of Highways 136 and 75), TURN left (south).
: 4. At stop light (intersection of Highways 136 and 75), TURN left (south).
: 5. TRAVEL through town to 26th Street (last street on south edge of town) .
: 5. TRAVEL through town to 26th Street (last street on south edge of town).
: 6. TURN right (west) and TRAVEL                                       rv 1/2 mile to 'P' Street.
: 6. TURN right (west) and TRAVEL rv 1/2 mile to 'P' Street.
: 7. TURN left (south) one block. Off-Site Assembly Area is the Nemaha County Maintenance Yard (Nemaha County Barn).
: 7. TURN left (south) one block. Off-Site Assembly Area is the Nemaha County Maintenance Yard (Nemaha County Barn).
: 8. PARK in an orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
: 8. PARK in an orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
Line 169: Line 174:
: NOTE - Do not contact Control Room for event updates.
: NOTE - Do not contact Control Room for event updates.
: 10. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
: 10. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
: 11. REPORT for duty                         rv   1/2 hour prior to beginning of your shift.
: 11. REPORT for duty rv 1/2 hour prior to beginning of your shift.
PROCEDURE           5. 7 .11                                                         REVISION       19                     PAGE     9   OF   20
PROCEDURE 5. 7.11 REVISION 19 PAGE 9 OF 20  


ATIACHMENT 7                         SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP
)
ATIACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP
[INFORMATION USE]
[INFORMATION USE]
ATTACHMENT 7   SOUTH EVACUATIO N INSTRUCTIONS AND ROUTE MAP (INFORMATION USE]
ATTACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP (INFORMATION USE]
: 1. South evacuation route selected by Radiological Control Manager based on wind direction and release rates.
: 1. South evacuation route selected by Radiological Control Manager based on wind direction and release rates.
: 2. EXIT CNS and TURN lelt (south) at end of access road.
: 2. EXIT CNS and TURN lelt (south) at end of access road.
: 3. FOLLOW gravel road south to Nemaha.
: 3. FOLLOW gravel road south to Nemaha.
4 . At stop sign in Nemaha, TURN left (south).
: 4. At stop sign in Nemaha, TURN left (south).
: 5. PROCEED through town and over Nemaha River bridge (""' 1/2 mile south of Nemah a).
: 5. PROCEED through town and over Nemaha River bridge (""' 1/2 mile south of Nemaha).
: 6. Just over Nemaha River bridge, TURN right (west) on 724 Rd.
: 6. Just over Nemaha River bridge, TURN right (west) on 724 Rd.
: 7. TRAVEL""' 10 miles west to Highway 75 and TURN right (north) on Highway 75 to Auburn.
: 7. TRAVEL""' 10 miles west to Highway 75 and TURN right (north) on Highway 75 to Auburn.
: 8. In Auburn, TURN left (west) on 26th Street (first city street).
: 8. In Auburn, TURN left (west) on 26th Street (first city street).
: 9. TRAVEL "' 1/2 mile to 'P' Street and TURN left (south) one block. Off-Site Assemb ly Area is Nemaha County Maintenance Yard (Nemaha County Barn).
: 9. TRAVEL "' 1/2 mile to 'P' Street and TURN left (south) one block. Off-Site Assembly Area is Nemaha County Maintenance Yard (Nemaha County Barn).
: 10. PARK in orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
: 10. PARK in orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
: 11. Once re leased, REMAIN fit for duty and available for call-in.
: 11. Once released, REMAIN fit for duty and available for call-in.
(_ NOTE_-_ Do_not contact_Control _Room _for_event _updates.__________________ __________ _______________ .
(_ NOTE_-_ Do_ not contact_ Control _Room _for_ event_ updates. __________________ __________ _______________.
: 12. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
: 12. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
: 13. REPORT for duty""' 1/2 hour prior to beginning of your shift.
: 13. REPORT for duty""' 1/2 hour prior to beginning of your shift.
PROCEDURE 5. 7.11 REVISION 19 PAGE 10 OF 20
)
)
PROCEDURE          5. 7 .11                                                  REVISION      19                PAGE    10  OF  20
ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION
 
ATIACHMENT 8                 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION
[INFORMATION USE]
[INFORMATION USE]
ATIACHMENT 8   RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION (INFORMATION USE]
ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION (INFORMATION USE]
: 1. TSC Chemistry/RP Coordinator DISPATC H RP Tech (RPT) to conduct radiological surveys during evacuation at Nemaha County Decontamination Center.
: 1. TSC Chemistry/RP Coordinator DISPATCH RP Tech (RPT) to conduct radiological surveys during evacuation at Nemaha County Decontamination Center.
1.1 IF t ime permits, THEN RPT OBTAIN following prior to leaving site:
1.1 IF time permits, THEN RPT OBTAIN following prior to leaving site:
* CopyofEPIP5.7.ll.
* CopyofEPIP5.7.ll.
* Survey instruments.
* Survey instruments.
Line 204: Line 210:
: 3. Upon arrival, RPT DIRECT evacuees to remain in their vehicles until surveyed and released.
: 3. Upon arrival, RPT DIRECT evacuees to remain in their vehicles until surveyed and released.
: 4. RPT PERFORM radiological surveys of personnel and vehicles.
: 4. RPT PERFORM radiological surveys of personnel and vehicles.
: 5. RPT PERFORM decontamination of personnel and vehicles to meet Attachment 11, Table 1, for Unrestricted Release Limits.
: 5. RPT PERFORM decontamination of personnel and vehicles to meet 1, Table 1, for Unrestricted Release Limits.
5.1 RECORD results of evacuee surveys on Attachment 9.
5.1 RECORD results of evacuee surveys on Attachment 9.
5.2 RECORD results of vehicles or equipment surveys on Attachment 10.
5.2 RECORD results of vehicles or equipment surveys on Attachment 10.
Line 210: Line 216:
6.1 IF unrestricted release limits not achieved, THEN RPT INFORM Chemistry/RP Coordinator.
6.1 IF unrestricted release limits not achieved, THEN RPT INFORM Chemistry/RP Coordinator.
6.1.1 Chemistry/RP Coordinator CONSULT with Radiological Control Manager (RCM) and Governmental Authorities to determine course of action.
6.1.1 Chemistry/RP Coordinator CONSULT with Radiological Control Manager (RCM) and Governmental Authorities to determine course of action.
PROCEDURE 5. 7.11 REVISION 19 PAGE 11 OF 20
)
)
PROCEDURE    5. 7 .11                                              REVISION 19 PAGE 11 OF 20
ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION
 
ATIACHMENT 8       RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION
[INFORMATION USE]
[INFORMATION USE]
: 7. IF Deco ntamination Center parking lot vehicles not removed prio r to arrival of evacuees, THEN RPT SURVEY each vehicle prior to allowing them to leave.
: 7. IF Decontamination Center parking lot vehicles not removed prior to arrival of
: evacuees, THEN RPT SURVEY each vehicle prior to allowing them to leave.
: 8. RPT INFORM Chemistry/RP Coordinator when all evacuees and vehicles released and RECORD in facility log.
: 8. RPT INFORM Chemistry/RP Coordinator when all evacuees and vehicles released and RECORD in facility log.
)
PROCEDURE 5. 7.11 REVISION 19 PAGE 12 OF 20  
PROCEDURE 5. 7 .11                         REVISION 19         PAGE   12 OF 20


ATTACHMENT 9                 EVACUEE MONITORING DATA [I NFORMATION USE]
ATTACHMENT 9 EVACUEE MONITORING DATA [INFORMATION USE]
AITACHMENT 9 EVACUEE MONITORING DATA (INFORMATION USE]
AITACHMENT 9 EVACUEE MONITORING DATA (INFORMATION USE]
Location: - - - - - - - - - - - - - - - - - - - - - - Date:                           ----
Location:
Instrument Used: - - - - - - - - - - - - - - - - - - - - - - - - - -
Date:
Instrument S/N: _ _ _ _ _ _ _ _ _ _ _ __ __ _ _ _ __ _ _ _ _ __ _
Instrument Used: --------------------------
Background cpm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Instrument S/N: __________________________ _
Person Perfo rming Survey: _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ _ __
Background cpm: _________________________ _
Person Performing Survey: _____________________ _
TABLE 1 DIRECT SURVEY RESULTS MAXIMUM (MAXIMUM)
TABLE 1 DIRECT SURVEY RESULTS MAXIMUM (MAXIMUM)
READING         TIME NAME                 TIME             1ST         2ND         LOCATION     RELEASED
READING TIME NAME TIME 1ST 2ND LOCATION RELEASED  
,/
,/
PROCEDURE     5. 7 .11                                       REVISION 19       PAGE 13 OF 20
PROCEDURE 5. 7.11 REVISION 19 PAGE 13 OF 20  


ATTACHMENT 10                     POST-EVACUATION VEHICLE MONITORING DATA
ATTACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA
[INFORMATION USE]
[INFORMATION USE]
ATIACHM ENT 10 POST -EVACUATIO N VEHICLE MONITORING DATA ( INFORMATIO N USE]
ATIACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA (INFORMATION USE]
Location: - - - - - - - - - - - - - - - - - - - - - - - Date :                                       -----
Location:
Instrument Used: - - - - - - - - - - - - - - - - - - - - - - - - - - -
Date :
Instrument S/N: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Instrument Used: ---------------------------
Background cpm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Instrument S/N: _________________________ _
Person Performing Survey: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Background cpm: __________________________ _
TABLE 1 DIRECT SURVEY               SMEAR SURVEY TIME RESULTS                   RESULTS LICENSE                                                                                              VEHICLE NUMBER             OWNER               TIME           1ST               2ND       1ST     2ND     RELEASED PROCEDURE         5. 7 .11                                               REVISION 19       PAGE 14 OF 20
Person Performing Survey: ______________________ _
TABLE 1 DIRECT SURVEY SMEAR SURVEY TIME LICENSE RESULTS RESULTS VEHICLE NUMBER OWNER TIME 1ST 2ND 1ST 2ND RELEASED PROCEDURE 5. 7.11 REVISION 19 PAGE 14 OF 20  


ATIACHMENT 11                 DECONTAMINATION LIMITS [INFORMATION USE]
/
ATIACHMENT 11 DECONTAMINATION LIMITS [INFORMATION USE]
ATTACHMENT 11 DECONTAMINATION LIMITS (INFORMATION USE]
ATTACHMENT 11 DECONTAMINATION LIMITS (INFORMATION USE]
TABLE 1C1 )
SUBJECT Personnel Personal Effects/
SUBJECT                                UNRESTRICTED CONTAMINATION LIMITS Personnel                                      No detectable activity found when using an in strument with sensitivity of ::; 100 net cpm/probe area usin g GM detector with pancake probe .
Equipment/Vehicles TABLE 1C1)
or Clearance of fu nctioning portal monitor.
UNRESTRICTED CONTAMINATION LIMITS No detectable activity found when using an instrument with sensitivity of ::; 100 net cpm/probe area using GM detector with pancake probe.
Personal Effects/                              No detectable activity found when using an Equipment/Vehicles                            instrument with sensitivity of ::; 100 net cpm/probe area using GM detector with pancake probe .
or Clearance of functioning portal monitor.
No detectable activity found when using an instrument with sensitivity of ::; 100 net cpm/probe area using GM detector with pancake probe.
or No detectable activity found when using instrumentation with sensitivity of ::; 2.2 nCi as determined by gross gamma analysis with gamma sensitive counter.
or No detectable activity found when using instrumentation with sensitivity of ::; 2.2 nCi as determined by gross gamma analysis with gamma sensitive counter.
Cl) Derived from Procedure 9.RADOP.2, unrestricted contamination limits.
Cl) Derived from Procedure 9.RADOP.2, unrestricted contamination limits.
/
PROCEDURE 5.7.11 REVISION 19 PAGE 15 OF 20  
PROCEDURE     5.7.11                                           REVISION 19         PAGE 15 OF 20


ATIACHMENT 12                       INFORMATION SHEET [INFORMATION USE]
)
AlTACHMENT 12 IN FORMATION SH EET (N FORMATION USEJ
ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]
: 1. PURPOSE 1 1.1 Perform dismissal or evacuation of personnel from plant site as required by EPIP 5. 7 .2 or as directed by Emergency Director.
AlTACHMENT 12 INFORMATION SHEET (NFORMATION USEJ
: 1. PURPOSE 1 1.1 Perform dismissal or evacuation of personnel from plant site as required by EPIP 5. 7.2 or as directed by Emergency Director.
: 2. PRECAUTIONS AND LIMITATIONS 2.1 Evacuation of non-ERO personnel is required at Site Area Emergency or General Emergency.
: 2. PRECAUTIONS AND LIMITATIONS 2.1 Evacuation of non-ERO personnel is required at Site Area Emergency or General Emergency.
2.2 Dismissal of non-ERO personnel is permissible if NOUE or ALERT and release rate is less than NOUE limits.
2.2 Dismissal of non-ERO personnel is permissible if NOUE or ALERT and release rate is less than NOUE limits.
: 3. DISCUSSION 3.1 In event of emergency at CNS, it may be desirable to minimize number of personnel on-site by dismissing them. If emergency is a Site Area Emergency or General Emergency, or involves radiological release with the potential to cause contamination of personnel or vehicles, then evacuation of personnel is required to minimize exposure and cont amination.
: 3. DISCUSSION 3.1 In event of emergency at CNS, it may be desirable to minimize number of personnel on-site by dismissing them. If emergency is a Site Area Emergency or General Emergency, or involves radiological release with the potential to cause contamination of personnel or vehicles, then evacuation of personnel is required to minimize exposure and contamination.
3.2 Personnel will be assembled at their Designated Assembly Area per EPIP 5. 7 .10. Completion of EPIP 5. 7 .10 will result in Security Coordinator having a list .of any missing persons within Protected Area.
3.2 Personnel will be assembled at their Designated Assembly Area per EPIP 5. 7.10. Completion of EPIP 5. 7.10 will result in Security Coordinator having a list.of any missing persons within Protected Area.
3.3 After assembly and accountability has been completed, dismissal or evacuation of personnel will be initiated as required per EPIP 5.7.2 or at discretion of Emergency Director.
3.3 After assembly and accountability has been completed, dismissal or evacuation of personnel will be initiated as required per EPIP 5.7.2 or at discretion of Emergency Director.
3.4 Log istics Coordinator will utilize Logistics Coordinator DAAS West Warehouse to perform dismissal or evacuation per this procedure.
3.4 Logistics Coordinator will utilize Logistics Coordinator DAAS West Warehouse to perform dismissal or evacuation per this procedure.
3 .5 Dismissed or evacuated personnel shall follow all instructions with regard to dismissal or evacuation and obey all traffic laws.
3.5 Dismissed or evacuated personnel shall follow all instructions with regard to dismissal or evacuation and obey all traffic laws.
3.6 This procedure provides guidance in four areas:
3.6 This procedure provides guidance in four areas:
3.6.1 Determination of need for dismissal of personnel.
3.6.1 Determination of need for dismissal of personnel.
3.6.2 Determination of need for site evacuation.
3.6.2 Determination of need for site evacuation.
3.6.3 Determination of evacuation route and assembly area.
3.6.3 Determination of evacuation route and assembly area.
)
PROCEDURE 5.7.11 REVISION 19 PAGE 16 OF 20  
PROCEDURE       5.7.11                                 REVISION 19     PAGE 16 OF 20


ATIACHMENT 12           INFORMATION SHEET [INFORMATION USE]
ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]
3.6.4 Conducting evacuation and subsequent assembly, monitoring, and release of personnel in an orderly manner.
3.6.4 Conducting evacuation and subsequent assembly, monitoring, and release of personnel in an orderly manner.
3.7 DEFINITIONS
3.7 DEFINITIONS
: 3. 7 .1 Dismissal - Unrestricted release of personnel from plant site. No re-assembly or radiological monitoring required.
: 3. 7.1 Dismissal - Unrestricted release of personnel from plant site. No re-assembly or radiological monitoring required.
: 3. 7 .2 ERO Relief Shift personnel - ERO personnel being dismissed or evacuated and who are designated to return later to perform ERO relief duty.
: 3. 7.2 ERO Relief Shift personnel - ERO personnel being dismissed or evacuated and who are designated to return later to perform ERO relief duty.
3.7.3 Evacuation - Controlled release of personnel from site to off-site re-assembly point due to potential for radiological contamination or exposure to direct radiation. Evacuation requires specified routes be taken to an off-site re-assembly point where radiological monitoring (and decontamination, if required) will be performed prior to unrestricted release.
3.7.3 Evacuation - Controlled release of personnel from site to off-site re-assembly point due to potential for radiological contamination or exposure to direct radiation. Evacuation requires specified routes be taken to an off-site re-assembly point where radiological monitoring (and decontamination, if required) will be performed prior to unrestricted release.
3.8 DISMISSAL 3.8.1 If radiological conditions do not indicate need for evacuation but Emergency Director deems it appropriate to reduce number of personnel on-site, personnel will be dismissed to their homes.
3.8 DISMISSAL 3.8.1 If radiological conditions do not indicate need for evacuation but Emergency Director deems it appropriate to reduce number of personnel on-site, personnel will be dismissed to their homes.
Line 280: Line 289:
3.8.3 Logistics Coordinator Designated Assembly Area Supervisor (DAAS) in West Warehouse (WW) distributes Attachment 4 dismissal instructions to personnel being dismissed.
3.8.3 Logistics Coordinator Designated Assembly Area Supervisor (DAAS) in West Warehouse (WW) distributes Attachment 4 dismissal instructions to personnel being dismissed.
3.8.4 DAAS-WW to complete Attachment 3 dismissal form and to make a site-wide announcement with instructions regarding dismissal.
3.8.4 DAAS-WW to complete Attachment 3 dismissal form and to make a site-wide announcement with instructions regarding dismissal.
PROCEDURE 5. 7 .11                             REVISION 19         PAGE 17 OF 20
PROCEDURE 5. 7.11 REVISION 19 PAGE 17 OF 20  


ATIACHMENT 12             INFORMATION SHEET [INFORMATION USE]
)
3.9 EVACUATION 3 .9.1 If radiological conditions (or emergency class ification) indicate need for evacuation, Logistics Coordinator will coordinate evacuation when instructed .
ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]
3.9 .2 Radiological Control Manager (RCM) will determine evacuation route and provide to Logistics Coordinator.
3.9 EVACUATION 3.9.1 If radiological conditions (or emergency classification) indicate need for evacuation, Logistics Coordinator will coordinate evacuation when instructed.
3.9 .3 Logistics Coordinator will contact DAAS-WW and provide appropriate evacuation route attachment and instructions to be distributed to each evacuee .
3.9.2 Radiological Control Manager (RCM) will determine evacuation route and provide to Logistics Coordinator.
3 .9.4 Logistics Coordinator will direct DAAS-WW to complete Attachment 5 and provide site-wide announcement regarding evacuation of personnel.
3.9.3 Logistics Coordinator will contact DAAS-WW and provide appropriate evacuation route attachment and instructions to be distributed to each evacuee.
3.9.4 Logistics Coordinator will direct DAAS-WW to complete and provide site-wide announcement regarding evacuation of personnel.
3.9.5 Radiological Protection personnel provide surveying and releasing of evacuee and vehicles at Off-site Assembly Area.
3.9.5 Radiological Protection personnel provide surveying and releasing of evacuee and vehicles at Off-site Assembly Area.
3.10 DISMISSAL OR EVACUATION FLOWCHART 3.10.1 Attachment 1, Dismissal Flowchart, and Attachment 2, Evacuation Flowchart, are printed on an 11 inch by 17 inch laminated sheet and mounted on foam board.
3.10 DISMISSAL OR EVACUATION FLOWCHART 3.10.1 Attachment 1, Dismissal Flowchart, and Attachment 2, Evacuation Flowchart, are printed on an 11 inch by 17 inch laminated sheet and mounted on foam board.
3.10.2 Header data on upper right flowchart will contain revision number.
3.10.2 Header data on upper right flowchart will contain revision number.
3.10.3 Table 1 specifies current revision of Dismissal Flowchart and Evacuation Flowchart.
3.10.3 Table 1 specifies current revision of Dismissal Flowchart and Evacuation Flowchart.
TABLE 1 EPIP 5.7.11 Flowchart                 Revision Number Attachment 1, Dismissal Flowchart                                 0 Attachment 2, Evacuation Flowchart                               0 3.10.4 It is not necessary that flowchart revision number be revised with each revision of this procedure.
TABLE 1 EPIP 5.7.11 Flowchart Revision Number, Dismissal Flowchart 0, Evacuation Flowchart 0
3.10.4 It is not necessary that flowchart revision number be revised with each revision of this procedure.
3.10.5 If flowchart revised, then Attachment 12 is revised to reflect new flowchart revision data.
3.10.5 If flowchart revised, then Attachment 12 is revised to reflect new flowchart revision data.
)
PROCEDURE 5. 7.11 REVISION 19 PAGE 18 OF 20  
PROCEDURE   5. 7 .11                             REVISION 19         PAGE 18 OF 20


ATTACHMENT 12         INFORMATION SHEET [INFORMATION USE]
ATTACHMENT 12 INFORMATION SHEET [INFORMATION USE]
: 4. RECORDS 4.1 Following completed attachments from actual events shall be forwarded to EP Manager within 5 working days of their completion (quality record upon completion).
: 4. RECORDS 4.1 Following completed attachments from actual events shall be forwarded to EP Manager within 5 working days of their completion (quality record upon completion).
* Attachment 9.
* Attachment 9.
Line 308: Line 318:
5.2.2 Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.
5.2.2 Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.
5.2.3 Rad Protection Procedure 9.RADOP.2, Radiation Safety Standards and Limits.
5.2.3 Rad Protection Procedure 9.RADOP.2, Radiation Safety Standards and Limits.
PROCEDURE 5.7.11                           REVISION 19         PAGE 19 OF 20
PROCEDURE 5.7.11 REVISION 19 PAGE 19 OF 20  


ATIACHMENT 12         INFORMATION SHEET [INFORMATION USE]
ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]
5.3 MISCELLANEOUS
5.3 MISCELLANEOUS
: 5. 3 .1 QA Audit 93-05.
: 5. 3.1 QA Audit 93-05.
5.3.2 Radiological White Paper 03-01.
5.3.2 Radiological White Paper 03-01.
5.3.3 1 TIP Action Plan 5.2.2.1, Action Step 8, Revision 2. Revised Procedures 5.7.10 and 5 .7.11 to address changes in dismissal/evacuation. Affects entire procedure. Attachment 12, Section 1, Purpose is flagged.
5.3.3 1 TIP Action Plan 5.2.2.1, Action Step 8, Revision 2. Revised Procedures 5.7.10 and 5.7.11 to address changes in dismissal/evacuation. Affects entire procedure. Attachment 12, Section 1, Purpose is flagged.
PROCEDURE 5. 7 .11                             REVISION 19       PAGE 20 OF 20}}
PROCEDURE 5. 7.11 REVISION 19 PAGE 20 OF 20}}

Latest revision as of 17:28, 5 January 2025

Emergency Plan Implementing Procedure 5.7.11, Early Dismissal/Evacuation of Site Personnel, Rev. 19
ML18197A083
Person / Time
Site: Cooper 
Issue date: 07/11/2018
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18197A084 List:
References
NLS2018040
Download: ML18197A083 (23)


Text

NLS2018040 Attachment Page 1 of 2 Attachment Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.11, Revision 19 Change Description Revision 19 of Emergency Plan Implementing Procedure (EPIP) 5. 7.11, Early Dismissal/Evacuation of Site Personnel, is a total re-write to meet new format and performance guidance provided by Cooper Nuclear Station's (CNS) procedure writer's guide. The revisions included section/step sequence changes, changing notes containing actions into procedure steps, deleting redundant steps/duplicate information, re-writing steps to improve human performance, and a change to the level of use category.

Other major changes made to the EPIP were as follows:

Established Logistics Coordinator as lead in executing dismissal/evacuation.

Clarified Radiological Control Manager as having the responsibility of decision maker for when to terminate dismissal and begin evacuation, and for determination of evacuation routes.

Added new Attachments l and 2, (Dismissal Flowchart and Evacuation Flowchart), and transferred instructions for dismissal/evacuation actions into a flowchart format. Also added a Caution to these attachments concerning the potential threat of exposing personnel to severe weather or hostile action during dismissal or evacuation.

Added a new Section 3.10 to provide administrative controls for the new Dismissal and Evacuation Flowchart hard cards.

Change Summary of Analysis (10 CFR 50.54(q) evaluation)

Licensing Basis Affected by Change:

CNS Emergency Plan (E-Plan), Section 6.5, discusses actions that will be taken for on-site personnel whenever a radiological emergency has occurred which might result in concentrations of airborne activity or radiation levels in excess of pre-determined limits and other emergency situations where personnel safety is threatened.

E-Plan, Section 6.5.4, discusses initial assembly and accountability of personnel. This section also references EPIP 5. 7.11 for direction on site dismissal and evacuation.

E-Plan, Appendix A, describes procedures that implement the E-Plan, including EPIP 5.7.11.

How Change Complies with Regulations and Previous Commitments:

10 CFR 50.47(b)(l0) requires, in part, that a range of protective actions are developed for the plume exposure pathway EPZ for emergency workers and the public with consideration given to

NLS2018040 Attachment Page 2 of 2 evacuation, sheltering, and, as a supplement to these, the prophylactic use of potassium iodide, as appropriate.

The change continues to comply with the above regulation for establishing protective actions for plant emergency workers during emergency conditions.

There were no regulatory commitments identified related to dismissal or evacuation.

Affected Emergency Planning Functions/Impact on Effectiveness of Emergency Planning Functions:

10 CFR 50.47(b)(l0); Function - A range of protective actions is available for plant emergency workers during emergencies, including those for hostile action events.

The change made to EPIP 5. 7.11 does not affect the meaning or intent of descriptions, facilities/equipment, or the process for site dismissal or evacuation. Clarification of responsibilities and the addition of flow charts are considered enhancements to improve usability of the EPIP. The change continues to meet the above planning standard and does not constitute a decrease in effectiveness of the E-Plan.

NLS201 8040 Enclosure Page 1 of21 Enclosure Emergency Plan Implementing Procedure 5.7.11, Revision 19

UC E S T A T I 0 N Operations Manual Em erge ncy Preparedness EMERGENCY PLAN IMPLEMENTING PROCEDURE 5.7.11 EARLY DISMISSAL/EVACUATION OF SITE PERSONNEL PROCEDURE 5. 7.1 1 Level of Use:

MULTIPLE Quality: QAPD RELATED Effective Date: 6/13/18 Approval Authority: ITR-RDM Procedure Owner:

EP ON-SITE COORD REVISION 19 PAGE 1 OF 20

TABLE OF CONTENTS

1.

ENTRY CONDITIONS [REFERENCE USE].................................................... 3

2.

INSTRUCTIONS [REFERENCE USE]........................................................... 3 ATTACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE].................... 4 ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE].................. 5 ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [INFORMATION USE].......... 6 ATTACHMENT 4 DISMISSAL INFORMATION SHEET [INFORMATION USE].... 7 ATTACHMENT 5 EVACUATION ANNOUNCEMENT [INFORMATION USE]........ 8 ATTACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP

[INFORMATION USE].................................................... 9 ATTACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP

[INFORMATION USE].................................................. 10 ATTACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION [INFORMATION USE]............................... 11 ATTACHMENT 9 EVACUEE MONITORING DATA [INFORMATION USE]....... 13 ATTACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA

[INFORMATION USE].................................................. 14 ATTACHMENT 11 DECONTAMINATION LIMITS [INFORMATION USE].......... 15 ATTACHMENT 12 INFORMATION SHEET [NFORMATION USE].................... 16 J

PROCEDURE 5. 7.11 REVISION 19 PAGE 2 OF 20

1. ENTRY CONDITIONS [REFERENCE USE]

1.1 As directed per EPIP 5.7.2.

2. INSTRUCTIONS [REFERENCE USE]

2.1 DETERMINE if dismissal or evacuation required.

2.1.1 IF either of following are true:

  • Emergency Classification Site Area Emergency or higher classification.
  • Release of contaminated personnel for decontamination at off-site location desired.

THEN PERFORM Step 2.3 for evacuation of non-ERO and ERO Relief Shift personnel.

2.2 DIRECT Logistics Coordinator to coordinate dismissal of personnel per.

2.3 IF evacuation directed, THEN Logistics Coordinators PERFORM evacuation per Attachment 2.

PROCEDURE 5.7.11 REVISION 19 PAGE 3 OF 20

ATTACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE]

ATIACHMENT 1 DISMISSAL FLOWCHART [REFERENCE USE]

DISMISSA L FLOW CHART NO CAl/T1 OH 1 'i..

Injury and Death may occur from hostile action or severe weather when personnel relocate and are exposed during eVctC1Jation or dismissal.

L CONFERENCE wrth

  • EDF Director
  • osc supe,-,,isor
2. DETERMINE:
  • ERO personnel tD be: retained to staff ERFs
  • ERO Personnel to be dismissed that will retum ta perform ERO relief shift: duty.

CONTINOUSLY EVALUATE If SAE tr GE ded:ared and Release exceeds NOUE \\ Il:LEM radioJogbl release rate limits CON.SULT with RO"I and DETERMINE if stnp dismissal and EVACUATION REQU]REO If EVACUATION REQUIRED DIRECT OAAS-West warehouse (WW} to distribute Att-4 Dismiss-al Information sheet OAAS-WY'I C£>>4P1.ETE Step 1 Att-3 Dismissal Announcement DAAS-WW

  • MAKE dismissal announcement per S~ep 2 Att*3

<D

NOTIFY EOF cfirecror and RECORD in facility log 1 IliW

  • ANNOUNCE termination of dismissal.and persons not dismissed to rem.tin at OAA
  • EXIT Flowchart aod GO tc Attachment 2 NOTEl R.adiologica4 Control Manager {RCM}

decision to STOP dismis.sal and begin evacuation based on:

  • Point and magnitude of release
  • Wind direction and speed
  • TUT'le ~ft to complete dismissal N OTE2 Oosest Gaitronics handset located in East side First Roar \\"lest Warehouse Ulsida Managoment/EBS ~rea.

PROCEDURE 5. 7.11 REVISIO N 19 DISMISS PAGE 4 OF 20

ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE]

ATTACHMENT 2 EVACUATION FLOWCHART [REFERENCE USE]

EVACUATION FLOW CHART EVAC CAUTION 1r ~

Injury and De~ may ocwr from hostile adK>n or sevwara weather when personnel rek>cate and are exposed durino evaoJation or dismissal PERFORM CONOJRRENTL Y TO EVA OJ ATE Logistics CoOfd Rad Control Manager CONSULT with ROt 0£TERKINE e-,acuation route a nd instructions per Att-5 NOTIFY Security Coord in TSCo avao.,atic;n pbn DIRECT OAAS-WW to COMP1.£TE Att-5 including:

.. Selected ev.ticuation route

  • Precautions needed for sea,rity or weather
  • Locations or hazards to avoid NOTIF"f' Nem.iiN EOC or Sherilrs Office of:
  • Evacuation route
  • LOC3tion of Off-site Deo:,n/

Assembly area

  • The need tD deoon personneV vehides DAAS-WW OISTR1BUTE sel~ evacuation route to each
  • North route USE Att-6
  • South route USE Att-7 DETERMINE evawation route aod instr.x:tions per Att-5 DIRECT 01emist,v(RP Coordinator to provide radiological support of evacu of personnel and vfflides per Att-8.
  • I NFORM ED e113ruation mmplete
  • RECORD in facility log NDTE1 Omest Gaitrcnics handsd locatEd in Ea.st side First floor West warehouse inside Manag:ement/ESS area.

Coc>Pal MUO.EAR CPERATIOMS liCAMJM.

PROC""""'

fP"'S.7.11 "TTol'ICHIIEHT 2 R£Y; O PROCEDURE 5. 7.11 REVISION 19 PAGE 5 OF 20

ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [INFORMATION USE]

ATTACHMENT 3 DISMISSAL ANNOUNCEMENT [IN FORMATION USE]

1. USE this attachment to announce dismissal of non-ERO and ERO Relief Shift personnel (ERO personnel being dismissed and who are to return later to perform ERO relief duty).

1.1 IF not all personnel to be dismissed, THEN COMPLETE blank (1) in Step 2.1.

1.1.1 IDENTIFY those personnel to be dismissed.

1.2 IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 2.3.

1.2.1 PROVIDE locations to be avoided, specific routes to be taken due to emergency conditions, and precautions needed for security events/severe weather conditions.

2. ANNOUNCE following over station gaitronics:

2.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO Cl) (and _________________________ _

______________ ) personnel be dismissed from the site.

2.2 Leave site immediately and proceed directly to your homes obeying all traffic laws.

2.3 Stay clear of C2) _____________________

2.4 REPEAT announcement.

PROCEDURE 5.7.11 REVISIO N 19 PAGE 6 OF 20

ATIACHMENT 4 DISMISSAL INFORMATION SHEET [INFORMATION USE]

ATIACHMENT 4 DISMISSAL INFORMATION SHEET (INFORMATION USE]

1. You are being dismissed from CNS due to an emergency condition.
2. This condition is serious enough that it warrants full attention of Operations Crew and Emergency Response Organization.
3. Normally scheduled work is suspended.
4. Dismissal is unrestricted release of personnel from plant site. No re-assembly or radiological monitoring is required.
5. This Protective Action is mandatory. Unless you have been specifically notified to remain on-site, you are to immediately go to your home.
6. Drive your normal route home unless given other instructions.
7. Obey all traffic laws and instructions given by CNS Security personnel.
8. Remain fit-for-duty until your next scheduled work shift.

!_ NOTE_ - _ Do_ not contact_ Control _Room _for_ event_ updates. ___________________________________________ :

9. Call CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for your next scheduled shift.
10. Report for duty rv 1/2 hour prior to your shift.

PROCEDURE 5. 7.11 REVISION 19 PAGE 7 OF 20

)

./

ATIACHMENT 5 EVACUATION ANNOUNCEMENT [INFORMATION USE]

ATTACHMENT 5 EVACUATION AN NOUNCEMENT [I NFORMATION USE]

1. USE this attachment to announce evacuation of non-ERO and ERO Rel ief Shift personnel (ERO personnel being evacuated and who are to return later to perform ERO relief duty).
2. Radiological Control Manager (RCM), DETERMINE evacuation route.

2.1 IF wind direction from 90° to 180°,

THEN USE south route.

2.2 IF wind direction from 0° to 89° or 181 ° to 360°,

THEN USE north route.

2.2.1 RCM PROVIDE evacuation route to Logistics Coordinator.

2.2.2 Logistics Coordinator DIRECT DAAS-WW to record evacuation route in blank (1) in Step 4.2.

3. IF there are hazards to be avoided, THEN COMPLETE blank (2) in Step 4.3.

3.1 PROVIDE locations to be avoided or specific routes to be taken due to emergency conditions and any precautions needed for security events/severe weather conditions.

4. ANNOUNCE following over station gaitronics:

4.1 Attention all non-ERO and ERO Relief Shift personnel. The Emergency Director has directed that non-ERO and ERO Relief Shift personnel be evacuated from the site.

4.2 Non-ERO and ERO Relief Shift personnel are being evacuated to the Off-Site Assembly Area in Auburn using the (1) route.

Proceed directly to the Off-Site Assembly Area and remain there until released.

4.3 Stay clear of (2) ____________________ _

4.4 REPEAT announcement.

PROCEDURE 5. 7.11 REVISION 19 PAGE 8 OF 20

ATTACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP

[INFORMATION USE]

ATIACHMENT 6 NORTH EVACUATION INSTRUCTIONS AND ROUTE MAP [INFORMATION USE]

1. North evacuation route selected by Radiological Control Manager based on wind direction and release rates.
2. EXIT CNS and TU RN right (north) at end of access road.
3. TRAVEL north to Brownville, then TURN left (west) on Highway 136 to Auburn.
4. At stop light (intersection of Highways 136 and 75), TURN left (south).
5. TRAVEL through town to 26th Street (last street on south edge of town).
6. TURN right (west) and TRAVEL rv 1/2 mile to 'P' Street.
7. TURN left (south) one block. Off-Site Assembly Area is the Nemaha County Maintenance Yard (Nemaha County Barn).
8. PARK in an orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
9. Once released, REMAIN fit for duty and available for call-in (until your next scheduled shift).
NOTE - Do not contact Control Room for event updates.
10. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
11. REPORT for duty rv 1/2 hour prior to beginning of your shift.

PROCEDURE 5. 7.11 REVISION 19 PAGE 9 OF 20

)

ATIACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP

[INFORMATION USE]

ATTACHMENT 7 SOUTH EVACUATION INSTRUCTIONS AND ROUTE MAP (INFORMATION USE]

1. South evacuation route selected by Radiological Control Manager based on wind direction and release rates.
2. EXIT CNS and TURN lelt (south) at end of access road.
3. FOLLOW gravel road south to Nemaha.
4. At stop sign in Nemaha, TURN left (south).
5. PROCEED through town and over Nemaha River bridge (""' 1/2 mile south of Nemaha).
6. Just over Nemaha River bridge, TURN right (west) on 724 Rd.
7. TRAVEL""' 10 miles west to Highway 75 and TURN right (north) on Highway 75 to Auburn.
8. In Auburn, TURN left (west) on 26th Street (first city street).
9. TRAVEL "' 1/2 mile to 'P' Street and TURN left (south) one block. Off-Site Assembly Area is Nemaha County Maintenance Yard (Nemaha County Barn).
10. PARK in orderly fashion in gravel lot and REMAIN in your vehicle until directed by workers to be monitored.
11. Once released, REMAIN fit for duty and available for call-in.

(_ NOTE_-_ Do_ not contact_ Control _Room _for_ event_ updates. __________________ __________ _______________.

12. CALL CNS Employee Emergency Information Hotline ( 402) 825-5559 prior to traveling to CNS for next scheduled shift.
13. REPORT for duty""' 1/2 hour prior to beginning of your shift.

PROCEDURE 5. 7.11 REVISION 19 PAGE 10 OF 20

)

ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION

[INFORMATION USE]

ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION (INFORMATION USE]

1. TSC Chemistry/RP Coordinator DISPATCH RP Tech (RPT) to conduct radiological surveys during evacuation at Nemaha County Decontamination Center.

1.1 IF time permits, THEN RPT OBTAIN following prior to leaving site:

  • CopyofEPIP5.7.ll.
  • Survey instruments.
  • Decontamination supplies.

1.2 IF time does not permit, THEN USE decontamination equipment stored at Nemaha County Decontamination Center.

2. IF parking lots are used as monitoring points, THEN ATTEMPT to remove all vehicles in parking lot prior to arrival of evacuees.
3. Upon arrival, RPT DIRECT evacuees to remain in their vehicles until surveyed and released.
4. RPT PERFORM radiological surveys of personnel and vehicles.
5. RPT PERFORM decontamination of personnel and vehicles to meet 1, Table 1, for Unrestricted Release Limits.

5.1 RECORD results of evacuee surveys on Attachment 9.

5.2 RECORD results of vehicles or equipment surveys on Attachment 10.

6. RPT RELEASE clean or decontaminated personnel or vehicles to their homes per Attachment 11, Table 1.

6.1 IF unrestricted release limits not achieved, THEN RPT INFORM Chemistry/RP Coordinator.

6.1.1 Chemistry/RP Coordinator CONSULT with Radiological Control Manager (RCM) and Governmental Authorities to determine course of action.

PROCEDURE 5. 7.11 REVISION 19 PAGE 11 OF 20

)

ATIACHMENT 8 RADIOLOGICAL PROTECTION SUPPORT OF EVACUATION

[INFORMATION USE]

7. IF Decontamination Center parking lot vehicles not removed prior to arrival of
evacuees, THEN RPT SURVEY each vehicle prior to allowing them to leave.
8. RPT INFORM Chemistry/RP Coordinator when all evacuees and vehicles released and RECORD in facility log.

PROCEDURE 5. 7.11 REVISION 19 PAGE 12 OF 20

ATTACHMENT 9 EVACUEE MONITORING DATA [INFORMATION USE]

AITACHMENT 9 EVACUEE MONITORING DATA (INFORMATION USE]

Location:

Date:

Instrument Used: --------------------------

Instrument S/N: __________________________ _

Background cpm: _________________________ _

Person Performing Survey: _____________________ _

TABLE 1 DIRECT SURVEY RESULTS MAXIMUM (MAXIMUM)

READING TIME NAME TIME 1ST 2ND LOCATION RELEASED

,/

PROCEDURE 5. 7.11 REVISION 19 PAGE 13 OF 20

ATTACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA

[INFORMATION USE]

ATIACHMENT 10 POST-EVACUATION VEHICLE MONITORING DATA (INFORMATION USE]

Location:

Date :

Instrument Used: ---------------------------

Instrument S/N: _________________________ _

Background cpm: __________________________ _

Person Performing Survey: ______________________ _

TABLE 1 DIRECT SURVEY SMEAR SURVEY TIME LICENSE RESULTS RESULTS VEHICLE NUMBER OWNER TIME 1ST 2ND 1ST 2ND RELEASED PROCEDURE 5. 7.11 REVISION 19 PAGE 14 OF 20

/

ATIACHMENT 11 DECONTAMINATION LIMITS [INFORMATION USE]

ATTACHMENT 11 DECONTAMINATION LIMITS (INFORMATION USE]

SUBJECT Personnel Personal Effects/

Equipment/Vehicles TABLE 1C1)

UNRESTRICTED CONTAMINATION LIMITS No detectable activity found when using an instrument with sensitivity of ::; 100 net cpm/probe area using GM detector with pancake probe.

or Clearance of functioning portal monitor.

No detectable activity found when using an instrument with sensitivity of ::; 100 net cpm/probe area using GM detector with pancake probe.

or No detectable activity found when using instrumentation with sensitivity of ::; 2.2 nCi as determined by gross gamma analysis with gamma sensitive counter.

Cl) Derived from Procedure 9.RADOP.2, unrestricted contamination limits.

PROCEDURE 5.7.11 REVISION 19 PAGE 15 OF 20

)

ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]

AlTACHMENT 12 INFORMATION SHEET (NFORMATION USEJ

1. PURPOSE 1 1.1 Perform dismissal or evacuation of personnel from plant site as required by EPIP 5. 7.2 or as directed by Emergency Director.
2. PRECAUTIONS AND LIMITATIONS 2.1 Evacuation of non-ERO personnel is required at Site Area Emergency or General Emergency.

2.2 Dismissal of non-ERO personnel is permissible if NOUE or ALERT and release rate is less than NOUE limits.

3. DISCUSSION 3.1 In event of emergency at CNS, it may be desirable to minimize number of personnel on-site by dismissing them. If emergency is a Site Area Emergency or General Emergency, or involves radiological release with the potential to cause contamination of personnel or vehicles, then evacuation of personnel is required to minimize exposure and contamination.

3.2 Personnel will be assembled at their Designated Assembly Area per EPIP 5. 7.10. Completion of EPIP 5. 7.10 will result in Security Coordinator having a list.of any missing persons within Protected Area.

3.3 After assembly and accountability has been completed, dismissal or evacuation of personnel will be initiated as required per EPIP 5.7.2 or at discretion of Emergency Director.

3.4 Logistics Coordinator will utilize Logistics Coordinator DAAS West Warehouse to perform dismissal or evacuation per this procedure.

3.5 Dismissed or evacuated personnel shall follow all instructions with regard to dismissal or evacuation and obey all traffic laws.

3.6 This procedure provides guidance in four areas:

3.6.1 Determination of need for dismissal of personnel.

3.6.2 Determination of need for site evacuation.

3.6.3 Determination of evacuation route and assembly area.

PROCEDURE 5.7.11 REVISION 19 PAGE 16 OF 20

ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]

3.6.4 Conducting evacuation and subsequent assembly, monitoring, and release of personnel in an orderly manner.

3.7 DEFINITIONS

3. 7.1 Dismissal - Unrestricted release of personnel from plant site. No re-assembly or radiological monitoring required.
3. 7.2 ERO Relief Shift personnel - ERO personnel being dismissed or evacuated and who are designated to return later to perform ERO relief duty.

3.7.3 Evacuation - Controlled release of personnel from site to off-site re-assembly point due to potential for radiological contamination or exposure to direct radiation. Evacuation requires specified routes be taken to an off-site re-assembly point where radiological monitoring (and decontamination, if required) will be performed prior to unrestricted release.

3.8 DISMISSAL 3.8.1 If radiological conditions do not indicate need for evacuation but Emergency Director deems it appropriate to reduce number of personnel on-site, personnel will be dismissed to their homes.

3.8.2 Logistics Coordinator will coordinate this dismissal when instructed.

3.8.3 Logistics Coordinator Designated Assembly Area Supervisor (DAAS) in West Warehouse (WW) distributes Attachment 4 dismissal instructions to personnel being dismissed.

3.8.4 DAAS-WW to complete Attachment 3 dismissal form and to make a site-wide announcement with instructions regarding dismissal.

PROCEDURE 5. 7.11 REVISION 19 PAGE 17 OF 20

)

ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]

3.9 EVACUATION 3.9.1 If radiological conditions (or emergency classification) indicate need for evacuation, Logistics Coordinator will coordinate evacuation when instructed.

3.9.2 Radiological Control Manager (RCM) will determine evacuation route and provide to Logistics Coordinator.

3.9.3 Logistics Coordinator will contact DAAS-WW and provide appropriate evacuation route attachment and instructions to be distributed to each evacuee.

3.9.4 Logistics Coordinator will direct DAAS-WW to complete and provide site-wide announcement regarding evacuation of personnel.

3.9.5 Radiological Protection personnel provide surveying and releasing of evacuee and vehicles at Off-site Assembly Area.

3.10 DISMISSAL OR EVACUATION FLOWCHART 3.10.1 Attachment 1, Dismissal Flowchart, and Attachment 2, Evacuation Flowchart, are printed on an 11 inch by 17 inch laminated sheet and mounted on foam board.

3.10.2 Header data on upper right flowchart will contain revision number.

3.10.3 Table 1 specifies current revision of Dismissal Flowchart and Evacuation Flowchart.

TABLE 1 EPIP 5.7.11 Flowchart Revision Number, Dismissal Flowchart 0, Evacuation Flowchart 0

3.10.4 It is not necessary that flowchart revision number be revised with each revision of this procedure.

3.10.5 If flowchart revised, then Attachment 12 is revised to reflect new flowchart revision data.

PROCEDURE 5. 7.11 REVISION 19 PAGE 18 OF 20

ATTACHMENT 12 INFORMATION SHEET [INFORMATION USE]

4. RECORDS 4.1 Following completed attachments from actual events shall be forwarded to EP Manager within 5 working days of their completion (quality record upon completion).
  • Attachment 9.
  • Attachment 10.
5. REFERENCES 5.1 CODES AND STANDARDS 5.1.1 NPPD Emergency Plan for CNS.

5.1.2 NRC Safety Evaluation Report (SER), TAC Number ME0849 - ADAMS Accession Number ML100080231.

5.1.3 Nuclear Energy Institute (NEI) Document 99-01, Revision 5, Methodology for Development of Emergency Action Levels.

5.1.4 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

5.1.5 10CFR20.

5. 2 PROCEDURES 5.2.1 Emergency Plan Implementing Procedure 5.7.2, Emergency Director EPIP.

5.2.2 Emergency Plan Implementing Procedure 5.7.10, Personnel Assembly and Accountability.

5.2.3 Rad Protection Procedure 9.RADOP.2, Radiation Safety Standards and Limits.

PROCEDURE 5.7.11 REVISION 19 PAGE 19 OF 20

ATIACHMENT 12 INFORMATION SHEET [INFORMATION USE]

5.3 MISCELLANEOUS

5. 3.1 QA Audit 93-05.

5.3.2 Radiological White Paper 03-01.

5.3.3 1 TIP Action Plan 5.2.2.1, Action Step 8, Revision 2. Revised Procedures 5.7.10 and 5.7.11 to address changes in dismissal/evacuation. Affects entire procedure. Attachment 12, Section 1, Purpose is flagged.

PROCEDURE 5. 7.11 REVISION 19 PAGE 20 OF 20