L-77-231, Response to Request for Additional Information Re Large Scale Topographical Map in Compliance with Appendix I to 10 CFR 50: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMM | {{#Wiki_filter:U.S. NUCLEAR REGULATORY COMM 0 | ||
NRC FoRM 19K (2 76I NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL DOCK BER o) Z~g FILENVlN5 R TO: | |||
I Mr George Lear FROM: | |||
I PLANT NAME: | Florida Power | ||
& Light Company Miami, Florida Robert E | |||
TIC ACRS | Uhri DATE OF DOCUMENT 7/25/77 DATE RECEIVED 7/28/77 ETTE R 2fORIGINAL QCOPY DESCRIPTION 0 NOTOR IZED HUNC LASS IF I E D PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED | ||
/cubi+~~ | |||
Consists'of large scale topographical map concerning Appendix I additional information | |||
~ | |||
~ ~ | |||
I PLANT NAME: Turley Point Ynits 3 & 4 (l-P) | |||
APPENDIX I DISTRIBUTION AFTER ISSUANCE OF A LICENSE RJL 7/28/77 (l-P) | |||
. PONOT REMOVE PPpw I(vsf ACKNOWLEDGED SAFETY BRANCH CHIEF: | |||
FOR ACTION/INFORMATION INTERNALDISTRI BUTION PDR I&E 2 | |||
OELD GOSSICK & STAFF BUTLER GRIMES DENTON LTR AMMILL HULMAN MARKEE J. | |||
COLLINS 2 | |||
KREGER VERDERY LPDR: | |||
TIC ACRS | |||
>uuame s | |||
EXTERNALDISTRIBUTION CONTROL NUMBER 772090242 l | |||
NRC FORM 196 {2.76I | NRC FORM 196 {2.76I | ||
1 rr 1 | 1 rr 1 | ||
P.O. BOX 3100 MIAMI> | 1 P.O. BOX 3100 MIAMI>FLORIDA33101 I | ||
yy9lhg~ | |||
FLORIDA POWER | ~17<~Qg~ | ||
FLORIDA POWER L LIGHT COMPANY L-77-231 July 25, 1977 Office of Nuclear Reactor Regulation Attention: | |||
Mr. George Lear, Chief Operating Reactors Branch 53 Division of Operating Reactors U. | |||
S. Nuclear Regulatory Commission Washington, D. C. | |||
20555 | |||
==Dear Mr. Lear:== | ==Dear Mr. Lear:== | ||
Re: | |||
Very | Turkey Point Units 3 and 4 | ||
Docket Nos. | |||
50-250 and 50-251 A | |||
endix I Additional Information tS7] c 9 | |||
AR REG01ATpg S | |||
AO LHIN1 7,,4 eg | |||
((Ij p Your letter of September 9, | |||
1976 requested that Florida Power 6 Light Company provide additional information regarding compliance. at Turkey Point Units 3 and 4 with Appendix I to 10 CFR 50. | |||
Our letter L-76-358, of October 14, 1976 provided the information you requested except for the large scale topographical map. | |||
Duplication of the maps is now complete and 40 copies are hereby for-warded to you for your information. | |||
Very truly yours, Robert E. Uhrig Vice President REU/MAS/pg Enclosures cc: | |||
Mr. Norman C. Moseley Robert Lowenstein, Esquire 77cO90242 HELPING BUILD FLORIDA | |||
C AEC")YFD QQC(j> | C AEC")YFD QQC(j> | ||
Ul."I' | fptq'ACCESSlNG Ul."I' Sl(dN. 28 N) IOBB}} | ||
Latest revision as of 15:39, 5 January 2025
| ML18227B794 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/25/1977 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| L-77-231 | |
| Download: ML18227B794 (4) | |
Text
U.S. NUCLEAR REGULATORY COMM 0
NRC FoRM 19K (2 76I NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL DOCK BER o) Z~g FILENVlN5 R TO:
I Mr George Lear FROM:
Florida Power
& Light Company Miami, Florida Robert E
Uhri DATE OF DOCUMENT 7/25/77 DATE RECEIVED 7/28/77 ETTE R 2fORIGINAL QCOPY DESCRIPTION 0 NOTOR IZED HUNC LASS IF I E D PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED
/cubi+~~
Consists'of large scale topographical map concerning Appendix I additional information
~
~ ~
I PLANT NAME: Turley Point Ynits 3 & 4 (l-P)
APPENDIX I DISTRIBUTION AFTER ISSUANCE OF A LICENSE RJL 7/28/77 (l-P)
. PONOT REMOVE PPpw I(vsf ACKNOWLEDGED SAFETY BRANCH CHIEF:
FOR ACTION/INFORMATION INTERNALDISTRI BUTION PDR I&E 2
OELD GOSSICK & STAFF BUTLER GRIMES DENTON LTR AMMILL HULMAN MARKEE J.
COLLINS 2
KREGER VERDERY LPDR:
>uuame s
EXTERNALDISTRIBUTION CONTROL NUMBER 772090242 l
NRC FORM 196 {2.76I
1 rr 1
1 P.O. BOX 3100 MIAMI>FLORIDA33101 I
yy9lhg~
~17<~Qg~
FLORIDA POWER L LIGHT COMPANY L-77-231 July 25, 1977 Office of Nuclear Reactor Regulation Attention:
Mr. George Lear, Chief Operating Reactors Branch 53 Division of Operating Reactors U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Lear:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 A
endix I Additional Information tS7] c 9
AR REG01ATpg S
AO LHIN1 7,,4 eg
((Ij p Your letter of September 9,
1976 requested that Florida Power 6 Light Company provide additional information regarding compliance. at Turkey Point Units 3 and 4 with Appendix I to 10 CFR 50.
Our letter L-76-358, of October 14, 1976 provided the information you requested except for the large scale topographical map.
Duplication of the maps is now complete and 40 copies are hereby for-warded to you for your information.
Very truly yours, Robert E. Uhrig Vice President REU/MAS/pg Enclosures cc:
Mr. Norman C. Moseley Robert Lowenstein, Esquire 77cO90242 HELPING BUILD FLORIDA
C AEC")YFD QQC(j>
fptq'ACCESSlNG Ul."I' Sl(dN. 28 N) IOBB