{{#Wiki_filter:March 4, 2019
{{#Wiki_filter:March 4, 2019  
Mr. Eric Larson, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Mr. Eric Larson, Site Vice President  
Port Gibson, MS 39150
Entergy Operations, Inc.  
SUBJECT:         GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC TRIENNIAL
Grand Gulf Nuclear Station  
                  HEAT SINK PERFORMANCE INSPECTION (05000416/2019002) AND
P.O. Box 756  
                  REQUEST FOR INFORMATION
Port Gibson, MS 39150  
Dear Mr. Larson:
On June 17, 2019, the Nuclear Regulatory Commission (NRC) will begin the onsite portion of
SUBJECT:  
the triennial heat sink performance inspection at your Grand Gulf Nuclear Station. This
GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC TRIENNIAL  
inspection will be performed in accordance with NRC baseline inspection procedure
HEAT SINK PERFORMANCE INSPECTION (05000416/2019002) AND  
(IP) 71111.07 by one inspector from the NRCs Region IV office for one week.
REQUEST FOR INFORMATION  
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
Dear Mr. Larson:  
documents have been divided into three groups.
    *   The first group lists information necessary for our initial inspection scoping activities.
On June 17, 2019, the Nuclear Regulatory Commission (NRC) will begin the onsite portion of  
        This information should be available to the lead inspector no later than May 6, 2019.
the triennial heat sink performance inspection at your Grand Gulf Nuclear Station. This  
        By May 9, 2019, the inspector will communicate the initial selected set of approximately
inspection will be performed in accordance with NRC baseline inspection procedure
        2-3 risk-significant heat exchangers.
(IP) 71111.07 by one inspector from the NRCs Region IV office for one week.  
    *   The second group of documents requested includes those items needed to support our
        in-office preparation activities. This set of documents, including the calculations
In order to minimize the impact that the inspection has on the site and to ensure a productive  
        associated with the selected heat exchangers, should be available no later than June 3,
inspection, we have enclosed a request for documents needed for the inspection. The  
        2019. This information should be separated for each selected component, especially if
documents have been divided into three groups.  
        provided electronically (e.g., folder with component name that includes calculations,
        condition reports, maintenance history, etc.). During the in-office preparation activities,
*  
        the inspector may identify additional information needed to support the inspection.
The first group lists information necessary for our initial inspection scoping activities.  
    *   The last group includes the additional information above as well as plant specific
This information should be available to the lead inspector no later than May 6, 2019.  
        reference material. This information should be available onsite to the inspector on
By May 9, 2019, the inspector will communicate the initial selected set of approximately  
        June 17, 2019. It is also requested that corrective action documents and/or questions
2-3 risk-significant heat exchangers.  
        developed during the inspection be provided to the inspector as the documents are
        generated.
*  
It is important that these documents be as complete as possible, in order to minimize the
The second group of documents requested includes those items needed to support our  
number of documents requested during the preparation week or during the onsite inspection.
in-office preparation activities. This set of documents, including the calculations  
associated with the selected heat exchangers, should be available no later than June 3,  
2019. This information should be separated for each selected component, especially if  
provided electronically (e.g., folder with component name that includes calculations,  
condition reports, maintenance history, etc.). During the in-office preparation activities,  
the inspector may identify additional information needed to support the inspection.  
*  
The last group includes the additional information above as well as plant specific  
reference material. This information should be available onsite to the inspector on
June 17, 2019. It is also requested that corrective action documents and/or questions  
developed during the inspection be provided to the inspector as the documents are  
generated.  
It is important that these documents be as complete as possible, in order to minimize the  
number of documents requested during the preparation week or during the onsite inspection.  


E. Larson                                         2
All requested documents are to be for the time period from the onsite inspection period back to
E. Larson  
the last triennial heat sink performance inspection. If nothing addressing a request was done in
2  
that time period, then the request applies to the last applicable document in the previous time
period.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Mr. R. Meister of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the lead
inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
All requested documents are to be for the time period from the onsite inspection period back to  
This letter does not contain new or amended information collection requirements subject
the last triennial heat sink performance inspection. If nothing addressing a request was done in  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
that time period, then the request applies to the last applicable document in the previous time  
collection requirements were approved by the Office of Management and Budget, control
period.  
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
We have discussed the schedule for this inspection activity with your staff and understand that  
requesting document displays a currently valid Office of Management and Budget control
our regulatory contact for this inspection will be Mr. R. Meister of your licensing organization. If  
number.
there are any questions about this inspection or the material requested, please contact the lead  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.  
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
This letter does not contain new or amended information collection requirements subject
document system (ADAMS). ADAMS is accessible from the NRC Web site at
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
collection requirements were approved by the Office of Management and Budget, control  
                                                  Sincerely,
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
                                                  /RA/
respond to, a request for information or an information collection requirement unless the  
                                                  Vincent G. Gaddy, Chief
requesting document displays a currently valid Office of Management and Budget control  
                                                  Engineering Branch 1
number.  
                                                  Division of Reactor Safety
Docket No. 50-416
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
License No. NPF-29
and its enclosure will be available electronically for public inspection in the NRC Public  
Enclosure: Request for Information
Document Room or from the Publicly Available Records (PARS) component of NRC's
   Triennial Heat Sink Performance Inspection
document system (ADAMS). ADAMS is accessible from the NRC Web site at  
cc: w/ encl: Electronic Distribution
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Sincerely,  
    /RA/  
Vincent G. Gaddy, Chief  
Engineering Branch 1  
Division of Reactor Safety  
Docket No. 50-416  
License No. NPF-29  
Enclosure: Request for Information  
   Triennial Heat Sink Performance Inspection  
cc: w/ encl: Electronic Distribution  


                                      Request for Information
                            Triennial Heat Sink Performance Inspection
                                    Grand Gulf Nuclear Station
Inspection Report:               05000416/2019002
Enclosure
Inspection Dates:               June 17 - 21, 2019
Request for Information  
Inspection Procedure:           IP 71111.07, Triennial Heat Sink Performance
Triennial Heat Sink Performance Inspection  
Lead Inspector:                 Wayne C. Sifre, Senior Reactor Inspector
Grand Gulf Nuclear Station  
  I.   Information Requested by May 6, 2019:
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-
        Related Equipment, heat exchangers in order of risk significance
Inspection Report:  
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
05000416/2019002  
        exchanger
      3. List of corrective action program documents (with a short description) associated with
Inspection Dates:  
        GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger
        testing, for the previous 2 years or since the last heat sink performance inspection
June 17 - 21, 2019  
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers done since last
        heat sink performance inspection
Inspection Procedure:
      5. System health report(s) and maintenance rule system notebooks for all the GL 89-13
IP 71111.07, Triennial Heat Sink Performance  
        heat exchangers
      6. Copy of your responses for GL 89-13
Lead Inspector:  
  II.   Information Requested by June 3, 2019:
      1. For the specific heat exchangers selected:
Wayne C. Sifre, Senior Reactor Inspector  
        a. Copies of the two most recent completed tests confirming thermal performance for
            those heat exchangers which are performance tested;
        b. Copy of system description and design basis document for the heat exchangers (as
I.  
            applicable);
Information Requested by May 6, 2019:  
        c. Copy of any operability determinations or other documentation of degradation
            associated with the heat exchangers or the systems that support the operation for
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-
            the selected heat exchangers;
Related Equipment, heat exchangers in order of risk significance  
                                                                                  Enclosure
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
exchanger  
3. List of corrective action program documents (with a short description) associated with  
GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger  
testing, for the previous 2 years or since the last heat sink performance inspection  
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers done since last  
heat sink performance inspection  
5. System health report(s) and maintenance rule system notebooks for all the GL 89-13  
heat exchangers  
6. Copy of your responses for GL 89-13  
II.  
Information Requested by June 3, 2019:  
1. For the specific heat exchangers selected:  
a. Copies of the two most recent completed tests confirming thermal performance for  
those heat exchangers which are performance tested;
b. Copy of system description and design basis document for the heat exchangers (as  
applicable);  
c. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the operation for  
the selected heat exchangers;  


        d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for
            each heat exchanger; and
        e. Provide a list of calculations with a description which currently apply to each heat
2
            exchanger.
    2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat
        exchanger to be done during the onsite portion of the inspection
    3. Copies of procedures developed to implement the recommendations of GL 89-13,
        (e.g., the GL 89-13 Heat Exchanger Program description)
d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for  
    4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program
each heat exchanger; and  
    5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed power
        operation of the nuclear reactor. Please provide the documents that state these limits
e. Provide a list of calculations with a description which currently apply to each heat  
        (e.g., UFSAR or Technical Requirements Manual (TRM)) and the operating procedures
exchanger.  
        that ensure these limits are not exceeded.
III.   Information Requested by June 17, 2019:
2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat  
    1. For the specific heat exchangers selected:
exchanger to be done during the onsite portion of the inspection  
        a. Provide the Design Basis Documents and Updated Final Safety Analysis Report
            pages for the selected heat exchangers;
3. Copies of procedures developed to implement the recommendations of GL 89-13,
        b. Copy of the design specification and heat exchanger data sheets for each heat
(e.g., the GL 89-13 Heat Exchanger Program description)
            exchanger;
        c. Copy of the vendor manuals including component drawings for each heat exchanger;
4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program  
        d. Copy of the calculation which establishes the limiting (maximum) design basis heat
            load which is required to be removed by each of these heat exchangers;
5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed power  
        e. Copy of the calculation which correlates surveillance testing results from these heat
operation of the nuclear reactor. Please provide the documents that state these limits  
            exchangers with design basis heat removal capability (e.g., basis for surveillance test
(e.g., UFSAR or Technical Requirements Manual (TRM)) and the operating procedures  
            acceptance criteria);
that ensure these limits are not exceeded.  
        f. Copy of the calculations or documents which evaluate the potential for water
            hammer or excessive tube vibration in the heat exchanger or associated piping;
        g. List of engineering-related Operator Workarounds/Temporary Modifications for these
III.  
            heat exchangers since the last triennial heat sink performance inspection;
Information Requested by June 17, 2019:  
        h. Copy of the evaluations of data for the two most recent completed tests confirming
            the thermal performance of each heat exchanger;
1. For the specific heat exchangers selected:  
        i. Documentation and procedures that identify the types, accuracy, and location of any
                                                  2
a. Provide the Design Basis Documents and Updated Final Safety Analysis Report  
pages for the selected heat exchangers;  
b. Copy of the design specification and heat exchanger data sheets for each heat  
exchanger;  
c. Copy of the vendor manuals including component drawings for each heat exchanger;  
d. Copy of the calculation which establishes the limiting (maximum) design basis heat  
load which is required to be removed by each of these heat exchangers;  
e. Copy of the calculation which correlates surveillance testing results from these heat  
exchangers with design basis heat removal capability (e.g., basis for surveillance test  
acceptance criteria);  
f.  
Copy of the calculations or documents which evaluate the potential for water  
hammer or excessive tube vibration in the heat exchanger or associated piping;  
g. List of engineering-related Operator Workarounds/Temporary Modifications for these  
heat exchangers since the last triennial heat sink performance inspection;  
h. Copy of the evaluations of data for the two most recent completed tests confirming  
the thermal performance of each heat exchanger;  
i.  
Documentation and procedures that identify the types, accuracy, and location of any  


      special instrumentation used for the two most recently completed thermal
      performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
      instruments or temperature instruments). Include calibration records for the
3
      instruments used during these tests;
  j. Copies of those documents that describe the methods taken to control water
      chemistry in the heat exchangers;
special instrumentation used for the two most recently completed thermal  
  k. Copies of the documents that verify the structural integrity of the heat exchanger,
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
      e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection
instruments or temperature instruments). Include calibration records for the  
      results;
instruments used during these tests;  
  l. The cleaning and inspection maintenance schedule for each heat exchanger for the
      next 5 years;
j.  
  m. Copy of the document describing the inspection results for the last two cleaning and
Copies of those documents that describe the methods taken to control water  
      inspection activities completed on each heat exchanger;
chemistry in the heat exchangers;  
  n. Copy of the document which identifies the current number of tubes in service for
      each heat exchanger and the supporting calculation which establishes the maximum
k. Copies of the documents that verify the structural integrity of the heat exchanger,  
      number of tubes which can be plugged in each heat exchanger;
e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection  
  o. Copy of the document establishing the repair criteria (plugging limit) for degraded
results;  
      tubes which are identified in each heat exchanger; and
  p. Information regarding any alarms which monitor on-line performance.
l.  
2. For the ultimate heat sink (UHS):
The cleaning and inspection maintenance schedule for each heat exchanger for the  
  a. Maintenance or inspection of inaccessible below-water portions of the UHS system
next 5 years;  
      including results of underwater diving inspections and assessments of sediment
      intrusion and/or removal of sediment; and
m. Copy of the document describing the inspection results for the last two cleaning and  
  b. Documentation of inspections to verify no structural damage to intake structures that
inspection activities completed on each heat exchanger;  
      would indicate loss of structural integrity and/or capacity.
3. For the safety-related residual heat removal (RHR) service water and diesel generator
n. Copy of the document which identifies the current number of tubes in service for  
  cooling water systems (DGCWS):
each heat exchanger and the supporting calculation which establishes the maximum  
  a. Copies of the pipe testing and/or inspection program procedures and the latest
number of tubes which can be plugged in each heat exchanger;  
      completed surveillances and tests verifying structural integrity of the piping;
  b. History during the last 3 years of any through wall pipe leak on the system and the
o. Copy of the document establishing the repair criteria (plugging limit) for degraded  
      disposition documentation; and
tubes which are identified in each heat exchanger; and  
  c. Copies of the procedures to monitor, assess, and disposition active through wall pipe
      leaks, including structural evaluations and/or planned corrective actions.
p. Information regarding any alarms which monitor on-line performance.  
                                            3
2. For the ultimate heat sink (UHS):  
a. Maintenance or inspection of inaccessible below-water portions of the UHS system  
including results of underwater diving inspections and assessments of sediment  
intrusion and/or removal of sediment; and  
b. Documentation of inspections to verify no structural damage to intake structures that  
would indicate loss of structural integrity and/or capacity.  
3. For the safety-related residual heat removal (RHR) service water and diesel generator  
cooling water systems (DGCWS):  
a. Copies of the pipe testing and/or inspection program procedures and the latest  
completed surveillances and tests verifying structural integrity of the piping;  
b. History during the last 3 years of any through wall pipe leak on the system and the  
disposition documentation; and  
c. Copies of the procedures to monitor, assess, and disposition active through wall pipe  
leaks, including structural evaluations and/or planned corrective actions.  


If the information requested above will not be available, please contact Wayne Sifre as soon as
possible.
Inspector Contact Information:
4
Wayne C. Sifre
Senior Reactor Inspector
817-200-1193
If the information requested above will not be available, please contact Wayne Sifre as soon as  
Wayne.Sifre@nrc.gov
possible.  
Mailing Address:
U.S. NRC, Region IV
Inspector Contact Information:  
Attn: Wayne C. Sifre
1600 East Lamar Blvd.
Wayne C. Sifre  
Senior Reactor Inspector  
817-200-1193  
Wayne.Sifre@nrc.gov  
Mailing Address:  
U.S. NRC, Region IV  
Attn: Wayne C. Sifre  
1600 East Lamar Blvd.  
Arlington, TX 76011-4511
Arlington, TX 76011-4511
                                                4




ML19063B488
  ML19063B488  
  SUNSI Review: ADAMS:         Non-Publicly Available Non-Sensitive Keyword: NRC-002
  SUNSI Review:     ADAMS:               Non-Publicly Available         Non-Sensitive       Keyword: NRC-002  
By: WCS         Yes  No    Publicly Available       Sensitive
By: WCS                   Yes   No
  OFFICE       DRS:SRI/EB1 DRS:C/EB1
  Publicly Available                 Sensitive
  NAME         WSifre       VGaddy
   
  SIGNATURE         /RA/         /RA/
OFFICE  
  DATE           03/04/2019   03/04/2019
DRS:SRI/EB1  
DRS:C/EB1  
   
NAME  
WSifre  
VGaddy  
   
SIGNATURE  
/RA/  
/RA/  
   
DATE  
03/04/2019  
03/04/2019
}}
}}

Latest revision as of 04:31, 5 January 2025

Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information
ML19063B488
Person / Time
Site: Grand Gulf 
Issue date: 03/04/2019
From: Vincent Gaddy
Region 4 Engineering Branch 1
To: Emily Larson
Entergy Operations
Gaddy V
References
IR 2019002
Download: ML19063B488 (7)


See also: IR 05000416/2019002

Text

March 4, 2019

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION (05000416/2019002) AND

REQUEST FOR INFORMATION

Dear Mr. Larson:

On June 17, 2019, the Nuclear Regulatory Commission (NRC) will begin the onsite portion of

the triennial heat sink performance inspection at your Grand Gulf Nuclear Station. This

inspection will be performed in accordance with NRC baseline inspection procedure

(IP) 71111.07 by one inspector from the NRCs Region IV office for one week.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than May 6, 2019.

By May 9, 2019, the inspector will communicate the initial selected set of approximately

2-3 risk-significant heat exchangers.

The second group of documents requested includes those items needed to support our

in-office preparation activities. This set of documents, including the calculations

associated with the selected heat exchangers, should be available no later than June 3,

2019. This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.). During the in-office preparation activities,

the inspector may identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available onsite to the inspector on

June 17, 2019. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the onsite inspection.

E. Larson

2

All requested documents are to be for the time period from the onsite inspection period back to

the last triennial heat sink performance inspection. If nothing addressing a request was done in

that time period, then the request applies to the last applicable document in the previous time

period.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be Mr. R. Meister of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the lead

inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-416

License No. NPF-29

Enclosure: Request for Information

Triennial Heat Sink Performance Inspection

cc: w/ encl: Electronic Distribution

Enclosure

Request for Information

Triennial Heat Sink Performance Inspection

Grand Gulf Nuclear Station

Inspection Report: 05000416/2019002

Inspection Dates:

June 17 - 21, 2019

Inspection Procedure:

IP 71111.07, Triennial Heat Sink Performance

Lead Inspector:

Wayne C. Sifre, Senior Reactor Inspector

I.

Information Requested by May 6, 2019:

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-

Related Equipment, heat exchangers in order of risk significance

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger

3. List of corrective action program documents (with a short description) associated with

GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger

testing, for the previous 2 years or since the last heat sink performance inspection

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers done since last

heat sink performance inspection

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers

6. Copy of your responses for GL 89-13

II.

Information Requested by June 3, 2019:

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance for

those heat exchangers which are performance tested;

b. Copy of system description and design basis document for the heat exchangers (as

applicable);

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for

the selected heat exchangers;

2

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for

each heat exchanger; and

e. Provide a list of calculations with a description which currently apply to each heat

exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the onsite portion of the inspection

3. Copies of procedures developed to implement the recommendations of GL 89-13,

(e.g., the GL 89-13 Heat Exchanger Program description)

4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program

5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed power

operation of the nuclear reactor. Please provide the documents that state these limits

(e.g., UFSAR or Technical Requirements Manual (TRM)) and the operating procedures

that ensure these limits are not exceeded.

III.

Information Requested by June 17, 2019:

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers;

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

c. Copy of the vendor manuals including component drawings for each heat exchanger;

d. Copy of the calculation which establishes the limiting (maximum) design basis heat

load which is required to be removed by each of these heat exchangers;

e. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria);

f.

Copy of the calculations or documents which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping;

g. List of engineering-related Operator Workarounds/Temporary Modifications for these

heat exchangers since the last triennial heat sink performance inspection;

h. Copy of the evaluations of data for the two most recent completed tests confirming

the thermal performance of each heat exchanger;

i.

Documentation and procedures that identify the types, accuracy, and location of any

3

special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

j.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers;

k. Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results;

l.

The cleaning and inspection maintenance schedule for each heat exchanger for the

next 5 years;

m. Copy of the document describing the inspection results for the last two cleaning and

inspection activities completed on each heat exchanger;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the maximum

number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger; and

p. Information regarding any alarms which monitor on-line performance.

2. For the ultimate heat sink (UHS):

a. Maintenance or inspection of inaccessible below-water portions of the UHS system

including results of underwater diving inspections and assessments of sediment

intrusion and/or removal of sediment; and

b. Documentation of inspections to verify no structural damage to intake structures that

would indicate loss of structural integrity and/or capacity.

3. For the safety-related residual heat removal (RHR) service water and diesel generator

cooling water systems (DGCWS):

a. Copies of the pipe testing and/or inspection program procedures and the latest

completed surveillances and tests verifying structural integrity of the piping;

b. History during the last 3 years of any through wall pipe leak on the system and the

disposition documentation; and

c. Copies of the procedures to monitor, assess, and disposition active through wall pipe

leaks, including structural evaluations and/or planned corrective actions.

4

If the information requested above will not be available, please contact Wayne Sifre as soon as

possible.

Inspector Contact Information:

Wayne C. Sifre

Senior Reactor Inspector

817-200-1193

Wayne.Sifre@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne C. Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4511

ML19063B488

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: WCS Yes No

Publicly Available Sensitive

OFFICE

DRS:SRI/EB1

DRS:C/EB1

NAME

WSifre

VGaddy

SIGNATURE

/RA/

/RA/

DATE

03/04/2019

03/04/2019