L-19-029, Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station. Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station. and Perry Nuclear Power Plant: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 1: Line 1:
#REDIRECT [[L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report]]
{{Adams
| number = ML19074A242
| issue date = 03/15/2019
| title = Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station. Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station. and Perry Nuclear Power Plant
| author name = Benyak D
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000334, 05000346, 05000412, 05000440
| license number = DPR-066, NPF-003, NPF-058, NPF-073
| contact person =
| case reference number = L-19-029
| document type = Decommissioning Funding Plan DKTs 30, 40, 50, 70, Letter type:L, Status Report
| page count = 365
}}
 
=Text=
{{#Wiki_filter:}}

Latest revision as of 05:15, 5 January 2025

Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station. Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station. and Perry Nuclear Power Plant
ML19074A242
Person / Time
Site: Beaver Valley, Davis Besse, Perry
(DPR-066, NPF-003, NPF-058, NPF-073)
Issue date: 03/15/2019
From: Benyak D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-19-029
Download: ML19074A242 (365)


Text