L-19-029, Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station. Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station. and Perry Nuclear Power Plant: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML19074A242 | |||
| issue date = 03/15/2019 | |||
| title = Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station. Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station. and Perry Nuclear Power Plant | |||
| author name = Benyak D | |||
| author affiliation = FirstEnergy Nuclear Operating Co | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000334, 05000346, 05000412, 05000440 | |||
| license number = DPR-066, NPF-003, NPF-058, NPF-073 | |||
| contact person = | |||
| case reference number = L-19-029 | |||
| document type = Decommissioning Funding Plan DKTs 30, 40, 50, 70, Letter type:L, Status Report | |||
| page count = 365 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:}} | |||
Latest revision as of 05:15, 5 January 2025
| ML19074A242 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry (DPR-066, NPF-003, NPF-058, NPF-073) |
| Issue date: | 03/15/2019 |
| From: | Benyak D FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-19-029 | |
| Download: ML19074A242 (365) | |