ML19209A916: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_         -.-
{{#Wiki_filter:_
epCQ.
epCQ.
                      ~
~
                                                      ...e,~.e<ec1 ,c ~e e-e   c=~ ~-
...e,~.e<ec1,c ~e e-e c=~
August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director                         Serial No. 552A/070279 Office of Inspection & Enforcement                     PSE&C/DPB:adw:me U.S. Nuclear Regulatory Comission Region II                                               Docket Nos. 50-404 tlant     Georgia 353
~-
August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director Serial No. 552A/070279 Office of Inspection & Enforcement PSE&C/DPB:adw:me U.S. Nuclear Regulatory Comission Region II Docket Nos. 50-404 tlant Georgia 353


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
 
Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4.
Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4. On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK.
On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK.
* V   3rul your ,
/
                                                              /              /
/
                                                          /
V 3rul your,
A    '
/
y /        . Brown ], r.' (I Senior Vice President-Pc e Stati n Engineering an C nstruction
. Brown ], r.' (I A
                                                                  ~
y /
Senior Vice President-Pc e Stati n Engineering an C nstruction
~
cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h /
cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h /
                                                                            # MCIAL CC}}
# MCIAL CC}}

Latest revision as of 22:59, 4 January 2025

Notifies of Error in 790801 Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Related Piping Sys, in Item A,Ak Should Read Ax
ML19209A916
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/08/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
552-070279, 552-70279, NUDOCS 7910050621
Download: ML19209A916 (1)


Text

_

epCQ.

~

...e,~.e<ec1,c ~e e-e c=~

~-

August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director Serial No. 552A/070279 Office of Inspection & Enforcement PSE&C/DPB:adw:me U.S. Nuclear Regulatory Comission Region II Docket Nos. 50-404 tlant Georgia 353

Dear Mr. O'Reilly:

Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4.

On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK.

/

/

V 3rul your,

/

. Brown ], r.' (I A

y /

Senior Vice President-Pc e Stati n Engineering an C nstruction

~

cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h /

  1. MCIAL CC