ML19209A916: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
epCQ. | epCQ. | ||
~ | |||
...e,~.e<ec1,c ~e e-e c=~ | |||
August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director | ~- | ||
August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director Serial No. 552A/070279 Office of Inspection & Enforcement PSE&C/DPB:adw:me U.S. Nuclear Regulatory Comission Region II Docket Nos. 50-404 tlant Georgia 353 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4. | |||
Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4. On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK. | On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK. | ||
/ | |||
/ | |||
V 3rul your, | |||
/ | |||
. Brown ], r.' (I A | |||
y / | |||
Senior Vice President-Pc e Stati n Engineering an C nstruction | |||
~ | |||
cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h / | cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h / | ||
# MCIAL CC}} | |||
Latest revision as of 22:59, 4 January 2025
| ML19209A916 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/08/1979 |
| From: | Brown S VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 552-070279, 552-70279, NUDOCS 7910050621 | |
| Download: ML19209A916 (1) | |
Text
_
epCQ.
~
...e,~.e<ec1,c ~e e-e c=~
~-
August 8, 1979 q j.tif',13 ^ 3 ~ 10 Mr. Jamel P. O'Reilly, Director Serial No. 552A/070279 Office of Inspection & Enforcement PSE&C/DPB:adw:me U.S. Nuclear Regulatory Comission Region II Docket Nos. 50-404 tlant Georgia 353
Dear Mr. O'Reilly:
Our letter of August 1,1979, Serial Number 552/070279, responceo to IE Bulletin 79-14 for North Anna Units 3 and 4.
On page 2 of that letter, item A of the output documents from piping and su orts stress analysis and design should have read AX rathe than AK.
/
/
V 3rul your,
/
. Brown ], r.' (I A
y /
Senior Vice President-Pc e Stati n Engineering an C nstruction
~
cc: Mr. Victor Stello, Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1104 343 7910050 h /
- MCIAL CC