ML19260D892: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML19260D892
| number = ML19260D892
| issue date = 02/07/1980
| issue date = 02/07/1980
| title = Updates Util 791213 Ltr Re Methods Used to Ensure Integrity of Auxiliary Bldg Secondary Containment Enclosure.Security Officers Will Routinely Verify That roll-up Doors on Refueling Floor Are Closed When Not in Use
| title = Updates Util Re Methods Used to Ensure Integrity of Auxiliary Bldg Secondary Containment Enclosure.Security Officers Will Routinely Verify That roll-up Doors on Refueling Floor Are Closed When Not in Use
| author name = Mills L
| author name = Mills L
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8002120561
| document report number = NUDOCS 8002120561
| title reference date = 12-13-1979
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:TENNESSEE V;,: LEY AUTHORITY C H ATT,S N C C G A T C'.t. E S S E E 3 7.4 01 400 Chestnut Street Tower 11 February 7, 1980 Director of Nuclear Reactor Regulation t.ttention: Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555
{{#Wiki_filter:TENNESSEE V;,: LEY AUTHORITY C H ATT,S N C C G A T C'.t. E S S E E 3 7.4 01 400 Chestnut Street Tower 11 February 7, 1980 Director of Nuclear Reactor Regulation t.ttention:
Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Mr. Rubenstein:==
==Dear Mr. Rubenstein:==
 
In the Matter of the Application of
In the Matter of the Application of                     )         Docket Nos. 50-327 Tennessee Valley Authority                               )                     50-328 In Enclosure 3 of my December 13, 1979, letter to you, we described the interim Auxiliary Building Secondary Containment Enclosure (ABSCE) and the methods used to ensure the integrity of the interim ABSCE. As a result of additional discussions with members of the NRC staff since then, security officers patrolling the refueling floor of the Auxilia.y Building will routinely verify that the roll-up doors are closed when not in use. This verification wil3 provide additional assurance that interim ABSCE integrity will be maintained.
)
Very truly yours, TENNESSEE VALLEY AUT110RITY A         Yyk L. M. Mills, Mar.ager Nuclear Regulecion and Safety 1950 198       Sco/
Docket Nos. 50-327 Tennessee Valley Authority
ss ll0 8002120 3 6 i}}
)
50-328 In Enclosure 3 of my {{letter dated|date=December 13, 1979|text=December 13, 1979, letter}} to you, we described the interim Auxiliary Building Secondary Containment Enclosure (ABSCE) and the methods used to ensure the integrity of the interim ABSCE. As a result of additional discussions with members of the NRC staff since then, security officers patrolling the refueling floor of the Auxilia.y Building will routinely verify that the roll-up doors are closed when not in use.
This verification wil3 provide additional assurance that interim ABSCE integrity will be maintained.
Very truly yours, TENNESSEE VALLEY AUT110RITY A
Yyk L. M. Mills, Mar.ager Nuclear Regulecion and Safety 1950 198 Sco/
ss ll0 8002120 3 6 i
.}}

Latest revision as of 12:27, 3 January 2025

Updates Util Re Methods Used to Ensure Integrity of Auxiliary Bldg Secondary Containment Enclosure.Security Officers Will Routinely Verify That roll-up Doors on Refueling Floor Are Closed When Not in Use
ML19260D892
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/07/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8002120561
Download: ML19260D892 (1)


Text

TENNESSEE V;,: LEY AUTHORITY C H ATT,S N C C G A T C'.t. E S S E E 3 7.4 01 400 Chestnut Street Tower 11 February 7, 1980 Director of Nuclear Reactor Regulation t.ttention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 In Enclosure 3 of my December 13, 1979, letter to you, we described the interim Auxiliary Building Secondary Containment Enclosure (ABSCE) and the methods used to ensure the integrity of the interim ABSCE. As a result of additional discussions with members of the NRC staff since then, security officers patrolling the refueling floor of the Auxilia.y Building will routinely verify that the roll-up doors are closed when not in use.

This verification wil3 provide additional assurance that interim ABSCE integrity will be maintained.

Very truly yours, TENNESSEE VALLEY AUT110RITY A

Yyk L. M. Mills, Mar.ager Nuclear Regulecion and Safety 1950 198 Sco/

ss ll0 8002120 3 6 i

.