ML19260D892

From kanterella
Jump to navigation Jump to search
Updates Util Re Methods Used to Ensure Integrity of Auxiliary Bldg Secondary Containment Enclosure.Security Officers Will Routinely Verify That roll-up Doors on Refueling Floor Are Closed When Not in Use
ML19260D892
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/07/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8002120561
Download: ML19260D892 (1)


Text

TENNESSEE V;,: LEY AUTHORITY C H ATT,S N C C G A T C'.t. E S S E E 3 7.4 01 400 Chestnut Street Tower 11 February 7, 1980 Director of Nuclear Reactor Regulation t.ttention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 In Enclosure 3 of my December 13, 1979, letter to you, we described the interim Auxiliary Building Secondary Containment Enclosure (ABSCE) and the methods used to ensure the integrity of the interim ABSCE. As a result of additional discussions with members of the NRC staff since then, security officers patrolling the refueling floor of the Auxilia.y Building will routinely verify that the roll-up doors are closed when not in use.

This verification wil3 provide additional assurance that interim ABSCE integrity will be maintained.

Very truly yours, TENNESSEE VALLEY AUT110RITY A

Yyk L. M. Mills, Mar.ager Nuclear Regulecion and Safety 1950 198 Sco/

ss ll0 8002120 3 6 i

.