ML19296A834: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
                                                                                      /J C -
/J C -
GUZF STAT.E'S                       UTILITIES             COMPANY a: sc=ciesso,22s-..scauve4-                         r e x e- s 7 c2 A4EA C0CE 7.3       83s-663' December 3, 1979 RBG -
GUZF STAT.E'S UTILITIES COMPANY a: sc=ciesso,22s-..scauve4-r e x e-s 7
c2 A4EA C0CE 7.3 83s-663' December 3, 1979 RBG -
File G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Ormission Region IV Gil Ryan plaza Drive Suite 1000 Arlington, Texas 76011
File G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Ormission Region IV Gil Ryan plaza Drive Suite 1000 Arlington, Texas 76011


==Dear Mr. Seyfrit:==
==Dear Mr. Seyfrit:==
River Bend Sta' ion - Unit 1 Docket No. 50-458 Our notification to you on November 5, 1979 identified a potential deficiency reportable under 10CFR 50.55 (e). As stated, this potential deficiency was in regard to non-destructive examination (NDE) perfonned during the fabrication of the primary shield wall by Chicago Bridge and IIon - Nuclear, Memphis, Tennessee. We are in the process of cmpleting our evaluation of this concern and will provide you a report by January 5, 1980.
River Bend Sta' ion - Unit 1 Docket No. 50-458 Our notification to you on November 5, 1979 identified a potential deficiency reportable under 10CFR 50.55 (e). As stated, this potential deficiency was in regard to non-destructive examination (NDE) perfonned during the fabrication of the primary shield wall by Chicago Bridge and IIon - Nuclear, Memphis, Tennessee. We are in the process of cmpleting our evaluation of this concern and will provide you a report by January 5, 1980.
Sincerely,
Sincerely, s
                                                          . s
.G. Weigan General Manager -
                                                            .G. Weigan General Manager -
Nuclear Projects WJR/ par cc: Director Office Inspection and Enforcanent, Washington D.C.
Nuclear Projects WJR/ par cc: Director Office Inspection and Enforcanent, Washington D.C.
8002190}}
8002190}}

Latest revision as of 07:50, 2 January 2025

Advises That Rept on Protential Deficiency Reported 791105 Re NDT for Fabrication of Primary Shield Wall Will Be Provided by 800105
ML19296A834
Person / Time
Site: River Bend 
Issue date: 12/03/1979
From: Weigand J
GULF STATES UTILITIES CO.
To:
References
NUDOCS 8002190103
Download: ML19296A834 (1)


Text

_

/J C -

GUZF STAT.E'S UTILITIES COMPANY a: sc=ciesso,22s-..scauve4-r e x e-s 7

c2 A4EA C0CE 7.3 83s-663' December 3, 1979 RBG -

File G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Ormission Region IV Gil Ryan plaza Drive Suite 1000 Arlington, Texas 76011

Dear Mr. Seyfrit:

River Bend Sta' ion - Unit 1 Docket No. 50-458 Our notification to you on November 5, 1979 identified a potential deficiency reportable under 10CFR 50.55 (e). As stated, this potential deficiency was in regard to non-destructive examination (NDE) perfonned during the fabrication of the primary shield wall by Chicago Bridge and IIon - Nuclear, Memphis, Tennessee. We are in the process of cmpleting our evaluation of this concern and will provide you a report by January 5, 1980.

Sincerely, s

.G. Weigan General Manager -

Nuclear Projects WJR/ par cc: Director Office Inspection and Enforcanent, Washington D.C.

8002190