ML19305E680: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:s 005 gogo 26d LPDR TIC NSIC # | ||
s 005 gogo 26d | CENTRAL FILES GULF STATES UTILITIES COMPANY post oFFtOE Box 2951 B E A V 'A O N * | ||
***AS 77701 AREA coCE 713 938 663'. | |||
CENTRAL FILES GULF STATES | April 7, 1980 R3G - Th63 File No. G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Conmission, Region IV Office of Inspection and Enforcement 611 Ryan Pla::a Drive Suite 1000 Arlington, TX 76011 | ||
April 7, 1980 R3G - Th63 File No. G9.5 Mr. Karl V. Seyfrit , Director U.S. Nuclear Regulatory Conmission, Region IV Office of Inspection and Enforcement 611 Ryan Pla::a Drive Suite 1000 Arlington, TX | |||
==Dear Mr. Seyfrit:== | ==Dear Mr. Seyfrit:== | ||
River Bena Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the five month results of the AST ( C227 mortar bar test for lov alkali (job cement) with both fi'_.e and coarse aggregates. | River Bena Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the five month results of the AST ( C227 mortar bar test for lov alkali (job cement) with both fi'_.e and coarse aggregates. | ||
The five month results, recorded as an average length change percent, are +0.02 and +0.02 for fine and coarse aggre-gates respectively, are well within the acceptance limits cf | The five month results, recorded as an average length change percent, are +0.02 and +0.02 for fine and coarse aggre-gates respectively, are well within the acceptance limits cf | ||
+0.05 for 3 month and +0.1 for 6 month test durations. | |||
The 6 nonth (and final) results are scheduled to be com-pleted on April 10, 1980. | The 6 nonth (and final) results are scheduled to be com-pleted on April 10, 1980. | ||
We vill forward them to you as soon as we receive them. | |||
Sincerely, i | Sincerely, i | ||
I | I | ||
\\ | |||
,)b. | |||
J: ^^ | |||
G. Weigand u. | |||
Vice President Operations & Technical Systems JGW/JEB/WJR/mb Enclosures | |||
__}} | __}} | ||
Latest revision as of 05:17, 2 January 2025
| ML19305E680 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/07/1980 |
| From: | Weigand J GULF STATES UTILITIES CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19305E681 | List: |
| References | |
| NUDOCS 8005200260 | |
| Download: ML19305E680 (1) | |
Text
s 005 gogo 26d LPDR TIC NSIC #
CENTRAL FILES GULF STATES UTILITIES COMPANY post oFFtOE Box 2951 B E A V 'A O N *
- AS 77701 AREA coCE 713 938 663'.
April 7, 1980 R3G - Th63 File No. G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Conmission, Region IV Office of Inspection and Enforcement 611 Ryan Pla::a Drive Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
River Bena Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the five month results of the AST ( C227 mortar bar test for lov alkali (job cement) with both fi'_.e and coarse aggregates.
The five month results, recorded as an average length change percent, are +0.02 and +0.02 for fine and coarse aggre-gates respectively, are well within the acceptance limits cf
+0.05 for 3 month and +0.1 for 6 month test durations.
The 6 nonth (and final) results are scheduled to be com-pleted on April 10, 1980.
We vill forward them to you as soon as we receive them.
Sincerely, i
I
\\
,)b.
J: ^^
G. Weigand u.
Vice President Operations & Technical Systems JGW/JEB/WJR/mb Enclosures
__