ML19317D732: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19317D732
| number = ML19317D732
| issue date = 12/07/1972
| issue date = 12/07/1972
| title = Responds to 721113 Ltr.Notifies That Implementation of Shift Sizes Proceeding Per Deyoung 720815 Ltr
| title = Responds to .Notifies That Implementation of Shift Sizes Proceeding Per Deyoung
| author name = Thies A
| author name = Thies A
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7912100500
| document report number = NUDOCS 7912100500
| title reference date = 11-13-1972
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:b '' . t W       bilt* h*e                                   '-
{{#Wiki_filter:b ''. t W bilt* h*e L.
L.
DUKE POWER COMPANY POWER EUILDINO 4aa Sourn Caumen SrazzT, CnAn n.
DUKE POWER COMPANY POWER EUILDINO 4aa Sourn Caumen SrazzT, CnAn                         n.
~
                                                              -                            ~
.s e
                                                              .s
A r THits
                                                            .#              e                     $
-\\
A r THits                                         -\           2/.                 .                  P. G. Box a17e s.,, on     enessoanT                                   V           4 .',   *
2/.
            .o Tmamensissio%                                                    #*
s.,, on enessoanT V
Paooucteow h#''                       .&
4.',
December 7, 1972                             ej       #4 2 ..
P. G. Box a17e h#''
Paooucteow
.o Tmamensissio%
December 7, 1972 ej
#4 2..
If g s
If g s
1 g'.'                             x
1 g'.'
                                                                                                          -                          i s                                   si A '. 8           '
i x
Mr. John F. O' Leary Director of Licensing U. S. Atomic Energy Commission Washington, D. C.         20545 Re: Ocone Nuclea                 on Docket Nos.       269, -270, -287
s si A '. 8 Mr. John F. O' Leary Director of Licensing U. S. Atomic Energy Commission Washington, D. C.
20545 Re: Ocone Nuclea on Docket Nos.
269, -270, -287


==Dear Mr. O' Leary:==
==Dear Mr. O' Leary:==
This refers to your letter of November 13, 1972 concerning the minimum shift crew size for multiple units at Oconee Nuclear Station. For the initial operation of Oconee, we are proceeding to implement the shift sizes in accordance with R. C. DeYoung's letter of August 15, 1972. However, we remain convinced that these requirements are in excess of an optimum shift size.
This refers to your letter of November 13, 1972 concerning the minimum shift crew size for multiple units at Oconee Nuclear Station. For the initial operation of Oconee, we are proceeding to implement the shift sizes in accordance with R. C. DeYoung's letter of August 15, 1972. However, we remain convinced that these requirements are in excess of an optimum shift size.
After we have obtained sufficient operating experience at Oconee to adequately demonstrate that your required shift sizes are excessive, we will present this information to members of your staff.
After we have obtained sufficient operating experience at Oconee to adequately demonstrate that your required shift sizes are excessive, we will present this information to members of your staff.
Sincerely, A. C. Thies ACT:vr s'd b
Sincerely, A. C. Thies ACT:vr s'd b
                                                                                                -  . -        4 c_           , - -                  ,
4 c_
i
i
                                                                                                    's                         nTSS
's nTSS N
_      \ 9' N    r_ .        ,,
r_.
7912100 NO                              g}}
\\ 9' NO g
7912100}}

Latest revision as of 22:04, 1 January 2025

Responds to .Notifies That Implementation of Shift Sizes Proceeding Per Deyoung
ML19317D732
Person / Time
Site: Oconee  
Issue date: 12/07/1972
From: Thies A
DUKE POWER CO.
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912100500
Download: ML19317D732 (1)


Text

b . t W bilt* h*e L.

DUKE POWER COMPANY POWER EUILDINO 4aa Sourn Caumen SrazzT, CnAn n.

~

.s e

A r THits

-\\

2/.

s.,, on enessoanT V

4.',

P. G. Box a17e h#

Paooucteow

.o Tmamensissio%

December 7, 1972 ej

  1. 4 2..

If g s

1 g'.'

i x

s si A '. 8 Mr. John F. O' Leary Director of Licensing U. S. Atomic Energy Commission Washington, D. C.

20545 Re: Ocone Nuclea on Docket Nos.

269, -270, -287

Dear Mr. O' Leary:

This refers to your letter of November 13, 1972 concerning the minimum shift crew size for multiple units at Oconee Nuclear Station. For the initial operation of Oconee, we are proceeding to implement the shift sizes in accordance with R. C. DeYoung's letter of August 15, 1972. However, we remain convinced that these requirements are in excess of an optimum shift size.

After we have obtained sufficient operating experience at Oconee to adequately demonstrate that your required shift sizes are excessive, we will present this information to members of your staff.

Sincerely, A. C. Thies ACT:vr s'd b

4 c_

i

's nTSS N

r_.

\\ 9' NO g

7912100