ML19317E651: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:c.,
{{#Wiki_filter:c.,
U                                                                 "
U oNIT Ocon n Unit 3 DATE 8/10/77 l
      ,  ,.                                                                  oNIT Ocon n Unit 3 DATE 8/10/77 l
DOCKET NO.
DOCKET NO. 50-287 PREPARED 3Y     J. A. Reavis OPERATING STATUS
50-287 PREPARED 3Y J.
: 1. REPORTING PERIOD:       July 1             THROUGH       July 31, 1977 GROSS HOURS IN REPORTING PERIOD:             744.00
A. Reavis OPERATING STATUS 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net) :       860
REPORTING PERIOD:
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
July 1 THROUGH July 31, 1977 GROSS HOURS IN REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION (IF ANY)
744.00 2.
This Month       Year to Date     Cumulative
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net) :
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                   468.33           4170.40           17573.10
860 3.
: 6. REACTOR RESERVE SHUTDOWN HOURS             -                -
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
: 7. HOURS GENERATOR ON-LINE                   451.72           4127.43           17150.93
REASONS FOR RESTRICTION (IF ANY)
: 8. UNIT RESERVE SHUTDOWN HOURS               -                -
This Month Year to Date Cumulative 5.
: 9. GROSS THERMAL ENERGY GENERATED (MWH)1011241                   10266729         40634946
NUMBER OF HOURS THE REACTOR WAS CRITICAL 468.33 4170.40 17573.10 6.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                       349640           3576140           14015584
REACTOR RESERVE SHUTDOWN HOURS 7.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                       329750           3411526           13345168               f
HOURS GENERATOR ON-LINE 451.72 4127.43 17150.93 8.
: 12. REACTOR SERVICE FACTOR                     ,62 4 2            81.98            76.35
UNIT RESERVE SHUTDOWN HOURS 9.
: 13. REACTOR AVAIIABILITY FACTOR                 60.72             81.24             76.67
GROSS THERMAL ENERGY GENERATED (MWH)1011241 10266729 40634946 10.
: 14. UNIT SERVICE FACTOR                         60.72             81.14             74.52                 ,
GROSS ELECTRICAL ENERGY GENERATED (MWH) 349640 3576140 14015584 f
: 15. UNIT AVAILABILITY FACTOR                   60.72             81.14             74.52
11.
: 16. UNIT CAPACITY FAC"0R (Using Net             51.54             77.98             67.42 Capability)
NET ELECTRICAL ENERGY GENERATED (MWH) 329750 3411526 13345168 2
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                         49.97             75.61             65.37   _
81.98 76.35 12.
: 18. UNIT FORCED OUTAGE RATE                     39.28           18.86             15.20
REACTOR SERVICE FACTOR
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
,62 4 13.
Refueling - October 30. 1977 - 6 weeks
REACTOR AVAIIABILITY FACTOR 60.72 81.24 76.67 14.
: 20. IF SHUTDOWN AT END OF REPORT PERIC.'. ESTIMATED DATE OF STARTUP:
UNIT SERVICE FACTOR 60.72 81.14 74.52 15.
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAl' X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABIL11Y FACTOR = Hot!HS REACTOR WAS AVAILARI.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR   = H0lTS CD:ERATOR ON 1.1NE           0 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS A*.'A11 ALLE TO CD ERATE X 100 HOURS IN REPOKfING ERIOD UNIT CAPACITY FACTOR   = NET ELECTRICAL POWER GENERATED                           v
UNIT AVAILABILITY FACTOR 60.72 81.14 74.52 16.
[HetCapabilityorDesinn(Mwe-Net 71         toUnsINRt.P6hT"t:d00 UNIT FORCED OUTACE RATE r    P D OUTAGE HOURS HOURS GEliERATOR ON LII;E + FORCED OUTAGE HOURS
UNIT CAPACITY FAC"0R (Using Net 51.54 77.98 67.42 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 49.97 75.61 65.37 18.
UNIT FORCED OUTAGE RATE 39.28 18.86 15.20 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
Refueling - October 30. 1977 - 6 weeks 20.
IF SHUTDOWN AT END OF REPORT PERIC.'. ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAl' X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABIL11Y FACTOR = Hot!HS REACTOR WAS AVAILARI.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR
= H0lTS CD:ERATOR ON 1.1NE 0
HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS A*.'A11 ALLE TO CD ERATE X 100 HOURS IN REPOKfING ERIOD UNIT CAPACITY FACTOR
= NET ELECTRICAL POWER GENERATED toUnsINRt.P6hT"t:d00 v
[HetCapabilityorDesinn(Mwe-Net 71
[
[
L
UNIT FORCED OUTACE RATE r P D OUTAGE HOURS HOURS GEliERATOR ON LII;E + FORCED OUTAGE HOURS L


1
1
                                                                                                                      \
\\
j 1
j 1
DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 8/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH         Juiv, 1977 AVERAGE DAILY POWER LEVEL                         AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY                 (MWe-net) 1 842                           17 2                   856                           18 851                                               -
DOCKET NO. 50-287 UNIT oconee Unit 3 8/10/77 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH Juiv, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
3                                                  39 4                   850                                                -
DAY (MWe-net) 1 842 17 2
20 858                           g 5
856 18 851 3
6                   858                           22 744                                                 -
39 850 4
7                                                  23 8                   778                                                ~
20 858 5
24 806                                                 -
g 6
10                     811                           26 11                                                   27         __...
858 22 744 7
12                     825                           28                   468 836                                                 468 13                                                   29 34                     720                           30                   474 15
23 778 8
__              31 606 16                                   __
24
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
~
806 10 811 26 11 27 12 825 28 468 836 468 13 29 34 720 30 474 606 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
Dese figures w"! be used to plot a graph for each reporting month. Note that by usins maximum dependable enr: , for the net electrical rating of the unit. there may be .n easions when the daily average power .cv el exceeds the 100'1 line (or the restricted power lesel hne). In such cases. the a.cr:: e daily unit power output sheet should be footnoted to explain the apparent anomaly.
Dese figures w"! be used to plot a graph for each reporting month. Note that by usins maximum dependable enr:
, for the net electrical rating of the unit. there may be.n easions when the daily average power.c el exceeds the 100'1 line (or the restricted power lesel hne). In such cases. the v
a.cr:: e daily unit power output sheet should be footnoted to explain the apparent anomaly.
I t
I t


DdCKET NO. _"0-287 UNIT SHUTDOWNS                                 UNil NAMii oconee Unit 3          .
DdCKET NO. _"0-287 oconee Unit 3 UNIT SHUTDOWNS UNil NAMii DATli REPORT MONTil July, 1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATli REPORT MONTil       July, 1977 TYPE                                 METHOD OF F-FORCED   DURATION                 SHUTTING DOWN NO. DATE   S SCHEDULED   (HOURS) REASON (1)       THE REACTOR (2)           CORRECTIVE ACTIONS / COMMENTS 292.28     A                 1             Tube Icak on "3B" once-through steam 8  77-07-1o    F generator.
DATE S SCHEDULED (HOURS)
8 (1) REASON                         (2) METHOD A -EQUIPMENT F ALLURE (EXPLAIN)     l-MANUAL B- M AINT. OR TEST.               2-MANUAL           3
REASON (1)
                                                                                                        ~
THE REACTOR (2)
C- REI UELING                         SCRAM D-REGULA10RY RESTRICTION           3- AUTOM ATIC E-OPER ATOR TRAINING AND             SCRAM LICENSE EXAMIN ATION         4-Other F- ADMINISTR ATIVE G-OPERATION AL ERROR ILXPLAIN)
CORRECTIVE ACTIONS / COMMENTS 8
77-07-1o F
292.28 A
1 Tube Icak on "3B" once-through steam generator.
8 (1) REASON (2) METHOD A -EQUIPMENT F ALLURE (EXPLAIN) l-MANUAL B-M AINT. OR TEST.
2-MANUAL 3
C-REI UELING
~
SCRAM D-REGULA10RY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMIN ATION 4-Other F-ADMINISTR ATIVE G-OPERATION AL ERROR ILXPLAIN)
II-OillLR IEXPLAIN) l CUMMARY:
II-OillLR IEXPLAIN) l CUMMARY:
One major outage this month.}}
One major outage this month.}}

Latest revision as of 21:55, 1 January 2025

Monthly Operating Rept for Jul 1977
ML19317E651
Person / Time
Site: Oconee  
Issue date: 08/10/1977
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML19317E639 List:
References
NUDOCS 7912180831
Download: ML19317E651 (3)


Text

c.,

U oNIT Ocon n Unit 3 DATE 8/10/77 l

DOCKET NO.

50-287 PREPARED 3Y J.

A. Reavis OPERATING STATUS 1.

REPORTING PERIOD:

July 1 THROUGH July 31, 1977 GROSS HOURS IN REPORTING PERIOD:

744.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net) :

860 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 468.33 4170.40 17573.10 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 451.72 4127.43 17150.93 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1011241 10266729 40634946 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 349640 3576140 14015584 f

11.

NET ELECTRICAL ENERGY GENERATED (MWH) 329750 3411526 13345168 2

81.98 76.35 12.

REACTOR SERVICE FACTOR

,62 4 13.

REACTOR AVAIIABILITY FACTOR 60.72 81.24 76.67 14.

UNIT SERVICE FACTOR 60.72 81.14 74.52 15.

UNIT AVAILABILITY FACTOR 60.72 81.14 74.52 16.

UNIT CAPACITY FAC"0R (Using Net 51.54 77.98 67.42 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 49.97 75.61 65.37 18.

UNIT FORCED OUTAGE RATE 39.28 18.86 15.20 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - October 30. 1977 - 6 weeks 20.

IF SHUTDOWN AT END OF REPORT PERIC.'. ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAl' X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABIL11Y FACTOR = Hot!HS REACTOR WAS AVAILARI.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR

= H0lTS CD:ERATOR ON 1.1NE 0

HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS A*.'A11 ALLE TO CD ERATE X 100 HOURS IN REPOKfING ERIOD UNIT CAPACITY FACTOR

= NET ELECTRICAL POWER GENERATED toUnsINRt.P6hT"t:d00 v

[HetCapabilityorDesinn(Mwe-Net 71

[

UNIT FORCED OUTACE RATE r P D OUTAGE HOURS HOURS GEliERATOR ON LII;E + FORCED OUTAGE HOURS L

1

\\

j 1

DOCKET NO. 50-287 UNIT oconee Unit 3 8/10/77 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH Juiv, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 842 17 2

856 18 851 3

39 850 4

20 858 5

g 6

858 22 744 7

23 778 8

24

~

806 10 811 26 11 27 12 825 28 468 836 468 13 29 34 720 30 474 606 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.

Compute to the nearest whole megawatt.

Dese figures w"! be used to plot a graph for each reporting month. Note that by usins maximum dependable enr:

, for the net electrical rating of the unit. there may be.n easions when the daily average power.c el exceeds the 100'1 line (or the restricted power lesel hne). In such cases. the v

a.cr:: e daily unit power output sheet should be footnoted to explain the apparent anomaly.

I t

DdCKET NO. _"0-287 oconee Unit 3 UNIT SHUTDOWNS UNil NAMii DATli REPORT MONTil July, 1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 8

77-07-1o F

292.28 A

1 Tube Icak on "3B" once-through steam generator.

8 (1) REASON (2) METHOD A -EQUIPMENT F ALLURE (EXPLAIN) l-MANUAL B-M AINT. OR TEST.

2-MANUAL 3

C-REI UELING

~

SCRAM D-REGULA10RY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMIN ATION 4-Other F-ADMINISTR ATIVE G-OPERATION AL ERROR ILXPLAIN)

II-OillLR IEXPLAIN) l CUMMARY:

One major outage this month.