h                                                     orERTTING DATA REPORT 50-336 DOCKETDtTE JuTy 4, _980 NO.              1 COi!PLETED BY G.H. Howlett T ELEPliONE (203)447-'1791 X364 OPERATING ST A TUS
h orERTTING DATA REPORT 50-336 DOCKET NO. JuTy 4, _980 1
: 1. Unit Name:       Millsto_ne 2                                     Notes
DtTE COi!PLETED BY G.H. Howlett T ELEPliONE (203)447-'1791 X364 OPERATING ST A TUS
: 1. Unit Name:
Millsto_ne 2 Notes
* Items 21 & 22,
* Items 21 & 22,
: 2. Reportin; Period:     June 1980                                   cumulative are computed 2700                          using a weighted average.
: 2. Reportin; Period:
June 1980 cumulative are computed
: 3. Licensed Thermal Pov.er t.stwrl:
: 3. Licensed Thermal Pov.er t.stwrl:
: 4. Namep!.ite Rating (Gross AlWe):       909
2700 using a weighted average.
: 4. Namep!.ite Rating (Gross AlWe):
909
: 5. De>i;n Electrical Rating (Net 3the): 870
: 5. De>i;n Electrical Rating (Net 3the): 870
: 6. Stasimum Dependable Capacity (Gross 31We): 895
: 6. Stasimum Dependable Capacity (Gross 31We): 895
: 7. \ 1asimum Dependable Capacity (Net 31We):     864
\\
864 7.
1asimum Dependable Capacity (Net 31We):
: 5. If Charps Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise P.easons:
: 5. If Charps Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise P.easons:
one
one
: 9. Power Lesel To which Restricted.If AngetWep:     3:
: 9. Power Lesel To which Restricted.If Anget 3:
Wep:
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This 31onth       Yr..to-Date         Cumulative           .,
This 31onth Yr..to-Date Cumulative
: 11. Ifours in Reporting Period                               720               4,367             39,575
: 11. Ifours in Reporting Period 720 4,367 39,575
: 12. Number Of Hours Reactor Was Critical                     178               3,182.6 _         28,261./
: 12. Number Of Hours Reactor Was Critical 178 3,182.6 _
: 13. Reactor Resene Shutdown Ifours                           0                     0               2,072.4
28,261./
: 14. Hours Generator On.Line                                 163                                   26,916.9 3.096.7
: 13. Reactor Resene Shutdown Ifours 0
: 15. Unit Resene Shutdown Hours                               0                     0                 336.4
0 2,072.4
: 16. Gross Thermal Energy Generated (.\iWil)           404,890             8,161,936           65,860,564           .
: 14. Hours Generator On.Line 163 3.096.7 26,916.9
: 17. Gross Electrical Energy Generated (.\lWH;         134,199             2,671,b//           21,zb6,z22
: 15. Unit Resene Shutdown Hours 0
: 18. Net Electrical Energy Generated (31WH)           125,626             2,564,753           20,345,011
0 336.4
: 19. Unit Senice Factor                                       22.6                   70.9               68.0
: 16. Gross Thermal Energy Generated (.\\iWil) 404,890 8,161,936 65,860,564
: 20. Unit Availability Factor                                   22.6                   70.9               68.9
: 17. Gross Electrical Energy Generated (.\\lWH; 134,199 2,671,b//
: 21. Unit Capacity Factor (Using Af DC Neti                     20.2                 68 1
21,zb6,z22
: 18. Net Electrical Energy Generated (31WH) 125,626 2,564,753 20,345,011
: 19. Unit Senice Factor 22.6 70.9 68.0
: 20. Unit Availability Factor 22.6 70.9 68.9
: 21. Unit Capacity Factor (Using Af DC Neti 20.2 68 1
* 62.5
* 62.5
: 22. Unit Capacity Factor (Using DER Net)                       20.1                 67.5
: 22. Unit Capacity Factor (Using DER Net) 20.1 67.5
* 61.3
* 61.3
: 23. Unit Forced Outage Rate                                   77.4                 29 1                 24 D
: 23. Unit Forced Outage Rate 77.4 29 1 24 D
: 24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Eachi:
: 24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Eachi:
Refueling, August 2, 1980, 9 Weeks
Refueling, August 2, 1980, 9 Weeks
: 25. If Shut Down A: End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down A: End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status iPrior to Commercial Operation 1:                   Forecast           Achiesed INITI AL CRITICALITY                                   N/A                 N/A INITI AL ELECTRICI 'Y                                   N/A                 N/A CO\!\!ERCI A L OPER A TION                             N/A                 N/A p4:~ 7 )
: 26. Units In Test Status iPrior to Commercial Operation 1:
Forecast Achiesed INITI AL CRITICALITY N/A N/A INITI AL ELECTRICI 'Y N/A N/A CO\\!\\!ERCI A L OPER A TION N/A N/A p4:~ 7 )
80 07210395 ~
80 07210395 ~


            . . +'
.. +'
  's .
's AVER AGE DAILY L" NIT POhER LEVEL DOCKET NO.
AVER AGE DAILY L" NIT POhER LEVEL DOCKET NO. 50-336
50-336 Millstone 2 UNIT DATE 7/4/80 COMPLETED BY G.H. Howlett TELEPHONE (203)447-1791X364
                                                                                            .          UNIT    Millstone 2 DATE     7/4/80 COMPLETED BY       G.H. Howlett TELEPHONE     (203)447-1791X364
-MONTH June 1980 DAY
                    -MONTH       June 1980 DAY     . AVERAGE DAILY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe Net)                                           iMWe Net) 0-     -(-5)                                             0     (-4)
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) 0-
                            '                                                    37 2             0       (-5)-                               ig 0     (-5) 3             0       (-5)                               39 0     (-5) 4             0       (-5)                               ,o          0     (-5) 3             0       (-5)                               ;,
-(-5) 0
0    (-6) 6             0       (-5)                               22 0     (-13) 7 0-       (-5)                                             0     (-26) 23                                                   -
(-4) 37 2
3            -0       (-5)                               24 445 9             0       (-5)                               25           722 to             0       -(-4)                               '6 758 11 0       (-5)                               ,,
0
861
(-5)-
                                                                                  ~'
0
0'       (-5)                                             864 12 28
(-5) ig 3
                    . 13'             0       (-5)'                             ,,            864 14 0       (-5)                               3,.
0
863-
(-5) 0
                  - 15               0       (-5)                               3,             _
(-5) 39 4
                    .16 0       (-5)
0
                ~ INSTRUCTIONS On this format. list the aserage daily unit power leselin MWe Net for cach day in the repurr;n; m.> nth. C.in; pare to the nearest whole megawait.
(-5) 0
                                                                                                                      -~(9177 -
(-5)
l l
,o 3
                                                                                                                                        'I 1
0
                                                                        . . _ . .                                                      __j
(-5) 0
(-6) 6 0
(-5) 0
(-13) 22 0-(-5) 0
(-26) 7 23 3
-0
(-5) 445 24 9
0
(-5) 722 25 to 0
-(-4) 758
'6 0
(-5) 861 11
~'
0'
(-5) 864 12 28
. 13' 0
(-5)'
864 0
(-5) 863-14 3,.
- 15 0
(-5) 3,
.16 0
(-5)
~ INSTRUCTIONS On this format. list the aserage daily unit power leselin MWe Net for cach day in the repurr;n; m.> nth. C.in; pare to the nearest whole megawait.
-~(9177 -
l
'I
__j


t Docket- No. 50-336 Page 1 'of   1                                                                         Date       July 4, 1980 Unit Nane Millstone 2           -
t Docket-No. 50-336 Page 1 'of 1
Completed By G.H. Howlett-Telephone (203) 447-1791 X364
Date July 4, 1980 Unit Nane Millstone 2 Completed By G.H. Howlett-Telephone (203) 447-1791 X364 CORRECTIVE MAINTENANCE  
.                                  CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT Report Month   May 1980 DATE                     SYSTEM                       COMPONENT                               MAINTENANCE ACfl0N 4/11/80       High Pressure Safety     HPSI Pump, P-41B                   Realigned pump to motor.
FOR SAFETY RELATED EQUIPMENT Report Month May 1980 DATE SYSTEM COMPONENT MAINTENANCE ACfl0N 4/11/80 High Pressure Safety HPSI Pump, P-41B Realigned pump to motor.
Injection 5/1/80         Diesel Generator         D/G H-7A Starting Air Flask       Rebuilt leaking valves.
Injection 5/1/80 Diesel Generator D/G H-7A Starting Air Flask Rebuilt leaking valves.
Isclation Valves, 2-D/G-34A & 34B 5/12/80       Reactor Coolant           Reactor Coolant Pump P-40A         Replaced pump seal cartridge.
Isclation Valves, 2-D/G-34A & 34B 5/12/80 Reactor Coolant Reactor Coolant Pump P-40A Replaced pump seal cartridge.
5/15/30       Reactor Coolant           Reictor Coolant Pump, P-408       Replaced pump seal cartridge.
5/15/30 Reactor Coolant Reictor Coolant Pump, P-408 Replaced pump seal cartridge.
5/16/80       Reactor Coolant           Reactor vent to Enclosure           Rebuilt valve.
5/16/80 Reactor Coolant Reactor vent to Enclosure Rebuilt valve.
Building Filtration System Isolation, 2-RC-039 5/16/80       Reactor Coolant           Pressurizer Relief Line vent       Rebuilt valve.
Building Filtration System Isolation, 2-RC-039 5/16/80 Reactor Coolant Pressurizer Relief Line vent Rebuilt valve.
isolation, 2-RC-021 5/19/80       Safety Injection         HPSI Pump P-41B Discharge Drain     Repaired leaking valve.
isolation, 2-RC-021 5/19/80 Safety Injection HPSI Pump P-41B Discharge Drain Repaired leaking valve.
Valve, 2-SI-026 5/28/80       Safety Injection         HPSI Pump P-41A casing drain       Replace valve.
Valve, 2-SI-026 5/28/80 Safety Injection HPSI Pump P-41A casing drain Replace valve.
isolation valve, 2-SI-032 5/28/80       Chemical & Volume         RWST to Charging Pump Suction       Rebuilt valve.
isolation valve, 2-SI-032 5/28/80 Chemical & Volume RWST to Charging Pump Suction Rebuilt valve.
Control                   Check Valve, 2-CH-199 r
Control Check Valve, 2-CH-199 r


a _. _ . . . . _ _ _ -                                                      ..g-s DOCKET NO. 50-336 UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME ' MilIstone 2 DATE July 4,1980 COMPLETED BY     G.H. Howlett REPORT MONTil June 1980                     TELEPHONE      (2UJ} 447-1791X364 n.
a _.
                                        ,      .3 g 3     Y         Licensee     ,E r,   n.                 Cauw & Corrective No.         DJie       g     3g     s   2s5         Event       gg   gO3                      Action to
..g-s 50-336 DOCKET NO.
* 5   jg         Report a     mO                       Prevent Recurrence
UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME ' MilIstone 2 DATE July 4,1980 COMPLETED BY G.H. Howlett REPORT MONTil June 1980 (2UJ} 447-1791X364 TELEPHONE n.
                                                $5                                        g 6
.3 g 3
9        800508     F       557.0 .D     1                                   Continuation from previous months outage for seismic reevaluation and modification of pipe. supports per I&C Bulletin 79-02.
Y Licensee
,E r, n.
Cauw & Corrective 3
Action to No.
DJie g
3g s
2s5 Event gg gO
$5 5
jg Report a mO Prevent Recurrence g
6 9
800508 F
557.0
.D 1
Continuation from previous months outage for seismic reevaluation and modification of pipe. supports per I&C Bulletin 79-02.
i l
i l
Summary: The unit was shut down through the 22nd, went critical on the 23rd and returned on line on the P4th, with resultant full power operations from the 27th through the 30th.
Summary: The unit was shut down through the 22nd, went critical on the 23rd and returned on line on the P4th, with resultant full power operations from the 27th through the 30th.
I'8/77)
I'8/77)


4
4 Dockst Ns.
  --**'                                                          Dockst Ns. 50-336 Date:     July 9, 1980 Completed By: G.H. Howlett III Telephone:   203/447-1971 X364 REFUELING INFORMATION REQUEST
50-336 Date:
: 1. Name of facility:   Millstone 2
July 9, 1980 Completed By: G.H. Howlett III Telephone:
: 2. Scheduled date for next refueling shutdown: August 2, 1980
203/447-1971 X364 REFUELING INFORMATION REQUEST 1.
: 3. Schedule date for restart following refueling: September 28, 1980
Name of facility:
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Millstone 2 2.
Scheduled date for next refueling shutdown: August 2, 1980 3.
Schedule date for restart following refueling: September 28, 1980 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Technical Specification changes will be necessary as a result of
Technical Specification changes will be necessary as a result of
          .the change in fuel and safety analysis supplier.
.the change in fuel and safety analysis supplier.
: 5. Scheduled date(s) for submitting licensing action and supporting information:
5.
Scheduled date(s) for submitting licensing action and supporting information:
The schedule for submitting license action is as follows:
The schedule for submitting license action is as follows:
Basic Safety Report       3-6-80 Additional licensing documentation in support of cycle four (4) operation will be provided in response to Fuclear Regulatory Commission staff questions.                                                         ~
Basic Safety Report 3-6-80 Additional licensing documentation in support of cycle four (4) operation will be provided in response to Fuclear Regulatory Commission staff questions.
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
~
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Cycle 4 will be unique in that it will be the first s are the fuel and safety analysis will be supplied by Westinghouse.
Cycle 4 will be unique in that it will be the first s are the fuel and safety analysis will be supplied by Westinghouse.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
7.
(a)   In Core:       217                       (bl       144
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
: 8. The present licensed spent fuel pool st.,.' age capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
(a)
667
In Core:
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present ifcensed capacity:
217 (bl 144 8.
                .1985, Spent Fuel Pool, full core off load capability is reached.
The present licensed spent fuel pool st.,.' age capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present ifcensed capacity:
.1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.}}
1987, Core Full, Spent Fuel Pool contains 648 bundles.}}

Latest revision as of 03:08, 1 January 2025

Monthly Operating Rept for June 1980
ML19320D445
Person / Time
Site: Millstone 
Issue date: 07/02/1980
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19320D444 List:
References
NUDOCS 8007210375
Download: ML19320D445 (5)


Text

.

h orERTTING DATA REPORT 50-336 DOCKET NO. JuTy 4, _980 1

DtTE COi!PLETED BY G.H. Howlett T ELEPliONE (203)447-'1791 X364 OPERATING ST A TUS

1. Unit Name:

Millsto_ne 2 Notes

  • Items 21 & 22,
2. Reportin; Period:

June 1980 cumulative are computed

3. Licensed Thermal Pov.er t.stwrl:

2700 using a weighted average.

4. Namep!.ite Rating (Gross AlWe):

909

5. De>i;n Electrical Rating (Net 3the): 870
6. Stasimum Dependable Capacity (Gross 31We): 895

\\

864 7.

1asimum Dependable Capacity (Net 31We):

5. If Charps Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise P.easons:

one

9. Power Lesel To which Restricted.If Anget 3:

Wep:

10. Reasons For Restrictions. If Any:

This 31onth Yr..to-Date Cumulative

11. Ifours in Reporting Period 720 4,367 39,575
12. Number Of Hours Reactor Was Critical 178 3,182.6 _

28,261./

13. Reactor Resene Shutdown Ifours 0

0 2,072.4

14. Hours Generator On.Line 163 3.096.7 26,916.9
15. Unit Resene Shutdown Hours 0

0 336.4

16. Gross Thermal Energy Generated (.\\iWil) 404,890 8,161,936 65,860,564
17. Gross Electrical Energy Generated (.\\lWH; 134,199 2,671,b//

21,zb6,z22

18. Net Electrical Energy Generated (31WH) 125,626 2,564,753 20,345,011
19. Unit Senice Factor 22.6 70.9 68.0
20. Unit Availability Factor 22.6 70.9 68.9
21. Unit Capacity Factor (Using Af DC Neti 20.2 68 1
  • 62.5
22. Unit Capacity Factor (Using DER Net) 20.1 67.5
  • 61.3
23. Unit Forced Outage Rate 77.4 29 1 24 D
24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Eachi:

Refueling, August 2, 1980, 9 Weeks

25. If Shut Down A: End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operation 1:

Forecast Achiesed INITI AL CRITICALITY N/A N/A INITI AL ELECTRICI 'Y N/A N/A CO\\!\\!ERCI A L OPER A TION N/A N/A p4:~ 7 )

80 07210395 ~

.. +'

's AVER AGE DAILY L" NIT POhER LEVEL DOCKET NO.

50-336 Millstone 2 UNIT DATE 7/4/80 COMPLETED BY G.H. Howlett TELEPHONE (203)447-1791X364

-MONTH June 1980 DAY

. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) 0-

-(-5) 0

(-4) 37 2

0

(-5)-

0

(-5) ig 3

0

(-5) 0

(-5) 39 4

0

(-5) 0

(-5)

,o 3

0

(-5) 0

(-6) 6 0

(-5) 0

(-13) 22 0-(-5) 0

(-26) 7 23 3

-0

(-5) 445 24 9

0

(-5) 722 25 to 0

-(-4) 758

'6 0

(-5) 861 11

~'

0'

(-5) 864 12 28

. 13' 0

(-5)'

864 0

(-5) 863-14 3,.

- 15 0

(-5) 3,

.16 0

(-5)

~ INSTRUCTIONS On this format. list the aserage daily unit power leselin MWe Net for cach day in the repurr;n; m.> nth. C.in; pare to the nearest whole megawait.

-~(9177 -

l

'I

__j

t Docket-No. 50-336 Page 1 'of 1

Date July 4, 1980 Unit Nane Millstone 2 Completed By G.H. Howlett-Telephone (203) 447-1791 X364 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month May 1980 DATE SYSTEM COMPONENT MAINTENANCE ACfl0N 4/11/80 High Pressure Safety HPSI Pump, P-41B Realigned pump to motor.

Injection 5/1/80 Diesel Generator D/G H-7A Starting Air Flask Rebuilt leaking valves.

Isclation Valves, 2-D/G-34A & 34B 5/12/80 Reactor Coolant Reactor Coolant Pump P-40A Replaced pump seal cartridge.

5/15/30 Reactor Coolant Reictor Coolant Pump, P-408 Replaced pump seal cartridge.

5/16/80 Reactor Coolant Reactor vent to Enclosure Rebuilt valve.

Building Filtration System Isolation, 2-RC-039 5/16/80 Reactor Coolant Pressurizer Relief Line vent Rebuilt valve.

isolation, 2-RC-021 5/19/80 Safety Injection HPSI Pump P-41B Discharge Drain Repaired leaking valve.

Valve, 2-SI-026 5/28/80 Safety Injection HPSI Pump P-41A casing drain Replace valve.

isolation valve, 2-SI-032 5/28/80 Chemical & Volume RWST to Charging Pump Suction Rebuilt valve.

Control Check Valve, 2-CH-199 r

a _.

..g-s 50-336 DOCKET NO.

UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME ' MilIstone 2 DATE July 4,1980 COMPLETED BY G.H. Howlett REPORT MONTil June 1980 (2UJ} 447-1791X364 TELEPHONE n.

.3 g 3

Y Licensee

,E r, n.

Cauw & Corrective 3

Action to No.

DJie g

3g s

2s5 Event gg gO

$5 5

jg Report a mO Prevent Recurrence g

6 9

800508 F

557.0

.D 1

Continuation from previous months outage for seismic reevaluation and modification of pipe. supports per I&C Bulletin 79-02.

i l

Summary: The unit was shut down through the 22nd, went critical on the 23rd and returned on line on the P4th, with resultant full power operations from the 27th through the 30th.

I'8/77)

4 Dockst Ns.

50-336 Date:

July 9, 1980 Completed By: G.H. Howlett III Telephone:

203/447-1971 X364 REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown: August 2, 1980 3.

Schedule date for restart following refueling: September 28, 1980 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Technical Specification changes will be necessary as a result of

.the change in fuel and safety analysis supplier.

5.

Scheduled date(s) for submitting licensing action and supporting information:

The schedule for submitting license action is as follows:

Basic Safety Report 3-6-80 Additional licensing documentation in support of cycle four (4) operation will be provided in response to Fuclear Regulatory Commission staff questions.

~

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Cycle 4 will be unique in that it will be the first s are the fuel and safety analysis will be supplied by Westinghouse.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

In Core:

217 (bl 144 8.

The present licensed spent fuel pool st.,.' age capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present ifcensed capacity:

.1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.