==Dear Mr. Eisenhut:==
==Dear Mr. Eisenhut:==
As part of our effort in planning major outages at the Browns Ferry Nuclear Plant, we have evaluated implementation of major modifications over the next two years. In this evaluation we considered modifications to the primary containment torus, as identified by the Mark I Containment Program, and implementation of the TMI Lessons Learned requirements concurrent with rautio; inspections and outage work. Based on this evaluation, we deveL jd a schedule for implementation of these major modifications which is the most aggressive one possible consistent with our refueling outage schedule, manpower available (including supervision), and power system supply requirements.
As part of our effort in planning major outages at the Browns Ferry Nuclear Plant, we have evaluated implementation of major modifications over the next two years. In this evaluation we considered modifications to the primary containment torus, as identified by the Mark I Containment Program, and implementation of the TMI Lessons Learned requirements concurrent with rautio; inspections and outage work. Based on this evaluation, we deveL jd a schedule for implementation of these major modifications which is the most aggressive one possible consistent with our refueling outage schedule, manpower available (including supervision), and power system supply requirements.
Enclosed is our revised schedule for implementation of the Mark I torus modifications (Enclosure 1). We recognize that this schedule does not meet the NRC deadline as we now understand it, but still maintain that it is the most aggressive one possible.                                               ;
Enclosed is our revised schedule for implementation of the Mark I torus modifications (Enclosure 1).
We request a meeting with you and your staff to discuss our schedule and             -
We recognize that this schedule does not meet the NRC deadline as we now understand it, but still maintain that it is the most aggressive one possible.
explain the problems and complications involved in scheduling and performing these major modifications. The primary objective of our meeting would be to present to you and your staff an overview of the tremendcus impacts involved in implementing these maf or modifications. These NRC requirements are originating in different NRC livisions from different programs (Mark I, TMI, ATWS, etc.) and are being r,uperimposed on each other (i.e. , implementation is requested over the same period of time). This is creating significant problems for TVA. We will present reasons why we believe the planned                   i schedule for modifications cannot realistically be shortened. We also                 :
We request a meeting with you and your staff to discuss our schedule and explain the problems and complications involved in scheduling and performing these major modifications. The primary objective of our meeting would be to present to you and your staff an overview of the tremendcus impacts involved in implementing these maf or modifications. These NRC requirements are originating in different NRC livisions from different programs (Mark I, TMI, ATWS, etc.) and are being r,uperimposed on each other (i.e., implementation is requested over the same period of time). This is creating significant problems for TVA. We will present reasons why we believe the planned i
plan to discuss those items from NUREG-0578 which will not be implemented by January 1, 1981. A proposed agenda is enclosed (Enclosure 2).
schedule for modifications cannot realistically be shortened. We also plan to discuss those items from NUREG-0578 which will not be implemented by January 1, 1981. A proposed agenda is enclosed (Enclosure 2).
4 W.
4 W.
                                                                                          \'
\\'
800bi90N                     An Equal Opportunity Emetoyer
800bi90N An Equal Opportunity Emetoyer


Mr. Darrell G. Eisenhut                             May 19, 1980
. Mr. Darrell G. Eisenhut May 19, 1980 We also request a meeting with your staff to discuss our proposed design
                                                                                ~
~
We also request a meeting with your staff to discuss our proposed design of the post accident sampling facility required by NUREG-0578. We believe that our proposed design meets the requirements. However, based on the magnitude of this project, estimated completion is now scheduled for December 31, 1981.
of the post accident sampling facility required by NUREG-0578. We believe that our proposed design meets the requirements. However, based on the magnitude of this project, estimated completion is now scheduled for December 31, 1981.
Final arrangements for these meetings are being made through R. J. Clark of your staff. As discussed with Mr. Clark, we would like to have the meetings over two consecutive days, and propose May 28 and 29, 1980.
Final arrangements for these meetings are being made through R. J. Clark of your staff. As discussed with Mr. Clark, we would like to have the meetings over two consecutive days, and propose May 28 and 29, 1980.
Very truly yours, TENNESSEE VALLEY AUTHORITY 7
Very truly yours, TENNESSEE VALLEY AUTHORITY 7
                                            ,$ji}/L?LOs>,gy L. M. Mills, Manager Nuclear Regulation and Safety Enclosures i
,$ji}/L?LOs>,gy L. M. Mills, Manager Nuclear Regulation and Safety Enclosures i
l I
~l
                                                                                  ~l l


ENCLOSURE 1 TORUS MODIFICATION SCHEDULE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (DOCKET NOS. 50-259, -260, -296)                                                 _
ENCLOSURE 1 TORUS MODIFICATION SCHEDULE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (DOCKET NOS. 50-259, -260, -296)
It is now planned to perform the modifications to the torus, identified by the Mark I Containment Program, on the following schedule.
It is now planned to perform the modifications to the torus, identified by the Mark I Containment Program, on the following schedule.
Unit 1 - April 1981 Unit 3 - October 1981 Unit 2 - March 1982 4
Unit 1 - April 1981 Unit 3 - October 1981 Unit 2 - March 1982 4
Line 46: Line 44:
e
e


        .            MAY 29, 1980, 9 com.
MAY 29, 1980, 9 com.
BROWNS FERRY NUCLEAR PLANT OUTAGE AND MODIFICATION PLANNING       ENCLOSUF2 2 AGENDA
BROWNS FERRY NUCLEAR PLANT OUTAGE AND MODIFICATION PLANNING ENCLOSUF2 2 AGENDA INTRODUCTION OBJECTIVES OF THIS PRESENTATION
              . INTRODUCTION
~
                                                                ~
DISCUSSION OF MAJOR MODIFICATIONS 1.
              . OBJECTIVES OF THIS PRESENTATION
SCHEDULED MODIFICATIONS 2.
              . DISCUSSION OF MAJOR MODIFICATIONS
PLANNED REFUELING OUTAGES 3.
: 1. SCHEDULED MODIFICATIONS
GENERATOR BREAKERS 4.
: 2. PLANNED REFUELING OUTAGES
TORUS MODIFICATIONS 5.
: 3. GENERATOR BREAKERS
NUREG MODIFICATIONS INCLUDING SAMPLING BUILDING 6.
: 4. TORUS MODIFICATIONS
LLRW VOLUME REDUCTION 7.
: 5. NUREG MODIFICATIONS INCLUDING SAMPLING BUILDING
LLRW STORAGE COMMITMENT STATUS lONG-RANGE SCHEDULE WORKLOAD  
: 6. LLRW VOLUME REDUCTION
: 7. LLRW STORAGE
            . COMMITMENT STATUS
            . lONG-RANGE SCHEDULE
            . WORKLOAD  


==SUMMARY==
==SUMMARY==
 
UNDEFINED MODIFICATIONS
            . UNDEFINED MODIFICATIONS


==SUMMARY==
==SUMMARY==
e 4
e 4
e*
e*
O s
O s
f ' *}}
f
' *}}

Latest revision as of 19:58, 31 December 2024

Forwards Revised Schedule for Implementation of Mark I Primary Containment Torus Mods & Lesson Learned Task Force Requirements.Schedule Does Not Meet NRC Deadline.Requests Meeting Re Schedule & NUREG-0578.Proposed Agenda Encl
ML19323F783
Person / Time
Site: Browns Ferry  
Issue date: 05/19/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578 NUDOCS 8005290464
Download: ML19323F783 (4)


Text

' '

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II May 19, 1980 Mr. Darrell G. Eisenhut, Director Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

As part of our effort in planning major outages at the Browns Ferry Nuclear Plant, we have evaluated implementation of major modifications over the next two years. In this evaluation we considered modifications to the primary containment torus, as identified by the Mark I Containment Program, and implementation of the TMI Lessons Learned requirements concurrent with rautio; inspections and outage work. Based on this evaluation, we deveL jd a schedule for implementation of these major modifications which is the most aggressive one possible consistent with our refueling outage schedule, manpower available (including supervision), and power system supply requirements.

Enclosed is our revised schedule for implementation of the Mark I torus modifications (Enclosure 1).

We recognize that this schedule does not meet the NRC deadline as we now understand it, but still maintain that it is the most aggressive one possible.

We request a meeting with you and your staff to discuss our schedule and explain the problems and complications involved in scheduling and performing these major modifications. The primary objective of our meeting would be to present to you and your staff an overview of the tremendcus impacts involved in implementing these maf or modifications. These NRC requirements are originating in different NRC livisions from different programs (Mark I, TMI, ATWS, etc.) and are being r,uperimposed on each other (i.e., implementation is requested over the same period of time). This is creating significant problems for TVA. We will present reasons why we believe the planned i

schedule for modifications cannot realistically be shortened. We also plan to discuss those items from NUREG-0578 which will not be implemented by January 1, 1981. A proposed agenda is enclosed (Enclosure 2).

4 W.

\\'

800bi90N An Equal Opportunity Emetoyer

. Mr. Darrell G. Eisenhut May 19, 1980 We also request a meeting with your staff to discuss our proposed design

~

of the post accident sampling facility required by NUREG-0578. We believe that our proposed design meets the requirements. However, based on the magnitude of this project, estimated completion is now scheduled for December 31, 1981.

Final arrangements for these meetings are being made through R. J. Clark of your staff. As discussed with Mr. Clark, we would like to have the meetings over two consecutive days, and propose May 28 and 29, 1980.

Very truly yours, TENNESSEE VALLEY AUTHORITY 7

,$ji}/L?LOs>,gy L. M. Mills, Manager Nuclear Regulation and Safety Enclosures i

~l

ENCLOSURE 1 TORUS MODIFICATION SCHEDULE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (DOCKET NOS. 50-259, -260, -296)

It is now planned to perform the modifications to the torus, identified by the Mark I Containment Program, on the following schedule.

Unit 1 - April 1981 Unit 3 - October 1981 Unit 2 - March 1982 4

e I

e

MAY 29, 1980, 9 com.

BROWNS FERRY NUCLEAR PLANT OUTAGE AND MODIFICATION PLANNING ENCLOSUF2 2 AGENDA INTRODUCTION OBJECTIVES OF THIS PRESENTATION

~

DISCUSSION OF MAJOR MODIFICATIONS 1.

SCHEDULED MODIFICATIONS 2.

PLANNED REFUELING OUTAGES 3.

GENERATOR BREAKERS 4.

TORUS MODIFICATIONS 5.

NUREG MODIFICATIONS INCLUDING SAMPLING BUILDING 6.

LLRW VOLUME REDUCTION 7.

LLRW STORAGE COMMITMENT STATUS lONG-RANGE SCHEDULE WORKLOAD

SUMMARY

UNDEFINED MODIFICATIONS

SUMMARY

e 4

e*

O s

f

' *