ML19323H146: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19323H146
| number = ML19323H146
| issue date = 03/27/1980
| issue date = 03/27/1980
| title = Responds to NRC 800211 Ltr Re Violations Noted in IE Insp Rept 50-370/80-01.Corrective Actions:Complete Reinsp Made of Socket Weld Flanges Using Greater than Schedule 40 Pipe. All Rejected Welds Documented & Will Be Repaired
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-370/80-01.Corrective Actions:Complete Reinsp Made of Socket Weld Flanges Using Greater than Schedule 40 Pipe. All Rejected Welds Documented & Will Be Repaired
| author name = Parker W
| author name = Parker W
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8006120139
| document report number = NUDOCS 8006120139
| title reference date = 02-11-1980
| package number = ML19323H138
| package number = ML19323H138
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 18: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
O)'                                                                                     s*
O)'
DUKE POWER 7 ...,    COMPANY Powra Buttorno 422 SocTn Cnuncu SrazzT, CruntoTTE, N. C. as24a 1
s*
i; .hi' I w o ul A64 O. PA R R E R. J R.
DUKE POWER 7 COMPANY Powra Buttorno 422 SocTn Cnuncu SrazzT, CruntoTTE, N. C. as24a 1 i;.hi' I March"27, 1980 P l' 9y w o ul A64 O. PA R R E R. J R.
March"27, 1980 P l' 9y    -
Vice Patsiorav TcLtemoe.c: Anta 704 Svtans Paoouction 373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Vice Patsiorav                                                                 TcLtemoe.c: Anta 704 Svtans Paoouction                                                                                         373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303


==Subject:==
==Subject:==
Line 28: Line 28:


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
As requested by Mr. Milt Hunt and Mr. Ed Girard of your staff in a conference call held on March 18, 1980, please find attached a supplemental response to Item A of the subject Inspection Report.
As requested by Mr. Milt Hunt and Mr. Ed Girard of your staff in a conference call held on March 18, 1980, please find attached a supplemental response to Item A of the subject Inspection Report.
Duke Power Company does not consider any information containel in IE Inspection Report No. 50-370/80-01 to be proprietary.
Duke Power Company does not consider any information containel in IE Inspection Report No. 50-370/80-01 to be proprietary.
V     'y truly yours, u_           L9. x William O. Parker, Jr LJB:ses Attachment 8006120lgg
V
                                                        '                                      , -cut. COPY I
'y truly yours, u_
L9. x William O. Parker, Jr LJB:ses Attachment 8006120lgg
, -cut. COPY I


o     .
o e
e
MCGUIRE NUCLEAR STATION Supplemental Response to IE Inspection Report No. 50-370/80-01
,                                            MCGUIRE NUCLEAR STATION Supplemental Response to IE Inspection Report No. 50-370/80-01


===RESPONSE===
===RESPONSE===
An audit has been conducted which included inspection of             a sample of flanges-and fittings in the following areas on McGuire Unit 2.
An audit has been conducted which included inspection of a sample of flanges-and fittings in the following areas on McGuire Unit 2.
(a) Socket weld flanges using greater than schedule 40 pipe for weld size.
(a) Socket weld flanges using greater than schedule 40 pipe for weld size.
(b) Socket weld flanges using less than schedule 40 pipe for weld size.
(b) Socket weld flanges using less than schedule 40 pipe for weld size.
(c) Socket weld fittings using greater than schedule 40 pipe for weld size.
(c) Socket weld fittings using greater than schedule 40 pipe for weld size.
In regard to Item (a), a complete reinspection was made of socket weld flanges using greater than schedule 40 pipe. One hundred and eleven welds were inspected with forty-three rejects. Under Item (b) one hundred welds selected at random were examined. Four of these welds were rejected. One weld was .187 inches below the minimum requirements. The other three welds had spots ranging from
In regard to Item (a), a complete reinspection was made of socket weld flanges using greater than schedule 40 pipe.
          .013 inches to .016 inches below the minimum requirements. The audit of Item (c) included one hundred welds selected at random. Three of these welds were reported as below the minimum requirements. Upon reinspection, one of the welds was found to be acceptable, the other two had spots which were .031 inches and .125 inches below the minimum requirements.
One hundred and eleven welds were inspected with forty-three rejects. Under Item (b) one hundred welds selected at random were examined. Four of these welds were rejected.
Based on these results, we have concluded that additional sampling and inspection of welds is not warranted on McGuire Unit 2. All of the rejected welds have been documented on nonconforming item reports and will be repaired. These repairs will be scheduled based on individual system availability.
One weld was.187 inches below the minimum requirements.
The other three welds had spots ranging from
.013 inches to.016 inches below the minimum requirements. The audit of Item (c) included one hundred welds selected at random. Three of these welds were reported as below the minimum requirements. Upon reinspection, one of the welds was found to be acceptable, the other two had spots which were.031 inches and.125 inches below the minimum requirements.
Based on these results, we have concluded that additional sampling and inspection of welds is not warranted on McGuire Unit 2.
All of the rejected welds have been documented on nonconforming item reports and will be repaired. These repairs will be scheduled based on individual system availability.
Socket welds are aise being reviewed for similar concerns on McGuire Unit 1.
Socket welds are aise being reviewed for similar concerns on McGuire Unit 1.
9
9
[
[
4
4
_ . - . , , , , ~ , . . _ -         ~ - ~ ~ , , . ~ ~ -                - ----
_. -.,,,, ~,.. _ -
~ - ~ ~,,. ~ ~ -


6 o -- e y QUKE POWER COMPANY
6 o --
                                              /         Powra Ut:st.nixo 422 Sot:rn Cut:ncu Stazzi, CnAnwriz, N. C. asa42
e y QUKE POWER COMPANY
                                                        . 03 wi we. o. en n a e n. s n.                   March 5, 1980 ect Persierut                                                             itLtp owt:Anta704 Setas Paoovction                                                                       373-4083 Mr. James P. O'Reilly, Director
/
Powra Ut:st.nixo 422 Sot:rn Cut:ncu Stazzi, CnAnwriz, N. C. asa42 03 wi we. o. en n a e n. s n.
March 5, 1980 ect Persierut itLtp owt:Anta704 Setas Paoovction 373-4083 Mr. James P. O'Reilly, Director
: 11. S. Nuclear Regulatory Commission legion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Gubject: McGuire Nuclear Station Docket No. 50-370
: 11. S. Nuclear Regulatory Commission legion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Gubject: McGuire Nuclear Station Docket No. 50-370


==Reference:==
==Reference:==
RII:EHG 50-370/80-01 i
RII:EHG 50-370/80-01


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
i As requested by your letter of February 11, 1980 pleas.: find attached a response to the items of noncompliance identified in the subjec.. inspection report.
i As requested by your letter of February 11, 1980 pleas.: find attached a response to the items of noncompliance identified in the subjec.. inspection report.
Duke Power Company does not consider any information contained in IE Inspection Report No. 50-370/80-01 to be proprietary.
Duke Power Company does not consider any information contained in IE Inspection Report No. 50-370/80-01 to be proprietary.
Very truly yours, N             V/ #
Very truly yours, N
V/ #
William O. Parker, Jr.
William O. Parker, Jr.
LJB:ses                                                                                               j Attachment h5h'D2NIiN55}NINNbi Y"Y - yjy4 l                         }       DUPLICATE DOCUMENT Entire document previously entered into system under:
LJB:ses j
ANO    hM hM No. of pages:             Q                                 ..
Attachment h5h'D2NIiN55}NINNbi Y"Y - yjy 4
yr FICIAL COM E                                                           4
l
                                's (. 3 D
}
                                                                  ~
DUPLICATE DOCUMENT Entire document previously entered into system under:
6(                                -
hM hM ANO No. of pages:
1}}
Q yr FICIAL COM E
's (. 3 6(
~
D 4
-}}

Latest revision as of 19:01, 31 December 2024

Responds to NRC Re Violations Noted in IE Insp Rept 50-370/80-01.Corrective Actions:Complete Reinsp Made of Socket Weld Flanges Using Greater than Schedule 40 Pipe. All Rejected Welds Documented & Will Be Repaired
ML19323H146
Person / Time
Site: Mcguire
Issue date: 03/27/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323H138 List:
References
NUDOCS 8006120139
Download: ML19323H146 (2)


Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

O)'

s*

DUKE POWER 7 COMPANY Powra Buttorno 422 SocTn Cnuncu SrazzT, CruntoTTE, N. C. as24a 1 i;.hi' I March"27, 1980 P l' 9y w o ul A64 O. PA R R E R. J R.

Vice Patsiorav TcLtemoe.c: Anta 704 Svtans Paoouction 373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Docket No. 50-370 Re: R;I:EHG 50-370/80-01

Dear Mr. O'Reilly:

As requested by Mr. Milt Hunt and Mr. Ed Girard of your staff in a conference call held on March 18, 1980, please find attached a supplemental response to Item A of the subject Inspection Report.

Duke Power Company does not consider any information containel in IE Inspection Report No. 50-370/80-01 to be proprietary.

V

'y truly yours, u_

L9. x William O. Parker, Jr LJB:ses Attachment 8006120lgg

, -cut. COPY I

o e

MCGUIRE NUCLEAR STATION Supplemental Response to IE Inspection Report No. 50-370/80-01

RESPONSE

An audit has been conducted which included inspection of a sample of flanges-and fittings in the following areas on McGuire Unit 2.

(a) Socket weld flanges using greater than schedule 40 pipe for weld size.

(b) Socket weld flanges using less than schedule 40 pipe for weld size.

(c) Socket weld fittings using greater than schedule 40 pipe for weld size.

In regard to Item (a), a complete reinspection was made of socket weld flanges using greater than schedule 40 pipe.

One hundred and eleven welds were inspected with forty-three rejects. Under Item (b) one hundred welds selected at random were examined. Four of these welds were rejected.

One weld was.187 inches below the minimum requirements.

The other three welds had spots ranging from

.013 inches to.016 inches below the minimum requirements. The audit of Item (c) included one hundred welds selected at random. Three of these welds were reported as below the minimum requirements. Upon reinspection, one of the welds was found to be acceptable, the other two had spots which were.031 inches and.125 inches below the minimum requirements.

Based on these results, we have concluded that additional sampling and inspection of welds is not warranted on McGuire Unit 2.

All of the rejected welds have been documented on nonconforming item reports and will be repaired. These repairs will be scheduled based on individual system availability.

Socket welds are aise being reviewed for similar concerns on McGuire Unit 1.

9

[

4

_. -.,,,, ~,.. _ -

~ - ~ ~,,. ~ ~ -

6 o --

e y QUKE POWER COMPANY

/

Powra Ut:st.nixo 422 Sot:rn Cut:ncu Stazzi, CnAnwriz, N. C. asa42 03 wi we. o. en n a e n. s n.

March 5, 1980 ect Persierut itLtp owt:Anta704 Setas Paoovction 373-4083 Mr. James P. O'Reilly, Director

11. S. Nuclear Regulatory Commission legion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Gubject: McGuire Nuclear Station Docket No. 50-370

Reference:

RII:EHG 50-370/80-01

Dear Mr. O'Reilly:

i As requested by your letter of February 11, 1980 pleas.: find attached a response to the items of noncompliance identified in the subjec.. inspection report.

Duke Power Company does not consider any information contained in IE Inspection Report No. 50-370/80-01 to be proprietary.

Very truly yours, N

V/ #

William O. Parker, Jr.

LJB:ses j

Attachment h5h'D2NIiN55}NINNbi Y"Y - yjy 4

l

}

DUPLICATE DOCUMENT Entire document previously entered into system under:

hM hM ANO No. of pages:

Q yr FICIAL COM E

's (. 3 6(

~

D 4

-