ML19323H996: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter::
{{#Wiki_filter::
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY       R. J. Hickle TELEPHONE h02-536 kh13 MONTH       May, 1980 DAY       AVERAGE DAILY POWER LEVEL                           DAY         AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1                       0.0                                   17                     0.0 2                       0.0                                   18                     0.0 3                       0.0                                                         0.0 39 4                       0.0                                                         0.0 20 5                       0.0                                   21     _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY R. J. Hickle TELEPHONE h02-536 kh13 MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
0.0 6                       0.0                                 22                     0.0 7a                     0.0                                                         0.0 23 8                       0.0                                   .4                     0.0 9                       0.0                                   25                     0.0 10                       0.0                                   26                     0.0 11                       0.0                                   27                     0 . 0-l2                       0.0                                   28                     0.0 13                       0.0                                   29                     0.0 34                       0.0                                                           0.0 30 15                       0.0                                   33                     0.0 16                       0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.
(MWe-Net) 1 0.0 17 0.0 2
0.0 18 0.0 3
0.0 39 0.0 4
0.0 20 0.0 5
0.0 21 0.0 6
0.0 22 0.0 7a 0.0 23 0.0 8
0.0
.4 0.0 9
0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0. 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 30 0.0 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.
1
1
                                                                                                                                  )
)
l (9/77)     {
(9/77)
{
8006170Y N
8006170Y N


                                                                                                          ~
OPERATING DATA REPORT
OPERATING DATA REPORT i
~
DOCKET NO. 50-285 DATE June o. 1980 COMPLETED BY B             J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1-                                            Notes                                  '
DOCKET NO. 50-285 i
DATE June o. 1980 COMPLETED BY B J.
Hickle TELEPHONE.hD2 'i2d::3413 OPERATING STA TUS
: 1. Unit Name:
: 1. Unit Name:
Fort Calhoun #1-Notes
: 2. Reporting Period; hv. 1080
+
+
: 2. Reporting Period;        hv . 1080
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):         1h20 4            4. Nameplate Rating (Gross MWe):           502
1h20
: 5. Design Electrical Rating (Net MWe):     h57
: 4. Nameplate Rating (Gross MWe):
,            6. Maximum Dependable Capacity (Gross MWe):           h81
502 4
!            7. Maximum Dependabie Capacity (Net MWe):             h57
: 5. Design Electrical Rating (Net MWe):
,            8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
h57
n/A j                                                                         N/A
: 6. Maximum Dependable Capacity (Gross MWe):
h81
: 7. Maximum Dependabie Capacity (Net MWe):
h57
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
n/A j
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:       N/A 2
N/A
This Month                   Yr. to-Date             Cumulative
: 10. Reasons For Restrictions.lf Any:
: 11. Hour 4 in Reporting Period                           744.0                           3,547.0                 58,584.0 0.0                                                    44,o34 5
N/A 2
: 12. Number Of Hours Reactor Was Critical                                                   432 9 _
This Month Yr. to-Date Cumulative
: 13. Reactor Reserve Shutdown Hours                         0.0                                 0.0     ,
: 11. Hour 4 in Reporting Period 744.0 3,547.0 58,584.0
1,309.5
: 12. Number Of Hours Reactor Was Critical 0.0 432 9 _
: 14. Haurs Generator On.Line                               0.0                             430.5                 43,881.6
44,o34 5
: 15. Unit Reserve Shutdown Hours                           0.0                                 0.0                       'O.0
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
: 16. Gross Thermal Energy Generated (MWH)                   0.0                       57h.710.0             53.809.760.2                                           '.
: 14. Haurs Generator On.Line 0.0 430.5 43,881.6
: 17. Gross Electrical Energy Generated (MWH)               0.0                 ,_,  190.604.0               17.850.833.6
: 15. Unit Reserve Shutdown Hours 0.0 0.0
,            18. Net Electrical Energy Generated (MWH)                 0.0                       180.935.1             16,868,454.9
'O.0
: 19. Unit Service Factor                                     0.0                               11.8                         74.9
: 16. Gross Thermal Energy Generated (MWH) 0.0 57h.710.0 53.809.760.2
: 20. Unit Availability Factor                               0.0                               11.8                         74.9
: 17. Gross Electrical Energy Generated (MWH) 0.0 190.604.0 17.850.833.6
: 21. Unit Capacity Factor (Using MDC Net) 0.0                               10.9                       63.4
: 18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9
,          22. Unit Capacity Factor (Using DER Net)                   0.0                               10.9                       63.0
: 19. Unit Service Factor 0.0 11.8 74.9
: 23. Unit Forced Outage Rate                                 0.0                                 0.0                       4.5
: 20. Unit Availability Factor 0.0 11.8 74.9
: 21. Unit Capacity Factor (Using MDC Net) 0.0 10.9 63.4
: 22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0
: 23. Unit Forced Outage Rate 0.0 0.0 4.5
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
None
None
: 25. If Shut Down At End Of Report Period.Esnmated Date of Startup:                 June 7, 1980
: 25. If Shut Down At End Of Report Period.Esnmated Date of Startup:
: 26. Units in Test Status tPrior to Commerci21 Operation):                               Forecast               Achieved l     -
June 7, 1980
i                                 th: 4AL CRITICALITY                                                                       -'
: 26. Units in Test Status tPrior to Commerci21 Operation):
!                                  INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)
Forecast Achieved l
i th: 4AL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)


                                                                                                                                                  + ..
+..
UNITSilUTDOWNS AND POWER REDUCTIONS                  DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m
DOCKETNO. 50-285 UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAME Fort Calhoun #1 DATE June 9. 1980 m
DATE June 9. 1980 4
COMPLETED BY B. J. Hickle 4
REPORT MONTH May. 1980                    COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 1
REPORT MONTH May. 1980 TELEPSIONE 402-536-4413 1
                                          =        r.      1.5.
1.5 c
c h          !0    ?jy          CC CC     j%                            Cause & Corrective No.         Date g
=
E.
r.
g .3            63m          : vent   ;,3 un U g}Uo                      Action to oO        E                  Report a                                 Prevent Recurrence y Di g 6
j%
80-01     800118       s     3216.5       c       1       n/A                           Reactor shutdown for annual refueling and maintenance outage.
g}U CC CC Cause & Corrective No.
i 1                     2                                                 3                             4 F: Forced           Reason:                                           Method:                         Exhibit G. Instructions S: Scheduled         A. Equipment Failure (Explain)                   1 Manual                         for Preparation of Data B. Maintenance of Test                           2 Manual Scram.                 Entry Sheets for Licensee C Refueling                                       3 Automatic Scram.               Event Report (LER) File (NUREG.
Date E.
D Regulatory Restriction                         4 Other (Explain)               0161)
h
E Operator Training & Ucense Examination F-Administrative                                                               5 G-Operational Error (Explain)                                                     Exhibit I- Sime Source (9/77)                 Il-Other (Explain)
?jy Action to
: vent
;,3 g
g.3 0
63m o
y Di g Report a un U Prevent Recurrence oO E
6 80-01 800118 s
3216.5 c
1 n/A Reactor shutdown for annual refueling and maintenance outage.
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I-Sime Source (9/77)
Il-Other (Explain)


Rcfueling Infonxttion Fort Calhoun - Unit No.1           -
Rcfueling Infonxttion Fort Calhoun - Unit No.1 Report for the month ending May 31, 1980 1.
Report for the month ending May 31, 1980         .
Scheduled date for next refueling shutdown.
Scheduled date for next refueling shutdown.                         March 15. 1981
March 15. 1981 2.
: 1.                                                         -
Scheduled date for restart folleaing refueling.
: 2. Scheduled date for restart folleaing refueling.                     May 15, 1981
May 15, 1981 3.
: 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
: a. If ana.cr is yes, what, in general, will these be?
a.
: b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload.                               No
If ana.cr is yes, what, in general, will these be?
          .c.     If no such review has taken place, when is it scheduled?                                               February 1, 1981
b.
: 4.     Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload.
: 5.     Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
No
: 6. The nu:rbor of fuel assemblies: a) in the core                       133         assemblies b) in the spent fuel pool           197 c) spent fuel pool' storage capacity             483 d) planned spent fuel pool storage capacity             483       .
.c.
: 7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity.                                                 1985 Prepared by                     MA                     Date       June 5, 1980 g
If no such review has taken place, when is it scheduled?
v M         4   e                   ,
February 1, 1981 4.
Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
5.
Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
6.
The nu:rbor of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool' storage capacity 483 d) planned spent fuel pool storage capacity 483
: 7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity.
1985 Prepared by MA Date June 5, 1980 g
v M
4 e


CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS  
CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I.
OPEPJ.TICUS  


==SUMMARY==
==SUMMARY==
Ford, Calhoun remained in a cold shutdown condition during the scnth of May..
Ford, Calhoun remained in a cold shutdown condition during the scnth of May..
Preparations and required prerequisites for plant startup were cenpleted during May.                                                                           -
Preparations and required prerequisites for plant startup were cenpleted during May.
Reactor coolant pump case coter gasket leaks vere disco'rered to be leak-ing during the cold hydro test and the plant was plc.ced in a ccnfigurstion to work en the reacter coolant pump.
Reactor coolant pump case coter gasket leaks vere disco'rered to be leak-ing during the cold hydro test and the plant was plc.ced in a ccnfigurstion to work en the reacter coolant pump.
The Operations Department attended Combustien Engineering Si=ulater Training during the =cnth of May. All shifts have ecmpleted the requeli-fication training at the simulator as prescribed in the Fort Calheen Training Progrsm.
The Operations Department attended Combustien Engineering Si=ulater Training during the =cnth of May. All shifts have ecmpleted the requeli-fication training at the simulator as prescribed in the Fort Calheen Training Progrsm.
Required surreillance tests and operational tests vere completed during May.
Required surreillance tests and operational tests vere completed during May.
A. PERFORM.GCE CHARACTERISTICS lER Number           Deficienev 80-007           As directed by "E Bulletin 79-013 the penetration es'le splices for the containment ventilation fans VA-3A, VA-33, VA-TC and VA-7D lack documentation on LOCA qualificatien. The splices are being reported even though an investigation of =aterial properties of Irrsthene SFT tapa, Irrasil tape, and silicone R""I indicate the splice vould with-stand a LOCA.
A.
: 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a
PERFORM.GCE CHARACTERISTICS lER Number Deficienev 80-007 As directed by "E Bulletin 79-013 the penetration es'le splices for the containment ventilation fans o
                . s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:
VA-3A, VA-33, VA-TC and VA-7D lack documentation on LOCA qualificatien. The splices are being reported even though an investigation of =aterial properties of Irrsthene SFT tapa, Irrasil tape, and silicone R""I indicate the splice vould with-stand a LOCA.
3.
CHANGES U GPERATING ME""dODS None C.
RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule.
Se folleving is a
. s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:


Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)
Menthly Operations Report May 1980 Page Two C.
RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)
Operations
Operations
_ Incident                 Deficiency OI-973     (ST-FIL-2)     7A-66 Freen Re=cval Efficiency Less than 995.
_ Incident Deficiency OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995.
OI-937     (ST-7A h)     7A-6h Flev Rate.
OI-937 (ST-7A h) 7A-6h Flev Rate.
OI-938     (ST-7A k)     7A-66 Flov Rate OI-976     (ST-PL-1)     HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977     (ST-DG-2)     Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov .
OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1)
pressure alar =, fuel oil transfer pu.p high pressure alar =, Jacket water te=perature cold, i==ersion heater te=perature centrol switch.
HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2)
D. CHANG 3, TESTS AND uu124EN"S CARRIED CUT EnCUT COMMISSION AFFROVAL F oceduce                 Descrittien CI-968     (ST-NDWC-1)   TIC-7333 Out of Tolerance.
Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov.
OI-967     (ST-C:~1)     TR-196, FR-1395, 73-1398 Cut of Tolerance         l l
pressure alar =, fuel oil transfer pu.p high pressure alar =, Jacket water te=perature cold, i==ersion heater te=perature centrol switch.
DCR 77-108                 Dual Volts /HZ, ST7 Relay /Cc=pleted as designed.
D.
l E. RESULTS CF LEAK' RATE TESTS                                                 l Local leak rates continued to be performed in May whil the plant was shut devn for the 1980 Refueling Cutage. A cc=plete report vill be forthec=ing at the end of the outage. No abnormal leaks were detected in May.                                                             j l
CHANG 3, TESTS AND uu124EN"S CARRIED CUT EnCUT COMMISSION AFFROVAL F oceduce Descrittien CI-968 (ST-NDWC-1)
F. C"-1ANGES ET PLANT CPERAT2TG STAFF                                           I The folleving individuals vere added to the plant staff:
TIC-7333 Out of Tolerance.
1 Mark 3are                   Mark L. Gutier ec                       I John C. 3 ranch               Michael I. K e an Dr. Ronald J. 3runo         Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these       -
OI-967 (ST-C:~1)
empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.
TR-196, FR-1395, 73-1398 Cut of Tolerance DCR 77-108 Dual Volts /HZ, ST7 Relay /Cc=pleted as designed.
E.
RESULTS CF LEAK' RATE TESTS Local leak rates continued to be performed in May whil the plant was shut devn for the 1980 Refueling Cutage. A cc=plete report vill be forthec=ing at the end of the outage. No abnormal leaks were detected in May.
j F.
C"-1ANGES ET PLANT CPERAT2TG STAFF The folleving individuals vere added to the plant staff:
Mark 3are Mark L. Gutier ec John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573.
Prior to being placed en a shift rotation these empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.


Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.
Monthly Operations Report May 19S0 Page Three G.
H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59
TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.
: 1. Changes to Facility Operating License DPR-ho Amendment Nc,. h6, dated May 27, 1980. The amendment revises the License as follows:
H.
CHAliGIS, TESTS AND EXPERIME:CS REQUIRING.TJC'2.AR REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59 1.
Changes to Facility Operating License DPR-ho Amendment Nc,. h6, dated May 27, 1980. The amendment revises the License as follows:
a) Modifies Appendix A Technical Specifications to:
a) Modifies Appendix A Technical Specifications to:
l
l
: 1) Add two shock suppressors to listing of those l                                   required to be tested.
: 1) Add two shock suppressors to listing of those l
required to be tested.
: 2) Permit limited testing of shock suppressors during power operation.
: 2) Permit limited testing of shock suppressors during power operation.
b) Modifies Appendix B Technical Specifications to:
b) Modifies Appendix B Technical Specifications to:
: 1) Incorporate secondary water ch mistry reqY re=ents into License conditions.
: 1) Incorporate secondary water ch mistry reqY re=ents into License conditions.
1st'
1st'
                                                                          'I'dtY\\..\@i Approved 3y                     -
'I'dtY\\\\..\\@i Approved 3y jfahager-For:'Calhoun Station i}
;                                                                    jfahager-For:'Calhoun Station i}
1 l
1 l
e u--
e u--


l 1
l Menthly Cperations Repcrt May 1980
Menthly Cperations Repcrt May 1980
?sge Four MA-.r.s A3CI (Signif10 ant Safety Related)
          ?sge Four
M.
:"" . MA-.r.s A3CI (Signif10 ant Safety Related)
0
M. 0
* a:e t
* a:e   t               esert :: ten           ;        ;c=ective A:: :n h7k5   5-5-80       Modify ACS-155/161.                   Work perfor=ed, restraint: returnec to operating condition.
esert :: ten
h388   5-10-80       Packing leak on HCV-3h8.               Replace packing and returned to operating condition.
;c=ective A:: :n h7k5 5-5-80 Modify ACS-155/161.
5713   5-12-80       Remote control and indications       Wiring corrected en TB k and failed on HCV-239                     viring changed to reflect prints.
Work perfor=ed, restraint: returnec to operating condition.
h388 5-10-80 Packing leak on HCV-3h8.
Replace packing and returned to operating condition.
5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints.
Retu=ed to Normal operation.
Retu=ed to Normal operation.
581h   5-15-80       AB-1 (K-1) Relay failed - RPS         Removed, repaired, and cleaned A3 Matrix.                             Belay contacts. Returned to operating condition.
581h 5-15-80 AB-1 (K-1) Relay failed - RPS Removed, repaired, and cleaned A3 Matrix.
5911   5-27-80       ?" one square foot section of         P" as required - Satisfactory.         4 A & B RC pumps.
Belay contacts. Returned to operating condition.
5913   5-23-80       Repair to =eet ASME XI requirements   Repaired as require?, - satisfacto:y.
5911 5-27-80
                        - cover-to-casing studs for RC pt=ps.
?" one square foot section of P" as required - Satisfactory.
5932   5-30-80       RC-3B Motor Removed.                 Replace RC-3B :otor - returned to operating condition.
4 A & B RC pumps.
kTL5   5-5-80       Modify Hanger #ACS-155/161.           Work perfor=ed and retu=ed,to operating ccndition.
5913 5-23-80 Repair to =eet ASME XI requirements Repaired as require?, - satisfacto:y.
5062   5-6-80       Modify Hanger # SIS-188.             Werk performed and raturned to operating ecndition.
- cover-to-casing studs for RC pt=ps.
5112   5-8-80       Modify Hanger #T4H-166.               Work perfor=ed and returned to operating condition.
5932 5-30-80 RC-3B Motor Removed.
5116   5-6-80       Modify Hanger /SISL119         ,
Replace RC-3B :otor - returned to operating condition.
Werk perfomed and returned to operating ccndition.
kTL5 5-5-80 Modify Hanger #ACS-155/161.
5118   5-7-80       Modify Hanger /ACH hh7.               Work perfc=ed and returned to operating conditicn.
Work perfor=ed and retu=ed,to operating ccndition.
51h3   5-1-80       Mcdify Hanger VRCH-19                 Work perfer:ed and retu ned te operating conditicn.
5062 5-6-80 Modify Hanger # SIS-188.
51k6   5-2-80       Modify Hanger ! ACE-327.             Werk perfo med md retun ed to operating condition.
Werk performed and raturned to operating ecndition.
3151   5-11-80       Modify Hanger # SIS ~127A.
5112 5-8-80 Modify Hanger #T4H-166.
                                                              'Jork perfc med and retum ed ,0c cperating condition, s
Work perfor=ed and returned to operating condition.
_, ,-    7   --
5116 5-6-80 Modify Hanger /SISL119 Werk perfomed and returned to operating ccndition.
5118 5-7-80 Modify Hanger /ACH hh7.
Work perfc=ed and returned to operating conditicn.
51h3 5-1-80 Mcdify Hanger VRCH-19 Work perfer:ed and retu ned te operating conditicn.
51k6 5-2-80 Modify Hanger ! ACE-327.
Werk perfo med md retun ed to operating condition.
3151 5-11-80 Modify Hanger # SIS ~127A.
'Jork perfc med and retum ed,0c cperating condition, s
7


Men:hly Operstiens 2epert May 1980
Men:hly Operstiens 2epert May 1980
              ?._z e ?1 re
?._z e ?1 re
              ~~. MA L .;_;riCI (31gnifi: ant safety Related)
~~. MA L.;_;riCI (31gnifi: ant safety Related)
:t. 2. e Cate     i             :escri cien           i       :c- ee:1. e Ac:::=
:t.
5152   5-2-80       Modiff Hanger #S*H-199               Work perfc =ed and retuned to operating ccndition.
2.
5162   5-5-80       Medief Hanger #RCS-53.               Werk perfo =ed and returned to operating condition.
e Cate i
5225   5-1-80       Modiff Hanger #ACH h13/275           'Jork perfor=ed and retun ed to operating conditicn.
:escri cien i
5228   5-2-80       Modiff Hanger #RCS-30A.             Work perfc med and returned to operating ccndition.
:c-ee:1. e Ac:::=
5237   5-(40       Modify Hanger #RCH-53               Werk perfor=ed and returned to operating ccndition.
5152 5-2-80 Modiff Hanger #S*H-199 Work perfc =ed and retuned to operating ccndition.
5258   5-3-80       Modif/ Hanger #ACH-335               Work perfer ed and retu ned to operating cen:iiticn.
5162 5-5-80 Medief Hanger #RCS-53.
53h5   5-2-80       Modify Hanger #SIH-lh1.             Work perfor:ed and returned to operating ccnditicn.
Werk perfo =ed and returned to operating condition.
53b6   5-6-80       Modif7 Hanger #SIH-210.             '4crk perfor=ed and retuned to opersting ccndition.
5225 5-1-80 Modiff Hanger #ACH h13/275
53h?   5-8-80       Medief Hanger #SIH-212/271.         ' Jerk perfersed and retu ned to operating condition.
'Jork perfor=ed and retun ed to operating conditicn.
5388   5 h-80       Medit/ Hanser #ACH-291/ACS-108.     Work perfomed     d - +urned to Operating cendition.
5228 5-2-80 Modiff Hanger #RCS-30A.
5h21   5-9-80       Modif7 Hanger #MSH-72.               Work perfo med and retuned to operating cendition.
Work perfc med and returned to operating ccndition.
5h22   5-9-80       Medief Hanger #MSH-75               Werk perfc = ed and returned to operating cendition.
5237 5-(40 Modify Hanger #RCH-53 Werk perfor=ed and returned to operating ccndition.
Sh23   5-9-80       Modiff Hanger #MSH-73               Work perfc =ed and returned to Operating cer.dition.
5258 5-3-80 Modif/ Hanger #ACH-335 Work perfer ed and retu ned to operating cen:iiticn.
5hh0   5-7-80       Modif/ Hanger #MSH-71.               Work perfor=ed and returned to operating conditicn.
53h5 5-2-80 Modify Hanger #SIH-lh1.
5k5i   3-2-80       Medie/ Hanger # SIS-132.             Work perfc=ed   -e --- ned to operating ccnditicn.
Work perfor:ed and returned to operating ccnditicn.
l 5h60     5-1-80       Modiff Hanger #C3W-3.               *4erk perfc=ed snd retuned to ~
53b6 5-6-80 Modif7 Hanger #SIH-210.
f                                                            operating condition.
'4crk perfor=ed and retuned to opersting ccndition.
53h?
5-8-80 Medief Hanger #SIH-212/271.
' Jerk perfersed and retu ned to operating condition.
5388 5 h-80 Medit/ Hanser #ACH-291/ACS-108.
Work perfomed d - +urned to Operating cendition.
5h21 5-9-80 Modif7 Hanger #MSH-72.
Work perfo med and retuned to operating cendition.
5h22 5-9-80 Medief Hanger #MSH-75 Werk perfc = ed and returned to operating cendition.
Sh23 5-9-80 Modiff Hanger #MSH-73 Work perfc =ed and returned to Operating cer.dition.
5hh0 5-7-80 Modif/ Hanger #MSH-71.
Work perfor=ed and returned to operating conditicn.
5k5i 3-2-80 Medie/ Hanger # SIS-132.
Work perfc=ed
-e --- ned to operating ccnditicn.
l 5h60 5-1-80 Modiff Hanger #C3W-3.
*4erk perfc=ed snd retuned to f
operating condition.
~


Ment h.1-/ Operstions Repar-May 1980 pige SiX
Ment h.1-/ Operstions Repar-May 1980 pige SiX
              !!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)
!!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)
:4. 2.
:4. 2.
* I     : ate   1               :esertp: ten         i       ;:rree:1re A::::n             e Sh66       5-3-80       Modify Hanger #ACH h06/ACS-291,     Work performed and returned to opersting condition, SkS9       5-3-80       Modify Hanger /WD(A-1k).           Work perfo=ed and returned to opersting condition.
I
5h99       5-10-80       Medity Hanger #MSH-76,             verk perfor=ed and returned to opersting condition.
: ate 1
5507       5-10-30       Modiff Hanger #ACS-350.             Work perfor=ed and returned to opersting condition, 5508       5-1-80       Modify Hanger # SIS-119             Work perfor=ed and returned to operating condition, 5509       5-11-30       Modi?/ Hanger #SIH-205,             'Jork perfer=ed and retumed to opersting conditien, 5511       5-5-30       ModiP/ Hanger #ACS-31hA.           Work perf =ed and retuned to opersting ecndition.
:esertp: ten i
5515       5-3-30       Modify Hanger #SIH-209             Work perfomed and retu=ed to operating condition, 5513       5-7-30       Modiff Hanger #SIH-208.             Werk perfc=ed snd retu ned to opersting condition, 5527       5-1-30       Modify Hanger #ACH-309             Work perf =ed and retu=ed to opersting conditi:n, 5530       5-3-30       Modiff Hanger # SIS-lho.           Werk perfomed snd retuned to Operating condition.
;:rree:1re A::::n e
5531       5-1-30       Modify Hanger # MSS-10.             Work perfor:ed and retuned to opersting condition.
Sh66 5-3-80 Modify Hanger #ACH h06/ACS-291, Work performed and returned to opersting condition, SkS9 5-3-80 Modify Hanger /WD(A-1k).
5533       5-2-30       Modiff Hanger 1AC(A-13E).           '4crk perf:rmed a-d --+umed to opersting condition, 553h       5 h-80       Modiff Hanger !CH(I-12),           Werk perfor=ed sad retu n ed to opersting condition.
Work perfo=ed and returned to opersting condition.
5533       5-1-30       Mcdify Hanger #SI(0-5).             Work perf =ed and returned to opersning ocndition.
5h99 5-10-80 Medity Hanger #MSH-76, verk perfor=ed and returned to opersting condition.
5536       5 h-30       Modiff Hanger !CH(C-31).           Werk perfc=ed   e-d ------e .
5507 5-10-30 Modiff Hanger #ACS-350.
t .
Work perfor=ed and returned to opersting condition, 5508 5-1-80 Modify Hanger # SIS-119 Work perfor=ed and returned to operating condition, 5509 5-11-30 Modi?/ Hanger #SIH-205,
'Jork perfer=ed and retumed to opersting conditien, 5511 5-5-30 ModiP/ Hanger #ACS-31hA.
Work perf =ed and retuned to opersting ecndition.
5515 5-3-30 Modify Hanger #SIH-209 Work perfomed and retu=ed to operating condition, 5513 5-7-30 Modiff Hanger #SIH-208.
Werk perfc=ed snd retu ned to opersting condition, 5527 5-1-30 Modify Hanger #ACH-309 Work perf =ed and retu=ed to opersting conditi:n, 5530 5-3-30 Modiff Hanger # SIS-lho.
Werk perfomed snd retuned to Operating condition.
5531 5-1-30 Modify Hanger # MSS-10.
Work perfor:ed and retuned to opersting condition.
5533 5-2-30 Modiff Hanger 1AC(A-13E).
'4crk perf:rmed a-d --+umed to opersting condition, 553h 5 h-80 Modiff Hanger !CH(I-12),
Werk perfor=ed sad retu n ed to opersting condition.
5533 5-1-30 Mcdify Hanger #SI(0-5).
Work perf =ed and returned to opersning ocndition.
5536 5 h-30 Modiff Hanger !CH(C-31).
Werk perfc=ed e-d
------e t
Operating 00ndition.
Operating 00ndition.
I
I


Menthly 0;erati::s Re;cr-May 1980 Page Seven
Menthly 0;erati::s Re;cr-May 1980 Page Seven
                  ~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)
~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)
M.  : . I ; ate   i             Jescri;;;:n             a       : rree :ve A::::n               i 5537     5-3-80     Modify Hanger #SI(E h).               Work perfor=ed ani returned to operating condition.
I
5538     5-2-30     Modify Hanger #CH(E-3h).             Work perfor=ed and returned to opersting condition.
; ate i
55ho     5-10-80     Modify Hanger #ACH-356.               Work perfer=ed and returned to opersting ccndition.
Jescri;;;:n a
55h1     5-6-80     Modify Hanger # MSS-9A.               Work perferned and returned to opersting condition.
: rree :ve A::::n i
55L2     5-1-30     Mcdify Hanger # MSS-13.               Work performed and returned to operating 00ndition.
M.
55h5     5-7-80     Mcdify Hanger #SIH-211.               Work perforned and returned to operating condition.
5537 5-3-80 Modify Hanger #SI(E h).
55k6     5-9-80     Modify Hanger #MSH-Th.               Werk perferned and returned to operating condition.
Work perfor=ed ani returned to operating condition.
5558     5-3-30     Modify Hanger VAC(A-26).             Work perfer=ed and returned to operating condition.
5538 5-2-30 Modify Hanger #CH(E-3h).
5559     5-3-30     Modify Hanger # MSS-9                 Work perfer=ed and returned to operating ccndition.
Work perfor=ed and returned to opersting condition.
5561     5-1k-80     Modify Hanger #SIH-131.               Wert performed and returned to Operating 00ndition.
55ho 5-10-80 Modify Hanger #ACH-356.
5563     5-6-30     Moddfy Hanger #ECS-58.               Work perfor=ed and returned to operating 00ndition.
Work perfer=ed and returned to opersting ccndition.
556b     5 h-80     Modify Hanger #AC(D-56).             Work perferned and returned to opersting condiJ10n.
55h1 5-6-80 Modify Hanger # MSS-9A.
55S2     5-10-30     Mcdify Hanger #ACS-353               Work perfor=ed and returned to operating condition.
Work perferned and returned to opersting condition.
5587     5-10-30     Mcdify Hanger #ACH-355               Werk perfor:ed and returned to opersting 00ndition.
55L2 5-1-30 Mcdify Hanger # MSS-13.
5589     5-3-30     Mcdify Hanger # SIS-193.             Work perfor=ed and returned to Operating condition.
Work performed and returned to operating 00ndition.
l 5590       5-a-80     Mcdify Hanger ! SIS-192.             Werk perfer=ed and returned ,to     i Operating Octdition.
55h5 5-7-80 Mcdify Hanger #SIH-211.
                                                              ,                  -  4-         w - ~ w--
Work perforned and returned to operating condition.
55k6 5-9-80 Modify Hanger #MSH-Th.
Werk perferned and returned to operating condition.
5558 5-3-30 Modify Hanger VAC(A-26).
Work perfer=ed and returned to operating condition.
5559 5-3-30 Modify Hanger # MSS-9 Work perfer=ed and returned to operating ccndition.
5561 5-1k-80 Modify Hanger #SIH-131.
Wert performed and returned to Operating 00ndition.
5563 5-6-30 Moddfy Hanger #ECS-58.
Work perfor=ed and returned to operating 00ndition.
556b 5 h-80 Modify Hanger #AC(D-56).
Work perferned and returned to opersting condiJ10n.
55S2 5-10-30 Mcdify Hanger #ACS-353 Work perfor=ed and returned to operating condition.
5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition.
5589 5-3-30 Mcdify Hanger # SIS-193.
Work perfor=ed and returned to Operating condition.
l 5590 5-a-80 Mcdify Hanger ! SIS-192.
Werk perfer=ed and returned,to i
Operating Octdition.
4-w
~
w--


Monthly Operati:ts Reper.
Monthly Operati:ts Reper.
May 1980
May 1980
                ?sge Hight
?sge Hight
                !!. MAR. s/CICE (Signifi:an: Safety Related' V   t.
!!. MAR. s/CICE (Signifi:an: Safety Related' V
* I   ate   f             Jesert::1:n         1       : r ee rre A::.:n 5591       5-5-80     Modify Hanger # SIS-lh9           Work perfc =ed and returned to operating condition.
t.
5592'     5-1-80     Modify Hanger #ACS-3h8             Work perfom ed and returned to operating condition.
I ate f
5597       5-6-80     Modify Hanger #ACH-301.           Work perfc =ed and returned a operating condition.
Jesert::1:n 1
5598       5-10-80   Modify Hanger #RCS-6 & 10.         ~4crk perfc=ed and returned to operating condition.
: r ee rre A::.:n 5591 5-5-80 Modify Hanger # SIS-lh9 Work perfc =ed and returned to operating condition.
5599       5-lk-80   Modify Hanger #ACS-113A/125       Work perfer=ed and returned to operating condition.
5592' 5-1-80 Modify Hanger #ACS-3h8 Work perfom ed and returned to operating condition.
5601       5 h-80     Modiff Hanger #F4H-56.             'Jork perfomed and returned to Operating condition.
5597 5-6-80 Modify Hanger #ACH-301.
5602       5-3-80     Modiff Hanger #T43-53             *4crk perf0=ed and returned to operating condition.
Work perfc =ed and returned a operating condition.
5603       5-1-80     Mcdify Hanger #NG(D-15).           'Jork perfor=ed snd returned to operating condition.
5598 5-10-80 Modify Hanger #RCS-6 & 10.
5609       5-lh-80   Modify Hanger #ACS-299             Jerk perfor=ed and returned to operating condition.
~4crk perfc=ed and returned to operating condition.
5610       5-12-80   Modify Hanger #ACH h08/ACS-299A. Work perf0=ed and returned to operating condition.
5599 5-lk-80 Modify Hanger #ACS-113A/125 Work perfer=ed and returned to operating condition.
5611     5-lh-80     Modiff Hanger #ACH kC8A.           *4crk perfo med and returned to operating 00ndition.
5601 5 h-80 Modiff Hanger #F4H-56.
3615       5-6-80     Modify Hanger #ACH-269/ACS-91. Work perfor=ed and --~ ~ ad to operating condition.
'Jork perfomed and returned to Operating condition.
5626     5-5-80     Modif/ Hanger # ACE h10.           Werk perf0=ed and returned to operating condition.
5602 5-3-80 Modiff Hanger #T43-53
362-     5-9-80     Modify Hanger #RCS-1.             'icrk perf0=ed and ret =ed to operating condition.
*4crk perf0=ed and returned to operating condition.
3628     5-12-80     Modify Hanger /ACS-127A.           *4crk perfor=ed and returned to Operating 20ndition.
5603 5-1-80 Mcdify Hanger #NG(D-15).
5630     3-1-80     Mcdiff Hsnger #ACH-318.           '4crk perfo=ed an d --*"~ ad t o cperating condition.
'Jork perfor=ed snd returned to operating condition.
5609 5-lh-80 Modify Hanger #ACS-299 Jerk perfor=ed and returned to operating condition.
5610 5-12-80 Modify Hanger #ACH h08/ACS-299A.
Work perf0=ed and returned to operating condition.
5611 5-lh-80 Modiff Hanger #ACH kC8A.
*4crk perfo med and returned to operating 00ndition.
3615 5-6-80 Modify Hanger #ACH-269/ACS-91.
Work perfor=ed and --~ ~ ad to operating condition.
5626 5-5-80 Modif/ Hanger # ACE h10.
Werk perf0=ed and returned to operating condition.
362-5-9-80 Modify Hanger #RCS-1.
'icrk perf0=ed and ret =ed to operating condition.
3628 5-12-80 Modify Hanger /ACS-127A.
*4crk perfor=ed and returned to Operating 20ndition.
5630 3-1-80 Mcdiff Hsnger #ACH-318.
'4crk perfo=ed an --*"~ ad t o d
cperating condition.


4 M:::h17 Operations Repcrt May 1980
4 M:::h17 Operations Repcrt May 1980
              ?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated)
?ege 31ne II.
L   ,  e j Ja:e   I               escri::: n             i       ;;r ect re A::ict 5631       5-11-80     Mcdiff Hanger #ACS-110A.               Work perfor=ed and returned to operating condition.
MA-...w A3C2 (Signift: ant Safe:/ 2 elated)
5650       5-10-80     Modify Hanger # SIS-160.               Werk perfo med and returned to operating condition.
L e
5651       5-lk-80     Modiff Hanger #SIH-162.                 'Jork perfc =ed and retu~ed to operating condition.
j Ja:e I
5652       5-7-80     Modif/ Hanger FACH kh0.                 '4crk perfo med and retuned to operating condition.
escri::: n i
5653       5-3-80     Modiff Hanger #ACS-363                 *4ork perfc=ed and retuned to operating condition.
;;r ect re A::ict 5631 5-11-80 Mcdiff Hanger #ACS-110A.
3656       5-6-80     Modify Hanger #CH(DW-1).               ' Jerk perfo med and retu~ed to operating condition.
Work perfor=ed and returned to operating condition.
5660       5 h-80     Modify Hanger #ACS-10h.                 Work perfor=ed and retuned .o operating condition.
5650 5-10-80 Modify Hanger # SIS-160.
5667       5-12-80     Modiff Hanger #ACS-97                   ' Jerk perfc=ed and retuned to operating condition.
Werk perfo med and returned to operating condition.
5669       5-7-30     Mcdify Hanger #ACS-300.                 Work perfor=ed and retu=ed to operating condition.          .
5651 5-lk-80 Modiff Hanger #SIH-162.
5670       5-6-80     Modif/ Hanger #ACS-1103.               Work perfomed and retuned to Operating 20ndition.
'Jork perfc =ed and retu~ed to operating condition.
567h       5-16-80     Modif/ Hanger # SIS-88.                 Work perfo med and retuned to operating condition.
5652 5-7-80 Modif/ Hanger FACH kh0.
5675       5-7-80     Mcdify Hanger #ACS-365                 Werk pert 0=ed and retuned to operating condition.
'4crk perfo med and retuned to operating condition.
5685       5-5-80     Mcdif/ Hanger #CAS h7.                 Werk perfe=ed and returned to operating condition.
5653 5-3-80 Modiff Hanger #ACS-363
5689       5-15-80     Modify Hanger #S H-172.                 Werk perfc=ed an:1 returned to Operating condition.
*4ork perfc=ed and retuned to operating condition.
569k       3-7-80     Mcdiff Hanger 15:S-17k/176.             Work perf0=ed and retuned to Operating conditien.
3656 5-6-80 Modify Hanger #CH(DW-1).
5697       5-7-80     Modify Hanger #CAS h6.                 Work perf0=ed and retu_~ed .to ,
' Jerk perfo med and retu~ed to operating condition.
J                                                    Operating condition.
5660 5 h-80 Modify Hanger #ACS-10h.
Work perfor=ed and retuned
.o operating condition.
5667 5-12-80 Modiff Hanger #ACS-97
' Jerk perfc=ed and retuned to operating condition.
5669 5-7-30 Mcdify Hanger #ACS-300.
Work perfor=ed and retu=ed to operating condition.
5670 5-6-80 Modif/ Hanger #ACS-1103.
Work perfomed and retuned to Operating 20ndition.
567h 5-16-80 Modif/ Hanger # SIS-88.
Work perfo med and retuned to operating condition.
5675 5-7-80 Mcdify Hanger #ACS-365 Werk pert 0=ed and retuned to operating condition.
5685 5-5-80 Mcdif/ Hanger #CAS h7.
Werk perfe=ed and returned to operating condition.
5689 5-15-80 Modify Hanger #S H-172.
Werk perfc=ed an:1 returned to Operating condition.
569k 3-7-80 Mcdiff Hanger 15:S-17k/176.
Work perf0=ed and retuned to Operating conditien.
5697 5-7-80 Modify Hanger #CAS h6.
Work perf0=ed and retu_~ed.to J
Operating condition.
i i
i i


4 Menthly Opersti:ns Repor May 1980
4 Menthly Opersti:ns Repor May 1980
                  ?sge Ten
?sge Ten
                  ~~. MACC2~iArI (Significan Safe / Related)
~~. MACC2~iArI (Significan Safe / Related)
A. 2.   = late     1             J esert ::::n       t         ;crrect:cre A:: :n 5T10       5-16-80   Modiff Hanger /S!H-192.             ~4crk performed and returned to operating condition.
A.
571h       5-7-80     Modify Hanger #T4H-53               Work perfor=ed and retu=ed to operating condition.
2.
5715       5-7-80     Modify Hanger #F4H-56.             '4ork perfomed and returned to opersting condition.
=
5723       5-9-80     Modify Hanger /RCS-59               Work perfor=ed and retur.:ed to opersting condition.
late 1
5731     5-10-80   Modify Hanger /ACH-309.             Work perfomed and retumed to cpersting cendition.
J esert ::::n t
1 57h2       5-11-80   Modiff Hanger /ACH-363/ SIS-177     Werk perfor=ed and ret'trned to operating condition.
;crrect:cre A:: :n 5T10 5-16-80 Modiff Hanger /S!H-192.
57k3     5-10-80   Modiff Hanger /ACS-351.             Work perfomed and retu =ed to opersting condition.
~4crk performed and returned to operating condition.
57bh     5-15-80   Modiff Hanger #SE-5                 ~4crk perfe=ed and returned to operating condition.
571h 5-7-80 Modify Hanger #T4H-53 Work perfor=ed and retu=ed to operating condition.
5751     5-10-80   Modif-f Hanger # MSS-SC.           Werk perfer=ed sud retu =ed to operating condition.
5715 5-7-80 Modify Hanger #F4H-56.
5752       5-12-80   Modify Hanger #SH-208.             Work perfor=ed and returned to cperating condition.
'4ork perfomed and returned to opersting condition.
5765       5-12-80   Modify Hanger #74H-163/?43 h8.     '4erk perferned and returned to Operating condition.
5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition.
5768     5-lh-80   Varicus hangers had replacenent     Work perfor=ed and returned to non-class =aterial -ith class       operating cendition.
5731 5-10-80 Modify Hanger /ACH-309.
                              =aterial.
Work perfomed and retumed to cpersting cendition.
5771     5-15-80   Mcdify Hanger #SE-lhh.             Werk perfc=ed sud retuned to operating condition.
1 57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition.
l 5778     5-lh.-80   Modiff Hanger 153-152.             Work peric=ed and retu=ed to   i
57k3 5-10-80 Modiff Hanger /ACS-351.
                                                                . Operating condition, 5802     5-lh-80   Modiff Esnger /ACH-270/ACS-92       ~4crk perfc=ed and returned to opersting condition.           ;
Work perfomed and retu =ed to opersting condition.
5813       5-15-80   Modify Hanger #ACS-97.             Work perfc=cd and returned 'to Operating condition.
57bh 5-15-80 Modiff Hanger #SE-5
~4crk perfe=ed and returned to operating condition.
5751 5-10-80 Modif-f Hanger # MSS-SC.
Werk perfer=ed sud retu =ed to operating condition.
5752 5-12-80 Modify Hanger #SH-208.
Work perfor=ed and returned to cperating condition.
5765 5-12-80 Modify Hanger #74H-163/?43 h8.
'4erk perferned and returned to Operating condition.
5768 5-lh-80 Varicus hangers had replacenent Work perfor=ed and returned to non-class =aterial -ith class operating cendition.
=aterial.
5771 5-15-80 Mcdify Hanger #SE-lhh.
Werk perfc=ed sud retuned to operating condition.
l 5778 5-lh.-80 Modiff Hanger 153-152.
Work peric=ed and retu=ed to i
Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92
~4crk perfc=ed and returned to opersting condition.
5813 5-15-80 Modify Hanger #ACS-97.
Work perfc=cd and returned 'to Operating condition.


Men hl-/ ^,peraticos Reper.
Men hl-/ ^,peraticos Reper.
May 1930
May 1930
                ?tge Eleven
?tge Eleven
::. MA   ..z 4/CICE (Signift:an: 3 ate:7 2elste'il
::. MA
:f. 2. = I : ate   I             :escri;; ten               !      ;Orrective A:::::
..z 4/CICE (Signift:an: 3 ate:7 2elste'il
5E17     5-16-80     Modify Hanger #ACS-350.                 Work perfor ed and returned to operating condition.
:f.
5931     6-5-80       PC-3A Motor renoved.                   Replace RC-3A and returned to operating condition.
2.
5933     6-5-80       ac-3C notor re=oved.                   Replace RC-3C and returned to operating condition.
=
I
: ate I
:escri;; ten
;Orrective A:::::
5E17 5-16-80 Modify Hanger #ACS-350.
Work perfor ed and returned to operating condition.
5931 6-5-80 PC-3A Motor renoved.
Replace RC-3A and returned to operating condition.
5933 6-5-80 ac-3C notor re=oved.
Replace RC-3C and returned to operating condition.
iI l
iI l
                            ..                . . .}}
...}}

Latest revision as of 18:42, 31 December 2024

Monthly Operating Rept for May 1980
ML19323H996
Person / Time
Site: Fort Calhoun 
Issue date: 06/09/1980
From: Hickle B
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML19323H995 List:
References
NUDOCS 8006170443
Download: ML19323H996 (15)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY R. J. Hickle TELEPHONE h02-536 kh13 MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0.0 17 0.0 2

0.0 18 0.0 3

0.0 39 0.0 4

0.0 20 0.0 5

0.0 21 0.0 6

0.0 22 0.0 7a 0.0 23 0.0 8

0.0

.4 0.0 9

0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0. 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 30 0.0 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.

1

)

(9/77)

{

8006170Y N

OPERATING DATA REPORT

~

DOCKET NO. 50-285 i

DATE June o. 1980 COMPLETED BY B J.

Hickle TELEPHONE.hD2 'i2d::3413 OPERATING STA TUS

1. Unit Name:

Fort Calhoun #1-Notes

2. Reporting Period; hv. 1080

+

3. Licensed Thermal Power (MWt):

1h20

4. Nameplate Rating (Gross MWe):

502 4

5. Design Electrical Rating (Net MWe):

h57

6. Maximum Dependable Capacity (Gross MWe):

h81

7. Maximum Dependabie Capacity (Net MWe):

h57

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

n/A j

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions.lf Any:

N/A 2

This Month Yr. to-Date Cumulative

11. Hour 4 in Reporting Period 744.0 3,547.0 58,584.0
12. Number Of Hours Reactor Was Critical 0.0 432 9 _

44,o34 5

13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
14. Haurs Generator On.Line 0.0 430.5 43,881.6
15. Unit Reserve Shutdown Hours 0.0 0.0

'O.0

16. Gross Thermal Energy Generated (MWH) 0.0 57h.710.0 53.809.760.2
17. Gross Electrical Energy Generated (MWH) 0.0 190.604.0 17.850.833.6
18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9
19. Unit Service Factor 0.0 11.8 74.9
20. Unit Availability Factor 0.0 11.8 74.9
21. Unit Capacity Factor (Using MDC Net) 0.0 10.9 63.4
22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0
23. Unit Forced Outage Rate 0.0 0.0 4.5
24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period.Esnmated Date of Startup:

June 7, 1980

26. Units in Test Status tPrior to Commerci21 Operation):

Forecast Achieved l

i th: 4AL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)

+..

DOCKETNO. 50-285 UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAME Fort Calhoun #1 DATE June 9. 1980 m

COMPLETED BY B. J. Hickle 4

REPORT MONTH May. 1980 TELEPSIONE 402-536-4413 1

1.5 c

=

r.

j%

g}U CC CC Cause & Corrective No.

Date E.

h

?jy Action to

vent
,3 g

g.3 0

63m o

y Di g Report a un U Prevent Recurrence oO E

6 80-01 800118 s

3216.5 c

1 n/A Reactor shutdown for annual refueling and maintenance outage.

i 1

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & Ucense Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I-Sime Source (9/77)

Il-Other (Explain)

Rcfueling Infonxttion Fort Calhoun - Unit No.1 Report for the month ending May 31, 1980 1.

Scheduled date for next refueling shutdown.

March 15. 1981 2.

Scheduled date for restart folleaing refueling.

May 15, 1981 3.

Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?

a.

If ana.cr is yes, what, in general, will these be?

b.

If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload.

No

.c.

If no such review has taken place, when is it scheduled?

February 1, 1981 4.

Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.

5.

Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.

6.

The nu:rbor of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool' storage capacity 483 d) planned spent fuel pool storage capacity 483

7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity.

1985 Prepared by MA Date June 5, 1980 g

v M

4 e

CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I.

OPEPJ.TICUS

SUMMARY

Ford, Calhoun remained in a cold shutdown condition during the scnth of May..

Preparations and required prerequisites for plant startup were cenpleted during May.

Reactor coolant pump case coter gasket leaks vere disco'rered to be leak-ing during the cold hydro test and the plant was plc.ced in a ccnfigurstion to work en the reacter coolant pump.

The Operations Department attended Combustien Engineering Si=ulater Training during the =cnth of May. All shifts have ecmpleted the requeli-fication training at the simulator as prescribed in the Fort Calheen Training Progrsm.

Required surreillance tests and operational tests vere completed during May.

A.

PERFORM.GCE CHARACTERISTICS lER Number Deficienev 80-007 As directed by "E Bulletin 79-013 the penetration es'le splices for the containment ventilation fans o

VA-3A, VA-33, VA-TC and VA-7D lack documentation on LOCA qualificatien. The splices are being reported even though an investigation of =aterial properties of Irrsthene SFT tapa, Irrasil tape, and silicone R""I indicate the splice vould with-stand a LOCA.

3.

CHANGES U GPERATING ME""dODS None C.

RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule.

Se folleving is a

. s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:

Menthly Operations Report May 1980 Page Two C.

RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)

Operations

_ Incident Deficiency OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995.

OI-937 (ST-7A h) 7A-6h Flev Rate.

OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1)

HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2)

Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov.

pressure alar =, fuel oil transfer pu.p high pressure alar =, Jacket water te=perature cold, i==ersion heater te=perature centrol switch.

D.

CHANG 3, TESTS AND uu124EN"S CARRIED CUT EnCUT COMMISSION AFFROVAL F oceduce Descrittien CI-968 (ST-NDWC-1)

TIC-7333 Out of Tolerance.

OI-967 (ST-C:~1)

TR-196, FR-1395, 73-1398 Cut of Tolerance DCR 77-108 Dual Volts /HZ, ST7 Relay /Cc=pleted as designed.

E.

RESULTS CF LEAK' RATE TESTS Local leak rates continued to be performed in May whil the plant was shut devn for the 1980 Refueling Cutage. A cc=plete report vill be forthec=ing at the end of the outage. No abnormal leaks were detected in May.

j F.

C"-1ANGES ET PLANT CPERAT2TG STAFF The folleving individuals vere added to the plant staff:

Mark 3are Mark L. Gutier ec John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573.

Prior to being placed en a shift rotation these empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.

Monthly Operations Report May 19S0 Page Three G.

TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.

H.

CHAliGIS, TESTS AND EXPERIME:CS REQUIRING.TJC'2.AR REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59 1.

Changes to Facility Operating License DPR-ho Amendment Nc,. h6, dated May 27, 1980. The amendment revises the License as follows:

a) Modifies Appendix A Technical Specifications to:

l

1) Add two shock suppressors to listing of those l

required to be tested.

2) Permit limited testing of shock suppressors during power operation.

b) Modifies Appendix B Technical Specifications to:

1) Incorporate secondary water ch mistry reqY re=ents into License conditions.

1st'

'I'dtY\\\\..\\@i Approved 3y jfahager-For:'Calhoun Station i}

1 l

e u--

l Menthly Cperations Repcrt May 1980

?sge Four MA-.r.s A3CI (Signif10 ant Safety Related)

M.

0

  • a:e t

esert :: ten

c=ective A
: :n h7k5 5-5-80 Modify ACS-155/161.

Work perfor=ed, restraint: returnec to operating condition.

h388 5-10-80 Packing leak on HCV-3h8.

Replace packing and returned to operating condition.

5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints.

Retu=ed to Normal operation.

581h 5-15-80 AB-1 (K-1) Relay failed - RPS Removed, repaired, and cleaned A3 Matrix.

Belay contacts. Returned to operating condition.

5911 5-27-80

?" one square foot section of P" as required - Satisfactory.

4 A & B RC pumps.

5913 5-23-80 Repair to =eet ASME XI requirements Repaired as require?, - satisfacto:y.

- cover-to-casing studs for RC pt=ps.

5932 5-30-80 RC-3B Motor Removed.

Replace RC-3B :otor - returned to operating condition.

kTL5 5-5-80 Modify Hanger #ACS-155/161.

Work perfor=ed and retu=ed,to operating ccndition.

5062 5-6-80 Modify Hanger # SIS-188.

Werk performed and raturned to operating ecndition.

5112 5-8-80 Modify Hanger #T4H-166.

Work perfor=ed and returned to operating condition.

5116 5-6-80 Modify Hanger /SISL119 Werk perfomed and returned to operating ccndition.

5118 5-7-80 Modify Hanger /ACH hh7.

Work perfc=ed and returned to operating conditicn.

51h3 5-1-80 Mcdify Hanger VRCH-19 Work perfer:ed and retu ned te operating conditicn.

51k6 5-2-80 Modify Hanger ! ACE-327.

Werk perfo med md retun ed to operating condition.

3151 5-11-80 Modify Hanger # SIS ~127A.

'Jork perfc med and retum ed,0c cperating condition, s

7

Men:hly Operstiens 2epert May 1980

?._z e ?1 re

~~. MA L.;_;riCI (31gnifi: ant safety Related)

t.

2.

e Cate i

escri cien i
c-ee:1. e Ac:::=

5152 5-2-80 Modiff Hanger #S*H-199 Work perfc =ed and retuned to operating ccndition.

5162 5-5-80 Medief Hanger #RCS-53.

Werk perfo =ed and returned to operating condition.

5225 5-1-80 Modiff Hanger #ACH h13/275

'Jork perfor=ed and retun ed to operating conditicn.

5228 5-2-80 Modiff Hanger #RCS-30A.

Work perfc med and returned to operating ccndition.

5237 5-(40 Modify Hanger #RCH-53 Werk perfor=ed and returned to operating ccndition.

5258 5-3-80 Modif/ Hanger #ACH-335 Work perfer ed and retu ned to operating cen:iiticn.

53h5 5-2-80 Modify Hanger #SIH-lh1.

Work perfor:ed and returned to operating ccnditicn.

53b6 5-6-80 Modif7 Hanger #SIH-210.

'4crk perfor=ed and retuned to opersting ccndition.

53h?

5-8-80 Medief Hanger #SIH-212/271.

' Jerk perfersed and retu ned to operating condition.

5388 5 h-80 Medit/ Hanser #ACH-291/ACS-108.

Work perfomed d - +urned to Operating cendition.

5h21 5-9-80 Modif7 Hanger #MSH-72.

Work perfo med and retuned to operating cendition.

5h22 5-9-80 Medief Hanger #MSH-75 Werk perfc = ed and returned to operating cendition.

Sh23 5-9-80 Modiff Hanger #MSH-73 Work perfc =ed and returned to Operating cer.dition.

5hh0 5-7-80 Modif/ Hanger #MSH-71.

Work perfor=ed and returned to operating conditicn.

5k5i 3-2-80 Medie/ Hanger # SIS-132.

Work perfc=ed

-e --- ned to operating ccnditicn.

l 5h60 5-1-80 Modiff Hanger #C3W-3.

  • 4erk perfc=ed snd retuned to f

operating condition.

~

Ment h.1-/ Operstions Repar-May 1980 pige SiX

!!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)

4. 2.

I

ate 1
esertp: ten i
rree
1re A::::n e

Sh66 5-3-80 Modify Hanger #ACH h06/ACS-291, Work performed and returned to opersting condition, SkS9 5-3-80 Modify Hanger /WD(A-1k).

Work perfo=ed and returned to opersting condition.

5h99 5-10-80 Medity Hanger #MSH-76, verk perfor=ed and returned to opersting condition.

5507 5-10-30 Modiff Hanger #ACS-350.

Work perfor=ed and returned to opersting condition, 5508 5-1-80 Modify Hanger # SIS-119 Work perfor=ed and returned to operating condition, 5509 5-11-30 Modi?/ Hanger #SIH-205,

'Jork perfer=ed and retumed to opersting conditien, 5511 5-5-30 ModiP/ Hanger #ACS-31hA.

Work perf =ed and retuned to opersting ecndition.

5515 5-3-30 Modify Hanger #SIH-209 Work perfomed and retu=ed to operating condition, 5513 5-7-30 Modiff Hanger #SIH-208.

Werk perfc=ed snd retu ned to opersting condition, 5527 5-1-30 Modify Hanger #ACH-309 Work perf =ed and retu=ed to opersting conditi:n, 5530 5-3-30 Modiff Hanger # SIS-lho.

Werk perfomed snd retuned to Operating condition.

5531 5-1-30 Modify Hanger # MSS-10.

Work perfor:ed and retuned to opersting condition.

5533 5-2-30 Modiff Hanger 1AC(A-13E).

'4crk perf:rmed a-d --+umed to opersting condition, 553h 5 h-80 Modiff Hanger !CH(I-12),

Werk perfor=ed sad retu n ed to opersting condition.

5533 5-1-30 Mcdify Hanger #SI(0-5).

Work perf =ed and returned to opersning ocndition.

5536 5 h-30 Modiff Hanger !CH(C-31).

Werk perfc=ed e-d


e t

Operating 00ndition.

I

Menthly 0;erati::s Re;cr-May 1980 Page Seven

~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)

I

ate i

Jescri;;;:n a

rree :ve A::::n i

M.

5537 5-3-80 Modify Hanger #SI(E h).

Work perfor=ed ani returned to operating condition.

5538 5-2-30 Modify Hanger #CH(E-3h).

Work perfor=ed and returned to opersting condition.

55ho 5-10-80 Modify Hanger #ACH-356.

Work perfer=ed and returned to opersting ccndition.

55h1 5-6-80 Modify Hanger # MSS-9A.

Work perferned and returned to opersting condition.

55L2 5-1-30 Mcdify Hanger # MSS-13.

Work performed and returned to operating 00ndition.

55h5 5-7-80 Mcdify Hanger #SIH-211.

Work perforned and returned to operating condition.

55k6 5-9-80 Modify Hanger #MSH-Th.

Werk perferned and returned to operating condition.

5558 5-3-30 Modify Hanger VAC(A-26).

Work perfer=ed and returned to operating condition.

5559 5-3-30 Modify Hanger # MSS-9 Work perfer=ed and returned to operating ccndition.

5561 5-1k-80 Modify Hanger #SIH-131.

Wert performed and returned to Operating 00ndition.

5563 5-6-30 Moddfy Hanger #ECS-58.

Work perfor=ed and returned to operating 00ndition.

556b 5 h-80 Modify Hanger #AC(D-56).

Work perferned and returned to opersting condiJ10n.

55S2 5-10-30 Mcdify Hanger #ACS-353 Work perfor=ed and returned to operating condition.

5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition.

5589 5-3-30 Mcdify Hanger # SIS-193.

Work perfor=ed and returned to Operating condition.

l 5590 5-a-80 Mcdify Hanger ! SIS-192.

Werk perfer=ed and returned,to i

Operating Octdition.

4-w

~

w--

Monthly Operati:ts Reper.

May 1980

?sge Hight

!!. MAR. s/CICE (Signifi:an: Safety Related' V

t.

I ate f

Jesert::1:n 1

r ee rre A::.:n 5591 5-5-80 Modify Hanger # SIS-lh9 Work perfc =ed and returned to operating condition.

5592' 5-1-80 Modify Hanger #ACS-3h8 Work perfom ed and returned to operating condition.

5597 5-6-80 Modify Hanger #ACH-301.

Work perfc =ed and returned a operating condition.

5598 5-10-80 Modify Hanger #RCS-6 & 10.

~4crk perfc=ed and returned to operating condition.

5599 5-lk-80 Modify Hanger #ACS-113A/125 Work perfer=ed and returned to operating condition.

5601 5 h-80 Modiff Hanger #F4H-56.

'Jork perfomed and returned to Operating condition.

5602 5-3-80 Modiff Hanger #T43-53

  • 4crk perf0=ed and returned to operating condition.

5603 5-1-80 Mcdify Hanger #NG(D-15).

'Jork perfor=ed snd returned to operating condition.

5609 5-lh-80 Modify Hanger #ACS-299 Jerk perfor=ed and returned to operating condition.

5610 5-12-80 Modify Hanger #ACH h08/ACS-299A.

Work perf0=ed and returned to operating condition.

5611 5-lh-80 Modiff Hanger #ACH kC8A.

  • 4crk perfo med and returned to operating 00ndition.

3615 5-6-80 Modify Hanger #ACH-269/ACS-91.

Work perfor=ed and --~ ~ ad to operating condition.

5626 5-5-80 Modif/ Hanger # ACE h10.

Werk perf0=ed and returned to operating condition.

362-5-9-80 Modify Hanger #RCS-1.

'icrk perf0=ed and ret =ed to operating condition.

3628 5-12-80 Modify Hanger /ACS-127A.

  • 4crk perfor=ed and returned to Operating 20ndition.

5630 3-1-80 Mcdiff Hsnger #ACH-318.

'4crk perfo=ed an --*"~ ad t o d

cperating condition.

4 M:::h17 Operations Repcrt May 1980

?ege 31ne II.

MA-...w A3C2 (Signift: ant Safe:/ 2 elated)

L e

j Ja:e I

escri::: n i

r ect re A
ict 5631 5-11-80 Mcdiff Hanger #ACS-110A.

Work perfor=ed and returned to operating condition.

5650 5-10-80 Modify Hanger # SIS-160.

Werk perfo med and returned to operating condition.

5651 5-lk-80 Modiff Hanger #SIH-162.

'Jork perfc =ed and retu~ed to operating condition.

5652 5-7-80 Modif/ Hanger FACH kh0.

'4crk perfo med and retuned to operating condition.

5653 5-3-80 Modiff Hanger #ACS-363

  • 4ork perfc=ed and retuned to operating condition.

3656 5-6-80 Modify Hanger #CH(DW-1).

' Jerk perfo med and retu~ed to operating condition.

5660 5 h-80 Modify Hanger #ACS-10h.

Work perfor=ed and retuned

.o operating condition.

5667 5-12-80 Modiff Hanger #ACS-97

' Jerk perfc=ed and retuned to operating condition.

5669 5-7-30 Mcdify Hanger #ACS-300.

Work perfor=ed and retu=ed to operating condition.

5670 5-6-80 Modif/ Hanger #ACS-1103.

Work perfomed and retuned to Operating 20ndition.

567h 5-16-80 Modif/ Hanger # SIS-88.

Work perfo med and retuned to operating condition.

5675 5-7-80 Mcdify Hanger #ACS-365 Werk pert 0=ed and retuned to operating condition.

5685 5-5-80 Mcdif/ Hanger #CAS h7.

Werk perfe=ed and returned to operating condition.

5689 5-15-80 Modify Hanger #S H-172.

Werk perfc=ed an:1 returned to Operating condition.

569k 3-7-80 Mcdiff Hanger 15:S-17k/176.

Work perf0=ed and retuned to Operating conditien.

5697 5-7-80 Modify Hanger #CAS h6.

Work perf0=ed and retu_~ed.to J

Operating condition.

i i

4 Menthly Opersti:ns Repor May 1980

?sge Ten

~~. MACC2~iArI (Significan Safe / Related)

A.

2.

=

late 1

J esert ::::n t

crrect
cre A:: :n 5T10 5-16-80 Modiff Hanger /S!H-192.

~4crk performed and returned to operating condition.

571h 5-7-80 Modify Hanger #T4H-53 Work perfor=ed and retu=ed to operating condition.

5715 5-7-80 Modify Hanger #F4H-56.

'4ork perfomed and returned to opersting condition.

5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition.

5731 5-10-80 Modify Hanger /ACH-309.

Work perfomed and retumed to cpersting cendition.

1 57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition.

57k3 5-10-80 Modiff Hanger /ACS-351.

Work perfomed and retu =ed to opersting condition.

57bh 5-15-80 Modiff Hanger #SE-5

~4crk perfe=ed and returned to operating condition.

5751 5-10-80 Modif-f Hanger # MSS-SC.

Werk perfer=ed sud retu =ed to operating condition.

5752 5-12-80 Modify Hanger #SH-208.

Work perfor=ed and returned to cperating condition.

5765 5-12-80 Modify Hanger #74H-163/?43 h8.

'4erk perferned and returned to Operating condition.

5768 5-lh-80 Varicus hangers had replacenent Work perfor=ed and returned to non-class =aterial -ith class operating cendition.

=aterial.

5771 5-15-80 Mcdify Hanger #SE-lhh.

Werk perfc=ed sud retuned to operating condition.

l 5778 5-lh.-80 Modiff Hanger 153-152.

Work peric=ed and retu=ed to i

Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92

~4crk perfc=ed and returned to opersting condition.

5813 5-15-80 Modify Hanger #ACS-97.

Work perfc=cd and returned 'to Operating condition.

Men hl-/ ^,peraticos Reper.

May 1930

?tge Eleven

. MA

..z 4/CICE (Signift:an: 3 ate:7 2elste'il

f.

2.

=

I

ate I
escri;; ten
Orrective A
::::

5E17 5-16-80 Modify Hanger #ACS-350.

Work perfor ed and returned to operating condition.

5931 6-5-80 PC-3A Motor renoved.

Replace RC-3A and returned to operating condition.

5933 6-5-80 ac-3C notor re=oved.

Replace RC-3C and returned to operating condition.

iI l

...