{{#Wiki_filter:A Southern Nuclear | {{#Wiki_filter:A Southern Nuclear December 2, 2019 Docket No.: | ||
In letter NL 1455, dated November 29, 2019, Southern Nuclear Operating Company (SNC) submitted a request for a proposed emergency license amendment to the Technical Specifications (TS) for Hatch Nuclear Plant (HNP) Unit 1 renewed facility operating license DPR-57. The proposed amendment would have revised TS 3.7.1, "Residual Heat Removal Service Water (RHRSW) System ," Condition A , "One RHRSW pump inoperable," to allow a one-time increase in the Completion Time from 30 days to 45 days. | 50-321 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Regulatory Affairs Edwin I. Hatch Nuclear Plant Unit 1 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel 205 992 7795 fax NL-19-1471 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.1 Regarding One-Time Extension of Completion Time for RHRSW Pump Inoperable Ladies and Gentlemen: | ||
Subsequent to the submittal , HNP personnel were able to complete the necessary repairs of the | In letter NL-19-1455, dated November 29, 2019, Southern Nuclear Operating Company (SNC) submitted a request for a proposed emergency license amendment to the Technical Specifications (TS) for Hatch Nuclear Plant (HNP) Unit 1 renewed facility operating license DPR-57. The proposed amendment would have revised TS 3.7.1, "Residual Heat Removal Service Water (RHRSW) System," Condition A, "One RHRSW pump inoperable," to allow a one-time increase in the Completion Time from 30 days to 45 days. | ||
Therefore , SNC hereby withdraws the subject request for an emergency license amendment for HNP Unit 1 TS 3.7.1. | Subsequent to the submittal, HNP personnel were able to complete the necessary repairs of the 1 B RHRSW pump and return it to Operable condition within the original completion time for Condition A and thus there is no longer a need for an extension of the completion time. | ||
In accordance with 10 CFR 50.91 , SNC is notifying the State of Georgia of the withdrawal of this license amendment request by transmitting a copy of this letter to the designated State Official. | Therefore, SNC hereby withdraws the subject request for an emergency license amendment for HNP Unit 1 TS 3.7.1. | ||
This letter contains no NRC commitments . If you have any questions, please contact Jamie Coleman at 205.992 .6611. | In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia of the withdrawal of this license amendment request by transmitting a copy of this letter to the designated State Official. | ||
Respectfully submitted , | This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611. | ||
C. A. Gay a Director, Regulatory Affairs Southern Nuclear Operating Company | Respectfully submitted, C. A. Gay a | ||
Director, Regulatory Affairs Southern Nuclear Operating Company | |||
U.S. Nuclear Regulatory Commission NL-19-1471 Page 2 of 2 CAG/TLE/scm cc: | U.S. Nuclear Regulatory Commission NL-19-1471 Page 2 of 2 CAG/TLE/scm cc: | ||
NRC Regional Administrator, Region II NRC NRR Project Manager-Hatch NRC Senior Resident Inspector-Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004}} | |||
Latest revision as of 17:24, 25 December 2024
| ML19336B596 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/02/2019 |
| From: | Gayheart C Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-19-1471 | |
| Download: ML19336B596 (2) | |
Text
A Southern Nuclear December 2, 2019 Docket No.:
50-321 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Regulatory Affairs Edwin I. Hatch Nuclear Plant Unit 1 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel 205 992 7795 fax NL-19-1471 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.1 Regarding One-Time Extension of Completion Time for RHRSW Pump Inoperable Ladies and Gentlemen:
In letter NL-19-1455, dated November 29, 2019, Southern Nuclear Operating Company (SNC) submitted a request for a proposed emergency license amendment to the Technical Specifications (TS) for Hatch Nuclear Plant (HNP) Unit 1 renewed facility operating license DPR-57. The proposed amendment would have revised TS 3.7.1, "Residual Heat Removal Service Water (RHRSW) System," Condition A, "One RHRSW pump inoperable," to allow a one-time increase in the Completion Time from 30 days to 45 days.
Subsequent to the submittal, HNP personnel were able to complete the necessary repairs of the 1 B RHRSW pump and return it to Operable condition within the original completion time for Condition A and thus there is no longer a need for an extension of the completion time.
Therefore, SNC hereby withdraws the subject request for an emergency license amendment for HNP Unit 1 TS 3.7.1.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia of the withdrawal of this license amendment request by transmitting a copy of this letter to the designated State Official.
This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.
Respectfully submitted, C. A. Gay a
Director, Regulatory Affairs Southern Nuclear Operating Company
U.S. Nuclear Regulatory Commission NL-19-1471 Page 2 of 2 CAG/TLE/scm cc:
NRC Regional Administrator, Region II NRC NRR Project Manager-Hatch NRC Senior Resident Inspector-Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004