ML19341D034: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML19341D034 | | number = ML19341D034 | ||
| issue date = 02/09/1981 | | issue date = 02/09/1981 | ||
| title = Suppls Response to NRC | | title = Suppls Response to NRC Re Violations Noted in IE Insp Rept 50-302/80-36.Corrective Actions:All Plant Personnel Advised by Mgt Memo That All Plant Procedures Shall Be Strictly Adhered to | ||
| author name = Hancock J | | author name = Hancock J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = CS-81-011, CS-81-11, NUDOCS 8103040747 | | document report number = CS-81-011, CS-81-11, NUDOCS 8103040747 | ||
| title reference date = 11-12-1980 | |||
| package number = ML19341D032 | | package number = ML19341D032 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:*' | ||
'k u'u9wm: | |||
m:XJSo y '. ?A | m:XJSo 7 | ||
y '. ?A Florida gg 3-0-3-a-3 c o | |||
3-0-3-a-3 CS-81 -Oll Mr. J. P. O'Reilly, Director | ,0.. | ||
,0 ~ | |||
CS-81 -Oll Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Conmission Ref.: | |||
RII:JJL 101 Marietta St., Suite 3100 50-302/80-36 Atlanta, GA 30303 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
In accordance with your request, we offer the following supplemental response to the apparent Item of Noncompliance identified as item B in the referenced inspection report. | In accordance with your request, we offer the following supplemental response to the apparent Item of Noncompliance identified as item B in the referenced inspection report. | ||
B. Supplemental Response: | B. | ||
Each plant employee has acknowledged this memorandum by his signa-ture and the acknowledgement is on file. In the future, all plant procedures shall be adhered-to, and full compliance has been achieved. | Supplemental Response: | ||
In addition to the original response offered in our letter CS-80-281, all plant personnel have been advised by a Management Memorandum that all plant procedures shall be strictly adhered-to or the procedure be changed in accordance with the provisions of Administrative Procedure AI-400. | |||
Each plant employee has acknowledged this memorandum by his signa-ture and the acknowledgement is on file. | |||
In the future, all plant procedures shall be adhered-to, and full compliance has been achieved. | |||
Should there be further questions, please contact us. | Should there be further questions, please contact us. | ||
Very truly yours , | Very truly yours, | ||
FLORI | FLORI POWER CORPORATION g/f | ||
/ | |||
'y Nucleaf Pldnt Manager | |||
. A. Hancock 7 | |||
Assistant Vice President Nuclear Operations JC/rc I | |||
General Office 320i nierfdurfAMi sair2 P O Bou 1404L st Petersburg, Fiorica 33733 813-866-5151}} | |||
Latest revision as of 16:29, 24 December 2024
| ML19341D034 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/09/1981 |
| From: | Hancock J FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19341D032 | List: |
| References | |
| CS-81-011, CS-81-11, NUDOCS 8103040747 | |
| Download: ML19341D034 (1) | |
Text
- '
'k u'u9wm:
m:XJSo 7
y '. ?A Florida gg 3-0-3-a-3 c o
,0..
,0 ~
CS-81 -Oll Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Conmission Ref.:
RII:JJL 101 Marietta St., Suite 3100 50-302/80-36 Atlanta, GA 30303
Dear Mr. O'Reilly:
In accordance with your request, we offer the following supplemental response to the apparent Item of Noncompliance identified as item B in the referenced inspection report.
B.
Supplemental Response:
In addition to the original response offered in our letter CS-80-281, all plant personnel have been advised by a Management Memorandum that all plant procedures shall be strictly adhered-to or the procedure be changed in accordance with the provisions of Administrative Procedure AI-400.
Each plant employee has acknowledged this memorandum by his signa-ture and the acknowledgement is on file.
In the future, all plant procedures shall be adhered-to, and full compliance has been achieved.
Should there be further questions, please contact us.
Very truly yours,
FLORI POWER CORPORATION g/f
/
'y Nucleaf Pldnt Manager
. A. Hancock 7
Assistant Vice President Nuclear Operations JC/rc I
General Office 320i nierfdurfAMi sair2 P O Bou 1404L st Petersburg, Fiorica 33733 813-866-5151