ML19344B173: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 14: | Line 14: | ||
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | | document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:4 | {{#Wiki_filter:- | ||
POWER DISTRIBUTION LIMITS O SURVEILLANCE REQUIREMENTS (Continued) | 4 POWER DISTRIBUTION LIMITS O | ||
SURVEILLANCE REQUIREMENTS (Continued) | |||
: e. The F | When the F[ is less than or equal to the FR 2. | ||
limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF and Fxy at least x | |||
once per 31 EFPD. | |||
~ | |||
shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes e. | |||
F | The F l | ||
l = 10 | 1. | ||
FhTP $ 4=M for core elevations from 2.4 f t. | FRTP < 1.71 for all core planes containing bank "D" control rbs,~and 2. | ||
RTP | For all unrodded core planes: | ||
F | |||
$ 1.68 up to core elevations of 2.4 ft. | |||
l = 10 FhTP $ 4=M for core elevations from 2.4 f t. | |||
to 7.2 ft. | |||
RTP F | |||
5 1.61 for core elevations above 7.2 ft. | |||
xy f. | |||
The F limits of e, above, are not applicable in the following core hane regions as measured in percent of core height from the bottom of the fuel: | |||
1. | |||
Lower core region from 0 to 15%, inclusive. | |||
2. | |||
Upper core region from 85 to 100%, inclusive. | |||
3. | |||
Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%, | |||
60.6 + 2% and 74.9 + 2%, inclusive. | 60.6 + 2% and 74.9 + 2%, inclusive. | ||
l_ | l_ | ||
4.- | 4.- | ||
inches) about the bank demand position of the bank "D" control rods. | Core plane regions within | ||
b | -2% of core height ( 2.88 inches) about the bank demand position of the bank "D" control rods. | ||
C b | |||
t. | g. | ||
4.2.2.3 | With F exceeding F the effects of F on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 t. | ||
q 4.2.2.3 When F (Z) is measured pursuant to specification 4.10.2.2, an q | |||
overall measured F (Z) shall be obtained from a power distribution map n | |||
and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty. | and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty. | ||
FARLEY - UNIT 1 | FARLEY - UNIT 1 3/4 2-7 | ||
^ | |||
} 00 UV | |||
._}} | |||
Latest revision as of 11:35, 24 December 2024
| ML19344B173 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/15/1980 |
| From: | ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19344B172 | List: |
| References | |
| NUDOCS 8008250698 | |
| Download: ML19344B173 (1) | |
Text
-
4 POWER DISTRIBUTION LIMITS O
SURVEILLANCE REQUIREMENTS (Continued)
When the F[ is less than or equal to the FR 2.
limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF and Fxy at least x
once per 31 EFPD.
~
shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes e.
The F l
1.
FRTP < 1.71 for all core planes containing bank "D" control rbs,~and 2.
For all unrodded core planes:
F
$ 1.68 up to core elevations of 2.4 ft.
l = 10 FhTP $ 4=M for core elevations from 2.4 f t.
to 7.2 ft.
RTP F
5 1.61 for core elevations above 7.2 ft.
xy f.
The F limits of e, above, are not applicable in the following core hane regions as measured in percent of core height from the bottom of the fuel:
1.
Lower core region from 0 to 15%, inclusive.
2.
Upper core region from 85 to 100%, inclusive.
3.
Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%,
60.6 + 2% and 74.9 + 2%, inclusive.
l_
4.-
Core plane regions within
-2% of core height ( 2.88 inches) about the bank demand position of the bank "D" control rods.
C b
g.
With F exceeding F the effects of F on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 t.
q 4.2.2.3 When F (Z) is measured pursuant to specification 4.10.2.2, an q
overall measured F (Z) shall be obtained from a power distribution map n
and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.
FARLEY - UNIT 1 3/4 2-7
^
} 00 UV
._