ML19353A101: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML19353A101 | | number = ML19353A101 | ||
| issue date = 11/12/1980 | | issue date = 11/12/1980 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-313/80-16 & 50-368/80-16.Corrective Actions:Site QA Audit Repts Will Be Reviewed by Plant Safety Committee | ||
| author name = Trimble D | | author name = Trimble D | ||
| author affiliation = ARKANSAS POWER & LIGHT CO. | | author affiliation = ARKANSAS POWER & LIGHT CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 1-110-13, 2-110-19, NUDOCS 8101070164 | | document report number = 1-110-13, 2-110-19, NUDOCS 8101070164 | ||
| title reference date = 10-23-1980 | |||
| package number = ML19353A099 | | package number = ML19353A099 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(3 's' | {{#Wiki_filter:(3 's' | ||
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 55 i L!TTLE ROCK ARKANSAS 72203 (501)371 4000 November 12, 1980 1-110-13 2-110-19 Mr. G. L. Madsen, Chief Reactor Operations & Nuclear Support Offi.:e of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas | .c s | ||
L) | |||
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 55 i L!TTLE ROCK ARKANSAS 72203 (501)371 4000 November 12, 1980 1-110-13 2-110-19 Mr. G. L. Madsen, Chief Reactor Operations & Nuclear Support Offi.:e of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Response to NRC Notice of Violation Follow Up IR: 50-313/80-16 and 50-368/80-16 (File: 0232, 2-0232) l | Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Response to NRC Notice of Violation Follow Up IR: 50-313/80-16 and 50-368/80-16 (File: 0232, 2-0232) l Gentlemen: | ||
In response to a Notice of Violation for noncompliance item A as stated l | In response to a Notice of Violation for noncompliance item A as stated l | ||
in your letter to Mr. William Cavanaugh III, dated October 23, 1980, the following additional information is provided. | |||
===RESPONSE=== | ===RESPONSE=== | ||
Thank you for the clarification concerning "being responsible for" as stated in the reference letter. The Plant Safety Committee (PSC) will either review or approve the review of site QA Audit Reports that are required by AN0 Procedure 1000.02, Plant Safety Committee Operation. To assure continued compliance, the PSC Chairman will receive a copy of site OA Audit Reports for PSC review in accordance with AN0 Procedure 1000.02. | Thank you for the clarification concerning "being responsible for" as stated in the reference letter. | ||
The Plant Safety Committee (PSC) will either review or approve the review of site QA Audit Reports that are required by AN0 Procedure 1000.02, Plant Safety Committee Operation. | |||
To assure continued compliance, the PSC Chairman will receive a copy of site OA Audit Reports for PSC review in accordance with AN0 Procedure 1000.02. | |||
Full compliance has been achieved. | Full compliance has been achieved. | ||
Inspection Report 50-368/78-04 which is referenced in your October 23, 1980 letter stated that an NRC position was being developed to clarify the interpre-tation of "being responsible for". | Inspection Report 50-368/78-04 which is referenced in your {{letter dated|date=October 23, 1980|text=October 23, 1980 letter}} stated that an NRC position was being developed to clarify the interpre-tation of "being responsible for". | ||
Please provide a copy of this position clarification to the ANO General Manager as soon as it is available. | |||
Very truly yours, | Very truly yours, | ||
.s | |||
/ | |||
l] 2n.A C YL J() | l] 2n.A C YL J() | ||
8101070 | 8101070 David C. Trimble, Manager, Licensing MEMOEA MCCLE SOUTH UT1UTIES SYSTEM | ||
.T | .T Mr. G. L. Madsen, Chief November 12, 1980 DCT:GAC:1p M | ||
Mr. G. L. Madsen, Chief | cc: | ||
cc: | Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555}} | |||
Latest revision as of 17:00, 23 December 2024
| ML19353A101 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/12/1980 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19353A099 | List: |
| References | |
| 1-110-13, 2-110-19, NUDOCS 8101070164 | |
| Download: ML19353A101 (2) | |
Text
(3 's'
.c s
L)
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 55 i L!TTLE ROCK ARKANSAS 72203 (501)371 4000 November 12, 1980 1-110-13 2-110-19 Mr. G. L. Madsen, Chief Reactor Operations & Nuclear Support Offi.:e of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
SUBJECT:
Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Response to NRC Notice of Violation Follow Up IR: 50-313/80-16 and 50-368/80-16 (File: 0232, 2-0232) l Gentlemen:
In response to a Notice of Violation for noncompliance item A as stated l
in your letter to Mr. William Cavanaugh III, dated October 23, 1980, the following additional information is provided.
RESPONSE
Thank you for the clarification concerning "being responsible for" as stated in the reference letter.
The Plant Safety Committee (PSC) will either review or approve the review of site QA Audit Reports that are required by AN0 Procedure 1000.02, Plant Safety Committee Operation.
To assure continued compliance, the PSC Chairman will receive a copy of site OA Audit Reports for PSC review in accordance with AN0 Procedure 1000.02.
Full compliance has been achieved.
Inspection Report 50-368/78-04 which is referenced in your October 23, 1980 letter stated that an NRC position was being developed to clarify the interpre-tation of "being responsible for".
Please provide a copy of this position clarification to the ANO General Manager as soon as it is available.
Very truly yours,
.s
/
l] 2n.A C YL J()
8101070 David C. Trimble, Manager, Licensing MEMOEA MCCLE SOUTH UT1UTIES SYSTEM
.T Mr. G. L. Madsen, Chief November 12, 1980 DCT:GAC:1p M
cc:
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555