ML20002B007: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
~._..,_
sr3.y. 9
.f y, t. -
5y -
5y -
                                    .1 r . -         ~ g - . --     rn .:       - -  u- - .
.1 r. -
sr3.y. 9
~ g -. --
                                                                                                          ,                      .f y, r., t . -
rn.:
    .g                .          .. _  ..          ~ ._ .. ,_        -    & _                  i    ..      .
u-
.g i
r.,
P o. Box 5000 e CLEVELANo. OHIO 44101 e TELEPHONE (216) 622 9800 e ILLUMINATING BLoG. *
P o. Box 5000 e CLEVELANo. OHIO 44101 e TELEPHONE (216) 622 9800 e ILLUMINATING BLoG. *
* SS PUBLICSoVARE
* SS PUBLICSoVARE e Best Lohon in the Nation g
                                                .                                                g  e Best Lohon in the Nation Daiwyn R. Davidson VICE PRES!OENT                                                                                               '
Daiwyn R. Davidson VICE PRES!OENT SYSTEM ENGmEERWG AND CONSTRUCTION December 4, 1980 Mr. James G. Keppler Director of Region III
SYSTEM ENGmEERWG AND CONSTRUCTION                                 December 4, 1980
']
* Mr. James G. Keppler                                                                                                                 '
Office of Inspection and Enforcement 2
Director of Region III                                                                               -
United States Nuclear Regulatory Commission v4 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
                                                                                                                          '] ;
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Significant Deficiency RE:
Office of Inspection and Enforcement                                                             ,,            , 2 United States Nuclear Regulatory Commission                                     , ,
Solubility of Mono-Sol 7-0015-3 CWS Polyvinyl Alcohol Film
v4 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:   Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Significant Deficiency RE:     Solubility of Mono-Sol 7-0015-3 CWS Polyvinyl Alcohol Film


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
The Interim Report regarding subject significant deficiency states the Final Report is scheduled to be submitted to your office by Dec6mber 15,1980.
The Interim Report regarding subject significant deficiency states the Final Report is scheduled to be submitted to your office by Dec6mber 15,1980.
As discussed with Mr. J. Konklin on November 26,,1980, we are continuing our investigation to determine the full extent of the problem and a method to assure sa tis fac to ry ' resolution. Until this investigation is completed, our Final Report cannot be prepared.           It is anticipated that the evaluation will be completed so that a Final Report can be submitted by February 1,1981.
As discussed with Mr. J. Konklin on November 26,,1980, we are continuing our investigation to determine the full extent of the problem and a method to assure sa tis fac to ry ' resolution. Until this investigation is completed, our Final Report cannot be prepared.
It is anticipated that the evaluation will be completed so that a Final Report can be submitted by February 1,1981.
Very truly yours,
Very truly yours,
                                                                          $ A*f Dalwyn      .
$ A*f Yo ]/$ ?/
Yo ]/$ ?/
Dalwyn Davidson Vice P esident System Engineering and Construction ksz cc:
Davidson Vice P esident System Engineering and Construction ksz cc:   J. Hughes NRC -- Site Mr. Victor Stello, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555               .
J. Hughes NRC -- Site Mr. Victor Stello, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
U. S. Nuclear Regulatory Commission
20555
                                                                                                                    '60/7 c/o Document Management Branch                                                                   di Washington, D.C.           20555
'60/7 U. S. Nuclear Regulatory Commission c/o Document Management Branch di Washington, D.C.
                                                                                                                      / C) 8 01200 0}}<3 gr
20555
                                                                    -                                                                      a ..,}}
/ C) 8 01200 0}}<3 gr a
..,}}

Latest revision as of 15:57, 23 December 2024

Notifies of Delay Until 810201 for Final Deficiency Rept Re Solubility of Mono-Sol 7-0015-3 CWS Polyvinyl Alcohol Film. Addl Time Is Needed to Determine Extent of Problem & Resolution
ML20002B007
Person / Time
Site: Perry  
Issue date: 12/04/1980
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8012090307
Download: ML20002B007 (1)


Text

.

~._..,_

sr3.y. 9

.f y, t. -

5y -

.1 r. -

~ g -. --

rn.:

u-

.g i

r.,

P o. Box 5000 e CLEVELANo. OHIO 44101 e TELEPHONE (216) 622 9800 e ILLUMINATING BLoG. *

  • SS PUBLICSoVARE e Best Lohon in the Nation g

Daiwyn R. Davidson VICE PRES!OENT SYSTEM ENGmEERWG AND CONSTRUCTION December 4, 1980 Mr. James G. Keppler Director of Region III

']

Office of Inspection and Enforcement 2

United States Nuclear Regulatory Commission v4 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Significant Deficiency RE:

Solubility of Mono-Sol 7-0015-3 CWS Polyvinyl Alcohol Film

Dear Mr. Keppler:

The Interim Report regarding subject significant deficiency states the Final Report is scheduled to be submitted to your office by Dec6mber 15,1980.

As discussed with Mr. J. Konklin on November 26,,1980, we are continuing our investigation to determine the full extent of the problem and a method to assure sa tis fac to ry ' resolution. Until this investigation is completed, our Final Report cannot be prepared.

It is anticipated that the evaluation will be completed so that a Final Report can be submitted by February 1,1981.

Very truly yours,

$ A*f Yo ]/$ ?/

Dalwyn Davidson Vice P esident System Engineering and Construction ksz cc:

J. Hughes NRC -- Site Mr. Victor Stello, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555

'60/7 U. S. Nuclear Regulatory Commission c/o Document Management Branch di Washington, D.C.

20555

/ C) 8 01200 0<3 gr a ..,}}