ML20002B007
| ML20002B007 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/04/1980 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8012090307 | |
| Download: ML20002B007 (1) | |
Text
.
~._..,_
sr3.y. 9
.f y, t. -
5y -
.1 r. -
~ g -. --
rn.:
u-
.g i
r.,
P o. Box 5000 e CLEVELANo. OHIO 44101 e TELEPHONE (216) 622 9800 e ILLUMINATING BLoG. *
- SS PUBLICSoVARE e Best Lohon in the Nation g
Daiwyn R. Davidson VICE PRES!OENT SYSTEM ENGmEERWG AND CONSTRUCTION December 4, 1980 Mr. James G. Keppler Director of Region III
']
Office of Inspection and Enforcement 2
United States Nuclear Regulatory Commission v4 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Significant Deficiency RE:
Solubility of Mono-Sol 7-0015-3 CWS Polyvinyl Alcohol Film
Dear Mr. Keppler:
The Interim Report regarding subject significant deficiency states the Final Report is scheduled to be submitted to your office by Dec6mber 15,1980.
As discussed with Mr. J. Konklin on November 26,,1980, we are continuing our investigation to determine the full extent of the problem and a method to assure sa tis fac to ry ' resolution. Until this investigation is completed, our Final Report cannot be prepared.
It is anticipated that the evaluation will be completed so that a Final Report can be submitted by February 1,1981.
Very truly yours,
$ A*f Yo ]/$ ?/
Dalwyn Davidson Vice P esident System Engineering and Construction ksz cc:
J. Hughes NRC -- Site Mr. Victor Stello, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555
'60/7 U. S. Nuclear Regulatory Commission c/o Document Management Branch di Washington, D.C.
20555
/ C) 8 01200 0<3 gr a ..,}}