                                                      ' ' 8.5 :l O P ** (J MISSISSIPPI POWEC&. LIGHT COMPANY Helping Build Mississippi                                 l
' ' 8.5 :l O P ** (J MISSISSIPPI POWEC&. LIGHT COMPANY Helping Build Mississippi
\                                                                                                       '
\\
l                         P. O . B O X 16 4 0, J A .!
l P. O. B O X 16 4 0, J A C f:!ji.O N, M I S S I S S I P P I 3 9 2 0 5 si:'
C f:!ji.O si:' "
:l 50 t
N,MISSISSIPPI39205 t
D[ HEM January 6, 1981 l
:l   50 D[ HEM                                                   January 6, 1981 l         80- 052 - 03b "                                                                               l l
80- 052 - 03b "
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
l Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 Attention:   Mr. J. P. O'Reilly, Director
Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Director


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
==SUBJECT:==
==SUBJECT:==
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/52, Standby Service Water Basin Fans, Status Report No. 2 AECM-81/22 l             On August 26, 1980, Mississippi Power & Light Company notified
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/52, Standby Service Water Basin Fans, Status Report No. 2 AECM-81/22 l
(       Mr. M. Hunt of your office of a Potentially Reportable Deficiency I         (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.
On August 26, 1980, Mississippi Power & Light Company notified
(
Mr. M. Hunt of your office of a Potentially Reportable Deficiency I
(PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.
This deficiency concerned the failure of pillow block bearings in the Standby Service Water Basin Fans.
This deficiency concerned the failure of pillow block bearings in the Standby Service Water Basin Fans.
l We are continuing our investigation of this item for reporta-bility under 10CFR50.55(e) and 10CFR21. Our status report on this deficiency is attached.
l We are continuing our investigation of this item for reporta-bility under 10CFR50.55(e) and 10CFR21. Our status report on this deficiency is attached.
            " We expect to complete our evaluation and report to you on this matter by April 22, 1981.
" We expect to complete our evaluation and report to you on this matter by April 22, 1981.
Yours truly, s
Yours truly, s
          ~
~
y J. P. McGaughy, Jr.                 /f EWC:mt Attachment cc:   Mr. N. L. Stampley       Mr. Victor Stello, Director             Mr. G. B. Taylor Mr. R. B. McGehee         Division of Insp. & Enforcement           South Miss. Electric Mr. T. B. Conner         U. S. Nuclear Regulatory Comm.             Power Association Washington, D.C. 20555                   P. O. Box 1589 Hattiesburg, MS 39401 83012005/9'                 Member Middle South Utilities System OFFICIAL cony
y J. P. McGaughy, Jr.
                                                                                                        )
/ f EWC:mt Attachment cc:
Mr. N. L. Stampley Mr. Victor Stello, Director Mr. G. B. Taylor Mr. R. B. McGehee Division of Insp. & Enforcement South Miss. Electric Mr. T. B. Conner U. S. Nuclear Regulatory Comm.
Power Association Washington, D.C.
20555 P. O. Box 1589 Hattiesburg, MS 39401 83012005/9' OFFICIAL cony Member Middle South Utilities System


      #                                                          Attschment to AECM-81/22 Paga 1 of 1 STATUS' REPORT #2 FOR PRD-80/52 I. Description of Deficiency Pillow block bearings on three of the eight Standby Service Water Cooling Tower Fans (Q1PA1C002A-A, B-A, and C-B) for GGNS Units 1 and 2 supplied by Ceramic Cooling Tower of Fort Worth, Texas, failed completely after 300 hours of operation. This condition did not meet the Bochtel Design Specification 9645-M-015.1, which specified a minimum life expectancy of 100,000 hours for radial and axial shaft load, roller bearings.                                                   !
Attschment to AECM-81/22 Paga 1 of 1 STATUS' REPORT #2 FOR PRD-80/52 I.
II. Approach to Resolution of the Deficiency The following actions have been planned to resolve this deficiency:
Description of Deficiency Pillow block bearings on three of the eight Standby Service Water Cooling Tower Fans (Q1PA1C002A-A, B-A, and C-B) for GGNS Units 1 and 2 supplied by Ceramic Cooling Tower of Fort Worth, Texas, failed completely after 300 hours of operation. This condition did not meet the Bochtel Design Specification 9645-M-015.1, which specified a minimum life expectancy of 100,000 hours for radial and axial shaft load, roller bearings.
: a. Determine the cause of the bearing failures;
II.
: b. Evaluate the deficiency to determine its affect on safe oper-ations of the GGNS. This evaluation will assume that the deficiency remains uncorrected throughout the expected life-time of the plant;
Approach to Resolution of the Deficiency The following actions have been planned to resolve this deficiency:
: c. Determine if similar deficiencies exist, or could exist, and take appropriate actions to correct them; and
a.
: d. Perform corrective actions to include actions to preclude recurrence.         _
Determine the cause of the bearing failures; b.
t The above actions are being tracked under Bechtel Quality Action Request, QAR F-218, which is available for inspection at the GGNS job site.
Evaluate the deficiency to determine its affect on safe oper-ations of the GGNS. This evaluation will assume that the deficiency remains uncorrected throughout the expected life-time of the plant; c.
III. Status of the Proposed Resolution The constructor and supplier are conducting evaluations to deter-mine the cause of the failure. The supplier has recommended re-placement of the damaged bearings with bearings having a different model number. Unit 1 bearings are scheduled to be replaced in January, 1981, with Unit 2 bearings to be replaced later.             Ceramic Cooling Tower has also recommended replacement of the drive shafts on the three affected fans with the drive shafts from the Unit 2 fans and that the Unit 1 drive shafts be returned to them for ev&luation.
Determine if similar deficiencies exist, or could exist, and take appropriate actions to correct them; and d.
IV. Reasons for Final Report Delay The investigation to determine reportability has not been completed.
Perform corrective actions to include actions to preclude recurrence.
V. Projected Completion ~Date I             A final report will be available April 22, 1981.
The above actions are being tracked under Bechtel Quality Action t
j ..                            . . . . - . - . . - - - - . . .      . . - - - . .  - . - - - ..}}
Request, QAR F-218, which is available for inspection at the GGNS job site.
III. Status of the Proposed Resolution The constructor and supplier are conducting evaluations to deter-mine the cause of the failure. The supplier has recommended re-placement of the damaged bearings with bearings having a different model number. Unit 1 bearings are scheduled to be replaced in January, 1981, with Unit 2 bearings to be replaced later.
Ceramic Cooling Tower has also recommended replacement of the drive shafts on the three affected fans with the drive shafts from the Unit 2 fans and that the Unit 1 drive shafts be returned to them for ev&luation.
IV.
Reasons for Final Report Delay The investigation to determine reportability has not been completed.
V.
Projected Completion ~Date I
A final report will be available April 22, 1981.
j
..}}

Latest revision as of 16:14, 23 December 2024

Interim Deficiency Rept 2 Re Standby Svc Water Basin Fans, Initially Reported 800826.Fan Pillow Block Bearings Failed After 300-h of Operation.Constructor & Supplier Conducting Evaluations.Final Rept Will Be Filed by 810422
ML20002E152
Person / Time
Site: Grand Gulf  
Issue date: 01/06/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-22, NUDOCS 8101260519
Download: ML20002E152 (2)


Text

.

' ' 8.5 :l O P ** (J MISSISSIPPI POWEC&. LIGHT COMPANY Helping Build Mississippi

\\

l P. O. B O X 16 4 0, J A C f:!ji.O N, M I S S I S S I P P I 3 9 2 0 5 si:'

l 50 t

D[ HEM January 6, 1981 l

80- 052 - 03b "

l Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/52, Standby Service Water Basin Fans, Status Report No. 2 AECM-81/22 l

On August 26, 1980, Mississippi Power & Light Company notified

(

Mr. M. Hunt of your office of a Potentially Reportable Deficiency I

(PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.

This deficiency concerned the failure of pillow block bearings in the Standby Service Water Basin Fans.

l We are continuing our investigation of this item for reporta-bility under 10CFR50.55(e) and 10CFR21. Our status report on this deficiency is attached.

" We expect to complete our evaluation and report to you on this matter by April 22, 1981.

Yours truly, s

~

y J. P. McGaughy, Jr.

/ f EWC:mt Attachment cc:

Mr. N. L. Stampley Mr. Victor Stello, Director Mr. G. B. Taylor Mr. R. B. McGehee Division of Insp. & Enforcement South Miss. Electric Mr. T. B. Conner U. S. Nuclear Regulatory Comm.

Power Association Washington, D.C.

20555 P. O. Box 1589 Hattiesburg, MS 39401 83012005/9' OFFICIAL cony Member Middle South Utilities System

Attschment to AECM-81/22 Paga 1 of 1 STATUS' REPORT #2 FOR PRD-80/52 I.

Description of Deficiency Pillow block bearings on three of the eight Standby Service Water Cooling Tower Fans (Q1PA1C002A-A, B-A, and C-B) for GGNS Units 1 and 2 supplied by Ceramic Cooling Tower of Fort Worth, Texas, failed completely after 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of operation. This condition did not meet the Bochtel Design Specification 9645-M-015.1, which specified a minimum life expectancy of 100,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for radial and axial shaft load, roller bearings.

II.

Approach to Resolution of the Deficiency The following actions have been planned to resolve this deficiency:

a.

Determine the cause of the bearing failures; b.

Evaluate the deficiency to determine its affect on safe oper-ations of the GGNS. This evaluation will assume that the deficiency remains uncorrected throughout the expected life-time of the plant; c.

Determine if similar deficiencies exist, or could exist, and take appropriate actions to correct them; and d.

Perform corrective actions to include actions to preclude recurrence.

The above actions are being tracked under Bechtel Quality Action t

Request, QAR F-218, which is available for inspection at the GGNS job site.

III. Status of the Proposed Resolution The constructor and supplier are conducting evaluations to deter-mine the cause of the failure. The supplier has recommended re-placement of the damaged bearings with bearings having a different model number. Unit 1 bearings are scheduled to be replaced in January, 1981, with Unit 2 bearings to be replaced later.

Ceramic Cooling Tower has also recommended replacement of the drive shafts on the three affected fans with the drive shafts from the Unit 2 fans and that the Unit 1 drive shafts be returned to them for ev&luation.

IV.

Reasons for Final Report Delay The investigation to determine reportability has not been completed.

V.

Projected Completion ~Date I

A final report will be available April 22, 1981.