ML20003C550: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:%
{{#Wiki_filter:%
4.
4.
    'Af M                                                       sm 4se.cooo 027C" 15219 2DLC-3924
'Af M
                                                                    ~
sm 4se.cooo 027C" 2DLC-3924 15219 January 29, 1981
January 29, 1981                   ~
~
                                                            /5 United States Nuclear Regulatory Commission             /g                 g Region I 631 Park Avenue d7/ k
/5
                                                          '            ~j[
~
King of Prussia, PA       19406                             IES       yggy    ._9 ATTENTION:     Mr. Boyce H. Grier, Director           U      Duh% a/       g
United States Nuclear Regulatory Commission
/g g
Region I d7/ k
~j[
631 Park Avenue King of Prussia, PA 19406 IES
._9 yggy N:(\\ Duh%
U a/
ATTENTION:
Mr. Boyce H. Grier, Director g
N
/
g, \\ )


==SUBJECT:==
==SUBJECT:==
BEAVER VALLEY POWER STATION - UNIT NO. 2 N:(\
BEAVER VALLEY POWER STATION - UNIT NO. 2
N
/
                                                            #                  /
Docket No. 50-412 IE Bulletin No. 80-23 Failures of Solenoid Valves Manufacturered by Valtor Engineering Corporation Gentlemen:
Docket No. 50-412                               %      g, \ /)
IE Bulletin No. 80-23 Failures of Solenoid Valves Manufacturered by Valtor Engineering Corporation Gentlemen:
We have received IE Bulletin No. 80-23 which reported that Valcor Engineering Corporation (Valcor) has submitted 10CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.
We have received IE Bulletin No. 80-23 which reported that Valcor Engineering Corporation (Valcor) has submitted 10CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.
A review was performed by Stone G Webster and Westinghouse within their respective scopes of supply and it has been deter-mined that no Valcor valves are being supplied on Beaver Valley Power Station - Unit No. 2 as of this date.
A review was performed by Stone G Webster and Westinghouse within their respective scopes of supply and it has been deter-mined that no Valcor valves are being supplied on Beaver Valley Power Station - Unit No. 2 as of this date.
The manpower expended in review and preparation of this report required by this IE Bulletin is about five hours.
The manpower expended in review and preparation of this report required by this IE Bulletin is about five hours.
Duquesne Light Company By   of Q    f I,
Duquesne Light Company Q
: k. J.~Woolever Vice President cc:     Mr. V. Stello (15)
I, By of f
: k. J.~Woolever Vice President cc:
Mr. V. Stello (15)
Mr. K. Jabbour 8103060'/20 h}}
Mr. K. Jabbour 8103060'/20 h}}

Latest revision as of 14:30, 23 December 2024

Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. No Valcor Valves Being Supplied to Facility
ML20003C550
Person / Time
Site: Beaver Valley
Issue date: 01/29/1981
From: Woolever E
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2DLC-3924, IEB-80-23, NUDOCS 8103060420
Download: ML20003C550 (1)


Text

%

4.

'Af M

sm 4se.cooo 027C" 2DLC-3924 15219 January 29, 1981

~

/5

~

United States Nuclear Regulatory Commission

/g g

Region I d7/ k

~j[

631 Park Avenue King of Prussia, PA 19406 IES

._9 yggy N:(\\ Duh%

U a/

ATTENTION:

Mr. Boyce H. Grier, Director g

N

/

g, \\ )

SUBJECT:

BEAVER VALLEY POWER STATION - UNIT NO. 2

/

Docket No. 50-412 IE Bulletin No. 80-23 Failures of Solenoid Valves Manufacturered by Valtor Engineering Corporation Gentlemen:

We have received IE Bulletin No. 80-23 which reported that Valcor Engineering Corporation (Valcor) has submitted 10CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.

A review was performed by Stone G Webster and Westinghouse within their respective scopes of supply and it has been deter-mined that no Valcor valves are being supplied on Beaver Valley Power Station - Unit No. 2 as of this date.

The manpower expended in review and preparation of this report required by this IE Bulletin is about five hours.

Duquesne Light Company Q

I, By of f

k. J.~Woolever Vice President cc:

Mr. V. Stello (15)

Mr. K. Jabbour 8103060'/20 h