ML20003H970: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Alibims P:wer Company 600 Nor:n 18th Street | {{#Wiki_filter:Alibims P:wer Company 600 Nor:n 18th Street | ||
) | |||
Birmingham, Altbam335291 | Post Offica Box 2S41 | ||
Telephone 205 250-1000 | ) | ||
Senior Vice President | Birmingham, Altbam335291 Telephone 205 250-1000 j | ||
F. L CLAYTON, JR. | |||
os | Senior Vice President Alabama Power the swit:em electnc system May 4, 1981 | ||
~ | |||
os A | |||
101 Marietta Street, N.W. | Docket No. 50-348 U. S. Nuclear Regulatory Commission i-O7 /Sg7 A u | ||
Office of Inspection and Enforcement h | |||
j ~_, | Qe,%'*'r s /q Region II b | ||
Atlanta, Georgia 30303 | "N U. 8 101 Marietta Street, N.W. | ||
O N | |||
Suite 3100 j ~_, | |||
3 Atlanta, Georgia 30303 | |||
==Dear Sir:== | ==Dear Sir:== | ||
Joseph M. Farley Nuclear Plant, Unit 1, License Event Reports Nos. | Joseph M. Farley Nuclear Plant, Unit 1, License Event Reports Nos. | ||
LER 81-012/03-L-0, LER 81-015/03-L-0, LER 81-016/03-L-0, and LER 81-017/ | LER 81-012/03-L-0, LER 81-015/03-L-0, LER 81-016/03-L-0, and LER 81-017/ | ||
03-L-0 are forwarded herewith with three (3) copies of each, in accordance | 03-L-0 are forwarded herewith with three (3) copies of each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written | ||
~ | |||
with FNP Technical Specification 6.9 to provide thirty (30) days written notification of the occurrence. | notification of the occurrence. | ||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very truly, F. L. Clayton, | Yours very truly, | ||
) | |||
FLCJr/JRC:nac Enclosure xc: 6 (30 copies) | F. L. Clayton, FLCJr/JRC:nac Enclosure xc: 6 (30 copies) | ||
Director, MIPC (3 copies) 001 | Director, MIPC (3 copies) 001 s | ||
ib l | |||
1 l | 1 l | ||
5 | 5 sl os os o 953 | ||
_}} | |||
Latest revision as of 11:54, 23 December 2024
Text
Alibims P:wer Company 600 Nor:n 18th Street
)
Post Offica Box 2S41
)
Birmingham, Altbam335291 Telephone 205 250-1000 j
F. L CLAYTON, JR.
Senior Vice President Alabama Power the swit:em electnc system May 4, 1981
~
os A
Docket No. 50-348 U. S. Nuclear Regulatory Commission i-O7 /Sg7 A u
Office of Inspection and Enforcement h
Qe,%'*'r s /q Region II b
"N U. 8 101 Marietta Street, N.W.
O N
Suite 3100 j ~_,
3 Atlanta, Georgia 30303
Dear Sir:
Joseph M. Farley Nuclear Plant, Unit 1, License Event Reports Nos.
LER 81-012/03-L-0, LER 81-015/03-L-0, LER 81-016/03-L-0, and LER 81-017/
03-L-0 are forwarded herewith with three (3) copies of each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written
~
notification of the occurrence.
If you have any questions, please advise.
Yours very truly,
)
F. L. Clayton, FLCJr/JRC:nac Enclosure xc: 6 (30 copies)
Director, MIPC (3 copies) 001 s
ib l
1 l
5 sl os os o 953
_