| number = ML20029C510
| number = ML20029C510
| issue date = 10/12/1993
| issue date = 10/12/1993
| title = Informs That Provisions of Amends 175 & 178 to Licenses DPR-44 & DPR-56 Issued Via NRC 930528 Ltr Implemented on 930528
| title = Informs That Provisions of Amends 175 & 178 to Licenses DPR-44 & DPR-56 Issued Via NRC Implemented on 930528
| author name = Hunger G
| author name = Hunger G
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9310190150
| document report number = NUDOCS 9310190150
| title reference date = 05-28-1993
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:, _ _ _ _
{{#Wiki_filter:, _ _ _
: g.                      PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
PHILADELPHIA ELECTRIC COMPANY g.
WAYNE, PA 19087-5691 October 12, 1993       l (215) 640-60(X)                                   !
NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
Docket Nos. 50-277 50-278 License Nos. DPR-44 STATION SUPPORT DEPARTMENT DPR-56      ;
WAYNE, PA 19087-5691 October 12, 1993 l
i i
(215) 640-60(X)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,       DC   20555
Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 STATION SUPPORT DEPARTMENT i
i U.
S.
Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request (TSCR) 92-21                         !
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request (TSCR) 92-21
I


==Dear Sir:==
==Dear Sir:==
l By letter dated May 28, 1993, the NRC issued Amendment Nos.                       l 175 and 178 to Facility Operating License 1 sos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
By {{letter dated|date=May 28, 1993|text=letter dated May 28, 1993}}, the NRC issued Amendment Nos.
The amendments consisted of changes to the Technical Specifications (TS) as proposed by Philadelphia Electric                                 '
175 and 178 to Facility Operating License 1 sos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
_ Company's (PECo's) letter dated February 5, 1993.
The amendments consisted of changes to the Technical Specifications (TS) as proposed by Philadelphia Electric
_ Company's (PECo's) {{letter dated|date=February 5, 1993|text=letter dated February 5, 1993}}.
The amendments revise TS Section 5.5.D concerning fuel storage criteria and allow the use of the maximum k-infinity method of demonstrating compliance with fuel storage criticality limits, replacing the U-235 loading / enrichment method.
The amendments revise TS Section 5.5.D concerning fuel storage criteria and allow the use of the maximum k-infinity method of demonstrating compliance with fuel storage criticality limits, replacing the U-235 loading / enrichment method.
In the May 28, 1993 letter, the NRC requested PECo to notify them when the provisions of the amendments had been fully implemented.       This letter is to inform you that the provisions of amendments 175 and 178 were fully implemented on May 28, 1993.
In the {{letter dated|date=May 28, 1993|text=May 28, 1993 letter}}, the NRC requested PECo to notify them when the provisions of the amendments had been fully implemented.
This letter is to inform you that the provisions of amendments 175 and 178 were fully implemented on May 28, 1993.
If you have any questions concerning this matter please contact us.
If you have any questions concerning this matter please contact us.
Sincerely, 1800 %                          SG. ,b   b ' , Jr.,hDirector K. Junger Licensing Section ec: T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident Inspector,             PBAPS W. P. Dornsife, Commonwealth of Pennsylvania                       r 0
Sincerely, S,b b ', Jr.,h 1800 %
9310190150 931012         P                                         L PDR   ADOCK 05000277 R                                               MD(
G.
P                PDR     b}}
K.
Junger Director Licensing Section ec:
T.
T.
Martin, Administrator, Region I, USNRC W.
L. Schmidt, USNRC Senior Resident Inspector, PBAPS W.
P. Dornsife, Commonwealth of Pennsylvania r
0 9310190150 931012 P
L PDR ADOCK 05000277 R MD P
PDR b
(}}

Latest revision as of 16:53, 20 December 2024

Informs That Provisions of Amends 175 & 178 to Licenses DPR-44 & DPR-56 Issued Via NRC Implemented on 930528
ML20029C510
Person / Time
Site: Peach Bottom  
Issue date: 10/12/1993
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9310190150
Download: ML20029C510 (1)


Text

, _ _ _

PHILADELPHIA ELECTRIC COMPANY g.

NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.

WAYNE, PA 19087-5691 October 12, 1993 l

(215) 640-60(X)

Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 STATION SUPPORT DEPARTMENT i

i U.

S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request (TSCR) 92-21

Dear Sir:

By letter dated May 28, 1993, the NRC issued Amendment Nos.

175 and 178 to Facility Operating License 1 sos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.

The amendments consisted of changes to the Technical Specifications (TS) as proposed by Philadelphia Electric

_ Company's (PECo's) letter dated February 5, 1993.

The amendments revise TS Section 5.5.D concerning fuel storage criteria and allow the use of the maximum k-infinity method of demonstrating compliance with fuel storage criticality limits, replacing the U-235 loading / enrichment method.

In the May 28, 1993 letter, the NRC requested PECo to notify them when the provisions of the amendments had been fully implemented.

This letter is to inform you that the provisions of amendments 175 and 178 were fully implemented on May 28, 1993.

If you have any questions concerning this matter please contact us.

Sincerely, S,b b ', Jr.,h 1800 %

G.

K.

Junger Director Licensing Section ec:

T.

T.

Martin, Administrator, Region I, USNRC W.

L. Schmidt, USNRC Senior Resident Inspector, PBAPS W.

P. Dornsife, Commonwealth of Pennsylvania r