| Line 1: |
Line 1: |
| {{Adams
| | #REDIRECT [[05000311/LER-1981-130, Forwards LER 81-130/03L-0.Detailed Event Analysis Encl]] |
| | number = ML20040C945
| |
| | issue date = 01/15/1982
| |
| | title = Forwards LER 81-130/03L-0.Detailed Event Analysis Encl
| |
| | author name = Midura H
| |
| | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| |
| | addressee name = Haynes R
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| |
| | docket = 05000311
| |
| | license number =
| |
| | contact person =
| |
| | document report number = NUDOCS 8201290398
| |
| | package number = ML20040C946
| |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| |
| | page count = 3
| |
| }}
| |
| | |
| =Text=
| |
| {{#Wiki_filter:'
| |
| O PSEG Put> tic Service Electric and Gas Company P.O. Box 168 Hancocks Bridge, New Jersev 08038 Salem Generating Station January 15, 1982 Mr. R. C. Ilaynes m
| |
| ~
| |
| Director of USNRC T- s Office of Inspection and Enforcement ,
| |
| Region 1 @ (a 631 Park Avenue RECElygo King of Prussia, Pennsylvania 19406 Mgg [
| |
| 6}
| |
| | |
| ==Dear Mr. Ilaynes :==
| |
| 'k-9,\
| |
| fNhf]pgM U ice q LICENSE NO. DPR-75 ,
| |
| DOCKET NO. 50-311 N/ f REPORTABLE OCCURRENCE 81-130/03L Pursuant to the requirements of Salem Generating Station Unit No. 2, Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 81-130/03L. This report is required within thirty (30) days of the occurrence.
| |
| Sincerely yours, l ]lffltrw' H. J. Midura General Manager -
| |
| Salem Operations FD: al Distribution QCC:
| |
| 8201290398 820115 Th e E. e r g'y' P t' ,sm nn, , n y hDRADOCK05000 b
| |
| | |
| . . . . . m
| |
| . . e
| |
| ?eport Number: 81-130/03L Report Date: 01-15-82 Occurrence Date: 12-19-81 and 12-21-81 Facility: Salem Generating Station, Unit 2 Public Service Electric & Gas Company H acocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
| |
| Axial Flux Difference - Outside the Target Band.
| |
| This report was initiated by Incident Reports 81-505, 81-506, 81-507, and 81-508.
| |
| CONDITIONS PRIOR TO OCCURRENCE:
| |
| 12-19-81 Mode 1 - Rx Power 50% - Unit Load 580 MWe 12-21-81 Mode 1 - Rx Power 48% - Unit Load 560 MWe DESCRIPTION OF OCCURRENCE:
| |
| On four separate occasions, due to Load Rejection Testing, the Axial Flux Difference (AFD) shifted outside the +5% target band.
| |
| On December 19, 1981 at 0125, 0623, and 2220 hours, during power reductions of 75% to 50%, 75% to 57%, and 85% to 50%, the AFD d
| |
| shifted outside the target band and Action Statement 3.2.1.a.2 was entered. Again, at 2040 hours, December 21, 1981, a power-reduction from 85% to 48% shifted the AFD outside the target.
| |
| kand and the Action Statement was entered.
| |
| This occurrence constituted operation in a degraded mode in accordance with Technical Specification 6.9.1.9.b.
| |
| DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
| |
| As power decreased, the AFD shifted upward. At the same time, the rods going in pushed the flux downward, causing the AFD to shift out of the target band.
| |
| ANALYSIS OF OCCURRENCE:
| |
| Technical Specification 3.2.1.a.2 requires:
| |
| Power operation may continue provided the indicated AFD has not been outside of the +5% target band for more than 1 hour penalty deviation cumulative during the previous 24 hours, and the indicated AFD is within the limits shown on Figure 3.2-1. Otherwise, reduce thermal power within 30 minutes.
| |
| | |
| LER 130/03L CORRECTIVE ACTION:
| |
| After the control rods were in and the flux stabilized, the AFD shifted back into the +5% target band. At 0148, 0628, and 2248 hours December 19, 198T, and 2107 hours, December 21, 1981, respectively, Action Statement 3.2.1.a.2 was terminated.
| |
| FAILURE DATA:
| |
| Not Applicable Prepared By F. Dickey //cI h[ '"
| |
| GendraY Manager -
| |
| Salem Operations SORC Meeting No. 82- 08 v}}
| |