ML20041A103: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
s,-                                                                                                       y
s,-
                                                                                                      .9                 i hL                                                                                               A N AVED 7@A                                                                                      $ M223R2d j,                  FEB101981 M                                                                                   ,
y
s                           si2ussrooo
.9 i
          ',smIo7E"
hL A N AVED 7@
: d.                                                                                          k'/h,1Q ; }s                 ~
$ M223R2d,
2DI.C4478 United States Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Washington, D.C. 20555 ATTENTION:       Mr. H. Denton, Director
A j
FEB101981 M
si2ussrooo s
' Io7E" k'/h d.
2DI.C
~ 4478
,1Q ; }s
,sm United States Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Washington, D.C.
20555 ATTENTION:
Mr. H. Denton, Director


==SUBJECT:==
==SUBJECT:==
BEAVER VALLEY POWER STATION - UNIT NO. 2 DOCKET NO. 50-412 ORGANIZATIONAL CHANGES i
BEAVER VALLEY POWER STATION - UNIT NO. 2 DOCKET NO. 50-412 ORGANIZATIONAL CHANGES i
Gentlemen :                                                                                                                           I This letter is to inform you of our recent organizational changes for Beaver Valley Power Station Unit No. 2.
Gentlemen :
Our letter of January 8,1982 reported Mr. Washabaugh's assumption of the role of Project Manager.                                                     Mr. E. J. Woolaver has now been appointed as Vice President of Nuclear Construction and has moved to the Beaver Valley 2 Project Of fice. Mr. E. F. Kurtz has replaced Mr. R. E. Martin as the licensing representative for the project. In addition, Mr. H. M. Siegel has been added as the Director of Engineering.
I This letter is to inform you of our recent organizational changes for Beaver Valley Power Station Unit No. 2.
Our letter of January 8,1982 reported Mr. Washabaugh's assumption of the role of Project Manager.
Mr. E. J. Woolaver has now been appointed as Vice President of Nuclear Construction and has moved to the Beaver Valley 2 Project Of fice.
Mr. E. F. Kurtz has replaced Mr. R. E. Martin as the licensing representative for the project. In addition, Mr. H. M. Siegel has been added as the Director of Engineering.
As a result of these changes, the Beaver Valley Unit 2 correspondence distribution list for Duquesne Light Company should consist of the following people:
As a result of these changes, the Beaver Valley Unit 2 correspondence distribution list for Duquesne Light Company should consist of the following people:
: 1. Mr. E. J. Woolever, Vice President , Nuclear Construction
1.
: 2. Mr. R. J. Washabaugh, Project Manager
Mr. E.
: 3. Mr. E. F. Kurtz, Director of Licensing
J. Woolever, Vice President, Nuclear Construction 2.
: 4. Mr. H. M. Siegel, Director of Engineering
Mr. R. J. Washabaugh, Project Manager 3.
: 5. Mr. C. E. Ewing, Quality Assurance Manager The first four addressee. are located at the following address:
Mr. E.
Beaver Valley Two Project Duquesne Light Company Robinson Plaza Building No. 2 Suite #210 PA Route 60 Pittsbu rgh, PA 15205 8202190100 920210 PDR ADOCK 05000412                                                                                                             ig    (y H                 PDR
F. Kurtz, Director of Licensing 4.
Mr. H. M. Siegel, Director of Engineering 5.
Mr. C. E. Ewing, Quality Assurance Manager The first four addressee. are located at the following address:
Beaver Valley Two Project Duquesne Light Company Robinson Plaza Building No. 2 Suite #210 PA Route 60 Pittsbu rgh, PA 15205 i g (y
8202190100 920210 PDR ADOCK 05000412 H
PDR


                    ' Mr. Ewing's address ~ remains as follows:
' Mr. Ewing's address ~ remains as follows:
Quality Assuran'ce Department-Duquesne Light Company.
Quality Assuran'ce Department-Duquesne Light Company.
P.O. Box'186 Shippingport, PA. 15077-DUQUESNE LIGHT C0ra'ANY
P.O. Box'186 Shippingport, PA. 15077-DUQUESNE LIGHT C0ra'ANY
                                                                                                                  /.
/.
                                                            -By n,f T.(f.Doolever Vice President cc: Mr. _R. 'DeYoung, Director Office of Inspection and Enforcement Mr. D. Eisenhut, Director
-By n,f T.(f.Doolever Vice President cc:
            . Division of Licensing Ms. E. Doolittle, Project Manager Division of Licensing Mr.. G. Walton, Resident Inspector Beaver Valley Power. Station Unit No. 2 Mr. R. Haynes, Administrator Region I
Mr. _R. 'DeYoung, Director Office of Inspection and Enforcement Mr. D. Eisenhut, Director
                                                                                                                    ~}}
. Division of Licensing Ms. E. Doolittle, Project Manager Division of Licensing Mr.. G. Walton, Resident Inspector Beaver Valley Power. Station Unit No. 2 Mr. R. Haynes, Administrator Region I
~}}

Latest revision as of 20:35, 19 December 2024

Informs of Organizational Changes.Correspondence Distribution List Submitted
ML20041A103
Person / Time
Site: Beaver Valley
Issue date: 02/10/1982
From: Woolever E
DUQUESNE LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2DLC-4478, NUDOCS 8202190100
Download: ML20041A103 (2)


Text

_

s,-

y

.9 i

hL A N AVED 7@

$ M223R2d,

A j

FEB101981 M

si2ussrooo s

' Io7E" k'/h d.

2DI.C

~ 4478

,1Q ; }s

,sm United States Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Washington, D.C.

20555 ATTENTION:

Mr. H. Denton, Director

SUBJECT:

BEAVER VALLEY POWER STATION - UNIT NO. 2 DOCKET NO. 50-412 ORGANIZATIONAL CHANGES i

Gentlemen :

I This letter is to inform you of our recent organizational changes for Beaver Valley Power Station Unit No. 2.

Our letter of January 8,1982 reported Mr. Washabaugh's assumption of the role of Project Manager.

Mr. E. J. Woolaver has now been appointed as Vice President of Nuclear Construction and has moved to the Beaver Valley 2 Project Of fice.

Mr. E. F. Kurtz has replaced Mr. R. E. Martin as the licensing representative for the project. In addition, Mr. H. M. Siegel has been added as the Director of Engineering.

As a result of these changes, the Beaver Valley Unit 2 correspondence distribution list for Duquesne Light Company should consist of the following people:

1.

Mr. E.

J. Woolever, Vice President, Nuclear Construction 2.

Mr. R. J. Washabaugh, Project Manager 3.

Mr. E.

F. Kurtz, Director of Licensing 4.

Mr. H. M. Siegel, Director of Engineering 5.

Mr. C. E. Ewing, Quality Assurance Manager The first four addressee. are located at the following address:

Beaver Valley Two Project Duquesne Light Company Robinson Plaza Building No. 2 Suite #210 PA Route 60 Pittsbu rgh, PA 15205 i g (y

8202190100 920210 PDR ADOCK 05000412 H

PDR

' Mr. Ewing's address ~ remains as follows:

Quality Assuran'ce Department-Duquesne Light Company.

P.O. Box'186 Shippingport, PA. 15077-DUQUESNE LIGHT C0ra'ANY

/.

-By n,f T.(f.Doolever Vice President cc:

Mr. _R. 'DeYoung, Director Office of Inspection and Enforcement Mr. D. Eisenhut, Director

. Division of Licensing Ms. E. Doolittle, Project Manager Division of Licensing Mr.. G. Walton, Resident Inspector Beaver Valley Power. Station Unit No. 2 Mr. R. Haynes, Administrator Region I

~