ML20041A103
| ML20041A103 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/10/1982 |
| From: | Woolever E DUQUESNE LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 2DLC-4478, NUDOCS 8202190100 | |
| Download: ML20041A103 (2) | |
Text
_
s,-
y
.9 i
hL A N AVED 7@
$ M223R2d,
A j
FEB101981 M
si2ussrooo s
' Io7E" k'/h d.
2DI.C
~ 4478
,1Q ; }s
,sm United States Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Washington, D.C.
20555 ATTENTION:
Mr. H. Denton, Director
SUBJECT:
BEAVER VALLEY POWER STATION - UNIT NO. 2 DOCKET NO. 50-412 ORGANIZATIONAL CHANGES i
Gentlemen :
I This letter is to inform you of our recent organizational changes for Beaver Valley Power Station Unit No. 2.
Our letter of January 8,1982 reported Mr. Washabaugh's assumption of the role of Project Manager.
Mr. E. J. Woolaver has now been appointed as Vice President of Nuclear Construction and has moved to the Beaver Valley 2 Project Of fice.
Mr. E. F. Kurtz has replaced Mr. R. E. Martin as the licensing representative for the project. In addition, Mr. H. M. Siegel has been added as the Director of Engineering.
As a result of these changes, the Beaver Valley Unit 2 correspondence distribution list for Duquesne Light Company should consist of the following people:
1.
Mr. E.
J. Woolever, Vice President, Nuclear Construction 2.
Mr. R. J. Washabaugh, Project Manager 3.
Mr. E.
F. Kurtz, Director of Licensing 4.
Mr. H. M. Siegel, Director of Engineering 5.
Mr. C. E. Ewing, Quality Assurance Manager The first four addressee. are located at the following address:
Beaver Valley Two Project Duquesne Light Company Robinson Plaza Building No. 2 Suite #210 PA Route 60 Pittsbu rgh, PA 15205 i g (y
8202190100 920210 PDR ADOCK 05000412 H
' Mr. Ewing's address ~ remains as follows:
Quality Assuran'ce Department-Duquesne Light Company.
P.O. Box'186 Shippingport, PA. 15077-DUQUESNE LIGHT C0ra'ANY
/.
-By n,f T.(f.Doolever Vice President cc:
Mr. _R. 'DeYoung, Director Office of Inspection and Enforcement Mr. D. Eisenhut, Director
. Division of Licensing Ms. E. Doolittle, Project Manager Division of Licensing Mr.. G. Walton, Resident Inspector Beaver Valley Power. Station Unit No. 2 Mr. R. Haynes, Administrator Region I
~