OPERATING DATA REPORT DOCKET NO. 50-369 DATE  I- N C051PLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING STATUS Notes
OPERATING DATA REPORT 50-369 DOCKET NO.
: 1. Unit Name:               McGuire #1
I-N DATE C051PLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING STATUS Notes
: 2. Reporting Period:         June 1. 1982 - June 30, 1982
: 1. Unit Name:
: 3. Licensed Thennal Power IS!Wil;             3 411
McGuire #1
: 4. Nameplate Rating (Grow Slwe p                 1 220
: 2. Reporting Period:
: 5. Design Electrical RatingINet alWel:             1 180
June 1. 1982 - June 30, 1982 3 411
: 6. Slavimum Dependstile Capacity tGrow .\twe):
: 3. Licensed Thennal Power IS!Wil; 1 220
: 4. Nameplate Rating (Grow Slw p e
1 180
: 5. Design Electrical RatingINet alWel:
: 6. Slavimum Dependstile Capacity tGrow.\\twe):
: 7. Masimum Dependable Capacity INet 5the):
: 7. Masimum Dependable Capacity INet 5the):
S. If Changes Occur in Capacity Itatinp tiiems Number 3 Through 7)Since Last Report.Gise Reasons:
S. If Changes Occur in Capacity Itatinp tiiems Number 3 Through 7)Since Last Report.Gise Reasons:
None
None
: 9. Power Level To Which Restricted.lf Any INet alwe):           None
: 9. Power Level To Which Restricted.lf Any INet alwe):
None
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This Month           Yr. to.Date         Cumulative
This Month Yr. to.Date Cumulative 720.0 4 343.0 5 087.0
              !!. Ilours in Reporting Period                            720.0               4 343.0             5 087.0
!!. Ilours in Reporting Period
: 12. Number Of II.mrs Reactor was Critical                 516.9               3 548.2             3 593.9
: 12. Number Of II.mrs Reactor was Critical 516.9 3 548.2 3 593.9
: 13. Reactor Resene Shutdown flours
: 13. Reactor Resene Shutdown flours
: 14. Ilours Generator On Line                               514.3               3 321.3             3 567.0
: 14. Ilours Generator On Line 514.3 3 321.3 3 567.0
: 15. Unit Resene Shutdown llours
: 15. Unit Resene Shutdown llours 1 266 005 6 801 485 6 886 440
: 16. Gross Thermal Energy Generated (>lWil)             1 266 005                6 801 485            6 886 440  .
: 16. Gross Thermal Energy Generated (>lWil)
: 17. Grow Electrical Energy Generated (MWil)               444 564 _ ,         2 322 360           2 350 796
: 17. Grow Electrical Energy Generated (MWil) 444 564 _,
: 18. Net Electrical Energy Generated (alwil)               420 468              2 177 661            2 196 717
2 322 360 2 350 796 420 468 2 177 661 2 196 717
: 19. Unit Sernce Factor                                     71.4                     81.1               70.1
: 18. Net Electrical Energy Generated (alwil)
: 20. Unit Availability Factor                               71.4                     81.1               70.1
: 19. Unit Sernce Factor 71.4 81.1 70.1
: 21. Unit Capacity Factor IUsing MDC Neti                   49.5                     42.5               36.6
: 20. Unit Availability Factor 71.4 81.1 70.1
: 22. Unit Capacity Factor (Using DER Net)                   65.9                      56.6                48.7
: 21. Unit Capacity Factor IUsing MDC Neti 49.5 42.5 36.6 65.9 56.6 48.7
: 23. Unit Forced Outace Rate                                 28.6                       18.9               29.9
: 22. Unit Capacity Factor (Using DER Net)
            - 24. Shutdowns Scheduled Oser Nest 6 \lonths (Type. Date.and Duration of Facht:
: 23. Unit Forced Outace Rate 28.6 18.9 29.9
- 24. Shutdowns Scheduled Oser Nest 6 \\lonths (Type. Date.and Duration of Facht:
Eddy Current testing - October 27, 1982 - 3 weeks
Eddy Current testing - October 27, 1982 - 3 weeks
: 25. If Shut Down At End Of Report Ptrind. Estimated Date of Startup:     July 18. 1982 j               26. Units in Test Status (Prior io Commercial Operation):                     Forecast             Achiesed INITI \ L CillTICA LI T Y INITI A L 1 LLC 1 RICI T Y CO\l\ll.itCIAL OPLit A IION YW DO$foho@
: 25. If Shut Down At End Of Report Ptrind. Estimated Date of Startup:
PDR
July 18. 1982 j
: 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achiesed INITI \\ L CillTICA LI T Y INITI A L 1 LLC 1 RICI T Y CO\\l\\ll.itCIAL OPLit A IION DO$foho@
YW PDR


7                                                                           ~
7
50-360 UNIT SilUTDOWNS AND POWElt HEDUC110NS                   DOCKET NO.
~
UNIT NAME           McGuire 1 DATE         7-15-82 COMPLETED BY           .I . A. Renvist Itt: PORT MONTil June, 1982 TELEPil0NE       704-373-Fi s s?
UNIT SilUTDOWNS AND POWElt HEDUC110NS DOCKET NO.
                                                        . 3                                   -
50-360 UNIT NAME McGuire 1 DATE 7-15-82 Itt: PORT MONTil June, 1982 COMPLETED BY
                                ;,    .! E     3     kYk             Licensee     ,E -r,       t,               Cause & Corrective N...         Date       g     3g         (   .g g 5           Event       s?         $.''?                    Actiim in H
.I.
                                      $5         $    jgg             Repini e   rE 0
A.
                                                                                                ]U                 Prevent Itceurtente b
Renvist TELEPil0NE 704-373-Fi s s?
8-p       82-06-01     F       --
3
H         --
.! E 3
CB         HTEXCH Holding at 75% power for thirty (30) da /
kYk Licensee
,E -r,
$.''?
t, Cause & Corrective N...
Date g
3g
(
.g g 5 Event s?
Actiim in
$5 jgg Repini e rE 0
]U Prevent Itceurtente H
b 8-p 82-06-01 F
H CB HTEXCH Holding at 75% power for thirty (30) da /
test run at this level.
test run at this level.
9-p       82-06-05     F       --
9-p 82-06-05 F
A         --
A HA INSTRU Control runback from 75% to 50% power due to loss of "Bj' feedwater pump when a suction transmitter failed.
HA         INSTRU Control runback from 75% to 50% power due to loss of "Bj' feedwater pump when a suction transmitter failed.
11 82-06-13 F
11         82-06-13     F     53.62       A       3                         IA         INSTRU Loss of more than one (1) reactor coolant (NC) flow transmitter caused unit trip.
53.62 A
10-p       82-06-15     F       --
3 IA INSTRU Loss of more than one (1) reactor coolant (NC) flow transmitter caused unit trip.
H       --
10-p 82-06-15 F
CB-       HTEXCH Holding at 75% power for a thirty (30) day test run.
H CB-HTEXCH Holding at 75% power for a thirty (30) day test run.
l 11-p       82-06-22     F       --
l 11-p 82-06-22 F
H       --
H CB HTEXCH Reduced to 50% power following completion of test run at 75% power.
CB         HTEXCH Reduced to 50% power following completion of test run at 75% power.
12-p 82-06-23 F
12-p       82-06-23     F       --
A HA
A       --
'INSTRU Turbine control runback due to incorrect pressure switch setpoint.
HA        'INSTRU   Turbine control runback due to incorrect pressure switch setpoint.
I 2
I                     2                                                     1                               4 F: Finced           Reamn:                                                 Mettusl:                           Exhibii G Instructions S. Schedufed         A.Fquipment Failure (Explain)                           I Manual                         for Preparation of D.na ll Maintenance of Test                                 2 Manual Scram.                   F.nny Sheets for Licensee C Refueling                                             1 Automatic Scram.               Thent Report (LLit) File (NilREG.
1 4
D Regulatory Restriction                               4 Other (lixplain)                 0101) 1: Ope.ator Training & License Examination F Administrative                                                                     5 G-Opetational Eirur (INplain)                                                             E.stubit I Same Source                 .
F: Finced Reamn:
01/77)                   Il-Other (lixplain)
Mettusl:
Exhibii G Instructions S. Schedufed A.Fquipment Failure (Explain)
I Manual for Preparation of D.na ll Maintenance of Test 2 Manual Scram.
F.nny Sheets for Licensee C Refueling 1 Automatic Scram.
Thent Report (LLit) File (NilREG.
D Regulatory Restriction 4 Other (lixplain) 0101) 1: Ope.ator Training & License Examination F Administrative 5
G-Opetational Eirur (INplain)
E.stubit I Same Source 01/77)
Il-Other (lixplain)


DOCK ET NO.          50-369       -
50-369 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCK ET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNil NAME           McGuire 1 7-15-82 DATE COMPLETED HY           J. A. Reavis Ill.POItT MON iil June. 1982                     TELEPilONE         704-373-8552 e          re    i u,2           .          ..
UNil NAME McGuire 1 DATE 7-15-82 COMPLETED HY J. A. Reavis Ill.POItT MON iil June. 1982 TELEPilONE 704-373-8552 i u,2 5*
5*
e re
                            -,      .2 _e       E     , .s '4       Licensee     g-r,       c o              Cauw & Corrective N. . .       Date       g,     3g         j     .g g cy         Even:       3,7         y.g                   Agijon in H
.2 _e E
                                    $E          s    e
,.s '4 Licensee g-r, Cauw & Corrective c
                                                        ~g5 e;            Report c     mU o5O Prevent Recurrence g
o N...
o i
Date g,
12     82-06-24     F     152.10     B       1                           CB     HTEXCH     Outage for inspection (eddy current) of steam generator tubes.
3g j
                                                                                                                        ~
.g g cy Even:
I i
3,7 y.g Agijon in
j I
~g5 Report c mU 5O Prevent Recurrence
l 2
$E s
1                    2                                                     .I                               4 F: Forced           Reason:                                                 Methott:                       Exhibit G Instructions
H e;
,    S: Scheduled         A Etiuipment Failure (Explain)                         1 Manual                       for Preparation of Data ll Maintenance or Test                                 2 Manual Scram.                 Entry Sheet > for I.ieensee C Refacting               -
g o
1 Automatic Scram.             livent Reporn (LER) File (NtlREG-D Regulatory Restriction                               4 Other (IIxplain)             0161)
e o
,'                        1 -Ope.ator Training & Licen.se lixamination F Administrative                                                                     5 G-Opeiational lis ror (Explain)                                                         Eshibit 1 S.nne Somee 19/77)                 Il-Other (lixplain)
i 12 82-06-24 F
152.10 B
1 CB HTEXCH Outage for inspection (eddy current) of steam generator tubes.
I
~
i j
I l
2 1
2
.I 4
F: Forced Reason:
Methott:
Exhibit G Instructions S: Scheduled A Etiuipment Failure (Explain) 1 Manual for Preparation of Data ll Maintenance or Test 2 Manual Scram.
Entry Sheet > for I.ieensee C Refacting 1 Automatic Scram.
livent Reporn (LER) File (NtlREG-D Regulatory Restriction 4 Other (IIxplain) 0161) 1 -Ope.ator Training & Licen.se lixamination F Administrative 5
G-Opeiational lis ror (Explain)
Eshibit 1 S.nne Somee 19/77)
Il-Other (lixplain)


DOCKET NO.       50-369 UNIT Mccuire 1 DATE 7-15-82 AVERAGE DAILY UNIT POWER LEVEL June, 1982 MOhTil
DOCKET NO.
,          AVERAGE D AILY l'OWER LEVEL                         AVERAGE DAILY POWER LEVEL DAY                 (MWe-net)                     DAY                 (MWe-net)           ,
50-369 UNIT Mccuire 1 DATE 7-15-82 AVERAGE DAILY UNIT POWER LEVEL MOhTil June, 1982 AVERAGE D AILY l'OWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
874                           17                   871 1
DAY (MWe-net) 874 17 871 1
871                           18                   861 2
2 871 18 861 874 19 862 3
874                           19                   862 3
866 4
20                  866 4                   872 843                           21                   862 5
872 20 843 21 862 5
871                           22                   843 6
871 22 843 6
872                           23                   522 7
872 23 522 7
871                           24                 317 8
871 24 317 8
g                    870                           25                   -
870 25 g
867                           26 10 865                           27 11 12 867                           28                   -
867 26 10 865 27 11 867 28 12 13 29 14 30 349 31 15 16 869 i
29 13 30 14 349                           31 15 16                   869 i
DAILY UNIT POWER LEVEL FOR\\1 INSTRUCTIONS On this fonn, hst the averare daily unit power lesel in MWe net for each day in the reporting n.onth.
DAILY UNIT POWER LEVEL FOR\1 INSTRUCTIONS On this fonn, hst the averare daily unit power lesel in MWe net for each day in the reporting n.onth.
Compute to the nearest wnote megawatt.
Compute to the nearest wnote megawatt.
These figures will i e used to plot a graph l'or each reporting nionth. Note that by usinli maximum l                                                                    there may be ..s easions when Ilie daily i      dependable capacity Ior the net electrical ratin: of the unit average power levet cureds the 1001 hne f or tlie restricted power lesel bne). In such c.ises, the average daily umt power output sheet should be footnoted to tsplain the app.uent anomaly.
l These figures will i e used to plot a graph l'or each reporting nionth. Note that by usinli maximum there may be..s easions when Ilie daily dependable capacity Ior the net electrical ratin: of the unit i
average power levet cureds the 1001 hne f or tlie restricted power lesel bne). In such c.ises, the average daily umt power output sheet should be footnoted to tsplain the app.uent anomaly.
I
I


110MT10.' 'REFUELt2G 7NFo:1WJION REo g                                 l 1
110MT10.' 'REFUELt2G 7NFo:1WJION REo g 1
l l
l 1.
: 1. Facility name:                 McGuire Unit 1                                             1
Facility name:
: 2. Scheduled next refueling shutdown:         June. 1983                               .    .
McGuire Unit 1 2.
: 3. Scheduled restart following refueling:                                             .
Scheduled next refueling shutdown:
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?                 .
June. 1983 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Co=sittee regarding unreviewed safety questions?           N/A     ,
If no, has reload design and core configuration been reviewed by Safety Review Co=sittee regarding unreviewed safety questions?
If no, when is review scheduled?         N/A                                       .
N/A If no, when is review scheduled?
5.
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:       N/A i
Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:
6.
N/A 6.
I=portant licensing considerations (new or dif ferent design or supplier, i
I=portant licensing considerations (new or dif ferent design or supplier, i
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).           N/A i
unreviewed design or performance analysis methods, significant changes in i
i
design or new operating procedures).
: 7. Number of fuel assemblies (a) in the core:         193   .
N/A i
(b) in the spent fuel pool:           27     .
i 7.
: 8. Present licensed fuel pool capacity:           500                               .
Number of fuel assemblies (a) in the core:
Size of requested or planned increase:                                           .
193 (b) in the spent fuel pool:
,      9. Projected date of last refueling which can be accec=odated by present licensed capacity:
27 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accec=odated by present licensed capacity:
i a
i a
DUKE PC'JER COMPANY                     Date:           July 15, 1982             .
DUKE PC'JER COMPANY Date:
;              Name of
July 15, 1982 Name of


==Contact:==
==Contact:==
J. A. Reavis                                     ,
J. A. Reavis i
i r
r


O DOCKET NO:               50-369 UNIT: McGuire #1 DATE:         7-15-82 NARRATIVE SUF9fARY Month: June, 1982 McGuire 1 began the month operating at 75% power.- A control runback from 75%
O DOCKET NO:
to 50 % power occurred on June 5 when a failed transmitter tripped the "B" feedwater pump. It was returned to 75% power in a few hours.
50-369 UNIT: McGuire #1 DATE:
The loss of more than one (1) reactor coolant flow transmitter in the same loop resulted in a unit trip on June 13. One transmitter was out and a momentary loss of voltage due to an inverter problem caused another transmitter to fail low. After needed maintenance was completed, the unit was returned to service on June 15 and increased to 75% power.
7-15-82 NARRATIVE SUF9fARY Month: June, 1982 McGuire 1 began the month operating at 75% power.- A control runback from 75%
to 50 % power occurred on June 5 when a failed transmitter tripped the "B" feedwater pump.
It was returned to 75% power in a few hours.
The loss of more than one (1) reactor coolant flow transmitter in the same loop resulted in a unit trip on June 13.
One transmitter was out and a momentary loss of voltage due to an inverter problem caused another transmitter to fail low. After needed maintenance was completed, the unit was returned to service on June 15 and increased to 75% power.
Reactor power was reduced to 50% on June 22 following the completion of the thirty day test run at 75%.
Reactor power was reduced to 50% on June 22 following the completion of the thirty day test run at 75%.
An incorrect pressure switch setpoint caused a turbine control runback on June 23. The unit was returned to 50% power within two hours.
An incorrect pressure switch setpoint caused a turbine control runback on June 23.
The unit was returned to 50% power within two hours.
McGuire 1 was removed from service on June 24 to inspect the steam generator tubes. A loss of offsite power test was successfully completed during the chutdown. The outage continues.
McGuire 1 was removed from service on June 24 to inspect the steam generator tubes. A loss of offsite power test was successfully completed during the chutdown. The outage continues.
i I
i I
i 4
i 4
      - - - - - ,  e w     >se -    - - , - e w   ,eg-w .--~ yn-, e--,- >-n.- , . . ,-m . - ----. -o - e-n, . --,r   , - - , - , - ~ , - ~
e w
>se e w
,eg-w
.--~
yn-,
e--,-
>-n.-
,-m
-o e-n,
--,r
, - -, -, - ~, - ~


.o .
.o McGUIRE NUCLEAR STATION Operating Status Report 1.
McGUIRE NUCLEAR STATION Operating Status Report
Personnel Exposure:
: 1. Personnel Exposure:
For the month of May, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
For the month of May, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
: 2. The total station liquid release contribution to whole body dose for May has been compared with the Technical Specifications annual value of 3 mrem; the total release for May was less than 10 percent of this limit.
2.
The total station liquid release contribution to whole body dose for May has been compared with the Technical Specifications annual value of 3 mrem; the total release for May was less than 10 percent of this limit.
The total station gscous release contribution to any organ dose for May has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for May was less than 10 percent of this limit.}}
The total station gscous release contribution to any organ dose for May has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for May was less than 10 percent of this limit.}}

Latest revision as of 16:09, 17 December 2024

Monthly Operating Rept for June 1982
ML20055B084
Person / Time
Site: McGuire 
Issue date: 07/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20055B083 List:
References
NUDOCS 8207200346
Download: ML20055B084 (7)


Text

'

OPERATING DATA REPORT 50-369 DOCKET NO.

I-N DATE C051PLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING STATUS Notes

1. Unit Name:

McGuire #1

2. Reporting Period:

June 1. 1982 - June 30, 1982 3 411

3. Licensed Thennal Power IS!Wil; 1 220
4. Nameplate Rating (Grow Slw p e

1 180

5. Design Electrical RatingINet alWel:
6. Slavimum Dependstile Capacity tGrow.\\twe):
7. Masimum Dependable Capacity INet 5the):

S. If Changes Occur in Capacity Itatinp tiiems Number 3 Through 7)Since Last Report.Gise Reasons:

None

9. Power Level To Which Restricted.lf Any INet alwe):

None

10. Reasons For Restrictions. If Any:

This Month Yr. to.Date Cumulative 720.0 4 343.0 5 087.0

!!. Ilours in Reporting Period

12. Number Of II.mrs Reactor was Critical 516.9 3 548.2 3 593.9
13. Reactor Resene Shutdown flours
14. Ilours Generator On Line 514.3 3 321.3 3 567.0
15. Unit Resene Shutdown llours 1 266 005 6 801 485 6 886 440
16. Gross Thermal Energy Generated (>lWil)
17. Grow Electrical Energy Generated (MWil) 444 564 _,

2 322 360 2 350 796 420 468 2 177 661 2 196 717

18. Net Electrical Energy Generated (alwil)
19. Unit Sernce Factor 71.4 81.1 70.1
20. Unit Availability Factor 71.4 81.1 70.1
21. Unit Capacity Factor IUsing MDC Neti 49.5 42.5 36.6 65.9 56.6 48.7
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outace Rate 28.6 18.9 29.9

- 24. Shutdowns Scheduled Oser Nest 6 \\lonths (Type. Date.and Duration of Facht:

Eddy Current testing - October 27, 1982 - 3 weeks

25. If Shut Down At End Of Report Ptrind. Estimated Date of Startup:

July 18. 1982 j

26. Units in Test Status (Prior io Commercial Operation):

Forecast Achiesed INITI \\ L CillTICA LI T Y INITI A L 1 LLC 1 RICI T Y CO\\l\\ll.itCIAL OPLit A IION DO$foho@

YW PDR

7

~

UNIT SilUTDOWNS AND POWElt HEDUC110NS DOCKET NO.

50-360 UNIT NAME McGuire 1 DATE 7-15-82 Itt: PORT MONTil June, 1982 COMPLETED BY

.I.

A.

Renvist TELEPil0NE 704-373-Fi s s?

3

.! E 3

kYk Licensee

,E -r,

$.?

t, Cause & Corrective N...

Date g

3g

(

.g g 5 Event s?

Actiim in

$5 jgg Repini e rE 0

]U Prevent Itceurtente H

b 8-p 82-06-01 F

H CB HTEXCH Holding at 75% power for thirty (30) da /

test run at this level.

9-p 82-06-05 F

A HA INSTRU Control runback from 75% to 50% power due to loss of "Bj' feedwater pump when a suction transmitter failed.

11 82-06-13 F

53.62 A

3 IA INSTRU Loss of more than one (1) reactor coolant (NC) flow transmitter caused unit trip.

10-p 82-06-15 F

H CB-HTEXCH Holding at 75% power for a thirty (30) day test run.

l 11-p 82-06-22 F

H CB HTEXCH Reduced to 50% power following completion of test run at 75% power.

12-p 82-06-23 F

A HA

'INSTRU Turbine control runback due to incorrect pressure switch setpoint.

I 2

1 4

F: Finced Reamn:

Mettusl:

Exhibii G Instructions S. Schedufed A.Fquipment Failure (Explain)

I Manual for Preparation of D.na ll Maintenance of Test 2 Manual Scram.

F.nny Sheets for Licensee C Refueling 1 Automatic Scram.

Thent Report (LLit) File (NilREG.

D Regulatory Restriction 4 Other (lixplain) 0101) 1: Ope.ator Training & License Examination F Administrative 5

G-Opetational Eirur (INplain)

E.stubit I Same Source 01/77)

Il-Other (lixplain)

50-369 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCK ET NO.

UNil NAME McGuire 1 DATE 7-15-82 COMPLETED HY J. A. Reavis Ill.POItT MON iil June. 1982 TELEPilONE 704-373-8552 i u,2 5*

e re

.2 _e E

,.s '4 Licensee g-r, Cauw & Corrective c

o N...

Date g,

3g j

.g g cy Even:

3,7 y.g Agijon in

~g5 Report c mU 5O Prevent Recurrence

$E s

H e;

g o

e o

i 12 82-06-24 F

152.10 B

1 CB HTEXCH Outage for inspection (eddy current) of steam generator tubes.

I

~

i j

I l

2 1

2

.I 4

F: Forced Reason:

Methott:

Exhibit G Instructions S: Scheduled A Etiuipment Failure (Explain) 1 Manual for Preparation of Data ll Maintenance or Test 2 Manual Scram.

Entry Sheet > for I.ieensee C Refacting 1 Automatic Scram.

livent Reporn (LER) File (NtlREG-D Regulatory Restriction 4 Other (IIxplain) 0161) 1 -Ope.ator Training & Licen.se lixamination F Administrative 5

G-Opeiational lis ror (Explain)

Eshibit 1 S.nne Somee 19/77)

Il-Other (lixplain)

DOCKET NO.

50-369 UNIT Mccuire 1 DATE 7-15-82 AVERAGE DAILY UNIT POWER LEVEL MOhTil June, 1982 AVERAGE D AILY l'OWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 874 17 871 1

2 871 18 861 874 19 862 3

866 4

872 20 843 21 862 5

871 22 843 6

872 23 522 7

871 24 317 8

870 25 g

867 26 10 865 27 11 867 28 12 13 29 14 30 349 31 15 16 869 i

DAILY UNIT POWER LEVEL FOR\\1 INSTRUCTIONS On this fonn, hst the averare daily unit power lesel in MWe net for each day in the reporting n.onth.

Compute to the nearest wnote megawatt.

l These figures will i e used to plot a graph l'or each reporting nionth. Note that by usinli maximum there may be..s easions when Ilie daily dependable capacity Ior the net electrical ratin: of the unit i

average power levet cureds the 1001 hne f or tlie restricted power lesel bne). In such c.ises, the average daily umt power output sheet should be footnoted to tsplain the app.uent anomaly.

I

110MT10.' 'REFUELt2G 7NFo:1WJION REo g 1

l 1.

Facility name:

McGuire Unit 1 2.

Scheduled next refueling shutdown:

June. 1983 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Co=sittee regarding unreviewed safety questions?

N/A If no, when is review scheduled?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:

N/A 6.

I=portant licensing considerations (new or dif ferent design or supplier, i

unreviewed design or performance analysis methods, significant changes in i

design or new operating procedures).

N/A i

i 7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

27 8.

Present licensed fuel pool capacity:

500 Size of requested or planned increase:

9.

Projected date of last refueling which can be accec=odated by present licensed capacity:

i a

DUKE PC'JER COMPANY Date:

July 15, 1982 Name of

Contact:

J. A. Reavis i

r

O DOCKET NO:

50-369 UNIT: McGuire #1 DATE:

7-15-82 NARRATIVE SUF9fARY Month: June, 1982 McGuire 1 began the month operating at 75% power.- A control runback from 75%

to 50 % power occurred on June 5 when a failed transmitter tripped the "B" feedwater pump.

It was returned to 75% power in a few hours.

The loss of more than one (1) reactor coolant flow transmitter in the same loop resulted in a unit trip on June 13.

One transmitter was out and a momentary loss of voltage due to an inverter problem caused another transmitter to fail low. After needed maintenance was completed, the unit was returned to service on June 15 and increased to 75% power.

Reactor power was reduced to 50% on June 22 following the completion of the thirty day test run at 75%.

An incorrect pressure switch setpoint caused a turbine control runback on June 23.

The unit was returned to 50% power within two hours.

McGuire 1 was removed from service on June 24 to inspect the steam generator tubes. A loss of offsite power test was successfully completed during the chutdown. The outage continues.

i I

i 4

e w

>se e w

,eg-w

.--~

yn-,

e--,-

>-n.-

,-m

-o e-n,

--,r

, - -, -, - ~, - ~

.o McGUIRE NUCLEAR STATION Operating Status Report 1.

Personnel Exposure:

For the month of May, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release contribution to whole body dose for May has been compared with the Technical Specifications annual value of 3 mrem; the total release for May was less than 10 percent of this limit.

The total station gscous release contribution to any organ dose for May has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for May was less than 10 percent of this limit.