ML20055E879: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:-      -          -
{{#Wiki_filter:j; j
j;
~
    ~                                                                                                       j June 27,1990
[
[ +
June 27,1990
I Docket Nos. STN 50-454, STN 50-455                         .DISTRIBUT: ON:,
+
and STN 50-456, STN 50-457                     ipoeterriies     NRC & Local PDRs   i PDIII-2 r/f     JZwolinski         i Mr. Thomas J. Kovach                                     RBarrett       SSands             l CMoore         OGC-WF1           l Nuclear Licensing Manager EJordan                            l Commonwealth Edison Company - Suite 300                                   ACRS(10)
I Docket Nos. STN 50-454, STN 50-455
DPUS West III-                                           PDIII-2 Gray   TBoyce 1400 OPUS Place Downers Grove, Illinois 60515
.DISTRIBUT: ON:,
and STN 50-456, STN 50-457 ipoeterriies NRC & Local PDRs PDIII-2 r/f JZwolinski Mr. Thomas J. Kovach RBarrett SSands Nuclear Licensing Manager CMoore OGC-WF1 Commonwealth Edison Company - Suite 300 EJordan ACRS(10)
DPUS West III-PDIII-2 Gray TBoyce 1400 OPUS Place Downers Grove, Illinois 60515


==Dear Mr. Kovach:==
==Dear Mr. Kovach:==
==SUBJECT:==
==SUBJECT:==
WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING
WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2, AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2, TO REDUCE THE CONTAINMENT TENDON DESIGN STRESSES (TAC NOS. 67448, 67449, 67450,67451)
    ,>                      LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2, AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2, TO REDUCE THE CONTAINMENT TENDON DESIGN STRESSES (TAC NOS. 67448, 67449,                     '
By letter dated Larv. 9, 1988, Commonwealth Edison Company (CECO) submitted an application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications. By {{letter dated|date=May 31, 1990|text=letter dated May 31, 1990}}, Ceco requested withdrawal of the above application.
67450,67451)
The Commission has filed the enclosed " Notice of Withdrawal of Application for Amendments to Facility Operating Licenses," granting the withdrawal, with.the Office of the Federal Register for publication.
By letter dated Larv. 9, 1988, Commonwealth Edison Company (CECO) submitted                 ,
i Sincerely, i
an application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications. By {{letter dated|date=May 31, 1990|text=letter dated May 31, 1990}}, Ceco requested withdrawal of the above application.
/s/
The Commission has filed the enclosed " Notice of Withdrawal of Application for Amendments to Facility Operating Licenses," granting the withdrawal, with.the Office of the Federal Register for publication.                                   i Sincerely, i
Stephen P. Sands, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
                                                                        /s/
Stephen P. Sands, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects               ,
Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc: See next page DOCUMENTNgE:
CONTAINMENT IGN A
N
~TI-2 P
SDI~I -2 PD/
2 Office:
LA/
I Surname t-ore SSands/tg RBa e Date:
h /Zy/90 4 ////90
//?1/90 l
l 9007130046 900627 f:DR ADOCK 05000454 l(,
PDC I


As stated
['g,4 hic jo,,
:                cc: See next page CONTAINMENT            IGN DOCUMENTNgE:
UNITED STATES og
A            N Office:    LA/  I
. [' '
                                    ~TI-2          P  SDI~I -2            PD/      2 Surname t-      ore              SSands/tg              RBa e l
g NUCLEAR REGULATORY COMMISSION 5
Date:      h /Zy/90              4 ////90                //?1/90 l
.A E W ASHING TON, D. C. 20$$$
9007130046 900627                                          l(,
%...../
    '              f:DR ADOCK 05000454  PDC                                    I
Dune 27,1990 s
 
r Docket Nos.
og
STN 50-454, STN 50-455 and STN 50-456, STN 50-457
'.    *    ['g,4 hic jo,,                             UNITED STATES
' Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company - Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515
  ,    . [' '           g               NUCLEAR REGULATORY COMMISSION 5         .A E                           W ASHING TON, D. C. 20$$$
Dune 27,1990
          %...../
s r
Docket Nos. STN 50-454, STN 50-455                                                               '
and STN 50-456, STN 50-457
                ' Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company - Suite 300 OPUS West III 1400 OPUS Place                                                                               .
Downers Grove, Illinois 60515


==Dear Mr. Kovech:==
==Dear Mr. Kovech:==
==SUBJECT:==
==SUBJECT:==
WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2. TO REDUCE THE                     '
WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2. TO REDUCE THE CONTAINMENT TENDON DESIGN STRESSES (TAC N05. 67448, 67449, 67450,67451)
CONTAINMENT TENDON DESIGN STRESSES (TAC N05. 67448, 67449, 67450,67451)
By {{letter dated|date=March 2, 1988|text=letter dated March 2, 1988}}, Commonwealth Edison Company (Ceco) submitted Jn application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications.
By {{letter dated|date=March 2, 1988|text=letter dated March 2, 1988}}, Commonwealth Edison Company (Ceco) submitted Jn application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications. By {{letter dated|date=May 31, 1990|text=letter dated May 31, 1990}}, CECO requested withdrawal of the above application.
By {{letter dated|date=May 31, 1990|text=letter dated May 31, 1990}}, CECO requested withdrawal of the above application.
The Commission has filed the enclosed, " Notice of Withdrawal of Application                   ,
The Commission has filed the enclosed, " Notice of Withdrawal of Application for Amendments to Facility Operating Licenses," granting the withdrawal, with the Office of the Federal Register for publication.
for Amendments to Facility Operating Licenses," granting the withdrawal,                       ,
Sincerely, b
with the Office of the Federal Register for publication.
Step 'n P. Sands, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Sincerely,                                   ;
b Step 'n P. Sands, Project Manager           ,
Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc:
See next page


As stated cc:    See next page
i Mr. Thomas J. Kovach Byron /Braidwood Power Station l
 
5 Comonwealth Edison Company Unit Nos. I and 2 cc:
i Mr. Thomas J. Kovach               Byron /Braidwood Power Station         l 5
j I
Comonwealth Edison Company         Unit Nos. I and 2 cc:                                                                       j Mr. Gabe Toth                       U. S. Nuclear Regulatory Comission     I Westinghouse Electric Corporation   Byron / Resident Inspectors Office     !
Mr. Gabe Toth U. S. Nuclear Regulatory Comission Westinghouse Electric Corporation Byron / Resident Inspectors Office Energy Systems Business Unit 4448 North German Church Road Post Office Box 355, Bay 236 West Byron, Illinois 61010 Pittsburgh, Pennsylvania 15230 Ms. Lorraine Creek l
Energy Systems Business Unit       4448 North German Church Road         :
Joseph Gallo, Esq.
Post Office Box 355, Bay 236 West   Byron, Illinois 61010                 '
Rt. 1, Box 182 Hopkins and Sutter Manteno Illinois 60950 8RB 16th Street, N.W.
Pittsburgh, Pennsylvania 15230 Ms. Lorraine Creek                     l Joseph Gallo, Esq.                 Rt. 1, Box 182                         ;
Suite 700 Mrs. Phillip B. Johnson Washington, D.C. 20006 1907 Stratford Lane Rockford, Illinois 61107 Regional Administrator U. S. NRC, Region III Douglass Cassel Esq.
Hopkins and Sutter                 Manteno Illinois 60950                 ,
i 799 Roosevelt Road, Bldg. #4 109 N. Derarborn Street Glen Ellyn, Illinois 60137 Suite 1300 Ms. Bridget Little Rorem Appleseed Coordinator David C. Thomas, Esq.
8RB 16th Street, N.W.
117 North Linden Street 77 S. Wacker Drive Essex, Illinois 60935 Chicago, Illinois 60601 Mr. Edward R. Crass Michael Miller, Esq.
Suite 700                           Mrs. Phillip B. Johnson
Nuclear Safeguards and Licensing Sidley and Austin Division One First National Plaza Sargent & Lundy Engineers Chicago, Illinois 60690 4
* Washington, D.C. 20006             1907 Stratford Lane Rockford, Illinois 61107               '
55 East Monroe Street Chicago, Illinois 60603 George L. Edgar i
Regional Administrator                                                     '
Newman & Holtzinger, P.C.
U. S. NRC, Region III               Douglass Cassel Esq.                   i 799 Roosevelt Road, Bldg. #4       109 N. Derarborn Street Glen Ellyn, Illinois 60137         Suite 1300 Ms. Bridget Little Rorem                                                   :
Appleseed Coordinator               David C. Thomas, Esq.
117 North Linden Street             77 S. Wacker Drive Essex, Illinois 60935               Chicago, Illinois 60601 Mr. Edward R. Crass                 Michael Miller, Esq.                   !
Nuclear Safeguards and Licensing   Sidley and Austin Division                       One First National Plaza Sargent & Lundy Engineers           Chicago, Illinois 60690               4 55 East Monroe Street Chicago, Illinois 60603             George L. Edgar                       i Newman & Holtzinger, P.C.
U. S. Nuclear Regulatory Commission 1615 L Street, N.W.
U. S. Nuclear Regulatory Commission 1615 L Street, N.W.
Resident inspectors Office         Washington, D.C. 20036                 ,
Resident inspectors Office Washington, D.C.
RR#1, Box 79 Braceville, Illinois 60407         Commonwealth Edison Company           ,
20036 RR#1, Box 79 Braceville, Illinois 60407 Commonwealth Edison Company Byron Station Manager Mr. Thomas W. Ortciger, Director 44E0 North German Church Road Illinois Emergency Services Byron, Illinois 61010 and Disaster Agency 110 East Adams Street Illinois Department of i
Byron Station Manager                 '
Springfield, Illinois 62706 Nuclear Safety Office of Nuclear Faciltiy Safety Robert Neumann 1035 Outer Park Drive Office of Public Counsel Springfield, Illinois 62704 State of Illinois Center l
Mr. Thomas W. Ortciger, Director   44E0 North German Church Road         .
100 W. Randolph Suite 11-300 l
Illinois Emergency Services         Byron, Illinois 61010
Chicago, Illinois 60601
* and Disaster Agency 110 East Adams Street               Illinois Department of                 i Springfield, Illinois 62706             Nuclear Safety Office of Nuclear Faciltiy Safety     :
-}}
Robert Neumann                     1035 Outer Park Drive Office of Public Counsel           Springfield, Illinois 62704           .
State of Illinois Center l
100 W. Randolph Suite 11-300 l                 Chicago, Illinois 60601
                                                                                            ,}}

Latest revision as of 14:54, 17 December 2024

Forwards Notice of Withdrawal of 880302 Application for Amend to Change Tech Spec 4.6.1.6.1.d,to Reduce Containment Tendon Design Stresses to Incorporate Addl Design Margin Not Reflected in Values Currently in Tech Specs,Per
ML20055E879
Person / Time
Site: Byron, Braidwood  
Issue date: 06/27/1990
From: Sands S
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
Shared Package
ML20055E880 List:
References
TAC-67448, TAC-67449, TAC-67450, TAC-67451, NUDOCS 9007130046
Download: ML20055E879 (3)


Text

j; j

~

[

June 27,1990

+

I Docket Nos. STN 50-454, STN 50-455

.DISTRIBUT: ON:,

and STN 50-456, STN 50-457 ipoeterriies NRC & Local PDRs PDIII-2 r/f JZwolinski Mr. Thomas J. Kovach RBarrett SSands Nuclear Licensing Manager CMoore OGC-WF1 Commonwealth Edison Company - Suite 300 EJordan ACRS(10)

DPUS West III-PDIII-2 Gray TBoyce 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Kovach:

SUBJECT:

WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2, AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2, TO REDUCE THE CONTAINMENT TENDON DESIGN STRESSES (TAC NOS. 67448, 67449, 67450,67451)

By letter dated Larv. 9, 1988, Commonwealth Edison Company (CECO) submitted an application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications. By letter dated May 31, 1990, Ceco requested withdrawal of the above application.

The Commission has filed the enclosed " Notice of Withdrawal of Application for Amendments to Facility Operating Licenses," granting the withdrawal, with.the Office of the Federal Register for publication.

i Sincerely, i

/s/

Stephen P. Sands, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page DOCUMENTNgE:

CONTAINMENT IGN A

N

~TI-2 P

SDI~I -2 PD/

2 Office:

LA/

I Surname t-ore SSands/tg RBa e Date:

h /Zy/90 4 ////90

//?1/90 l

l 9007130046 900627 f:DR ADOCK 05000454 l(,

PDC I

['g,4 hic jo,,

UNITED STATES og

. [' '

g NUCLEAR REGULATORY COMMISSION 5

.A E W ASHING TON, D. C. 20$$$

%...../

Dune 27,1990 s

r Docket Nos.

STN 50-454, STN 50-455 and STN 50-456, STN 50-457

' Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company - Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Kovech:

SUBJECT:

WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES FOR BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 AND BRAIDWOOD NUCLEAR POWER STATION, UNITS 1 AND 2. TO REDUCE THE CONTAINMENT TENDON DESIGN STRESSES (TAC N05. 67448, 67449, 67450,67451)

By letter dated March 2, 1988, Commonwealth Edison Company (Ceco) submitted Jn application for amendment requesting a change to Technical Specification 4.6.1.6.1.d to reduce the containment tendon design stresses to incorporate additional design margin not reflected in the values currently included in the Byron and Braidwood Technical Specifications.

By letter dated May 31, 1990, CECO requested withdrawal of the above application.

The Commission has filed the enclosed, " Notice of Withdrawal of Application for Amendments to Facility Operating Licenses," granting the withdrawal, with the Office of the Federal Register for publication.

Sincerely, b

Step 'n P. Sands, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

See next page

i Mr. Thomas J. Kovach Byron /Braidwood Power Station l

5 Comonwealth Edison Company Unit Nos. I and 2 cc:

j I

Mr. Gabe Toth U. S. Nuclear Regulatory Comission Westinghouse Electric Corporation Byron / Resident Inspectors Office Energy Systems Business Unit 4448 North German Church Road Post Office Box 355, Bay 236 West Byron, Illinois 61010 Pittsburgh, Pennsylvania 15230 Ms. Lorraine Creek l

Joseph Gallo, Esq.

Rt. 1, Box 182 Hopkins and Sutter Manteno Illinois 60950 8RB 16th Street, N.W.

Suite 700 Mrs. Phillip B. Johnson Washington, D.C. 20006 1907 Stratford Lane Rockford, Illinois 61107 Regional Administrator U. S. NRC, Region III Douglass Cassel Esq.

i 799 Roosevelt Road, Bldg. #4 109 N. Derarborn Street Glen Ellyn, Illinois 60137 Suite 1300 Ms. Bridget Little Rorem Appleseed Coordinator David C. Thomas, Esq.

117 North Linden Street 77 S. Wacker Drive Essex, Illinois 60935 Chicago, Illinois 60601 Mr. Edward R. Crass Michael Miller, Esq.

Nuclear Safeguards and Licensing Sidley and Austin Division One First National Plaza Sargent & Lundy Engineers Chicago, Illinois 60690 4

55 East Monroe Street Chicago, Illinois 60603 George L. Edgar i

Newman & Holtzinger, P.C.

U. S. Nuclear Regulatory Commission 1615 L Street, N.W.

Resident inspectors Office Washington, D.C.

20036 RR#1, Box 79 Braceville, Illinois 60407 Commonwealth Edison Company Byron Station Manager Mr. Thomas W. Ortciger, Director 44E0 North German Church Road Illinois Emergency Services Byron, Illinois 61010 and Disaster Agency 110 East Adams Street Illinois Department of i

Springfield, Illinois 62706 Nuclear Safety Office of Nuclear Faciltiy Safety Robert Neumann 1035 Outer Park Drive Office of Public Counsel Springfield, Illinois 62704 State of Illinois Center l

100 W. Randolph Suite 11-300 l

Chicago, Illinois 60601

-