{{#Wiki_filter:________________
{{#Wiki_filter:________________
PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924                   b PDR                 ADOCK 05000368 19 P                             PDR   $
PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924 b
PDR ADOCK 05000368 19 P
PDR


INSTRUMENTATION                                                                             ,
INSTRUMENTATION i
i    INCORE DETECTORS                                                                           l l'    LIMITING CONDITION FOR OPERATION                                                           l i
INCORE DETECTORS l
j     3.3.3.2   The incore detection system shall be OPERABLE with:
l LIMITING CONDITION FOR OPERATION i
l
j 3.3.3.2 The incore detection system shall be OPERABLE with:
* i          a. At least 75% of all incore detectors with at least one incore               l l d
l a.
detector in each quadrant at each level, and                                   :
At least 75% of all incore detectors with at least one incore l
4
l i
: b. At least 75% of all incore detector locations *, and                       j 4
detector in each quadrant at each level, and d
t
b.
:          c. Sufficient operable incore detectors to perform at least six tilt             l
At least 75% of all incore detector locations *, and j
4 4
t c.
Sufficient operable incore detectors to perform at least six tilt l
estimates with at least one tilt estimate at each of three j
^
^
estimates with at least one tilt estimate at each of three                    j levels.                                                                       l t
levels.
An OPERABLE incore detector location shall consist of a fuel assembly                     (
l t
i containing either a fixed detector string with a minimum of three OPERABLE               [
An OPERABLE incore detector location shall consist of a fuel assembly
l     rhodium detectors or an OPERABLE movable incore detector capable of mapping             _;
(
the location.                                                                             l
i containing either a fixed detector string with a minimum of three OPERABLE
  !                                                                                            I A tilt estimate can be made from two sets of symmetric pairs of incore
[
;    detectors. Two sets of symmetric pairs of incore detectors are formed by               .
l rhodium detectors or an OPERABLE movable incore detector capable of mapping the location.
l                                                                                             '
l I
two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant.                                                                   ;
A tilt estimate can be made from two sets of symmetric pairs of incore detectors.
AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB                 ,
Two sets of symmetric pairs of incore detectors are formed by l
margin.
two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant.
l ACTION:                                                                                   !
AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
With the incore detection system inoperable, do not use the system for the               j above applicable monitoring or calibration functions.         The provisions of           j Specifications 3.0.3 are not applicable.
l ACTION:
SURVEILLANCE REQUIREMENTS                                                                 l 4.3.3.2   The incore detection system shall be demonstrated OPERABLE:                   j
With the incore detection system inoperable, do not use the system for the j
: a. By performance of a CHANNEL CHECK within 24 hours prior to its                 ,
above applicable monitoring or calibration functions.
use and at least once per 7 days thereafter when required for                 !
The provisions of j
monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.                                             l
Specifications 3.0.3 are not applicable.
: b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components. The neutron detectors shall               i l              be calibrated prior to installation in the reactor core.                       !
SURVEILLANCE REQUIREMENTS l
4.3.3.2 The incore detection system shall be demonstrated OPERABLE:
j a.
By performance of a CHANNEL CHECK within 24 hours prior to its use and at least once per 7 days thereafter when required for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
l b.
At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components.
The neutron detectors shall i
be calibrated prior to installation in the reactor core.
l i
* For the remainder of Fuel Cycle 10 the incore detection system may be cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full l
1.0% increase in overall uncertainty on the CECOR F measurement) are
~
y applied to the COLSS and CPCs.
ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 63, 434 l
i
i
* For the remainder of Fuel Cycle 10 the incore detection system may be                  ,
cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full                  l
                                                                                                ~
1.0% increase in overall uncertainty on the CECOR F y measurement) are applied to the COLSS and CPCs.
ARKANSAS - UNIT 2                    3/4 3-28  Amendment No. 63, 434                  l i


a-               &-m, A =   s .-A - dd.En, - #u - .b     n p s m l
a-
1 s
&-m, A
i i
=
f i
s
                                                                                ?
.-A dd.En,
#u
.b n
p s
m 1
s i
i f
i
?
l t
l t
MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS                     ,
MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS I
I (FOR INFO ONLY)                                     !
(FOR INFO ONLY)
                                                                                .I i
. I i
                                                                                -l f
- l f
l l
l l
r
r
                                                                                )
)
I l
I l
l l
l l
i i
l
l
(
INSTRUMENTATION l
t INCORE DETECTORS i
LIMITING CONDITION FOR OPERATION t
3.3.3.2 The incore detection system shall be OPERABLE with:
a.
At least 75% of oil incore detectors 1 with at least one incore l
detector in each quadrant at each level, and
{
b.
At least 75% of all incore detector locations 1, and l-c.
Sufficient operable incore detectors to perform at least six tilt estimates with at least one tilt estimate at each of three levele An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping the location.
I A tilt estimate can be made f rom two sets of symmetric pairs of incore j
detectors.
Two sets of symmetric pairs of incore detectors are formed by two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.
i AEELICAB111)): When the incore detection system is used for monitoring the AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
f ACllfli:
[
4 l
With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions.
The provisions of Specifications 3.0.3 are not applicable.
l SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated OPERABLE:
a.
By performance of a CHANNEL CHECK within 24 hours prior to its use and at least once per 7 days thereafter when required for i
monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
b.
At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components.
The neutron detectors shall be calibrated prior to installation in the reactor core llor the=nem_aj nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_
m


i                                                                                                                              !
==ponsi dere dRERAB LE wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d x
i
_ d e t e ct.o r.._l ora ti on s.prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full
      .                                                                                                                      l INSTRUMENTATION
= lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr
(                                                                                                                              ;
_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 53, 434 l
t l
INCORE DETECTORS                                                                                                    i LIMITING CONDITION FOR OPERATION 3.3.3.2      The incore detection system shall be OPERABLE with:                                                  t
: a. At least 75% of oil incore detectors 1 with at least one incore                                  l detector in each quadrant at each level, and                                                        {
: b.      At least 75% of all incore detector locations 1, and                                            l-
: c.      Sufficient operable incore detectors to perform at least six tilt                                  !
estimates with at least one tilt estimate at each of three                                          !
levele                                                                                            ;
An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping                                        ,
the location.                                                                                                      I A tilt estimate can be made f rom two sets of symmetric pairs of incore                                            j detectors.          Two sets of symmetric pairs of incore detectors are formed by                                  ;
two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.
i AEELICAB111)): When the incore detection system is used for monitoring the                                          !
AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB                                          ;
margin.                                                                                                            ;
f          ACllfli:                                                                                                            l 4
[
With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions.                        The provisions of Specifications 3.0.3 are not applicable.                                                                          l SURVEILLANCE REQUIREMENTS 4.3.3.2          The incore detection system shall be demonstrated OPERABLE:
: a.      By performance of a CHANNEL CHECK within 24 hours prior to its                                    ,
use and at least once per 7 days thereafter when required for                                    i monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
: b.      At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components.              The neutron detectors          shall            ;
be calibrated prior to installation in the reactor core llor the=nem_aj m              nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_
            ==ponsi dere dRERAB LEx wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d
_ d e t e ct.o r.._l ora ti on s .prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full
          = lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr
_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2                           3/4 3-28       Amendment No. 53, 434                               l


_m.. .            .          _  ~._
_m..
l l-                                             at an se faulpBB
~._
                                            ' SEA E AOWN ECsERI l
l l-at an se faulpBB
' SEA E AOWN ECsERI l
Entergy Operations, Inc.
Entergy Operations, Inc.
Arkansas Nuclear One - Unit 2             i September 21, 1993                         '
Arkansas Nuclear One - Unit 2 i
l A-93-026 1
September 21, 1993 A-93-026 Mr. F. T. Philpott Entergy Operations, Inc.
Mr. F. T. Philpott
Arkansas Nuclear One P. O. Box 608 Russellville AR 72801
* Entergy Operations, Inc.
Arkansas Nuclear One P. O. Box 608                                                                                           ,
Russellville AR 72801


==Subject:==
==Subject:==
ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced                       i Number of Operable incore Detectors
ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced i
Number of Operable incore Detectors


==Dear Mr. Philpott:==
==Dear Mr. Philpott:==
 
This letter provides revised COLSS and CPCS addressable constants and COLSS database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information i
This letter provides revised COLSS and CPCS addressable constants and COLSS                             :
provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures.
database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a                                 l reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information                         i provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures.                                                 i The revised COLSS and CPCS constants are provided in Enclosure 1.                         Enclosure 1  i also contains a Software Media Transfer Form to be signed and returned to M.                           ;
i The revised COLSS and CPCS constants are provided in Enclosure 1.
A. Book at ABB Windsor. Enclosure 2 contains supporting information,                                   j including an administrative procedure change, for the proposed Technical                               ,
i also contains a Software Media Transfer Form to be signed and returned to M.
Specification change and a marked up copy of the proposed new Technical                               i Specification.                                                                                         '
A. Book at ABB Windsor. contains supporting information, j
The information provided in this letter supercedes that provided, based on                             i engineering judgement, in Reference 1. As expected, the information provided in Reference I has been shown to have excess conservatism.
including an administrative procedure change, for the proposed Technical Specification change and a marked up copy of the proposed new Technical i
Specification.
The information provided in this letter supercedes that provided, based on i
engineering judgement, in Reference 1.
As expected, the information provided in Reference I has been shown to have excess conservatism.
If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.
If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.
Sincerely, COMBUSTION ENGINEERING, INC.
Sincerely, COMBUSTION ENGINEERING, INC.
f      hA'E DIWs D. R. Earles
hA'E f
                                                                            /
DIWs /
Project Manager, Nuclear fuel                               '
D. R. Earles Project Manager, Nuclear fuel ABB Combustion Engineering Nuclear Power c~en on-enc.
l ABB Combustion Engineering Nuclear Power c~en on-enc.       g gs g n=                         ggmeg,g81911 Windso' Connectcat C6095-0500     Te'er 99297 COf/ BEN WSOR
g gs g n=
ggmeg,g81911 Windso' Connectcat C6095-0500 Te' r 99297 COf/ BEN WSOR e


1 F. T. Philpott               Page 2                             A-93-026 l
F. T. Philpott Page 2 A-93-026


==Enclosures:==
==Enclosures:==
: 1. COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors
1.
: 2. Proposed Changes to Incore Detector Technical           '
COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors 2.
Specification
Proposed Changes to Incore Detector Technical Specification


==Reference:==
==Reference:==
: 1. D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.
1.
xc:                                                                       .
D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.
M. A. Book       5318-GC28   (CE)
xc:
J. A. Brown       5318-GC28   (CE)
M. A. Book 5318-GC28 (CE)
S. P. Emery       9341-0425   (CE)
J. A. Brown 5318-GC28 (CE)
S. Etemadi       5318-GC28   (CE)
S. P. Emery 9341-0425 (CE)
C. B. Franklin   Entergy/ECH       (w/o encl.)
S. Etemadi 5318-GC28 (CE)
S. F. Grill       5318-GC28   (CE)
C. B. Franklin Entergy/ECH (w/o encl.)
J. G. llead       Entergy/AN0 K. L. Heitman     5318-GC28   (CE)
S. F. Grill 5318-GC28 (CE)
R. B. Lang       Entergy/ECH K. H. Marquis     5318-GC28   (CE)
J. G. llead Entergy/AN0 K. L. Heitman 5318-GC28 (CE)
M. R. McKinney   Entergy/ANO
R. B. Lang Entergy/ECH K. H. Marquis 5318-GC28 (CE)
: 0. C. Mims       Entergy/AN0 W. E. Russell     5318-GC28   (CE)
M. R. McKinney Entergy/ANO
P. Rensen         5318-GC28   (CE)
: 0. C. Mims Entergy/AN0 W. E. Russell 5318-GC28 (CE)
R. C. Sykes       ABB-CE/AN0 E. L. Trapp       5304-GC27   (CE) (w/o encl .)
P. Rensen 5318-GC28 (CE)
C. H. Turk       Entergy/AND R. M. Wilkins     Entergy/ECH       (w/o encl.)                         '
R. C. Sykes ABB-CE/AN0 E. L. Trapp 5304-GC27 (CE)
R. S. Wirges     Entergy/ANO J. D. Young       5304-GC27   (CE)
(w/o encl.)
K. T. Zelnick     Entergy/AND ANO-DCC           Entergy/ANO i
C. H. Turk Entergy/AND R. M. Wilkins Entergy/ECH (w/o encl.)
R. S. Wirges Entergy/ANO J. D. Young 5304-GC27 (CE)
K. T. Zelnick Entergy/AND ANO-DCC Entergy/ANO i
i I}}
i I}}

Latest revision as of 11:57, 17 December 2024

Proposed Tech Spec 3.3.3.2,revising LCO Re Incore Detection Sys
ML20057D068
Person / Time
Site: Arkansas Nuclear 
Issue date: 09/24/1993
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20046D604 List:
References
NUDOCS 9310010056
Download: ML20057D068 (6)


Text

________________

PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924 b

PDR ADOCK 05000368 19 P

PDR

INSTRUMENTATION i

INCORE DETECTORS l

l LIMITING CONDITION FOR OPERATION i

j 3.3.3.2 The incore detection system shall be OPERABLE with:

l a.

At least 75% of all incore detectors with at least one incore l

l i

detector in each quadrant at each level, and d

b.

At least 75% of all incore detector locations *, and j

4 4

t c.

Sufficient operable incore detectors to perform at least six tilt l

estimates with at least one tilt estimate at each of three j

^

levels.

l t

An OPERABLE incore detector location shall consist of a fuel assembly

(

i containing either a fixed detector string with a minimum of three OPERABLE

[

l rhodium detectors or an OPERABLE movable incore detector capable of mapping the location.

l I

A tilt estimate can be made from two sets of symmetric pairs of incore detectors.

Two sets of symmetric pairs of incore detectors are formed by l

two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant.

AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.

l ACTION:

With the incore detection system inoperable, do not use the system for the j

above applicable monitoring or calibration functions.

The provisions of j

Specifications 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS l

4.3.3.2 The incore detection system shall be demonstrated OPERABLE:

j a.

By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its use and at least once per 7 days thereafter when required for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.

l b.

At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components.

The neutron detectors shall i

be calibrated prior to installation in the reactor core.

l i

  • For the remainder of Fuel Cycle 10 the incore detection system may be cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full l

1.0% increase in overall uncertainty on the CECOR F measurement) are

~

y applied to the COLSS and CPCs.

ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 63, 434 l

i

a-

&-m, A

=

s

.-A dd.En,

  1. u

.b n

p s

m 1

s i

i f

i

?

l t

MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS I

(FOR INFO ONLY)

. I i

- l f

l l

r

)

I l

l l

i i

l

(

INSTRUMENTATION l

t INCORE DETECTORS i

LIMITING CONDITION FOR OPERATION t

3.3.3.2 The incore detection system shall be OPERABLE with:

a.

At least 75% of oil incore detectors 1 with at least one incore l

detector in each quadrant at each level, and

{

b.

At least 75% of all incore detector locations 1, and l-c.

Sufficient operable incore detectors to perform at least six tilt estimates with at least one tilt estimate at each of three levele An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping the location.

I A tilt estimate can be made f rom two sets of symmetric pairs of incore j

detectors.

Two sets of symmetric pairs of incore detectors are formed by two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.

i AEELICAB111)): When the incore detection system is used for monitoring the AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.

f ACllfli:

[

4 l

With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions.

The provisions of Specifications 3.0.3 are not applicable.

l SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated OPERABLE:

a.

By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its use and at least once per 7 days thereafter when required for i

monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.

b.

At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components.

The neutron detectors shall be calibrated prior to installation in the reactor core llor the=nem_aj nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_

m

==ponsi dere dRERAB LE wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d x

_ d e t e ct.o r.._l ora ti on s.prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full

= lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr

_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 53, 434 l

_m..

~._

l l-at an se faulpBB

' SEA E AOWN ECsERI l

Entergy Operations, Inc.

Arkansas Nuclear One - Unit 2 i

September 21, 1993 A-93-026 Mr. F. T. Philpott Entergy Operations, Inc.

Arkansas Nuclear One P. O. Box 608 Russellville AR 72801

Subject:

ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced i

Number of Operable incore Detectors

Dear Mr. Philpott:

This letter provides revised COLSS and CPCS addressable constants and COLSS database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information i

provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures.

i The revised COLSS and CPCS constants are provided in Enclosure 1.

i also contains a Software Media Transfer Form to be signed and returned to M.

A. Book at ABB Windsor. contains supporting information, j

including an administrative procedure change, for the proposed Technical Specification change and a marked up copy of the proposed new Technical i

Specification.

The information provided in this letter supercedes that provided, based on i

engineering judgement, in Reference 1.

As expected, the information provided in Reference I has been shown to have excess conservatism.

If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.

Sincerely, COMBUSTION ENGINEERING, INC.

hA'E f

DIWs /

D. R. Earles Project Manager, Nuclear fuel ABB Combustion Engineering Nuclear Power c~en on-enc.

g gs g n=

ggmeg,g81911 Windso' Connectcat C6095-0500 Te' r 99297 COf/ BEN WSOR e

F. T. Philpott Page 2 A-93-026

Enclosures:

1.

COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors 2.

Proposed Changes to Incore Detector Technical Specification

Reference:

1.

D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.

xc:

M. A. Book 5318-GC28 (CE)

J. A. Brown 5318-GC28 (CE)

S. P. Emery 9341-0425 (CE)

S. Etemadi 5318-GC28 (CE)

C. B. Franklin Entergy/ECH (w/o encl.)

S. F. Grill 5318-GC28 (CE)

J. G. llead Entergy/AN0 K. L. Heitman 5318-GC28 (CE)

R. B. Lang Entergy/ECH K. H. Marquis 5318-GC28 (CE)

M. R. McKinney Entergy/ANO

0. C. Mims Entergy/AN0 W. E. Russell 5318-GC28 (CE)

P. Rensen 5318-GC28 (CE)

R. C. Sykes ABB-CE/AN0 E. L. Trapp 5304-GC27 (CE)

(w/o encl.)

C. H. Turk Entergy/AND R. M. Wilkins Entergy/ECH (w/o encl.)

R. S. Wirges Entergy/ANO J. D. Young 5304-GC27 (CE)