==Dear Mr. Barton:==
==Dear Mr. Barton:==
==SUBJECT:==
==SUBJECT:==
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) rc jarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane, the staff expressed concern that GPUN would not be complying with heavy loads criteria specified in NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a single failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) rc jarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane, the staff expressed concern that GPUN would not be complying with heavy loads criteria specified in NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a single failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
At the meeting you stated that per Generic Letter 85-11, NRC approval cf your planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.
At the meeting you stated that per Generic Letter 85-11, NRC approval cf your planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in the new dry storage casks.
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in the new dry storage casks.
Sincerely, Original signed by n F. o ,    edor 9312140367 931106                       Project Directorate I-4 PDR    ADOCK 05000219 Y                   PDR                 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page QlSTRIBUTION:
Sincerely, Original signed by n F.
Docket File         NRC & Local PDRs PDI-4 Plant         SVarga JCalvo               SNorris ADromerick           OGC ACRS (10)             CMcCracken JRogge, RGI 070038                                              NRC HLE CENTER COPY OFFICE   LA:PDI-4       PM;.PDJ A       Dh0;-4 W      SNDhfis"       AhomirNk:bf     JStb-
o edor 9312140367 931106 PDR ADOCK 05000219 Project Directorate I-4 Y
              "        12/(-/93     [9///93         [1/ob/93           / /           / /
PDR Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page QlSTRIBUTION:
OFFICIAL RECORD COPY l Document Name: G:\DROMERIC\ CRANE.0YS                                             0
Docket File NRC & Local PDRs PDI-4 Plant SVarga JCalvo SNorris ADromerick OGC ACRS (10)
{i
CMcCracken JRogge, RGI NRC HLE CENTER COPY 070038 OFFICE LA:PDI-4 PM;.PDJ A Dh0;-4 SNDhfis" AhomirNk:bf JStb-W 12/(-/93
[9///93
[1/ob/93
/ /
/ /
OFFICIAL RECORD COPY l Document Name:
G:\\DROMERIC\\ CRANE.0YS
{i 0


        / pPRfCpg%
/ pPRfCpg%
: f. -         .t                             UNITED STATES
: f. -
.t UNITED STATES
[,i*
[,i*
              .      j             NUCLEAR REGULATORY COMMISSION WASHINGTON, D C. 20555-0001 g              g November 6,1993 l
j NUCLEAR REGULATORY COMMISSION
        '% .... /
*g g
WASHINGTON, D C. 20555-0001
'%.... /
November 6,1993 l
Docket No. 50-219 Mr. John J. Barton Vice President and Director 3PU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
Docket No. 50-219 Mr. John J. Barton Vice President and Director 3PU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731


==Dear Mr. Barton:==
==Dear Mr. Barton:==
 
l l
l l          


==SUBJECT:==
==SUBJECT:==
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION
REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) l regarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane. the staff expressed concern that GPUN would not be i
,            At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) l           regarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane. the staff expressed concern that GPUN would not be i
complying with heavy ids criteria specified in NUREG-0612 " Control of Heavy I
complying with heavy       ids criteria specified in NUREG-0612 " Control of Heavy I Loads at Nuclear Power Plants." The criteria require the licensee either to         I utilize a singla failure proof crane in such movement or to assume a cask drop     l and to analyze the effects upon safe shutdown equipment on spent fuel in           l accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a singla failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in l
l                                                                                                l l
accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.
l            At the meeting you stated that per Generic letter 85-11, NRC approval of your I           planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.           !
l l
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in       l l           the new dry storage casks.                                                         l Sincerely,                               l l
At the meeting you stated that per Generic letter 85-11, NRC approval of your I
                                                      ~
planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.
l
We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in l
                                                        ~
l the new dry storage casks.
                                                            ,f/L         -
Sincerely, l
Joh 'F. Stolz,     irector; Pr ject Directorate I '
<~
i                                                       BIvision of Reactor Projects - I/II i-                                                     Office of Nuclear Reactor Regulation l
,f/L l
cc:   See next pace I
~
1 l
Joh 'F. Stolz, irector; Pr ject Directorate I '
i BIvision of Reactor Projects - I/II i-Office of Nuclear Reactor Regulation l
cc:
See next pace 1
l l
l l
1 l
I l
1
1


i Mr. John J. Barton                     Oyster Creek Nuclear                   !
i Mr. John J. Barton Oyster Creek Nuclear Generating Station cc:
Generating Station cc:                                                                           !
Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission i
Ernest L. Blake, Jr., Esquire           Resident Inspector Shaw, Pittman, Potts & Trowbridge       c/o U.S. Nuclear Regulatory Commission i 2300 N Street, NW.                     Post Office Box 445                   l Washington, DC 20037                   Forked River, New Jersey 08731 Regional Administrator, Region I       Kent Tosch, Chief U.S. Nuclear Regulatory Commission     New Jersey Department of 475 Allendale Road                       Environmental Protection             ,
2300 N Street, NW.
King of Prussia, Pennsylvania 19406     Bureau of Nuclear Engineering         l CN 415 BWR Licensing Manager                   Trenton, New Jersey 08625 GPU Nuclear Corporation                                                       ,
Post Office Box 445 l
1 Upper Pond Road Parsippany, New Jersey 07054 Mayor                                                                         l Lacey Township                                                                 j 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station                                       i Mail Stop: Site Emergency Bldg.
Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Mayor l
Lacey Township j
818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station i
Mail Stop:
Site Emergency Bldg.
Post Office Box 388 Forked River, New Jersey 08731 i
Post Office Box 388 Forked River, New Jersey 08731 i
h n
h n
i l
i l
                                                                                      }
}
I F}}
I F}}

Latest revision as of 08:36, 17 December 2024

Discusses 931119 Meeting W/Util Re ISFSI & Plant Bldg Crane. NRC Plans to Audit Plant 10CFR50.59 Evaluation Before Movement of Fuel in New Dry Storage Casks
ML20058K039
Person / Time
Site: Oyster Creek
Issue date: 11/06/1993
From: Stolz J
Office of Nuclear Reactor Regulation
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 9312140367
Download: ML20058K039 (3)


Text

l i

November 6,1993 Docket No. 50-219 Mr. John J. Barton Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Barton:

SUBJECT:

REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) rc jarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane, the staff expressed concern that GPUN would not be complying with heavy loads criteria specified in NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a single failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.

At the meeting you stated that per Generic Letter 85-11, NRC approval cf your planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.

We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in the new dry storage casks.

Sincerely, Original signed by n F.

o edor 9312140367 931106 PDR ADOCK 05000219 Project Directorate I-4 Y

PDR Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page QlSTRIBUTION:

Docket File NRC & Local PDRs PDI-4 Plant SVarga JCalvo SNorris ADromerick OGC ACRS (10)

CMcCracken JRogge, RGI NRC HLE CENTER COPY 070038 OFFICE LA:PDI-4 PM;.PDJ A Dh0;-4 SNDhfis" AhomirNk:bf JStb-W 12/(-/93

[9///93

[1/ob/93

/ /

/ /

OFFICIAL RECORD COPY l Document Name:

G:\\DROMERIC\\ CRANE.0YS

{i 0

/ pPRfCpg%

f. -

.t UNITED STATES

[,i*

j NUCLEAR REGULATORY COMMISSION

  • g g

WASHINGTON, D C. 20555-0001

'%.... /

November 6,1993 l

Docket No. 50-219 Mr. John J. Barton Vice President and Director 3PU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Barton:

l l

SUBJECT:

REACTOR BUILDING CRANE - OYSTER CREEK NUCLEAR GENERATING STATION At the meeting held on November 19, 1993, with GPU Nuclear Corporation (GPUN) l regarding Independent Spent Fuel Storage Installation and the Oyster Creek Reactor Building Crane. the staff expressed concern that GPUN would not be i

complying with heavy ids criteria specified in NUREG-0612 " Control of Heavy I

Loads at Nuclear Power Plants." The criteria require the licensee either to utilize a singla failure proof crane in such movement or to assume a cask drop and to analyze the effects upon safe shutdown equipment on spent fuel in l

accordance with Section 5.1, " Recommended Guidelines" of NUREG-0612.

l l

At the meeting you stated that per Generic letter 85-11, NRC approval of your I

planned actions was not required and that you plan to perform a 10 CFR 50.59 review and not propose to use an installation of a single failure crane.

We plan to audit your 10 CFR 50.59 evaluation before movement of any fuel in l

l the new dry storage casks.

Sincerely, l

<~

,f/L l

~

Joh 'F. Stolz, irector; Pr ject Directorate I '

i BIvision of Reactor Projects - I/II i-Office of Nuclear Reactor Regulation l

cc:

See next pace 1

l l

1

i Mr. John J. Barton Oyster Creek Nuclear Generating Station cc:

Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission i

2300 N Street, NW.

Post Office Box 445 l

Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Mayor l

Lacey Township j

818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station i

Mail Stop:

Site Emergency Bldg.

Post Office Box 388 Forked River, New Jersey 08731 i

h n

i l

}

I F