M8W                                 u NORTHERN STATES POWER COMPANY
M8W u
                                                      }tnticello, Mimesota 55302
NORTHERN STATES POWER COMPANY
[
[
I I, .                                                                                                 '
}tnticello, Mimesota 55302 I
{t                 :Febmary 10,1975 i                                                           ,    .
I,.
                    ,;                                        nbh.C[           ' ID h
{t
Mr. J. G. Keppler, Director
:Febmary 10,1975 i
: p.                       Regian:III                                                 -
nbh.C[
                                                                                      ~
' ID h
30ffice of Inspection and Enforcetent                               ,            :
Mr. J. G. Keppler, Director p.
              ~~
Regian:III 30ffice of Inspection and Enforcetent
United States Nuclear Regulatory Comission                   ;
~
799EcoseveltRoad Glen 4Ellyn, Illinois 60137                                     g
~~
United States Nuclear Regulatory Comission 799EcoseveltRoad Glen 4Ellyn, Illinois 60137 g


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
!sNfICEl10 NJCLEAR GENERATING PIM Docket No. 50-263 License No. DPR-22
                                                  !sNfICEl10 NJCLEAR GENERATING PIM Docket No. 50-263 License No. DPR-22
~
                                                                ~
On Febmarf 9,1975, smke was obserted cctaing frca the mtor starter for reactor water cleanup discharge ifolatien valve.10 2399.
On Febmarf 9,1975, smke was obserted cctaing frca the mtor starter for reactor water cleanup discharge ifolatien valve.10 2399. Investi-i                    gation revealed that a started relay coil resulted in overneating of the control transformer in the mtor starter. Failure of the contml transfomer caused the isolation valve to be iraperabic. Neither this I                   valve nor another valve in the discharge line was placed in the closed
Investi-gation revealed that a started relay coil resulted in overneating of i
      '                  position as required by Technical Specification 3.7 D 2. The failed relay and rotor starter wre replaced and the systea was retumed to r.orm1 cperation within 6 hours. Further investigation of this c~ccurrence iscontiming.
the control transformer in the mtor starter. Failure of the contml transfomer caused the isolation valve to be iraperabic. Neither this I
valve nor another valve in the discharge line was placed in the closed position as required by Technical Specification 3.7 D 2. The failed relay and rotor starter wre replaced and the systea was retumed to r.orm1 cperation within 6 hours. Further investigation of this c~ccurrence iscontiming.
Yours verf tgily, (b
Yours verf tgily, (b
C. 2. lars g
g C. 2. lars PlantManager CEl/ma
PlantManager CEl/ma                                           'bR
'bR
                                                                            .,L'
.,L'
_cc:.s:A.tGlasbusso           y 2igggg gggggg63, i ._ .                 ~~ "     -- **                        CF L}}
_cc: s:A.tGlasbusso y 2igggg gggggg63, i._.
. ~~ "
CF L
_ _ -}}

Latest revision as of 08:23, 17 December 2024

Ro:On 750209,smoke Observed Coming from Motor Starter for Reactor Water Cleanup Discharge Isolation Valve. Investigation Revealed That Shorted Relay Coil Resulted in Overheating of Control Transformer
ML20058K800
Person / Time
Site: Monticello 
Issue date: 02/10/1975
From: Larson C
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9102140418
Download: ML20058K800 (1)


Text

. '.

M8W u

NORTHERN STATES POWER COMPANY

[

}tnticello, Mimesota 55302 I

I,.

{t

Febmary 10,1975 i

nbh.C[

' ID h

Mr. J. G. Keppler, Director p.

Regian:III 30ffice of Inspection and Enforcetent

~

~~

United States Nuclear Regulatory Comission 799EcoseveltRoad Glen 4Ellyn, Illinois 60137 g

Dear Mr. Keppler:

!sNfICEl10 NJCLEAR GENERATING PIM Docket No. 50-263 License No. DPR-22

~

On Febmarf 9,1975, smke was obserted cctaing frca the mtor starter for reactor water cleanup discharge ifolatien valve.10 2399.

Investi-gation revealed that a started relay coil resulted in overneating of i

the control transformer in the mtor starter. Failure of the contml transfomer caused the isolation valve to be iraperabic. Neither this I

valve nor another valve in the discharge line was placed in the closed position as required by Technical Specification 3.7 D 2. The failed relay and rotor starter wre replaced and the systea was retumed to r.orm1 cperation within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Further investigation of this c~ccurrence iscontiming.

Yours verf tgily, (b

g C. 2. lars PlantManager CEl/ma

'bR

.,L'

_cc: s:A.tGlasbusso y 2igggg gggggg63, i._.

. ~~ "

CF L

_ _ -