ML20058N037: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:a I
E, 8
f f[E:?
1 Southem Califomla Edison Company 23 PARKER STREET lRVINE. CAtliORNIA 92716 August 9, 1990 n.u RosrNatuu
. AuAar n o, m.i..,$.eo
. NUCL t AN ht 004 A10NT AFF AtRS 1
s U. S.. Nuclear Rcgulatory Commission Attention Dccument Control Desk Washington, D.C. 205S5 l
Gentlement j
 
==Subject:==
Radiological Environmental Monitoring Program San Onofre Nuclear Generdting Station Units 1, 2,~and 3 j
4 Technical Specification Section 3.18.2, Action B.1 of Appendix A, to Provisional Operating License No. DPR-13 for San Onofre Unit 1
?
and Section 5.2.2 of the offsite Dose calculations Manual (ODCMs) for San onofre Units 2 and 3 Facility Operating License No's NPF-10 and NPF-15, __ respectively, require a 30-day written report be submitted when the land use census identifies a location which yields a calculated dose greater than the value currently.being calculated. On July 13, 1990, the contractor performing SCE's 1990
+
Land Use. census reported a new land use, " Enlisted Beach Trailers
.Residenco," in Sector Q at a distance of 1.1 miles from the mid-point of Units 2 and 3.
The new location results in an annual dose increase of 27% for Units 2 and 3, and 39% increase for Unit 1.
j Sincerely, R M bu I
-MGtLUCtja cct J.
B. Martin (Regional Administrator, NRC Region V)
C. W.
Caldwell (NRC Senior Resident Inspector, SONGS Units 1, 2 and 3)
J. E. Tatum (NRC Project Manager, San Onofre Unit 1)
D.
L. Speed (California Department of Health Servicos)
Institute of Nuclear Power Operations (INPO) t
>i E3'0178' 90090?
009 ADOCK0500g6 PDR
'\\0 e
-}}

Latest revision as of 07:56, 17 December 2024

Advises That on 900713,new Land Use Located W/Calculated Dose Greater than Value Currently Calculated.New Location Results in Annual Dose Increase of 27% for Units 2 & 3 & 39% Increase for Unit 1
ML20058N037
Person / Time
Site: San Onofre  
Issue date: 08/09/1990
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008130178
Download: ML20058N037 (1)


Text

a I

E, 8

f f[E:?

1 Southem Califomla Edison Company 23 PARKER STREET lRVINE. CAtliORNIA 92716 August 9, 1990 n.u RosrNatuu

. AuAar n o, m.i..,$.eo

. NUCL t AN ht 004 A10NT AFF AtRS 1

s U. S.. Nuclear Rcgulatory Commission Attention Dccument Control Desk Washington, D.C. 205S5 l

Gentlement j

Subject:

Radiological Environmental Monitoring Program San Onofre Nuclear Generdting Station Units 1, 2,~and 3 j

4 Technical Specification Section 3.18.2, Action B.1 of Appendix A, to Provisional Operating License No. DPR-13 for San Onofre Unit 1

?

and Section 5.2.2 of the offsite Dose calculations Manual (ODCMs) for San onofre Units 2 and 3 Facility Operating License No's NPF-10 and NPF-15, __ respectively, require a 30-day written report be submitted when the land use census identifies a location which yields a calculated dose greater than the value currently.being calculated. On July 13, 1990, the contractor performing SCE's 1990

+

Land Use. census reported a new land use, " Enlisted Beach Trailers

.Residenco," in Sector Q at a distance of 1.1 miles from the mid-point of Units 2 and 3.

The new location results in an annual dose increase of 27% for Units 2 and 3, and 39% increase for Unit 1.

j Sincerely, R M bu I

-MGtLUCtja cct J.

B. Martin (Regional Administrator, NRC Region V)

C. W.

Caldwell (NRC Senior Resident Inspector, SONGS Units 1, 2 and 3)

J. E. Tatum (NRC Project Manager, San Onofre Unit 1)

D.

L. Speed (California Department of Health Servicos)

Institute of Nuclear Power Operations (INPO) t

>i E3'0178' 90090?

009 ADOCK0500g6 PDR

'\\0 e

-