{{#Wiki_filter:.       .-                                   _               . - _ . _ . . _
{{#Wiki_filter:.
                                                                                        - _ _ _ - _ _ ,
.-
                                                                                                              .
_
    ..                                                                                                       ,
. - _ . _ . . _
                                                                                                              :
- _ _ _ - _ _ ,
                                                                                                              :
.
  i                                                                                                           !
..
,
:
:
.
i
!
00T 151993
:
Docket No. 50-483
,
Union Electric Company
:
ATTN: Mr. Donald F. Schnell
i
Senior Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, M0 63166
Dear Mr. Schnell:
;
This refers to the routine safety inspection conducted by Mr. B. L. Bartlett,
j
Ms. D. R. Calhoun, and Mr. G. F. O'Dwyer of this office from August' I through
September 18, 1993, of activities at Callaway Plant, Unit 1, authorized by
;
NRC Operating License NPF-30, and to the discussion of our findings with
Mr. J. D. Blosser and others of your staff at the conclusion of the
j
inspection.
.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted.of a selective
examination of procedures and representative records, observations, and
;
interviews with personnel.
'
Based on the results of this inspection, certain of your activities-appear to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
One violation, cited with four examples, involved the
failure to properly follow plant procedures.
Although the individual examples
in the cited violation had minimal safety significance, this. violation is of
,
concern.because it is inconsistent with the past excellent performance by your-
;
licensed operations staff members.
As such, it warrants your attention for
;
proper identification of root cause and effective implementation of corrective
actions. Two other violations were also identified, but were not' cited
:
because the criteria identified in 10 CFR Part 2, Appendix C,-Section VII.B
}ODIl
'
were satisfied.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response, you should
document the specific actions taken and any additional actions you plan to:
prevent recurrence.
After reviewing your response to the Notice, including
your proposed corrective actions and the results of future inspections, the
NRC will determine whether further NRC enforcement action-is necessary to
ensure compliance with NRC regulatory requirements
.
9310260317 931015-
PDR
ADOCK 050004B3
0
PDR
-
.
.
,
-
-
.
.
                                              00T 151993
                                                                                                              :
        Docket No. 50-483                                                                                    ,
        Union Electric Company                                                                              :
        ATTN: Mr. Donald F. Schnell                                                                        i
                  Senior Vice President - Nuclear
        Post Office Box 149 - Mail Code 400
        St. Louis, M0 63166                                                                                  ;
        Dear Mr. Schnell:                                                                                    ;
        This refers to the routine safety inspection conducted by Mr. B. L. Bartlett,                        j
        Ms. D. R. Calhoun, and Mr. G. F. O'Dwyer of this office from August' I through
        September 18, 1993, of activities at Callaway Plant, Unit 1, authorized by                          ;
        NRC Operating License NPF-30, and to the discussion of our findings with
        Mr. J. D. Blosser and others of your staff at the conclusion of the                                  j
        inspection.
                                                                                                              .
        The enclosed copy of our inspection report identifies areas examined during                          !
        the inspection. Within these areas, the inspection consisted.of a selective
        examination of procedures and representative records, observations, and                              ;
        interviews with personnel.
                                                                                                              '
        Based on the results of this inspection, certain of your activities-appear to
        be in violation of NRC requirements, as specified in the enclosed Notice of
        Violation (Notice). One violation, cited with four examples, involved the
        failure to properly follow plant procedures. Although the individual examples
        in the cited violation had minimal safety significance, this. violation is of                        ,
        concern.because it is inconsistent with the past excellent performance by your-                      ;
        licensed operations staff members. As such, it warrants your attention for                          ;
        proper identification of root cause and effective implementation of corrective
        actions. Two other violations were also identified, but were not' cited                              :
        because the criteria identified in 10 CFR Part 2, Appendix C,-Section VII.B
        were satisfied.                                                                                '
                                                                                                    }ODIl
        You are required to respond to this letter and should follow the instructions
        specified in the enclosed Notice when preparing your response, you should
        document the specific actions taken and any additional actions you plan to:
        prevent recurrence.    After reviewing your response to the Notice, including
        your proposed corrective actions and the results of future inspections, the
        NRC will determine whether further NRC enforcement action-is necessary to
        ensure compliance with NRC regulatory requirements
                                                                                                              .
                  9310260317 931015-
                PDR    ADOCK 050004B3
                0                  PDR
                          __                            ,                          -                -
                                                                                                          .


  .       .-             - . . .-.             .                   .-
.
      .
.-
    ~
- . . .-.
                                                                                            !
.
                                                                              OCT 151993     l
.-
        Union _ Electric Company                   2                                       ,
.
                                                                                            !
!
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of .
OCT 151993
        this letter, the enclosures, and your responses to this letter will be placed       i
l
        in the NRC Public Document Room.                                                 -l
~
        We will gladly discuss any questions you have concerning this inspection.
Union _ Electric Company
                                              Sincerely,
2
                                                                                            ;
,
                                                                                            I
!
                                                                                            -
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of .
                                                acn- o e a :nur by L.n. c~   f
this letter, the enclosures, and your responses to this letter will be placed
                                              L4 Robert Greger, Chief                       ;
i
                                              Reactor Projects Branch 3                     ;
in the NRC Public Document Room.
                                                                                            ,
-l
        Enclosures:
We will gladly discuss any questions you have concerning this inspection.
        1.   Notice of Violation                                                           ,
Sincerely,
        2.   Inspection Report No. 50-483/93012(DRP)                                       {'
;
        3.   Temporary Instruction 2500/028
I
                                                                                            ;
acn- o e a :nur by L.n. c~
        cc w/ enclosure:
f
        G. L. Randolph, Vice President,
-
          Nuclear Operations
L4 Robert Greger, Chief
        J. V. Laux, Manager,                                                                 ;
;
          Quality Assurance                                                                 l
Reactor Projects Branch 3
        S. E. Sampson, Supervising                                                         ;
;
          Engineer, Site Licensing                                                         *
,
        OC/LFDCB
Enclosures:
        Resident Inspector, RIII                                                             i
1.
        Region IV                                                                           ,
Notice of Violation
        Resident Inspector, Wolf Creek                                                       !
,
        K. Drey
2.
        C. Jchn Renken, Engineer
Inspection Report No. 50-483/93012(DRP)
          Policy & Federal Dept.                                                           ;
{'
        Gerald Charnoff, Esq.                                                                 >
3.
        R. A. Ysucera, Deputy Director                                                       l
Temporary Instruction 2500/028
          Department of Natural Resources                                                   l
;
        Chairman, Illinois Commerce                                                         i
cc w/ enclosure:
          Commission
G. L. Randolph, Vice President,
        bec:     PUBLIC
Nuclear Operations
J. V. Laux, Manager,
;
Quality Assurance
l
S. E. Sampson, Supervising
;
Engineer, Site Licensing
*
OC/LFDCB
Resident Inspector, RIII
i
Region IV
,
Resident Inspector, Wolf Creek
K. Drey
C. Jchn Renken, Engineer
Policy & Federal Dept.
;
Gerald Charnoff, Esq.
>
R. A. Ysucera, Deputy Director
Department of Natural Resources
Chairman, Illinois Commerce
i
Commission
bec:
PUBLIC
4
4
                                                                                        '
'
                                                                                          ~
%
                                    %
~
        8111                                   RIII
ti)l
          v a
8111
              -
RIII
                              ' .
' . &
                                      &r      uo                ti)l
uo
                                                                    ,
-
                                                                  reger
,
        h.
h.
          as                   +       ,     Oaltaku              a
Oaltaku
a
reger
v a
r
as
+
,
-
.
.
-
-
.
.
..
}}
}}

Latest revision as of 07:17, 17 December 2024

Forwards Insp Rept 50-483/93-12 on 930801-0918 & Nov. Expresses Concern That Violation Inconsistent W/Past Excellent Performance by Licensed Operations Staff Members
ML20059A381
Person / Time
Site: Callaway 
Issue date: 10/15/1993
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20059A385 List:
References
NUDOCS 9310260317
Download: ML20059A381 (2)


See also: IR 05000483/1993012

Text

.

.-

_

. - _ . _ . . _

- _ _ _ - _ _ ,

.

..

,

.

i

!

00T 151993

Docket No. 50-483

,

Union Electric Company

ATTN: Mr. Donald F. Schnell

i

Senior Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166

Dear Mr. Schnell:

This refers to the routine safety inspection conducted by Mr. B. L. Bartlett,

j

Ms. D. R. Calhoun, and Mr. G. F. O'Dwyer of this office from August' I through

September 18, 1993, of activities at Callaway Plant, Unit 1, authorized by

NRC Operating License NPF-30, and to the discussion of our findings with

Mr. J. D. Blosser and others of your staff at the conclusion of the

j

inspection.

.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted.of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

'

Based on the results of this inspection, certain of your activities-appear to

be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

One violation, cited with four examples, involved the

failure to properly follow plant procedures.

Although the individual examples

in the cited violation had minimal safety significance, this. violation is of

,

concern.because it is inconsistent with the past excellent performance by your-

licensed operations staff members.

As such, it warrants your attention for

proper identification of root cause and effective implementation of corrective

actions. Two other violations were also identified, but were not' cited

because the criteria identified in 10 CFR Part 2, Appendix C,-Section VII.B

}ODIl

'

were satisfied.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response, you should

document the specific actions taken and any additional actions you plan to:

prevent recurrence.

After reviewing your response to the Notice, including

your proposed corrective actions and the results of future inspections, the

NRC will determine whether further NRC enforcement action-is necessary to

ensure compliance with NRC regulatory requirements

.

9310260317 931015-

PDR

ADOCK 050004B3

0

PDR

-

.

.

,

-

-

.

.

.-

- . . .-.

.

.-

.

!

OCT 151993

l

~

Union _ Electric Company

2

,

!

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of .

this letter, the enclosures, and your responses to this letter will be placed

i

in the NRC Public Document Room.

-l

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

I

acn- o e a :nur by L.n. c~

f

-

L4 Robert Greger, Chief

Reactor Projects Branch 3

,

Enclosures:

1.

Notice of Violation

,

2.

Inspection Report No. 50-483/93012(DRP)

{'

3.

Temporary Instruction 2500/028

cc w/ enclosure:

G. L. Randolph, Vice President,

Nuclear Operations

J. V. Laux, Manager,

Quality Assurance

l

S. E. Sampson, Supervising

Engineer, Site Licensing

OC/LFDCB

Resident Inspector, RIII

i

Region IV

,

Resident Inspector, Wolf Creek

K. Drey

C. Jchn Renken, Engineer

Policy & Federal Dept.

Gerald Charnoff, Esq.

>

R. A. Ysucera, Deputy Director

Department of Natural Resources

Chairman, Illinois Commerce

i

Commission

bec:

PUBLIC

4

'

%

~

ti)l

8111

RIII

' . &

uo

-

,

h.

Oaltaku

a

reger

v a

r

as

+

,

-

.

.

-

-

.

.

..