ML20065H628: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:{- | {{#Wiki_filter:{- | ||
GULF STATES | GULF STATES UTELITIES COMPANY ~ | ||
BEAUMONT, TEXAS 77704 POSTOFFICEBOX 2951 A R E A 'C O D E 713 838+6631 September 27,.1982 RBG-13,440 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator T | |||
U. S. Nuclear Regulatory Commission | |||
/ | |||
a h."N ff Mn Region.IV, Office of Inspection and Enforcement I | |||
- L'dl[Pf | |||
Arlington, Texas 76011 | '611 Ryan Plaza Drive, Suite 1000 | ||
h$$g | / | ||
Si - | |||
Arlington, Texas 76011 | |||
/ | |||
h$$g | |||
' ll | |||
==Dear Mr. Collins:== | ==Dear Mr. Collins:== | ||
U River Bend Station Unit 1 | U River Bend Station Unit 1 j | ||
Docket No. 50-458 Interim Report /DR-71 On August 27, 1982, Gulf States Utilities Company (GSU) notified the Region IV Office of a condition potentially reportable under 10CFR50.55(e) concerning inconsistencies found in the QA program at the W. J. Woolley Company, the manufacturer of personnel air locks at River Bend Station (DR-71). | |||
GSU's investigation is not yet complete. -An Interim or Final' Status Report will be provided~by January 15, 1983. | GSU's investigation is not yet complete. -An Interim or Final' Status Report will be provided~by January 15, 1983. | ||
Sincerely, | Sincerely, | ||
/ | |||
i | |||
U. S. Nuclear Regulatory Commission Washington,_D. C. 20555 | ./ | ||
R. L.-Brown (RRI) i | w A J. E. Bo er | ||
/ ; Manager-Engineering & Licensing River Bend Nuclear Group JEB/ | |||
/kt cc: Director of Inspection & Enforcement | |||
] | |||
U. S. Nuclear Regulatory Commission Washington,_D. C. 20555 | |||
/ | |||
R. L.-Brown (RRI) i 8210050201 820927 N | |||
DR ADOCK 05000458 PDR | |||
.u | |||
.}} | |||
Latest revision as of 19:42, 16 December 2024
| ML20065H628 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/27/1982 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, DR-71, RGB-13-440, NUDOCS 8210050201 | |
| Download: ML20065H628 (1) | |
Text
{-
GULF STATES UTELITIES COMPANY ~
BEAUMONT, TEXAS 77704 POSTOFFICEBOX 2951 A R E A 'C O D E 713 838+6631 September 27,.1982 RBG-13,440 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator T
U. S. Nuclear Regulatory Commission
/
a h."N ff Mn Region.IV, Office of Inspection and Enforcement I
- L'dl[Pf
'611 Ryan Plaza Drive, Suite 1000
/
Si -
Arlington, Texas 76011
/
h$$g
' ll
Dear Mr. Collins:
U River Bend Station Unit 1 j
Docket No. 50-458 Interim Report /DR-71 On August 27, 1982, Gulf States Utilities Company (GSU) notified the Region IV Office of a condition potentially reportable under 10CFR50.55(e) concerning inconsistencies found in the QA program at the W. J. Woolley Company, the manufacturer of personnel air locks at River Bend Station (DR-71).
GSU's investigation is not yet complete. -An Interim or Final' Status Report will be provided~by January 15, 1983.
Sincerely,
/
i
./
w A J. E. Bo er
/ ; Manager-Engineering & Licensing River Bend Nuclear Group JEB/
/kt cc: Director of Inspection & Enforcement
]
U. S. Nuclear Regulatory Commission Washington,_D. C. 20555
/
R. L.-Brown (RRI) i 8210050201 820927 N
DR ADOCK 05000458 PDR
.u
.