Interim Deficiency Rept DR-71 Re QA Program Inconsistencies in Mfg of Personnel Air Locks.Initially Reported on 820827. Investigation Not Yet Complete.Next Rept Expected by 830115
ML20065H628
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/27/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-71, RGB-13-440, NUDOCS 8210050201
Download: ML20065H628 (1)


Text

{-

GULF STATES UTELITIES COMPANY ~

BEAUMONT, TEXAS 77704 POSTOFFICEBOX 2951 A R E A 'C O D E 713 838+6631 September 27,.1982 RBG-13,440 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator T

U. S. Nuclear Regulatory Commission

/

a h."N ff Mn Region.IV, Office of Inspection and Enforcement I

- L'dl[Pf

'611 Ryan Plaza Drive, Suite 1000

/

Si -

Arlington, Texas 76011

/

h$$g

' ll

Dear Mr. Collins:

U River Bend Station Unit 1 j

Docket No. 50-458 Interim Report /DR-71 On August 27, 1982, Gulf States Utilities Company (GSU) notified the Region IV Office of a condition potentially reportable under 10CFR50.55(e) concerning inconsistencies found in the QA program at the W. J. Woolley Company, the manufacturer of personnel air locks at River Bend Station (DR-71).

GSU's investigation is not yet complete. -An Interim or Final' Status Report will be provided~by January 15, 1983.

Sincerely,

/

i

./

w A J. E. Bo er

/ ; Manager-Engineering & Licensing River Bend Nuclear Group JEB/

/kt cc: Director of Inspection & Enforcement

]

U. S. Nuclear Regulatory Commission Washington,_D. C. 20555

/

R. L.-Brown (RRI) i 8210050201 820927 N

DR ADOCK 05000458 PDR