ML20065L780: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r -- , | {{#Wiki_filter:r --, | ||
m. | |||
December 04, 1990 g | |||
/filensihuann The attached Comanche Peak Training & Qualification Plan is part of th Site Plan but is not SAFEGUARDS and.hould be a part of the plan. So it needs to go through the docketing and distribution system. | |||
Some of these plans can be non-safeguards if they keep that type of information out of them. | Some of these plans can be non-safeguards if they keep that type of information out of them. | ||
Atiy further questions give me a call. | Atiy further questions give me a call. | ||
e:- | j rlf c | ||
6 - | |||
e:- | |||
Elaine Koup Licensing Asst NRR/DRIS/RSGB 9 D 24 x20932 l | Elaine Koup Licensing Asst NRR/DRIS/RSGB 9 D 24 x20932 l | ||
1 | 1 | ||
'1 | |||
;Q21OOo+e so3 u.7,s. | |||
so3 u.7,s. | noca moon. | ||
noca moon | n PDC | ||
PDC | : f. -e l | ||
e E | |||
Log # TXX 901043 File # 10011 Ref. # 10CFR50.54(p)(2) | Log # TXX 901043 File # 10011 Ref. # 10CFR50.54(p)(2) | ||
RIELECTRIC | RIELECTRIC | ||
[ljy,"jj.[*%iHlf,;, | [ljy,"jj.[*%iHlf,;, | ||
Noyember 27, 1990 U. S. Nuclear Regulatory Commission Attn: Document Centrol Desk | Noyember 27, 1990 U. S. Nuclear Regulatory Commission Attn: | ||
Washington, DC 20555 | Document Centrol Desk Washington, DC 20555 | ||
==SUBJECT:== | ==SUBJECT:== | ||
C(WANCHE PEAK STE,9M ELECTRIC STATION (CPSES) | C(WANCHE PEAK STE,9M ELECTRIC STATION (CPSES) | ||
DOCKET N05. 50 445 AND 50 446 TRANSMITTAL OF THE CPSES SECURITY TRAINING AND OVALIFICATION PLAN, REVISION 6 Gentlemen: | DOCKET N05. 50 445 AND 50 446 TRANSMITTAL OF THE CPSES SECURITY TRAINING AND OVALIFICATION PLAN, REVISION 6 Gentlemen: | ||
In accordance with 10CFR50.4, enclosed are four (4) copies of the CPSES Security Training and Qualification Plan, Revision 6 (Copy Hos. 13, 14, 15 and 16). | In accordance with 10CFR50.4, enclosed are four (4) copies of the CPSES Security Training and Qualification Plan, Revision 6 (Copy Hos. 13, 14, 15 and 16). | ||
Included with each Plan is a " Table of Changes" which lists the changes that were incorporated into Revision 6. | |||
Per 10CFR50.54(p)(2), an evaluation determined that these changes do not decrease the effectiveness of the security program. | |||
Also, as of this revision, the CPSES Security Training and Qualification Plan has been declassified as it contains no Safeguards Information as defined by 10CFR73.21. | |||
Sincerely, William J. Cahill, Jr. | Sincerely, William J. Cahill, Jr. | ||
GLB/grp Enclosure c | GLB/grp Enclosure c | ||
Mr. R. D. Martin, Region IV (2 copies Nos. 17 and 18) | |||
Resident inspectors, CPSES (3) clo Mr. J. W. Clifford NRR clo ops l' | Resident inspectors, CPSES (3) clo Mr. J. W. Clifford NRR clo ops l' | ||
400 North Olive Street L.B.81 Dallas, Texas 75201}} | 400 North Olive Street L.B.81 Dallas, Texas 75201}} | ||
Latest revision as of 19:28, 16 December 2024
| ML20065L780 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/27/1990 |
| From: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065L784 | List: |
| References | |
| TXX-901043, NUDOCS 9012100098 | |
| Download: ML20065L780 (2) | |
Text
r --,
m.
December 04, 1990 g
/filensihuann The attached Comanche Peak Training & Qualification Plan is part of th Site Plan but is not SAFEGUARDS and.hould be a part of the plan. So it needs to go through the docketing and distribution system.
Some of these plans can be non-safeguards if they keep that type of information out of them.
Atiy further questions give me a call.
j rlf c
6 -
e:-
Elaine Koup Licensing Asst NRR/DRIS/RSGB 9 D 24 x20932 l
1
'1
- Q21OOo+e so3 u.7,s.
noca moon.
n PDC
- f. -e l
e E
Log # TXX 901043 File # 10011 Ref. # 10CFR50.54(p)(2)
RIELECTRIC
[ljy,"jj.[*%iHlf,;,
Noyember 27, 1990 U. S. Nuclear Regulatory Commission Attn:
Document Centrol Desk Washington, DC 20555
SUBJECT:
C(WANCHE PEAK STE,9M ELECTRIC STATION (CPSES)
DOCKET N05. 50 445 AND 50 446 TRANSMITTAL OF THE CPSES SECURITY TRAINING AND OVALIFICATION PLAN, REVISION 6 Gentlemen:
In accordance with 10CFR50.4, enclosed are four (4) copies of the CPSES Security Training and Qualification Plan, Revision 6 (Copy Hos. 13, 14, 15 and 16).
Included with each Plan is a " Table of Changes" which lists the changes that were incorporated into Revision 6.
Per 10CFR50.54(p)(2), an evaluation determined that these changes do not decrease the effectiveness of the security program.
Also, as of this revision, the CPSES Security Training and Qualification Plan has been declassified as it contains no Safeguards Information as defined by 10CFR73.21.
Sincerely, William J. Cahill, Jr.
GLB/grp Enclosure c
Mr. R. D. Martin, Region IV (2 copies Nos. 17 and 18)
Resident inspectors, CPSES (3) clo Mr. J. W. Clifford NRR clo ops l'
400 North Olive Street L.B.81 Dallas, Texas 75201