{{#Wiki_filter:_                                                     -                            ___ __                  -
{{#Wiki_filter:_
!'*                                        We#LF CREEK NUCLEAR OPERATING CORPORATION l
We#LF CREEK NUCLEAR OPERATING CORPORATION John A. Baby ve. Pr o.rn Nuclear Operations December 13. 1990 NO 90-0305 U. 8. Nuclear Regulatory Commission ATTN Document Control Desk Mall Station P1-137 Washington, D. C.
l John A. Baby ve. Pr o.rn Nuclear Operations December 13. 1990
20$$$
;                                                                                      NO 90-0305 U. 8. Nuclear Regulatory Commission ATTN Document Control Desk Mall Station P1-137 Washington, D. C.           20$$$


==Subject:==
==Subject:==
Docket No. 50-482: November, 1990 Monthly Operating Report Gentlemen:
Docket No. 50-482: November, 1990 Monthly Operating Report Gentlemen:
Attached is the November,           1990       Monthly Operating Report for Wolf Creek Generating Station.               This submittal is being .made in accordance with the requirements of Technical Specification 6.9.1.8.
Attached is the November, 1990 Monthly Operating Report for Wolf Creek Generating Station.
This submittal is being.made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours.
Very truly yours.
John A. Bailey Vice President Nuclear Operations JAE/jra Attachment cci       A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a i
John A. Bailey Vice President Nuclear Operations JAE/jra Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a i
1
1
                                                                                                                    '. I
'. I
          *012180271 00113n
*012180271 00113n
{DR             Apocg 97,000482 PDR
{DR Apocg 97,000482 PDR
                                                """'"'""'''"9''*****''"""*(''')"-**''
[m' '
    . O "' n $d''(
. O "' n $d''(
An EquW Opportonny Empk yer MMCVET                         [m' '
"""'"'""'''"9''*****''"""*(''')"-**''
An EquW Opportonny Empk yer MMCVET


          . .      -        .      . _  . _ _ _ . -          . _ _ _ _ _ _ _ _ - . _ . _ . =   _ _ _ .    - . _ .          .. .__
. _ _ _ _ _ _ _ _ -. _. _. =
l Attachs.ent to NO 90-0305
l Attachs.ent to NO 90-0305
        .t l
.t l.
l.
l t
l t
!                              WOLF CREEK 1AKLDJ1 OPERATI!G 00RIORATIQ4 i                                     NOLF CREEK GDERATIIG STATIGi                                                                         ,
WOLF CREEK 1AKLDJ1 OPERATI!G 00RIORATIQ4 i
1 lOMILY OPERATIlG REPGIT i
NOLF CREEK GDERATIIG STATIGi lOMILY OPERATIlG REPGIT i
:                                10m1: , thurber               YEAR:                 1990 l
10m1:, thurber YEAR:
1990 l
Dxket Ib. : 50-482 Facility Operating License Ib. : NPF-42 Report !b. 69-l Pmpanxi by:
Dxket Ib. : 50-482 Facility Operating License Ib. : NPF-42 Report !b. 69-l Pmpanxi by:
Merlin G. Williams l
Merlin G. Williams l
a                                 p                             w.                 ,      -    -- -. --
a p
                        , --                                                                    ,-          7
w.
7


_ _ _ . _ _ _ .                                              . _ _ _ _ _ . _ _                                          m..__._._..._______._-..__..                                                                     __
m..__._._..._______._-..__..
i
i Attachinent to NO 90-0305 t
;            Attachinent to NO 90-0305 t
StNMARY
StNMARY
)
)
,                                      The follcwing report highlights the operating experience of Wolf Creo)
The follcwing report highlights the operating experience of Wolf Creo)
Generating Staticri for the month of N:msnber,1990. This report is being provide:1 pursuant to %chnical Specification 6.9.1.8.
Generating Staticri for the month of N:msnber,1990. This report is being provide:1 pursuant to %chnical Specification 6.9.1.8.
a I
a I
I.           SLNMARY OF OPDRTI!G EXPERIDCE The unit operated at 100% power th. yhout the month of Novmber with the exception of two power reductions te facilitate repairs.
I.
The first power reduction occurred on Novunber 7 as a result of a partial 4
SLNMARY OF OPDRTI!G EXPERIDCE The unit operated at 100% power th. yhout the month of Novmber with the exception of two power reductions te facilitate repairs.
loss of cooling on the aB" phase main transformer. Power was reduced to 87%
The first power reduction occurred on Novunber 7 as a result of a partial loss of cooling on the aB" phase main transformer. Power was reduced to 87%
for approximately two hces to stabilire winding taperatures while repairs e
4 for approximately two hces to stabilire winding taperatures while repairs could be ccrpleted.
could be ccrpleted.
e Power was again reduced late Novunber 9 through November 12 for secondary system maintenance activities. Specifically, Main Feedwater Punp PAE01B underwent speed sensor replacement and Heater Drain Imps PAF01A and B were encapsulated to stop ongoing leakage. Reactor power was decreased to 55%
Power was again reduced late Novunber 9 through November 12 for secondary system maintenance activities. Specifically, Main Feedwater Punp PAE01B underwent speed sensor replacement and Heater Drain Imps PAF01A and B were encapsulated to stop ongoing leakage. Reactor power was decreased to 55%
for the feedwater punp repair and increased to 95% until the heater drain punp repairs were ccmplete.
for the feedwater punp repair and increased to 95% until the heater drain punp repairs were ccmplete.                                                                                                                                                           ,
II. MMOR SAFEIT REIATED MAINTENAtCE ACTIVITIES i
II. MMOR SAFEIT REIATED MAINTENAtCE ACTIVITIES i                                         No majar safety related maintenance activities were perfoned in !bvenbar.
No majar safety related maintenance activities were perfoned in !bvenbar.
y a-h Wolf Creek Generating Station lenthly Operating Rotort Ibvember 1990 Page 1 of 5 i
y a-h Wolf Creek Generating Station lenthly Operating Rotort Ibvember 1990 Page 1 of 5 i
      ~ . , . . . . . _ . . , , , , - . . - , . , . , , , _ , -           -~ .,   - . . , , , , . .._.,,.._.---,---..,m,...
~.,..... _..,,,, -.. -,.,.,,, _, -
                                                                                                                                                , . , - . . - ~ _ - . _ _ . . , _ - _ . _ _ . , . - . _ . . . - , - , _ _ . -
-~.,
.._.,,.._.---,---..,m,...
. - ~ _ -. _ _.., _ - _. _ _.,. -. _... -, -, _ _. -


Attachment to NO 90-0305 I
Attachment to NO 90-0305 I
wERATDc twr> rmw DOCKET 10, 50-482 HOLF CREEK GE!ERATDG STA2' ION NOLF CREEK 1RKLEAR OP1RATI!G CCRIGATICN DATE 12-01-90 COPILTED BY M. WI.lli=.3 TELEPIENE & ~>64-8831 OPERATIlG STA7US
wERATDc twr> rmw DOCKET 10, 50-482 HOLF CREEK GE!ERATDG STA2' ION NOLF CREEK 1RKLEAR OP1RATI!G CCRIGATICN DATE 12-01-90 COPILTED BY M. WI.lli=.3 TELEPIENE & ~>64-8831 OPERATIlG STA7US 1.
: 1. Reporting Pericar_. Ibvunber,1990 _ Gross llours in Reporting Period: 720
Reporting Pericar_. Ibvunber,1990
: 3. Currently Authorized Power Invel(Mft): 3411 F.r-     Depand. Capacity (M&!bt):,_H25 Design Electrical Rating (Mbibt):     1170
_ Gross llours in Reporting Period: 720 3.
: 3. Power level to Which Rostricted (If Any)(Mhlbt):                       N/A
Currently Authorized Power Invel(Mft): 3411 F.r-Depand. Capacity (M&!bt):,_H25 Design Electrical Rating (Mbibt):
: 4. Roanons for restriction (If Any):     N/A 2his Itrith Yr. to Date         Cunulative
1170 3.
: 5. IMmber of 11ours Roactor was Critical               720.0       6,352.1       36,651.5
Power level to Which Rostricted (If Any)(Mhlbt):
: 6. Roactor Roservo Shutdown llotus                       0.0   ,,      0.0         339.8
N/A 4.
: 7. Ilours Generator an Idne                             720.0       6,292.7       36,079.8
Roanons for restriction (If Any):
: 8. thit Rosorvo Shutdown llours                           0.0             0.0             0.0.
N/A 2his Itrith Yr. to Date Cunulative 5.
: 9. Gross shonnal Energy Ganorated (MI)               2,421,081   21,056,411 119,533,666
IMmber of 11ours Roactor was Critical 720.0 6,352.1 36,651.5 6.
: 10. Gross Eloctrical Energy Generated (MNH)           __850J4c         .a41,223     41,620,170
Roactor Roservo Shutdown llotus 0.0 0.0 339.8 7.
: 11. Ibt Electrical Energy Generated (MI)                     _
Ilours Generator an Idne 720.0 6,292.7 36,079.8 8.
7,015,837     39,738,208
thit Rosorvo Shutdown llours 0.0 0.0 0.0.
: 12. Roactor Service Factor                                 100.0           79.2           79.7,
9.
: 13. Ronctor Availability Factor                           100.0           79.2           80.5
Gross shonnal Energy Ganorated (MI) 2,421,081 21,056,411 119,533,666
: 14. Unit Service Factor                                   100.0           78.5           78.5
: 10. Gross Eloctrical Energy Generated (MNH)
: 15. thit Availability Factor                               100.0           78.5           78.5
__850J4c
: 16. thtt Capacity Factor (Using MDC)                 _    100.0           77.1           76.5
.a41,223 41,620,170
: 17. Unit Capacity Factor (Using Design MWo)                 97.0           74.8           73.9
: 11. Ibt Electrical Energy Generated (MI) 7,015,837 39,738,208
: 18. Unit Forced Outage Rato                                 0.0   _ _ _ .
: 12. Roactor Service Factor 100.0 79.2 79.7,
1.9             4.1
: 13. Ronctor Availability Factor 100.0 79.2 80.5
: 14. Unit Service Factor 100.0 78.5 78.5
: 15. thit Availability Factor 100.0 78.5 78.5
: 16. thtt Capacity Factor (Using MDC) 100.0 77.1 76.5
: 17. Unit Capacity Factor (Using Design MWo) 97.0 74.8 73.9
: 18. Unit Forced Outage Rato 0.0 1.9 4.1
: 19. Shutdowns Schodulod Over !bxt 6 tenths (Typo, Date, and Duration of each): N/A
: 19. Shutdowns Schodulod Over !bxt 6 tenths (Typo, Date, and Duration of each): N/A
: 20. If Shut D:wn at End of Report Period, Estinated Date of Startup                 N/A Wolf Creek Generating Station Monthly Operating Report
: 20. If Shut D:wn at End of Report Period, Estinated Date of Startup N/A Wolf Creek Generating Station Monthly Operating Report
                                                                            !bvmber 1990 l
!bvmber 1990 Page 2 of 5 l
Page 2 of 5 l
l


                                                                                                                                              '1
'1
    - A,ttachment to NO 90-0305 AWWGE IRILY DlIT POWER LEVEL DOC 30!.T NO. 50-482 WOLP CREEK GENERATDG STATICH EXE CREEK MCLEAR OPl! RATING CORPORATIN IATE 12-01-90 CCMPLETED BY M. Williams TELEPH NE 316-364-8831
- A,ttachment to NO 90-0305 AWWGE IRILY DlIT POWER LEVEL DOC 30!.T NO.
      )01m1         tbvmber, 1990 DAY AVERAGE DAILY POWER LEVEL                                                     IRY AVERAGE IRILY POWER LEVEL (MWe-Net)                                                                         (MWe-Net)
50-482 WOLP CREEK GENERATDG STATICH EXE CREEK MCLEAR OPl! RATING CORPORATIN IATE 12-01-90 CCMPLETED BY M. Williams TELEPH NE 316-364-8831
A             1149                                                               17             1154 2
)01m1 tbvmber, 1990 DAY AVERAGE DAILY POWER LEVEL IRY AVERAGE IRILY POWER LEVEL (MWe-Net)
2-           1150                                                               18             :154 3-           1151                                                               19               .152 4             1152   _,,_                                          ,            20             :J,0 5'           1153                                                               21             :11L I
(MWe-Net)
6             1153                                                               22               1155 7             1121                                                               23               1153 8             1153                                                 ,,            24               1156 9             1152                                                               25             1156-10               764                                                               26             1155                                 a 11               1069                                                               27             1153                                 -i
A 1149 17 1154 2
      -12'             1111                                                               28             1155                                   ,
2-1150 18
: 13.             1152                                                               29             1156
:154 3-1151 19
: 14.             1147                                                 ,            30             1155 15               1152                                                               31                 N/A 16               1152 Wolf Creek Generating Station-Monthly Operating Report Novm ber.1990 Page 3 of 5
.152 4
1152 20
:J,0 5'
1153 21
:11L I
6 1153 22 1155 7
1121 23 1153 8
1153 24 1156 9
1152 25 1156-10 764 26 1155 a
11 1069 27 1153
-i
-12' 1111 28 1155 13.
1152 29 1156 14.
1147 30 1155 15 1152 31 N/A 16 1152 Wolf Creek Generating Station-Monthly Operating Report Novm ber.1990 Page 3 of 5


Attachment to NO 90-0305 UNIT SHUTDOWN AND POWER REDUCTIONS                                           .
Attachment to NO 90-0305 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
DOCKET NO. 50 482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 12-01-90 COMPLETED BY M. Williams REPORT 1.JNTH                       November. 1990                                                                             TELEPH)NE 316-364-8831 TYPE                         METHODS SHUTTING F: FORCED           DURATION REASON DOWN THE REACTOR                   CORRECTIVE ACTIONS / COMMENTS No           Date   S SCHEDULED         (HOURS)   (I) OR REDUCING PCrJER(2) 10           901109           S             0.0     A             5           Power was reduced to a low of S5I for replacement of *B*
50 482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 12-01-90 COMPLETED BY M. Williams REPORT 1.JNTH November. 1990 TELEPH)NE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S SCHEDULED (HOURS)
main feedwater pump speed sensor and leak encapsulation on heater drain pumps *A* and *B".
(I)
OR REDUCING PCrJER(2) 10 901109 S
0.0 A
5 Power was reduced to a low of S5I for replacement of *B*
main feedwater pump speed sensor and leak encapsulation on heater drain pumps
*A* and
*B".
t SUtMARY: The unit operated at or near IODI power throughout the month of November with the exception of power reductions on November 7 and November 9-12 for equipment repair.
t SUtMARY: The unit operated at or near IODI power throughout the month of November with the exception of power reductions on November 7 and November 9-12 for equipment repair.
: 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:                                 1. MANUAL B: MAINTENANCE OR TEST               F: ADMINISTRATIVE                                               2. MANUAL SCRAM C:     Rt,t ut. LING                 G: OPERATIONAL ERROR (EXPLAIN)                                 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION           H: OTHER (EXPLAIN)                                             4. CONTINUE 3
: 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
: 5. REDUCED LOAD
1.
: 9. OTHER Wolf Creek Generating Station Monthly Operating Report November 1990 Page 4 of 5
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C:
Rt,t ut. LING G: OPERATIONAL ERROR (EXPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUE 3 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report November 1990 Page 4 of 5


Attochment to N0 90-0305 WOLF CREEK 1RCLEAR OPDaTI!G COUORTIOi WOLF CREEK GDERATIIG STATIQ4 UNIT 10.1 M0ml             Ibvmber, 1990
Attochment to N0 90-0305 WOLF CREEK 1RCLEAR OPDaTI!G COUORTIOi WOLF CREEK GDERATIIG STATIQ4 UNIT 10.1 M0ml Ibvmber, 1990


==SUMMARY==
==SUMMARY==
OF OPERATI!G EXPERIDCE Listad below in chronological seguence is a sunnary of operating experiences for this nanth which required load reduction or resulted in significant non-load mlated incidents.
OF OPERATI!G EXPERIDCE Listad below in chronological seguence is a sunnary of operating experiences for this nanth which required load reduction or resulted in significant non-load mlated incidents.
DbG                   .DE&                                                 WDR lbvmber 1,1990         0000 hours                       Unit at 100% power.
DbG
Ibvmber 7, 1990       0533 hours                       Degan reducing power to 87% due to partial loss of "B" phase nain transformer cooling.
.DE&
1012 hours                       Power increased to 98% following transfomer repair.
WDR lbvmber 1,1990 0000 hours Unit at 100% power.
Ibvetnr 8,1990         0000 hours                       Unit at 100% power.
Ibvmber 7, 1990 0533 hours Degan reducing power to 87% due to partial loss of "B" phase nain transformer cooling.
  !bvmber 9,1990         2337 hours                       Ccumenced power reduction for "B" main foodwater punp speed indicator repair, as well as encapsulation of leakage on heater drain pumps "A" and "B".
1012 hours Power increased to 98% following transfomer repair.
  !bvomber 10, 1990     0350 hours                       Unit at 55% power.
Ibvetnr 8,1990 0000 hours Unit at 100% power.
1015 hours                       Power increased to 65% per request of systm operations.
!bvmber 9,1990 2337 hours Ccumenced power reduction for "B" main foodwater punp speed indicator repair, as well as encapsulation of leakage on heater drain pumps "A" and "B".
  !bvmber 11, 1990     0050 hours                         Increased power to approxinately 95% following main foodwater pump rupair.
!bvomber 10, 1990 0350 hours Unit at 55% power.
  !bvamber 12, 1990     1234 hours                       Unit at 100% power following heater drain pump repairs.
1015 hours Power increased to 65% per request of systm operations.
  !bvmber 30, 1990       2400 hours                       Unit at 100% power.
!bvmber 11, 1990 0050 hours Increased power to approxinately 95% following main foodwater pump rupair.
Wolf Creek Generating Station l_
!bvamber 12, 1990 1234 hours Unit at 100% power following heater drain pump repairs.
Nonthly Operating Report Ibvmber 1990 Page 5 of 5 i
!bvmber 30, 1990 2400 hours Unit at 100% power.
!                                        .  . - . - _ _ _            ,}}
Wolf Creek Generating Station Nonthly Operating Report l_
Ibvmber 1990 Page 5 of 5 i
,}}

Latest revision as of 19:11, 16 December 2024

Monthly Operating Rept for Wolf Creek Generating Station for Nov 1990
ML20065R211
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/1990
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NO-90-0305, NO-90-305, NUDOCS 9012180271
Download: ML20065R211 (7)


Text

_

We#LF CREEK NUCLEAR OPERATING CORPORATION John A. Baby ve. Pr o.rn Nuclear Operations December 13. 1990 NO 90-0305 U. 8. Nuclear Regulatory Commission ATTN Document Control Desk Mall Station P1-137 Washington, D. C.

20$$$

Subject:

Docket No. 50-482: November, 1990 Monthly Operating Report Gentlemen:

Attached is the November, 1990 Monthly Operating Report for Wolf Creek Generating Station.

This submittal is being.made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours.

John A. Bailey Vice President Nuclear Operations JAE/jra Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a i

1

'. I

  • 012180271 00113n

{DR Apocg 97,000482 PDR

[m' '

. O "' n $d(

"""'"'"""9*****"""*()"-**

An EquW Opportonny Empk yer MMCVET

. _ _ _ _ _ _ _ _ -. _. _. =

l Attachs.ent to NO 90-0305

.t l.

l t

WOLF CREEK 1AKLDJ1 OPERATI!G 00RIORATIQ4 i

NOLF CREEK GDERATIIG STATIGi lOMILY OPERATIlG REPGIT i

10m1:, thurber YEAR:

1990 l

Dxket Ib. : 50-482 Facility Operating License Ib. : NPF-42 Report !b. 69-l Pmpanxi by:

Merlin G. Williams l

a p

w.

7

m..__._._..._______._-..__..

i Attachinent to NO 90-0305 t

StNMARY

)

The follcwing report highlights the operating experience of Wolf Creo)

Generating Staticri for the month of N:msnber,1990. This report is being provide:1 pursuant to %chnical Specification 6.9.1.8.

a I

I.

SLNMARY OF OPDRTI!G EXPERIDCE The unit operated at 100% power th. yhout the month of Novmber with the exception of two power reductions te facilitate repairs.

The first power reduction occurred on Novunber 7 as a result of a partial loss of cooling on the aB" phase main transformer. Power was reduced to 87%

4 for approximately two hces to stabilire winding taperatures while repairs could be ccrpleted.

e Power was again reduced late Novunber 9 through November 12 for secondary system maintenance activities. Specifically, Main Feedwater Punp PAE01B underwent speed sensor replacement and Heater Drain Imps PAF01A and B were encapsulated to stop ongoing leakage. Reactor power was decreased to 55%

for the feedwater punp repair and increased to 95% until the heater drain punp repairs were ccmplete.

II. MMOR SAFEIT REIATED MAINTENAtCE ACTIVITIES i

No majar safety related maintenance activities were perfoned in !bvenbar.

y a-h Wolf Creek Generating Station lenthly Operating Rotort Ibvember 1990 Page 1 of 5 i

~.,..... _..,,,, -.. -,.,.,,, _, -

-~.,

.._.,,.._.---,---..,m,...

. - ~ _ -. _ _.., _ - _. _ _.,. -. _... -, -, _ _. -

Attachment to NO 90-0305 I

wERATDc twr> rmw DOCKET 10, 50-482 HOLF CREEK GE!ERATDG STA2' ION NOLF CREEK 1RKLEAR OP1RATI!G CCRIGATICN DATE 12-01-90 COPILTED BY M. WI.lli=.3 TELEPIENE & ~>64-8831 OPERATIlG STA7US 1.

Reporting Pericar_. Ibvunber,1990

_ Gross llours in Reporting Period: 720 3.

Currently Authorized Power Invel(Mft): 3411 F.r-Depand. Capacity (M&!bt):,_H25 Design Electrical Rating (Mbibt):

1170 3.

Power level to Which Rostricted (If Any)(Mhlbt):

N/A 4.

Roanons for restriction (If Any):

N/A 2his Itrith Yr. to Date Cunulative 5.

IMmber of 11ours Roactor was Critical 720.0 6,352.1 36,651.5 6.

Roactor Roservo Shutdown llotus 0.0 0.0 339.8 7.

Ilours Generator an Idne 720.0 6,292.7 36,079.8 8.

thit Rosorvo Shutdown llours 0.0 0.0 0.0.

9.

Gross shonnal Energy Ganorated (MI) 2,421,081 21,056,411 119,533,666

10. Gross Eloctrical Energy Generated (MNH)

__850J4c

.a41,223 41,620,170

11. Ibt Electrical Energy Generated (MI) 7,015,837 39,738,208
12. Roactor Service Factor 100.0 79.2 79.7,
13. Ronctor Availability Factor 100.0 79.2 80.5
14. Unit Service Factor 100.0 78.5 78.5
15. thit Availability Factor 100.0 78.5 78.5
16. thtt Capacity Factor (Using MDC) 100.0 77.1 76.5
17. Unit Capacity Factor (Using Design MWo) 97.0 74.8 73.9
18. Unit Forced Outage Rato 0.0 1.9 4.1
19. Shutdowns Schodulod Over !bxt 6 tenths (Typo, Date, and Duration of each): N/A
20. If Shut D:wn at End of Report Period, Estinated Date of Startup N/A Wolf Creek Generating Station Monthly Operating Report

!bvmber 1990 Page 2 of 5 l

l

'1

- A,ttachment to NO 90-0305 AWWGE IRILY DlIT POWER LEVEL DOC 30!.T NO.

50-482 WOLP CREEK GENERATDG STATICH EXE CREEK MCLEAR OPl! RATING CORPORATIN IATE 12-01-90 CCMPLETED BY M. Williams TELEPH NE 316-364-8831

)01m1 tbvmber, 1990 DAY AVERAGE DAILY POWER LEVEL IRY AVERAGE IRILY POWER LEVEL (MWe-Net)

(MWe-Net)

A 1149 17 1154 2

2-1150 18

154 3-1151 19

.152 4

1152 20

J,0 5'

1153 21

11L I

6 1153 22 1155 7

1121 23 1153 8

1153 24 1156 9

1152 25 1156-10 764 26 1155 a

11 1069 27 1153

-i

-12' 1111 28 1155 13.

1152 29 1156 14.

1147 30 1155 15 1152 31 N/A 16 1152 Wolf Creek Generating Station-Monthly Operating Report Novm ber.1990 Page 3 of 5

Attachment to NO 90-0305 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

50 482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 12-01-90 COMPLETED BY M. Williams REPORT 1.JNTH November. 1990 TELEPH)NE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S SCHEDULED (HOURS)

(I)

OR REDUCING PCrJER(2) 10 901109 S

0.0 A

5 Power was reduced to a low of S5I for replacement of *B*

main feedwater pump speed sensor and leak encapsulation on heater drain pumps

  • A* and
  • B".

t SUtMARY: The unit operated at or near IODI power throughout the month of November with the exception of power reductions on November 7 and November 9-12 for equipment repair.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C:

Rt,t ut. LING G: OPERATIONAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUE 3 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report November 1990 Page 4 of 5

Attochment to N0 90-0305 WOLF CREEK 1RCLEAR OPDaTI!G COUORTIOi WOLF CREEK GDERATIIG STATIQ4 UNIT 10.1 M0ml Ibvmber, 1990

SUMMARY

OF OPERATI!G EXPERIDCE Listad below in chronological seguence is a sunnary of operating experiences for this nanth which required load reduction or resulted in significant non-load mlated incidents.

DbG

.DE&

WDR lbvmber 1,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.

Ibvmber 7, 1990 0533 hours0.00617 days <br />0.148 hours <br />8.812831e-4 weeks <br />2.028065e-4 months <br /> Degan reducing power to 87% due to partial loss of "B" phase nain transformer cooling.

1012 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.85066e-4 months <br /> Power increased to 98% following transfomer repair.

Ibvetnr 8,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.

!bvmber 9,1990 2337 hours0.027 days <br />0.649 hours <br />0.00386 weeks <br />8.892285e-4 months <br /> Ccumenced power reduction for "B" main foodwater punp speed indicator repair, as well as encapsulation of leakage on heater drain pumps "A" and "B".

!bvomber 10, 1990 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> Unit at 55% power.

1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> Power increased to 65% per request of systm operations.

!bvmber 11, 1990 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Increased power to approxinately 95% following main foodwater pump rupair.

!bvamber 12, 1990 1234 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.69537e-4 months <br /> Unit at 100% power following heater drain pump repairs.

!bvmber 30, 1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100% power.

Wolf Creek Generating Station Nonthly Operating Report l_