{{#Wiki_filter:v t :
{{#Wiki_filter:v t
i CENTERIOR
i CENTERIOR ENERGY
    ^
^
ENERGY                                                                              ,
i 300Modson Avenue Louis E Storr Toledo, OH 43652-0001 Vice President-Nuclect 4tF249 2300
i 300Modson Avenue                                                     Louis E Storr Toledo, OH 43652-0001                                                 Vice President-Nuclect 4tF249 2300                                                         . Davis-Besse i
. Davis-Besse i
Docket Number 50-346.
Docket Number 50-346.
I License Number NPP-3 Serial Number 2203                                                                             '
I License Number NPP-3 Serial Number 2203 February 8, 1994 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.
February 8, 1994 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t:       Semiannual Fitness-For-Duty Report                                           ,
20555 Subj ec t:
July - December 1093 Centlemen:
Semiannual Fitness-For-Duty Report July - December 1093 Centlemen:
Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo                           ..'
Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of July - December 1993 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data.
Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of July - December 1993 for Davis-Besse Nuclear Power Station,                         ,
Unit 1.
Attachment 1 provides Toledo Edison's FFD Program Performance Data.
The data form is an industry standard developed by the Nuclear Hanagement and Resources Council to provide the information required by 10 CFR 26.71(d). Attachment 2 provides a summary of management actions-taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
The data form is an industry standard developed by the Nuclear Hanagement and Resources Council to provide the information required by 10 CFR 26.71(d). Attachment 2 provides a summary of management actions-taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
If you have any questions, please contact Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.
If you have any questions, please contact Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.
Verytrulyyou/rs /
Verytrulyyou/rs /
v         -                  Y DAB /amb Attachments cc:       J. B. Martin, Regional Administrator, NRC Region'III S. Stasek, NRC Region III, DB-1 Senior Resident Inspector                         .;
v Y
R. J. Stransky,'NRC/NRR-DB-1 Project Manager Utility Radiological Safety Board Opersng Compames.
DAB /amb Attachments cc:
                                                                                .h    ,
J. B. Martin, Regional Administrator, NRC Region'III S. Stasek, NRC Region III, DB-1 Senior Resident Inspector R. J. Stransky,'NRC/NRR-DB-1 Project Manager Utility Radiological Safety Board
1 ; n p ,, ,                   y c:eniend tie tne mummating ToWo fdison 9402170313 940209                           1' PDR ADOCK 05000346     3                       k
.h Opersng Compames.
                                      -R               PDR   _ff                     6'
1 ; n p,,,
y c:eniend tie tne mummating 9402170313 940209 1'
ToWo fdison PDR ADOCK 05000346 3
k
-R PDR
_ff 6'


                        ? Docket Number.50-346'
? Docket Number.50-346'
                        ' License Number NPF                                                                                                                             ,
' License Number NPF,
Serial Number.2203 i
Serial Number.2203 i
i i
i i
Line 45: Line 47:
i f
i f
7
7
                                                                                                                                                                          ~i Toledo Edison's Fitness-For-Duty Report                                                                                   >
~i Toledo Edison's Fitness-For-Duty Report i
i July - December 1993                                                                               -!
July - December 1993 I
I     _
l-
l-                                                                                                                                                                     ..;
'I f
                                                                                                                                                                        'I f
i P
i P
                                                                                                                                                                            ?
?
I.-
I.
l                                                                                                                                                                           1 i
l 1
4 l,;
!i 4
!-                                                                                                                                                                        -i 1-                                                                                                                                                                           ;
l,;
r i
-i 1-i r
I
I
.                                                                                                                                                                      .I
. I t.
: t.                                                                                                                                                                           j s                                                                                                                                                                             .
j s
l I
l
                                                                                                                                                                      -- f s
-- f I
                                                                                                                                                                            ?
s
?
9
9
                                                                                                                                                                  '4+-
'4+-
i
i
                                                                                                                                                                      ~
~
i   .
i i --
i' N .'
i' N.'
8 i
8!;
8
i 8
..                                                                                                .                                                                        .i U                                                                                                                                                                           !
.i U
km - - _ . -    _ _ . _ - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  _ . _ _ _ _ _ . _ _ . _ _ . . _ . _ _ _ . _                            . . _ _ _
km - -
                                                                                                                                                                      ;:j
;:j


Docket Number 50-346 License Number NPF-3 Serini Number 2203  
Docket Number 50-346 License Number NPF-3 Serini Number 2203 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison December 31, 1993 Company a nenew Eneng Davis-lie s se t.ocenon William T' O'Connor (419) 249-2366 contae nam Pnone (ineno. = ea cooe)
'                                        Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26                                                             '.
Cutotts: ScreerVConfirmation (ng'mt)
Toledo Edison                                                                       December 31, 1993 Company                                                         a nenew Eneng Davis-lie s se t.ocenon William T' O'Connor                                                   (419) 249-2366 contae nam                                                 Pnone (ineno. = ea cooe)
O Appendix A to 10CFP M Marijuana 50 / 15 Amphetamines 1000/ 500
Cutotts: ScreerVConfirmation (ng'mt)     O Appendix A to 10CFP M Marijuana           50 / 15             Amphetamines       1000/ 500                                             /
/
Cocaine           300 / 150           Phencyctidine         25 / 25                                           /
Cocaine 300 / 150 Phencyctidine 25 / 25
Oplates           300 / 300           Alcohol (% BAC)     0.04                                                 /'
/
Long-Term                     Short-Term Testing Results                           Ucensee Emptoyees       Contractor Personnel         Contractor Personnel Average Number writ                           1,038                                                     155 Unescorted Access Categories                                 Tested     Positive     Tested       Positive         Tested         Posttive Pre-Access                                   46       0                                           24             0 k     Post accident                         10       0                                             0             0 0                                                                                                     0             0
Oplates 300 / 300 Alcohol (% BAC) 0.04
    $      Observed behavior                       1       1 22             0 Random                                     672       0 22       0                                             o             o Fotlow up 0                                             o             o Other                                         6 1                                           46               0 Total                                       751 REV.1/92
/'
Long-Term Short-Term Testing Results Ucensee Emptoyees Contractor Personnel Contractor Personnel Average Number writ 1,038 155 Unescorted Access Categories Tested Positive Tested Positive Tested Posttive Pre-Access 46 0
24 0
k Post accident 10 0
0 0
0 0
0 Observed behavior 1
1 22 0
Random 672 0
22 0
o o
Fotlow up 0
o o
Other 6
1 46 0
Total 751 REV.1/92


  ' Breakdown of Confirmed Positive Tests for Specific Substances Amphe-   Pheccy-             Refusa!
' Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Pheccy-Refusa!
Marijuana   Cocaine ' Opiaus famines   CEdine   Alcohol   to Test 1         2       3         4       5
Marijuana Cocaine
                                                                                                        ~   ~       '
' Opiaus famines CEdine Alcohol to Test 1
    . Licensee Employees       0         0         0       0       0       1           0 Lorg-Term Contradors Short-Term Contractors   0         0         0       0       0       0           0                                                     A-Total                     0         0         0       0       0       1           0                                                     1 t
2 3
4 5
~
~
. Licensee Employees 0
0 0
0 0
1 0
Lorg-Term Contradors Short-Term Contractors 0
0 0
0 0
0 0
A-Total 0
0 0
0 0
1 0
1 t
l l
l l
l-t F
l-t F
l                                                                                                                                     ..
l yy
yy ~
~
37             g             9         p-         =         y' 7     y   e q--       we y e     a m   -m-z _  _- =.__e      P
37 g
9 p-
=
y' 7
y e
q--
we y
e a
m
-m-z
=.
e P


    ,;M-           DocketNumbSr50-346                                                                     '
,;M-DocketNumbSr50-346
                  -License Number NPF-3 l
-License Number NPF-3 Serial Number 2203 -
Serial Number 2203 -                                                                   !
~ Attachment 2~
n
n
              ~ Attachment 2~                                                                            ;
-l TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO j
                                                                                                      -l .
FITNESS-FOR-DUTY
TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO                                         j FITNESS-FOR-DUTY                                     -I l
-I l
Toledo Edison           Contractor Personnel             -Personnel Referred to EAP                         1                     0 Hanagement Sanctions                     1                     0 Toledo Edison does not perform onsite initial drug ~ screening tests;               j therefore, there.are no unconfirmed presumptive positive results'on-               -!
Toledo Edison Contractor Personnel
which to base management actions.                                                       '
-Personnel Referred to EAP 1
0 Hanagement Sanctions 1
0 Toledo Edison does not perform onsite initial drug ~ screening tests; j
therefore, there.are no unconfirmed presumptive positive results'on-which to base management actions.
a i
a i
TOLEDO EDISON'S FITNESS-FOR-DUTY                                         ,
TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS j
REPORTS                                           j
-i There were no Fitness-For-Duty reports submitted during this reporting i
                                                                                                      -i There were no Fitness-For-Duty reports submitted during this reporting                 i period (July - December 1993).                                                       '!
period (July - December 1993).
s
s
                                                                                                          )
)
l l
l l
a,       ,.                        _.                          -                      -          4 -)}}
-)
a, 4}}

Latest revision as of 11:41, 16 December 2024

Forwards Semiannual fitness-for-duty Rept for Jul-Dec 1993, Per 10CFR26.71(d).Summary of Mgt Actions Taken by Toledo Edison Based on Positive FFD Testing Results,Presumptive Positives & List of FFD Event Repts Also Encl
ML20067A413
Person / Time
Site: Davis Besse 
Issue date: 02/08/1994
From: Storz L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2203, NUDOCS 9402170313
Download: ML20067A413 (5)


Text

v t

i CENTERIOR ENERGY

^

i 300Modson Avenue Louis E Storr Toledo, OH 43652-0001 Vice President-Nuclect 4tF249 2300

. Davis-Besse i

Docket Number 50-346.

I License Number NPP-3 Serial Number 2203 February 8, 1994 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.

20555 Subj ec t:

Semiannual Fitness-For-Duty Report July - December 1093 Centlemen:

Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of July - December 1993 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data.

The data form is an industry standard developed by the Nuclear Hanagement and Resources Council to provide the information required by 10 CFR 26.71(d). Attachment 2 provides a summary of management actions-taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.

If you have any questions, please contact Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.

Verytrulyyou/rs /

v Y

DAB /amb Attachments cc:

J. B. Martin, Regional Administrator, NRC Region'III S. Stasek, NRC Region III, DB-1 Senior Resident Inspector R. J. Stransky,'NRC/NRR-DB-1 Project Manager Utility Radiological Safety Board

.h Opersng Compames.

1 ; n p,,,

y c:eniend tie tne mummating 9402170313 940209 1'

ToWo fdison PDR ADOCK 05000346 3

k

-R PDR

_ff 6'

? Docket Number.50-346'

' License Number NPF,

Serial Number.2203 i

i i

l i

i f

7

~i Toledo Edison's Fitness-For-Duty Report i

July - December 1993 I

l-

'I f

i P

?

I.

l 1

!i 4

l,;

-i 1-i r

I

. I t.

j s

l

-- f I

s

?

9

'4+-

i

~

i i --

i' N.'

8!;

i 8

.i U

km - -

j

Docket Number 50-346 License Number NPF-3 Serini Number 2203 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison December 31, 1993 Company a nenew Eneng Davis-lie s se t.ocenon William T' O'Connor (419) 249-2366 contae nam Pnone (ineno. = ea cooe)

Cutotts: ScreerVConfirmation (ng'mt)

O Appendix A to 10CFP M Marijuana 50 / 15 Amphetamines 1000/ 500

/

Cocaine 300 / 150 Phencyctidine 25 / 25

/

Oplates 300 / 300 Alcohol (% BAC) 0.04

/'

Long-Term Short-Term Testing Results Ucensee Emptoyees Contractor Personnel Contractor Personnel Average Number writ 1,038 155 Unescorted Access Categories Tested Positive Tested Positive Tested Posttive Pre-Access 46 0

24 0

k Post accident 10 0

0 0

0 0

0 Observed behavior 1

1 22 0

Random 672 0

22 0

o o

Fotlow up 0

o o

Other 6

1 46 0

Total 751 REV.1/92

' Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Pheccy-Refusa!

Marijuana Cocaine

' Opiaus famines CEdine Alcohol to Test 1

2 3

4 5

~

~

. Licensee Employees 0

0 0

0 0

1 0

Lorg-Term Contradors Short-Term Contractors 0

0 0

0 0

0 0

A-Total 0

0 0

0 0

1 0

1 t

l l

l-t F

l yy

~

37 g

9 p-

=

y' 7

y e

q--

we y

e a

m

-m-z

=.

e P

,;M-DocketNumbSr50-346

-License Number NPF-3 Serial Number 2203 -

~ Attachment 2~

n

-l TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO j

FITNESS-FOR-DUTY

-I l

Toledo Edison Contractor Personnel

-Personnel Referred to EAP 1

0 Hanagement Sanctions 1

0 Toledo Edison does not perform onsite initial drug ~ screening tests; j

therefore, there.are no unconfirmed presumptive positive results'on-which to base management actions.

a i

TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS j

-i There were no Fitness-For-Duty reports submitted during this reporting i

period (July - December 1993).

s

)

l l

-)

a, 4