v t

i CENTERIOR ENERGY

^

i 300Modson Avenue Louis E Storr Toledo, OH 43652-0001 Vice President-Nuclect 4tF249 2300

. Davis-Besse i

Docket Number 50-346.

I License Number NPP-3 Serial Number 2203 February 8, 1994 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.

20555 Subj ec t:

Semiannual Fitness-For-Duty Report July - December 1093 Centlemen:

Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of July - December 1993 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data.

The data form is an industry standard developed by the Nuclear Hanagement and Resources Council to provide the information required by 10 CFR 26.71(d). Attachment 2 provides a summary of management actions-taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.

If you have any questions, please contact Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.

Verytrulyyou/rs /

v Y

DAB /amb Attachments cc:

J. B. Martin, Regional Administrator, NRC Region'III S. Stasek, NRC Region III, DB-1 Senior Resident Inspector R. J. Stransky,'NRC/NRR-DB-1 Project Manager Utility Radiological Safety Board

.h Opersng Compames.

1 ; n p,,,

y c:eniend tie tne mummating 9402170313 940209 1'

ToWo fdison PDR ADOCK 05000346 3

k

-R PDR

_ff 6'

? Docket Number.50-346'

' License Number NPF,

Serial Number.2203 i

i i

l i

i f

7

~i Toledo Edison's Fitness-For-Duty Report i

July - December 1993 I

l-

'I f

i P

?

I.

l 1

!i 4

l,;

-i 1-i r

I

. I t.

j s

l

-- f I

s

?

9

'4+-

i

~

i i --

i' N.'

8!;

i 8

.i U

km - -

j

Docket Number 50-346 License Number NPF-3 Serini Number 2203 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison December 31, 1993 Company a nenew Eneng Davis-lie s se t.ocenon William T' O'Connor (419) 249-2366 contae nam Pnone (ineno. = ea cooe)

Cutotts: ScreerVConfirmation (ng'mt)

O Appendix A to 10CFP M Marijuana 50 / 15 Amphetamines 1000/ 500

/

Cocaine 300 / 150 Phencyctidine 25 / 25

/

Oplates 300 / 300 Alcohol (% BAC) 0.04

/'

Long-Term Short-Term Testing Results Ucensee Emptoyees Contractor Personnel Contractor Personnel Average Number writ 1,038 155 Unescorted Access Categories Tested Positive Tested Positive Tested Posttive Pre-Access 46 0

24 0

k Post accident 10 0

0 0

0 0

0 Observed behavior 1

1 22 0

Random 672 0

22 0

o o

Fotlow up 0

o o

Other 6

1 46 0

Total 751 REV.1/92

' Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Pheccy-Refusa!

Marijuana Cocaine

' Opiaus famines CEdine Alcohol to Test 1

2 3

4 5

~

~

. Licensee Employees 0

0 0

0 0

1 0

Lorg-Term Contradors Short-Term Contractors 0

0 0

0 0

0 0

A-Total 0

0 0

0 0

1 0

1 t

l l

l-t F

l yy

~

37 g

9 p-

=

y' 7

y e

q--

we y

e a

m

-m-z

=.

e P

,;M-DocketNumbSr50-346

-License Number NPF-3 Serial Number 2203 -

~ Attachment 2~

n

-l TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO j

FITNESS-FOR-DUTY

-I l

Toledo Edison Contractor Personnel

-Personnel Referred to EAP 1

0 Hanagement Sanctions 1

0 Toledo Edison does not perform onsite initial drug ~ screening tests; j

therefore, there.are no unconfirmed presumptive positive results'on-which to base management actions.

a i

TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS j

-i There were no Fitness-For-Duty reports submitted during this reporting i

period (July - December 1993).

s

)

l l

-)

a, 4