ML20069D926: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:p
{{#Wiki_filter:p
                                                                                                            ^
^
[,                               a So. itg3                 gyg
[,
%    ,                                                                50- WO UNION EuccTmc COMPANY CALLAWAY PLANT
a So. itg3 gyg 50- WO UNION EuccTmc COMPANY CALLAWAY PLANT
                                                                              "^" WG ADDRESS:
"^" WG ADDRESS:
February 28 @VWJIPAL STAFW p.mox emo FULT   J N. MO. 6 5 2 51 0/RA   SCS       i Mr. W. L. Axelson                           A/RA   PA0 NRC Region III                               GPRP   SLO 799 Roosevelt.Rd.                   ,
February 28
ORNA_   RC Glen Ellyn, IL 60137 p 7 / ,/ sfUiSF CEP
@VWJIPAL STAFW p.mox emo i
FULT J N. MO. 6 5 2 51 0/RA SCS i
Mr. W. L. Axelson A/RA PA0 NRC Region III GPRP SLO 799 Roosevelt.Rd.
ORNA_
RC Glen Ellyn, IL 60137 p 7 /,/ sfUiSF CEP


==Dear Mr. Axelson:==
==Dear Mr. Axelson:==
KL
KL
                                                                .0L     FILE yH This is a follow-up to our phone conversation of February 24, 1983.
.0L FILE yH This is a follow-up to our phone conversation of February 24, 1983.
{!                         The.10 and 50 mile EPZ maps supplied by your
{!
;                  office have the Callaway Plant incorrectly located, l                   The plant is shown on the maps 1 - 1 miles West of where it should be.
The.10 and 50 mile EPZ maps supplied by your office have the Callaway Plant incorrectly located, l
The plant is shown on the maps 1 - 1 miles West of where it should be.
The error probably occurred by using an incor-rect longitude given in the Callaway FSAR Site Adden-dum (2.1.1.1 Specification of Location) for the mid-point of two reactors.
The error probably occurred by using an incor-rect longitude given in the Callaway FSAR Site Adden-dum (2.1.1.1 Specification of Location) for the mid-point of two reactors.
The correct location for the midpoint should be 38*-45'-42.3" latitude and 91*-46'-52.4" longitude.
The correct location for the midpoint should be 38*-45'-42.3" latitude and 91*-46'-52.4" longitude.
Line 34: Line 39:
Since 1 - 1 miles is significant within the 10 mile EPZ and those maps were issued to FEMA, SEMA and NRC Incident Response Centers in Washington and Glen Ellyn, they should be corrected.
Since 1 - 1 miles is significant within the 10 mile EPZ and those maps were issued to FEMA, SEMA and NRC Incident Response Centers in Washington and Glen Ellyn, they should be corrected.
If you should have further questions, please call (314) 676-8261.
If you should have further questions, please call (314) 676-8261.
Very truly yours, JL( lJU
Very truly yours, JL( lJU Al White Supervisor, Emergency Preparedness AEW/dch cc:
              .                                  Al White Supervisor, Emergency Preparedness AEW/dch                                                                         ,
A. C. Passwater 8303210102 830228 PDR ADOCK 05000483 F
cc:   A. C. Passwater 8303210102 830228 PDR ADOCK 05000483 F               PDR                                                                 VAR 0 7 1983 1.2: M l}}
PDR VAR 0 7 1983 1.2: M
..}}

Latest revision as of 10:59, 16 December 2024

Discusses 830224 Telcon Re Incorrect Location of Plant on 10 & 50 Mile Emergency Planning Zone Maps.Error Probably Due to Incorrect Longitude Given in Plant FSAR Site Addendum
ML20069D926
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 02/28/1983
From: White A
UNION ELECTRIC CO.
To: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8303210102
Download: ML20069D926 (1)


Text

p

^

[,

a So. itg3 gyg 50- WO UNION EuccTmc COMPANY CALLAWAY PLANT

"^" WG ADDRESS:

February 28

@VWJIPAL STAFW p.mox emo i

FULT J N. MO. 6 5 2 51 0/RA SCS i

Mr. W. L. Axelson A/RA PA0 NRC Region III GPRP SLO 799 Roosevelt.Rd.

ORNA_

RC Glen Ellyn, IL 60137 p 7 /,/ sfUiSF CEP

Dear Mr. Axelson:

KL

.0L FILE yH This is a follow-up to our phone conversation of February 24, 1983.

{!

The.10 and 50 mile EPZ maps supplied by your office have the Callaway Plant incorrectly located, l

The plant is shown on the maps 1 - 1 miles West of where it should be.

The error probably occurred by using an incor-rect longitude given in the Callaway FSAR Site Adden-dum (2.1.1.1 Specification of Location) for the mid-point of two reactors.

The correct location for the midpoint should be 38*-45'-42.3" latitude and 91*-46'-52.4" longitude.

This correction will be incorporated in FSAR Revision 5, 2/83.

Since 1 - 1 miles is significant within the 10 mile EPZ and those maps were issued to FEMA, SEMA and NRC Incident Response Centers in Washington and Glen Ellyn, they should be corrected.

If you should have further questions, please call (314) 676-8261.

Very truly yours, JL( lJU Al White Supervisor, Emergency Preparedness AEW/dch cc:

A. C. Passwater 8303210102 830228 PDR ADOCK 05000483 F

PDR VAR 0 7 1983 1.2: M

..