TXX-3580, Interim Deficiency Rept Re Defective Limitorque Pinion Keys.Initially Reported on 820818.Matter Not Reportable Per 10CFR50.55(e) Based on Investigation: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:,
{{#Wiki_filter:,
TEXAS UTILITIFS GENERATING COMI%NY 2.mn.. m um :..isu.wn u m o,imm
TEXAS UTILITIFS GENERATING COMI%NY 2.mn.. m um :..isu.wn u m o,imm
  'T .h ' L'."'
'T
{3)[22dMJBb3}             ''
.h '
l' l OCT l 81982                 l
L'."'
                                                    ~ ~ ~>)           October 12, 1982 lU TXX-3580 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000                             Docket f5s. 50-445 Arlington, TX 76012                                                         50-446 COMANCHE PEAK STEAM ELECTRIC STATION DEFECTIVE LIMITORQUE PINION KEYS FILE NO.: 10110
{3)[22dMJBb3}
l' l OCT l 81982 l
lU
~ ~ ~>)
October 12, 1982 TXX-3580 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket f5s.
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION DEFECTIVE LIMITORQUE PINION KEYS FILE NO.:
10110


==Dear Mr. Madsen:==
==Dear Mr. Madsen:==
On August 18, 1982, we verbally informed your Mr. Tom Westerman of a deficiency regarding defective pinion keys in Limitorque motor operators. We have sub-mitted an interim report logged TXX-3569 dated September 14, 1982.
On August 18, 1982, we verbally informed your Mr. Tom Westerman of a deficiency regarding defective pinion keys in Limitorque motor operators. We have sub-mitted an interim report logged TXX-3569 dated September 14, 1982.
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.
Very truly yours, h     ,w Y'
Very truly yours, h
                                                                      . J. Gary RJG:eaq cc: NRC Region IV - (0 + 1 copy)
,w Y'
. J. Gary RJG:eaq cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555 h
U. S. Nuclear Regulatory Commission Washington, DC 20555 h
8210250338                           f
8210250338 f
                              -                                               -}}
- -}}

Latest revision as of 11:39, 16 December 2024

Interim Deficiency Rept Re Defective Limitorque Pinion Keys.Initially Reported on 820818.Matter Not Reportable Per 10CFR50.55(e) Based on Investigation
ML20069K010
Person / Time
Site: Comanche Peak  
Issue date: 10/12/1982
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3580, NUDOCS 8210250338
Download: ML20069K010 (1)


Text

,

TEXAS UTILITIFS GENERATING COMI%NY 2.mn.. m um :..isu.wn u m o,imm

'T

.h '

L'."'

{3)[22dMJBb3}

l' l OCT l 81982 l

lU

~ ~ ~>)

October 12, 1982 TXX-3580 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket f5s.

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION DEFECTIVE LIMITORQUE PINION KEYS FILE NO.:

10110

Dear Mr. Madsen:

On August 18, 1982, we verbally informed your Mr. Tom Westerman of a deficiency regarding defective pinion keys in Limitorque motor operators. We have sub-mitted an interim report logged TXX-3569 dated September 14, 1982.

We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.

Very truly yours, h

,w Y'

. J. Gary RJG:eaq cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 h

8210250338 f

- -