METROPOl.ITAN | METROPOl.ITAN EDISON CO M P A N Y soesioi.,y o, c.o.i codiic utii.ii., co,no,.iion TMI UNIT 1 NRC INSPECTION EXIT - | ||
G. P. Miller | Location TMI NUCLEAR STATION subject INSPECTION REPORT 79-24 Date JANUARY 14, 1980 To ACTION PARTIES ATTENDEES: | ||
G. P. Miller | |||
- Unit 1 Met-Ed Met-Ed - Manager HP Unit 1 W. E. Potts D. R. Haverkamp - Unit 1 Resident Inspector (Acting) | |||
7J{_T.; Collins | Senior Radiation Specialist (Acting) | ||
K. E. Plumlee | |||
-~ | |||
7J{_T.; Collins 2 | |||
NRC concern is in relation to the fact that Met-Ed owes a response and action. Met-Ed, by letter dated 12/11/79 - GQL 1510, committed a response on this item by 12/31/79 and this response has not been forwarded to date. To resolve this item: | -Deputy. Director,;TMI Support-7 l. | ||
(a) | This inspection covered Unit 1 operations and Health Physics through the period November 28, 1979 to January.4, 1980. The inspection in-cluded plant tours, inspections by shift NRC personnel, records and document searches. | ||
2. | |||
The Operations Area was found acceptable with no items of non-compiiance. | |||
3. | |||
Past Open Item 78-06-01 relative to work inside steam generators -- | |||
NRC concern is in relation to the fact that Met-Ed owes a response and action. | |||
Met-Ed, by letter dated 12/11/79 - GQL 1510, committed a response on this item by 12/31/79 and this response has not been forwarded to date. | |||
To resolve this item: | |||
(a) | |||
Met-Ed owes a response Action: Harding /Potts (b) | |||
Until HP will look at the Unit 2 commitment in this area and will resolve the items with the NRC Action: | |||
Potts 8212010390 800114 DR ADOCK 05000 INTER-0FFICE MEMORANDUM | |||
- r[ ' | |||
c, ACTION PARTIES PAGE 2 TMI UNIT 1 NRC INSPECTION EXIT - | |||
JANUARY 14, 1980 | JANUARY 14, 1980 INSPECTION REPORT 79-24 4. | ||
Health Physics reviewad: | |||
(a) | (a) | ||
Cleanliness (b) | |||
Housekeeping (c) | |||
Epicor I (d) | |||
Waste Solidification (e) | |||
Surveying and Frisking (f) | |||
Respiratory Program (g) | |||
Work Requests /RWP's (h) | |||
Logs / Records These areas found acceptable at this time. | |||
5. | |||
This Inspection Report and the next one will be issued for Units 1 and 2. | |||
The NRC intends to separate the Units' inspection reports in the future. | The NRC intends to separate the Units' inspection reports in the future. | ||
04# rMiller | 04# rMiller GPM/jl 4 | ||
J. J. Colitz D. Dyckman | cc: Attendees T. M. Hawkins - SU/T C. E. Hartman - PORC Chairman for review with PORC as applicable. | ||
L. W. Harding M. J. Ross D. M. Shovlin R. S. Harbin - 1. Inform G. Troffer | J. J. Colitz D. Dyckman L. W. Harding M. J. Ross D. M. Shovlin R. S. Harbin - 1. | ||
Inform G. Troffer 2. | |||
You have the follow-up action. | |||
.m, | |||
--nv | |||
.- - ~, - - -,, | |||
,w..--- | |||
...w.-, | |||
.,p-}} | |||
Latest revision as of 11:19, 16 December 2024
| ML20069M853 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/14/1980 |
| From: | Geoffrey Miller METROPOLITAN EDISON CO. |
| To: | METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 8212010390 | |
| Download: ML20069M853 (2) | |
Text
,
^*:
METROPOl.ITAN EDISON CO M P A N Y soesioi.,y o, c.o.i codiic utii.ii., co,no,.iion TMI UNIT 1 NRC INSPECTION EXIT -
Location TMI NUCLEAR STATION subject INSPECTION REPORT 79-24 Date JANUARY 14, 1980 To ACTION PARTIES ATTENDEES:
G. P. Miller
- Unit 1 Met-Ed Met-Ed - Manager HP Unit 1 W. E. Potts D. R. Haverkamp - Unit 1 Resident Inspector (Acting)
Senior Radiation Specialist (Acting)
K. E. Plumlee
-~
7J{_T.; Collins 2
-Deputy. Director,;TMI Support-7 l.
This inspection covered Unit 1 operations and Health Physics through the period November 28, 1979 to January.4, 1980. The inspection in-cluded plant tours, inspections by shift NRC personnel, records and document searches.
2.
The Operations Area was found acceptable with no items of non-compiiance.
3.
Past Open Item 78-06-01 relative to work inside steam generators --
NRC concern is in relation to the fact that Met-Ed owes a response and action.
Met-Ed, by letter dated 12/11/79 - GQL 1510, committed a response on this item by 12/31/79 and this response has not been forwarded to date.
To resolve this item:
(a)
Met-Ed owes a response Action: Harding /Potts (b)
Until HP will look at the Unit 2 commitment in this area and will resolve the items with the NRC Action:
Potts 8212010390 800114 DR ADOCK 05000 INTER-0FFICE MEMORANDUM
- r[ '
c, ACTION PARTIES PAGE 2 TMI UNIT 1 NRC INSPECTION EXIT -
JANUARY 14, 1980 INSPECTION REPORT 79-24 4.
Health Physics reviewad:
(a)
Cleanliness (b)
Housekeeping (c)
Epicor I (d)
Waste Solidification (e)
Surveying and Frisking (f)
Respiratory Program (g)
Work Requests /RWP's (h)
Logs / Records These areas found acceptable at this time.
5.
This Inspection Report and the next one will be issued for Units 1 and 2.
The NRC intends to separate the Units' inspection reports in the future.
04# rMiller GPM/jl 4
cc: Attendees T. M. Hawkins - SU/T C. E. Hartman - PORC Chairman for review with PORC as applicable.
J. J. Colitz D. Dyckman L. W. Harding M. J. Ross D. M. Shovlin R. S. Harbin - 1.
Inform G. Troffer 2.
You have the follow-up action.
.m,
--nv
.- - ~, - - -,,
,w..---
...w.-,
.,p-