ML20070A894: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:--  . . . -                      -              ._ _
{{#Wiki_filter:}}
EXERCISE MANUAL FORT ST. VRAIN NUCLEAR GENERATING STATION
                                            ~
NRC GRADED EXERCISE NOVEMBER 7, 1990 PUBLIC SERVICE COMPANY OF COLORADO l
3
(
d
[g1290158.900907 l-F      ADOCK 05000267                                    -
PDR l                                              .
A
 
FOSAVEX-89 GRADED EXERCISE MANUAL i
i TABLE OF CONTENTS                i SECTION                                        PAGE 1.0 Schedule of Events                        1.0-1 2.0 Scope and Objectives                      2.0-1 2.1 Scope                                2.1-1 2.2 Objectives                          2.2-1 3.0 Guidelines and Instructions              -3.0-1 3.1 Guidelines                          3.1-1 3.2 Player Instructions                  3.2-1 4.0 Controller / Observer Information          4.0-1 4.1 Precautions and Limitations          4.1-1 4.2 Assignments                          4.2-1 4.3 Instructions                        4.3-1 4.4 Emergency Response Facilities        4.4-1 4.5 Evaluation Sheets                    4.5-1 5.0 Scenario                                  5.0-1 5.1 Narrative Summary                    5.1-1 5.2 Initial Conditions                  5.2-1 5.3 Detailed Scenario                    5.3-1 5.4 Scenario Time Line                  5.4-1 l
6.0 Scenario Data Package                      6.0-1 o  Plant Messages o  Offsite Messages
        -o  Plant Parameters i
i-l l
 
TABLE OF CONTENTS (Cont.)
SECTION                                                  PAGE 7.0 Onsite Radiological Data                            7,0-1 7.1 Plant Monitoring Data                          7.1-1 7.2 Radiation / Chemistry Data                      7,2-1 7.3 Plant Area Radiation Levels                    7.3-1 8.0 Offsite Radiological Data                            8.0-1 8.1 Meteorological Data                            8.1-1 8.2 Relesse Rate / Dose Assessment                  8.2-1 8.3 Field Monitoring Data                          8.3-1 8.4 Maps                        .                  8.4-1 9.0 References                                          9.0-1 9.1 Procedure Index                                9.1-1 9.2 Key Documents                                  9.2-1 ii
 
_ _ _ . . _ . - . . _ . - -                      .._ _ _ . __                            _ , . _ . _ _ _        .        ~      _ . , _ . . . . . _ . , _ . _ . _ _
1 r
                                                                                                                                                  )
N k -
y-                                                      .t 1.0-1;                                            I SECTION:1.0'                                                                                            i SCHEDULE OF EVENTS Figure 1-1 provides- the schedule for thel1990' Fort.Stc Vrain NRC-Graded Exercise (F0$AVEX-90) which will be conducted on' November 7,                              -
1990,
                                                                                                                                              ~
i At 'the Controller / Observer briefing: scheduled for October 29,1990,: .
the specific-details of the scenario will be-presented. 'It will also-provide a forum for discussing any: problems encounteredtduring:thei                                                                        -5 1990 Dress Rehearsal.                Additionally, key; milestones : will:* bei identified and corresponding Controller /0bserver factions wil _l- be .-                                          ,
discussed, . Final Observer assig'nments_will.be made and,any>q'uestions relating to- the . scenario, or . the^iresponsibilities 'of .the;                                                                            '[
Controllers / Observers.:wil'1 be answered.
                                                                                                                                                                                        +
The Controller / Observer debriefing'will occur.'immediatelyfafter-thel
                                                                            ~
exercise is terminated by PSC/NRC. Each Controll'er/0bserver'will' be-                            -
l expected to provide a. brief --synopsis ofd .his/her findings (both                                                                              -
positive and negative). The Lead Controller / Observer will'. summarize--                                                                        .
these findings and will serve as-the) primary exercise spokesperson ati                                                                          '
the PSC/NRC critique. A preliminary exercise' report will .be provided i
to-the NRC at the conclusion of.the critique; I
                                                                                                                                                                                      ..E l
r s                        -
                                                                                                                                                                                      'k a
4j I'
l i-4  -
bh. Mg  =P''-
* p-    --=- ==y'q"--F'm,-rg*          *1  -d v  e'9    a  eg              A              y* 'qe                                    ' yy  8    'i-Fra''
 
l t
                                                                                                                                                                                                                                                                                                                                                      ' i i
1 f
                                                                                                                                                                                                                                                                                                                                                        -l  ,
                .l                                                                                                                                                                                                                                                                                                            l                          i
                -I                                                                                                                                                                                      fOsAvtx-90                                                                                                              l
                                                                                                                                                                                                                                                                                                                                                              +
1-                                                                                                                                                                  FtGURE 1-1 SClllDUtE Of EVENTS                                                                                                          l                          j
                ~l                                                                                                                                                                                                                                                                                                              i I                                                                                                                    I                                      i                        i                                                i                                                                  I                    ' '
                .I                                                                .EVENI                                                I      DATE                        'l        TIME            I                      toCAIION                    I                                COMMENTS                          I
.f                i                                                                                                                    l                                      i                  ,i                                                      1                                                                  1
                .. l -                                                                                                                  l :. _ . . .                        l        . ..    .1                                                        I                                                                  g.                            :
: 1. Controt ter/ Observer Briefing                                                                                    i Oct 29                              1 1300-1530 1 Visi tor Center i Attendance Mandatory for At t                                                                                  'i
                                                                                                                                                                                                                                                                                                                                                          .I l
                                                                                                                                      -l                                      l                        l Aud i to rium                                    i ControI ters/ Observers.                                          I                        j l            .
: 1.                          .
I                        1.                                                I                                                                  i                        M l              ~ l Pre-Exerci se . Pa rticipant Briefing i Nov 6                                                                                                              l 18:00-1530 1 visitor Center l Attendance Recommended ' for Ali key                                                                          .I                        -f 2
1                                                                                                                    l                                      l                        I Aud i to ri um -                                l FOSAVEX-90 Pa rt i c ipants.                                      l                        ~z6
: 1.                                                                                                                    I                                      i                        I                                                  i                                                                  l'
,                  l NRC inspection /QA Audit Entrances l IRA                                                                                                                  l IBA                    1 Visitor Center ,1 PSC Key Management, Lead Controllers,                                                              l                            ,
1                                                                                                                    I                                      l                      l, Auditorium                                    <l QA Auditors.                                                        l                        -[
: l.                                                                .      ..                                        l    .
                                                                                                                                                                            .i                    -l                                            .        !,
I
'                  i NRC.C.E.T. Training'and Badging                                                                                    1 TBA.                                l IBA              . I Conference Room,l NRC Inspectior Team and PSC Training / Security :l
                                                                                                                                                                              'l l                                                                                                                    l                                                              i Training Bldg.                                  l                                                                  .I-
                                                                                                                                                                                                    .I 8                                                                                                                .I                                      ,l'                                              .                      .
1                                                                  'l.                      t l NRC - Inspect ion Team . Scena rlo -                                                                            ' l' TBA                                  l TBA                  l Conference Room,1 NRC f nspection Mam and Key Controllers.                                                          7i!                            {
: l. Briefing :.                                                                                                    '1.
                                                                                                                                                                            .I                        1.Iraining Bldg.                                  'l
                                                                                                                                                                                                                                                                                                                              ;I-                            -
l!          . . .                      l                      l                                                  1L                                                                  1 j
              'I l"f0SAVEX-90 Exercise'
                                    ~
l'Nov 7'                              l!O700-1530 i Ati ERf's                                                                                                                          l:
e l-                                                                                            ..                    l..                                    I_              -
i . .                                              I                                                                  -!
1 l- f ollowing l ' Visitor Center I All PSC' C$ntrollerf')bservers and QA Auditors. .
, ~              1 Control ter/ Observer Debriefing.                                                                                  l'Nov 7
:.            l                                                                                                                :l                                        t exercise l Ated i to ri sse                                              i                                                                    t                            i 1
                                                                                                                                    't:                                        I                      l-                                                  l..
l PSC Exercise critique                                                                                              1 Nov 8-                              1.'' ! BA              l' Visitor Cr                            'e r 'l Controllers, Observers; Auditors, Key TOSAU                            !                            '
l-l                                                                                                                    1:                                                        - ' Audi toriti                                        i l'a rticipants/ Management' and State /f ederal                    I
              ;l-                                                                                                                    !l'                                    .l                                .-                                          I Personnel.c 1-                        :i
  ;              i                                                                              .
I:                                    1.                      l                    . .          .
                                                                                                                                                                                                                                                          -l'                                                                'Ij
  ,              l'KRC inspection Exit'-                                                                                            ,1?TBA                                    1 IBA .                l Visitor Center ' . I Same as above.                                                                                    I,                          i'
                'l                                                                                                                  :l                                                                                                                  - li f                                                                                                                                                                            l                    .I Auditorium                                                        ,
I
              'l            .
I-                                    IH                    I                      , .. .                .
                                                                                                                                                                                                                                                        ~!.        '                                                          .I' l QA Audit Exit..                                                                                                'I Nov;8f                                il IBA-                  I Visitor Center . l .' Same' a s above.                                                                                ;l i
I                                                                                                                    l-                                    l~                  ~f. Auditorium                      ''
                                                                                                                                                                                                                                                        'II                                                                  'lj
              .I      ..
                                                                                                                    .1              ,1 1..                .
I..          ..
                                                                                                                                                                                                  .. I ' .                                  .
                                                                                                                                                                                                                                                        't-                                                                    1                        1
<            18 Observer / Participant.l Critique                                                                                  i t : Nov 9..                              I? 1300-1530 ^l Visitor Center i I L All" interested Participants and Controller /                                                              1 l and-NRC/NfSC/QA Exit ReviewsL                                                                                    -82                                      1:                ' i l ~ Aud i to rium -.                                1 Observers. Will discuss initial critique                          1:                      :j
                                                                                                                                                                            .l.
3 l ''                                                                                                                  I ;'                                                      71-                                                    I: rindings, and exit findings. Will also obtaint l
I                                      l~                    l                                                    I                                                                  .11                            ;
l-                                                                                                                    l                                    'I                      l-                                                  I ; comments = and correct iens trna pa rticipants.
                                                                                                                                                                                                                                                                                      ~
1 i
                                                                                                                                  ~                                                                                                                        ~
t
,                                                                                                                                                                                                                                                                                                                                                        d
                                                                                                                                                                                                                                                                                                                                                        >t
            .'IHA 1Io-Be Announced-
                                                                                                                                                                                                                                                                                                                                                        ,i 1.0-2.
  ;                                                                                                                                                                                                                                                                                                                                                _      l L
3-    _. . ,,-
_4.-                                -      , _ .                          _                _.1      , . ;a4 n                                                q_, .              _a          L          ,  , , _ ,          , . _ . . .        _.          , _ _
 
  . -  -. ..            . . . _ .    .                .-  . . ~ .                  .
t 2.0-1 SECTION 2.0 SCOPE AND-0BJECTIVES SECTION                                                      PAGE 2.1 Scope                                                    2,1-1
                                                                                              .1 2.2 Objectives                                                2.2~1 s
l
{
f t
l i'
i
                                                                      ^*w.-.
 
2.1          -!
SECTION 2.1
                                                          - SCOPE- 0F FOSAVEX 0 The 1990 Fort St. Vrain NRC Graded Exercise, known as FOSAVEX-L 90, will be held on November 7, 1990.- FOSAVEX-90 is-intended to-provide a mechanism by which Public Service Company of Colorado -                          ;
(PSC) can test its Radiological-Emergency Response Plans (RERP).
Depending upon personnel availability, The State of Colorado'and-Weld County may participate in FOSAVEX-90. -Since 'the precise leul of participation is not known..no specific objectives for the coordiation of utility / state / local            r_esources -have been-established. However, the scenario has'been structured to allow.                        "
for this type of interaction is state / local -representation should occur.        F:MVEX-90 will also provide the means by which                        4 PSC can test _its ability to " protect" the. health and safety of the general public.
The exercise scenario will depict a series of' simulated events which will necessitate a number of specific response. actions to, be.taken by PSC. These response _ actions are defined in the Fort St. Vrain Radiological' Ernergency Response Plan -and Implementing:
Procedures,      and are intended to safeguard the health and safety of the general' public,- plant personnel,-- as well: as.                      the environment.        The scenario is. being planned such_that major elements of the FSV RERP Plan and-Piocedures are tested.
Since,        by  necessity, certain elements < off.FOSAVEX-90 'are
.                                simulated, whenever practicable, the exercise - wil'1 incorporate provisions for " free play" on the part of'the participants. The, only restrictions on this concept will be' if Player-l actions                              ,
would prematurely terminate the Exerciser or-'would restrict the                              4 scenh io in      such a manner that it iwould noti provide- an opportunity for PSC to meet its objectives (see Section12.2).
As        previou>ly stated, certain . elements- of LFOSAVEX-90 are-                          '
simulated. Attached -is the proposed table .depicti_ng-'which-activities are- to be simulated and which ones are[to actually-r                              . occur.                                                                                      i Activities - associated with FOSAVEX-900 will .be' observed; by' r
4 qualified centrollers, observers and' auditors from PSC, Section                              ;
4.0- provides.- information on. how -and to whatt criteria the exercise--is to be graded.-            A critique. will. be conducted following the exercise.'          Any-l deficiencies will be noted, and:
will form the basis for'' establishing: corrective ~ actions.
i 4
                . c.. _ _ _          . -                          .                    _  _  __      .      _ _.  ._,
 
9' 2.1-2
_ TABLE 2.1
                          $ COPE OF FOSAVEX-90 ACTUAL VS. SIMULATED EVENTS EVENT                                      - ACTUAL. SIMULATED-
: 1. ACCIDENT ASSESSMENT Ability to properly recognize and                X characterize' Simulated events.                                              '
Perform-dose calculations using                  X simulated meteorological and release rate data.                    .
        ' Perform field monitoring -                      X establish' radiation levels -
onsite and offsite.
Perfore, equipment repair                                    X
: 2. ACTIVATION OF EMERGENCY FACILITIES                                      -
Activate and staff all primary                  X Emergency Response. Facilities (ERFs).
Establish functional adequacy                    X of ERFs.
Use appropriate equipment and                    X supplies to respond to emergency.
l' 1
W
 
e 2,1                                        TABLE'2.1(Cont.)
EVENT                                  ACTUAL    SIMULATED 3,  NOTIFICATION AND COMMUNICATION Notify Plant, Corporate, Federal,        .X State and Local emergency response personnel.
Conduct follow-up notifications -          X verify communications.
Communicate with onsitt and      .        X offsite response teams.
Support " rumor control" activities.      X (Limited, due to non participation of state / local personnel)
Conduct press conferances.                              X Direct notification of persons                          X living on PSC property.
: 4. ORGANIZATION CONTROL Activate the PSC emergency                X response organization Coordinate with State / Local                            X response organizations.
l                Coordinate with Federal                                  X'-
i                response organizations.
Provide management' control of_            X' the emergency.
I l
 
                                                                '2.1-4
                                ' TABLE 2.1(Cont.)
EVENT                                    ACTUAL  SIMULATED-
: 5. HEALTH PHYSICS / SECURITY Receive and analyze field                  X monitoring data, Provide adequate radiation                  X protection services (dosimetry, monitoring, habitability,etc.),
Conduct a search and rescue      ,,        X operation.
Site evacuation of                                    X non essential personnel.
Use of protective clothing,                  X    Simulate use outside owner control-led area.
Provide first aid for an                    X    Transportation injured and contaminated,                        to hospital will individual,                                      be simulated, l                                                '
Decontaminate personnel                      X l      and/or equipment.
Conduct initial accountability.              X Maintain onsitt accountability,              X Maintain plant Security under                X emergency conditions.
Comply with the Security Plan                          X under DNSITE Radiological Conditions, 6,  PROTECTIVE ACTIONS-Assess and recommend protective              X actions.
Warn / advise onsite personnel              X about emergency situation.    ,
 
    -  - -- .- .-                      ~  .  -- . - . -                      -  .-.          . - - -              .  - - -
                                                              ,c          .-                                                          .
y
                                                                                                          ' 2.2-1                        0
:)
SECTION 2.2                                                                  .
i OBJECTIVES OF FOSAVEX-90 l
The objectives of -the, Fort              .St.- Vrain (FSV) 1990 Emergency; Preparedness Exercise Program are based: on- Nuclear Regulatory                                                    I Commission (NRC) requirements set forth in 10CFR50.47, Appendix                                                    '
E. Data provided in NUREG's 0654 (Rev. 1), 0696,.- and -0737-                                                  t (Supplement 1)1as well              as previous FSV exercise resultsiwere.                >
used in developing the objectives.                                                                              ;
                          - The exercise will include the activation _of the              1 PSC Emergency.
Response Facilities; It may:also include partiel participation l
by State = and Local support groups. '.-The FSV- Early Warning Alert I                            (EWA) System within tr4e five mile planning- zone will -not be activated in association with FOSAVEX-90; The    overall    objective of ;FOSAVEX-90 is to evaluate the effectiveness and capabilities of the FSV Emergency Preparedness:
Program.      The scenario is: _ structured. to. provide a mechanism which will accurately test the adenuacyfof both the' onsite and-offsite elements of the Emergency Preparedness: Program.
* Another. objective of TOSAVEX-90 is to demonstrate the abil.ity-of                                                '
the Observers / Controllers and Auditors to--conduct- an , exercise, and      evaluate- the . response of_ the" FSV, Emergency''; Response Organization. At the conclusion of the 'epercise,- a ' critique-    .
be ' held to evaluate the various activ.ities of FOSAVEX-90, will                                                                                                              i accordingly, another objective of this process is to demonstrate:
the ability. to conduct- an effectiveLLself_ evaluation of the;                                                  ;
exercise.
9 s
i i
1  '
W      "
(Y-'  T      TW 9                    f    e  ce        &      W  D-*"'          W      T  %                T-t
 
  ..            . . _ ._  . ~ . . _ _ . . , _ . .                            ._  _            ._          _.        _ _ . _ _          _ _ . _ _ _ .            -
2.2-2 Public-Service' Company of Colorado"has established the following objectives for.FOSAVEX-00:
ACCIDENT ASSESSMENT
: 1.          Demonstrate proficiency in recognizing 'and classifying emergency      conditions      according            to      _ pre-established =
Emergency Action Levels (EALs).
: 2.          Demonstrate the- ability to' perform dose calculations using radiolo'gical        and meteorological                information to establish the impact'to the environment.
1
: 3.          Demonstrate        the- effective ~ ness            of the:_ radiological monitoring teams: (onsite and offsite); to:_~ establish-radiation levels a'nd__to effectively track the plume.                                                              J ACTIVATION OF EMERGENCY FACILITIES                                                                          <
: 1.          Demonstrate        the ' ability          of_ station .and: corporate personnel to activate and staff the primarytemergency:
response facilities within 90 minutes of a declaration:of-an ALERT or higher: emergency ~ classification-during normal working hours (0700 hour _s tol1530 ho,urs).-
: 2.            Demonstrate the transition of responsibilities between:
E m gency facilities as a result of escalating accident.                                                            !
classifications.
: 3.            Demonstrate the functional capabilities of equipment (including status boards,. radiation monitoring. equipment,-
etc.) in-the Personnel Control Center.1 Technical. Support Center, Forward Command Post, State Emergency ' Operations Center, and the Executive Command Post.
: 4.            Demonstrate the_ ability _of the Emergency Coordinator to.
properly : select-the correct: location for the--Personnel                -
Control Center, r
                                                                                                                                                                      +
4
  - , ; _. w..;,        _                                    ,..;_.                  , ,4    . - . .  ,              ,      ,_    _              . , _  ,.  ,
 
                                                                                            ~
2.2-3 L
l l
NOTIFICATION AND COMMUNICATION
: 1. Demonstrate    the    effective        notification      of Plant, Corporate, Federal, State and Local            emergency _ response personnel.                                                                !
l Demonstrate that initial            notifications (and follow-up) l          2.
are verified and logged, I
: 3. Demonstrate the effectiveness and reliability of the emergency communications equipment,
: 4. Demonstrate the ability          'o t    communicate .with inplant.
monitoring teams, search _and rescue teams,              and other station personnel as needed.
: 5. Demonstrate the ability to communicate with the offsite radiological monitoring. teams.
: 6. Demonstrate the capability- to obtain,              coordinate and      ,
assemble emergency information for timely dissemination to the public via the media (actual press releases will l                be simulated).
l l          7. Demonstrate the ability of PSC,to-respond directly to i                simulated input from the public concerning "real" vs.
l                " rumored" events.
1
 
2.2        ,
ORGANIZATIONAL CONTROL                                  .
: 1. Demonstrate    the  capability to technically evaluate accident conditions and implement appropriate response-procedures.-
: 2. Denionstrate the ability of the Control Room Director, TSC Director, PCC Director, and the ' Corporate Emergency Director to manage          and/or  support -the emergency organization in accordance with the FSV-~ Emergency Plan and Implementing Procedures.-
: 3. Demonstrate the' ability of FSV emergency organization personnel to properly brief Search and Rescue,            Fire-Brigade,  Corrective Action Teams and other response
,          personnel of the emergency situation.
                                                                  ~
: 4. Demonstrate the ability to coordinate activities with FSV outside support groups'in responding to the emergency, as necessary.
: 5. Demonstrate the ability of the PSC response organization to follow established procedures.
 
I                                                                          2.2-5 1
HEALTH PHYSICS / SECURITY
: 1. Demonstrate the ability to perform and maintain site accountability      and    simulate      site    evacuation,.      as appropriate.
: 2. Demonstrate the ability to provide adequate radiation protection services        such    as    dosimetry,      personnel monitoring,    and  habitability    determinations    onsite  and offsite.
: 3. Demonstrate the ability to perform area surveys under emergency conditions.            .
4  Demonstrate the ability to monitor and control emergency
:          worker exposure (i.e. Various teams) within the plant.
: 5. Demonstrate the ability to decontaminate personnel as needed.
: 6. Demonstrate the ability to provide onsite first aid for
;          an injured individual who has been contaminated.                ?  -
l          (Transportation -to the offsite medical facility will be simulated) - ?.
: 7. Demonstrate      the    capability of offsite radiological            i monitoring teams to perform radiation monitoring and to collect samples.
: 8. Demonstrate the ability to maintain plant security under emergency conditions.
: 9. Demonstrate      the    ability    tc    conduct      timely dose projections      in    accordance      with    established. RERP Procedures.
: 10. Demonstrate the ability of the Security force to comply with the Security Plan            under -onsite        radiological condit. ions.
PROTECTIVE ACTIONS 1,  Demonstrate knowledge of          the Protective Action Guides (PAGs).
: 2. Demonstrate      the    abil'ity  to make protective action l          recommendations to offsite authorities.
1 1
i
    'Qg                                                    y          -      ~
 
3,0-1 SECTION 3.0 EXERCISE GUIDEi.INES ~-
AND INSTRUCTIONS I
i SECTION                                                                PAGE-i 3.1 -Guidelines-                                                      3,3 3-5 3.2 Player Instructions                                                3.2-1 l
l l
I l-1
                          .e      . . . .      m                    ,. . . - . . ,          y
 
t t
3(339                            ,
u SECTION 3.1
* GUIDELINES FOR CONDUCTING FOSAVEX                                                                                                                                                      )
This section of the . manual is inte'nded to pr6 vide guidance for conducting FOSAVEX-90. All Key _ Players will have had-an -opportunity to review this material prior-to.the exercise.                                                                                          -
P Simulatino Activities                                                                                                                  t Since drill exercises are intended to. demonstrate actual: emergency                                                                    ,
response capabilities, the participants of.FOSAVEX-90 should .act' as4                                                                  .
they: would during a real emergency- situation.; However,'-sincec                                                                        ;
exercise Players are " graded," it-is_important.that a;'certain level of " acting" be done._ This is: especial.ly important in_ areas that.
would normally be accomplished quickly-wiethout: _much notice 4because the events are : simulated ( e . g ,- checking monitoring = equipment,=
i conducting habitability surveys, etc.). In these'typesLof= situations                                                                    >
the . participant          should : inform' La Controller / Observer ~that .a:                                                          :
              " habitability survey" has just been completed and1that',- for; example;                                                                  I the TSC Director was informed of the " findings."                                                                                        '
Since this is an opportunity to . test the response organization,                                                                          ;
wherever possible, actions t should .be carried e out : to' the fulle'st extent practicable.                Only1 when it i s_ not feasible-to perform an-action, should it be simulated.                  Any--orders given, that ifor :any reason cannot or should not actually be-performed; should be.. prefaced with the word " Simulate". . For example, you would simulate, ' carrying =
a contaminated, iniured individual' up =a _ fl<ight off stairs .toLthe                                                                      '
ambulance. Where such actions are-being simulated,:it.is= Muggested                                                                      9 that participants inform any Controller (s)/ Observer (s) in the area                                                                    ;
what. specific actions would have been taken had~ the 1 emergency: been real. .In the example cited above, specific radiological / medical precautions that would be taken should' be ~ discussed Ewith -the                                                                          .
Controller (s)/ Observer (s).                                                                                                              :
            -Radiation Work Permits (RWP's) will not be; issued for FOSAVEX-90.' If                                                                    :
scenario events idirect ' Players to areas (that .are actually .RWP                                                                      [
controlled. Players will simulate activities that.would                    i              have' occurred                                  :
inside the area. Under no circumstances should-anyone enter an:.RWP
* controlled area even if they are authorized to dolso.-                                                                                  ?
Public protection l
Intentionally violating the law is unacceptable;during anyLexercise.            .
Participants should not ignore posted traffic laws:-(e.g., speed.
                                                                                                                                                      ~
limits,    stop signs, etc.). - Additionally, of fsite field monitoring.
teams should pay particular attention to public/ private' lands- (e.g.,
g            farming operations,. livestock, etc.). .
1
                                ,-.                -                    m.    .-;%.              4,              ,            -  +, ,,      s .-
 
                                                                              .3.1-2            .
Since the actions of Federal, State, Local and Utility organizations                  i receive -continuous public scrutiny,        it is possible      that the
    -      activities    associated  with FOSAVEX-90    could  be  misrepresented.
Therefore, it is imperative that all communications that can. be monitored by members of the general public (radios, loudspeakers, etc.) be prefaced and concluded with the words, "This is a . drill; This is a drill."
Maintaining Emergency Readiness During      F0$AVEX-90 the ability to recognize a real          emergency, terminate the exercise, and respond to the .new situation must- be maintained.      Therefore,    the exercise scenario and actions of participants will not include any actions which seriously degrade the condition of systems, equipment or supplies, or affect the detection,-
assessment, or response capability to            radiological    or- other emergencies.
Actions taken by the participants will also avoid actually reducing plant or public safety. The potential for creating real radiological or other emergencies will be specifically avoided.
If a real emergency occurs during the: exercise, requiring the actions                '
of plant and corporate personnel, the exercise will be terminated.                    '
All messages about real events will be clearly identified as such.
For example, precede a real message with:      "This is'NOT,' repeat, NOT an exercise message."
i
                                ,                    -            -                    ,, e- ,
 
3.2-1 SECTION 3.2 PLAYER INSTRUCTIONS Since the primary purpose for conducting an annual graded emergency exercise is to enhance the effectiveness of the FSV Emergency Preparedness Program,      it is important that the program receives feedback from both Players and Observers. As previously stated, it is important that the scenario events be treated as "real" situations requiring immediate actions and responses. As part of this response, certain procedures,      equip. ment,  and facilities may prove to be inefficient or totally inadequate. To improve the program, Players-are        requested to review the attached questionnaire.      At the conclusion of the exercise, you should complete the form and forward it to a PSC Controller / Observer or,Renee Millison at FSV. Every PSC-Controller /0bserver will have additional forms if.needed, i
f
 
                                                                      '3.2-2 PARTICIPANT QUESTIONNAIRE In order to identify areas requiring' improvement within the FSV Radiological Emergency Response Plan, you are requested to answer the following Questions.      Please be. candid, constructive criticism is appreciated. Please make-comments, identifying any deficiencies you feel exist.
Upon completion, please return to a PSC Controller / Observer or return via Company mail to Renee Millison, Emergency Preparedness, at Fort St. Vrain,    Thank you for you- assistance.
: 1. Name(optional)
Emergency Response Center
: 2. Approximate time you received initial notification:
: 3. Approximate time of your arrival        at your emergency response-center:
i    4,  Please briefly describe your functions / responsibilities:
: 5. D'. you feel as though .you. have been adequately trained-to fulfill _your duties?
: 6. What RERP. Implementing Procedures, if any, did you utilize or reference?
 
3.2-3
: 7. Were the procedures easy to locate?
: 8. Did the procedures adequately describe your functions and/or responsibilities?
: 9. Did you utilize checklists provided in the procedures?
If so, were the checklists:          .
  .        a. Compatible with the procedure?
: b. Able to be used without referring back to the procedure?
: c. Complete, (i.e., did they contain all appropriata steps)? _ _
If not, would a checklist have been helpful to you in complete your assigned dutics?
: 10. Was the equipment and/or material available at your response center adequate?                If not, please list any items that l          would have been helpful to you:
: 11. Were the communications systems used (i.e., radio, telephone, etc.) at your facility adequate?
 
4-
                                                                                  .I 3.2-4
: 12. Were internal    communications  (i.e.,  messages, status boards, t
etc.) handled effectively?
: 13. Were you aware of events as they occurred?
: 14. Comments:  Please' use this space to comment on any aspect of the exercise. Again, constructive criticism.is appreciated.
9 h
5 P
(
 
                                                                                    -}
I4.0-1 SECTION 4.0
_ CONTROLLER /0BSERVER INFORMATION l
SECTION                                              PAGE                    ,
t 4.1 Precautions and Limitations                      4.1-1
                                              +
4.2 Observer Assignments                            4.2-1 t
4.3 Instructions                                    4.3-1 4.4 Emergency Response Facilities                  4.4-1 4.5 Evaluation Sheets                              4.5-1 Control Room Technical Support Center Personnel Control Center Forward Command-Post Executive Command Post l
State Emergency Operations Center Security Force Onsite Radiological Monitoring Offsite Monitoring Teams Corrective Action (Repair) Teams First Aid / Search and Rescue - FSV e
 
    ..            -          - _ ~ .              .. . -                  - - . .        - - . - . . - - - - . .                                        - _-.- .
:k 4,2-1 SECTIOR 4.1 -                                _
PRECAUTIONS AND LIMITATIONST
      .-            Introduction                                                                                                                                              .
                                                                                                                                                                              .I Public Service Company of Colorado representatives will serve as                                                                                          ,
                    -Controllers / Observers for F0$AVEX-90.- Each Controller / Observer has, as a minimum, an Exercise Manual containing' Sections 1,0 thru 9.0 and should be familiar with the following:'
: 1.      The basic Objectives-of the exercise (Section 2.2).                                                                                              y
: 2.      The  Guidelines            and Instructions provided to' the Players-(Section3.0),                                                                                                                                    ,
: 3.      The  exercise 1 scenario,-                      including" othe initiating events (Section 5,l'and 5,2).
: 4.      The various onsite and.offsite locations that wil1 be utilized by_ the Players when responding to the' scenario events                                                                                          !
(Sections 4.4, 7.3,.and 8.4)'.                                                                                                                    t
: 5.      The exercise evaluation form ~(Section 4.5).                                                                            ,                        j Precautions and Limitations In -addition- to reviehing _the -five 'arecs- described above, .all:
Controllers / Observers must be aware of the following:
r
: 1.      Shoulo,      at- any time during the: course of-the conduct'of this exercise, an actual emergency situation 11arise, all Jactivities-li and communications related to the exercise will be suspended.--
                            ' It will. be              the            responsibility                      of-        any. : exercise
                          - Controller / Observer'thatibecomes aware of an actual emergency to suspend exercise responseL in his/her Limmediate' area and~ to r
4 inform a Lead Exercise ' Controller.tof the: 1 situation. . Upon t notification.of any actual emergency, a Lead Exercise: Controller-may notify all other1 Controllers /00 servers _to 1 suspend .all-exercise activities. fA Lead' Exercise Controller: together with-                                  s
                                                                                                                                                                              +
the TSC Director-and/or theJCorporate Emergency. Director will make a_ determination'at that point whetherito continue, suspend,                                                                                .
or terminate the exercise,
:t
                                                                                                                                                                              )
i 4
.        e--.. .-      4  -.e,    , +.    ,yy          , . ~ . . y-.        a,..w      .,,w        e  p,    ,,.-,e ,  ywy...-  -+-.-,y e ,-,e,.  ,,y,  ---w+--,
 
4.1-2
: 2. Should,      at any time during the course of the conduct of this exercise, an exercise Controller /0bserver witness- an exercise participant undertake any ection which would, in the opinion of the Controller / Observer, place either an individual or plant component in an unsafe condition, the Controller / Observer must      -
attempt to terminate the unsafe activity immediately.
Upon termination. o' the activity, the Controller /0bserver is responsible for esntacting a Lead Exercise Controller and informing him of the situation. A Lead Exercise Controller, together with the TSC Director and/or the Corporate Emergency Director, will make a determination at that point whether to continue, place on hold, or terminate the exercise.
: 3. Manipulation of any plant operating systems, valves, breakers, or controls in response to this exercise. are only to be simulated.      No alteration of any plant operacing equipment, systems, or circuits in response to this exercise should occur,
: 4. All    repair activities associated with the exercise will be simulated. Extreme caution should be used when working near
(    operating equipment.
S. All    telephone communications, radio transmissions, and public address announcements related to the exercise must begin and end-with      the    statement,    "This  is a    drill."    Should    a Controller /0bserver witness an exercise participant not                '
observing        this  practice, it is the Controller / Observer's
!      responsibility to remind the individual to follow this practice.
: 6. Any motor vehicle responding in this exercise, whether for medical, rescue, fire fighting, field monitroring, etc., should observe all normal traffic laws including posted speed limits, stop lights / signs, one way streets, etc. -Controllers / Observers should      ensure    that exercise participants      follow these requirements.
: 7. Care must be taken to prevent any individual not involved'with the exercise from believing that an actual        emergency- exists.
l Any Controller / Observer who believes that this situation exists, should approach that-individual and explain the nature of the exercise and its intent.
: 8. If- a Controller / Observer is aware of- any- of the above situations, he or she should immediately identify the situation to a Lead Exercise Controller.
 
  =  .-  . . . -        , . . . . . . . - . . . - .  ... .. ,.      .-. - .            ,      ..      . _
4.2-1; SECTION 4.    ,                                        , CONTROLLER /0BSERVERtASSIGNMENTS' Provided        below: are            the    ~
Controller /0bserverz Assignments' for F05AVEX-90. The! Lead Exercise Controller (s) are responsible for 'a l l -
l activities                associated            withi - the                    - exercise.          . Senior Controllers / Observers are responsible ,forc activities Lwithin; a specific' Emergency Response' Facility or for a specific response:
activity (e.g. , field monitoring, plant' surveys, etc.),-
                                                                                                                                    =I Facility / Activity                                      iControllers/ Observers:
: 1. Lead Exercise Controller                                          Renee Mil 1ison  L
: 2. Control Room                                              ' L: Joe Hun'ter                                    -- I
                                                                                    ' Wayne.Magninie:                              Ji
: 3. Technical Support Center                                        . Dale McCue-                                      l 1Jeff Johns                                    .,
: 4. Personne1' Control Center:                                        To Be Announced
                                                                                        --                                          1 Field Teams                                              iDuano $ herman To Be Announced:
Corrective Action --Repair-                                  Steve Werness                                    ,
Teams and-_Inplant Survey                                    To'Be, Announced:
                        . Teams                                                                                                        ,
MedicallResponse-                                          ;Marty Przybyski                                  j
                                                                                    -Laurie Exby-Stolley                              ,
: 5. Site Security Force-                                          : Charles Holland                              '!
l
: 6.    -Forward Command Post                                              Brian.Dyck LJim August!
y 7.-    Executive. Command Post-                                        -To Be Announced-
: 8. State EOC                                                        ' Robert.Husted-1 i
i NOTE:      Additional : Controller / Observer = locations 'to be identified:
later,            along' ~with "Se n i o r'' LERF        -
Controller / Observer      ci assignmentse
                                                                                                                                    ^
i                                                  i
                                                                                                      ?
 
  .---_--..--.-n.--.-.-....-.---.
1 l
!                                                                                                                                4.3          t t
a SECTION 4.3 l
CONTROLLER /0BSERVER INSTRUCTIONS l
NOTE:      Controller / Observer communication paths will be established, and all Controller / Observers will be informed, prior to.the exercise.
                                                                                                                    .e                          ,
Public Sert' ice Company of Colorado representatives ars" assigned as                                              '
Controllers / Observers at all key onsite and offsite exercise areas to;                                  '
,                          monitor and control F05AVEX 90.
l The        activities of the onsite Controllers / Observers will be
,                          coordinated by a Lead Exercise Controller.- 'If -unable' to reach,-                                                  '
contact the Senior Controller / Observer- in :the Technica' Support-Center (TSC).
The      activities    of    the offsite Controllers /0F.ervers will b''e-                                      .
Any -logistic
:                          coordinated from the Forward Command Post - (FCS).
J                          problems / questions        should          be-        directed        - to            the      Senior 3                          Controller / Observer at the rCP.
Message forms and simulated Control . Room                              iata- will be used to initiate, modify, and complete- the events' comprising the overall scenario.        Selected Controllers / Observers will use the message forms-to place the scenario' events in effect tnd to trigger responses -from-the emergency response organizations.                      Each Controller / Observer will-4                          have copies of the messages controlling the portion of the exercise i
scenario for which he/she 18 responsible.
Two kinds of messages will be used:                                    i                                              '
Control _ ling Messages used as a primary means of implementingLscenario events:
by announcing or placing an event in effect by . hypothesizing conditions resulting from previous actions.
Contingency i
_ Ma n9m used at the -discretion of the Contrc11ers/ Observers with the appraval of.a Lead Exercise Controller. ins order to
                                  - maintain the scenario _ plan continuity or schedule. Contin messages are noted with.t number followed by1a capital:"C."gency
                        ' Controlling; messages will be presented to-the designated exercise participant at the- time specified:Lin the event schedule.; =The Controller / Observer 'should follow ; up. ;withi an -; explanation: of the                                          :
                        -message and answer any questions tooensure. that.--the participant understands the message, j
1:
l l.
  ^
l y
_ . _ - . - - - - - ~.- -..~                    , ..-. ,..        ..- - -._                      , . , , _ , - _ . -      -..-v,
 
4.3-8 Controllers / Observers        will    n_o t  provide      information to      the participants regarding scenario cevelopment or resolution of problem areas.          The participants are expected to obtain infortnation through their own organization and exercise their                      own    judgement      in determining response actions and problem resolution,                  In the event of incomplete responses, or if the participant indicates lach of knowledge of how to proceed, the Controller /0bsever will prompt the participant with necessary instructions or contingency message cards and will so note these actions on his/her critique sheets.
It is important to note that the scenario events are hyt., atical.
Any portions of the scenario depicting plant system operational transients are simulated events. No Control Room actions, or reactions involving operation of pTant . systems or. affecting generation capability, will be initiated.                      All exercise scenario messages are prefixed and suffixed with the words "this is a drill."
Controllers / Observers        stationed      at areas vital to maintaining generating capability should be especially aware and take extra precautions in issuing m sages or giving instructions regarding the scenario events.
Some exercise particip
* may insist. that certain parts of the scenario are unrealistic.              The Controllers / Observers have            the authority to clarify any questions regarding scenario content.
However, in some cases, it may be necessary to exercise " Controller's-prerogative" and say, "This is due to exercise requirements                          to prdierve the continuity and objectives of the exercise".
Prior to commencement,            all telecommunications to be used by the Observers / Controllers should be tested to ensure satisfactory commun: cations are available to coordinate exercise activities.
Additionally, all Controllers / Observers will< synchronize their watches to ensure that messages are delivered at the proper time.                            !
Controllers should report to their assigned location approximately 20 minutes prior to any player action.
Since some exercise activities will                    be conducted offsite, it is important to remember that members of the general public may observe some mon 1toring activities.              Accordingly, to help alleviate any potential concerns, protective clothing will not be used outside the owner controlled area,                                                                      ,
Table      4-1      provides    additional      00's    and    DON'T's  for all Controllers / Observers.
t l
l                                                                                                  1 i
 
j 4.3 3                ,
i TABLE 4 '                                                                  !
i CONTROLLER $'/0BSERVER$' RULES                                                            j 00's                                                                                                                t
: 1.      Know the overell Controller / Observer Organization (section                                          ;
4.2).                                                                                                  >
: 2.      Remember that there may be two time ' designations:                                      a scenario time and a clock time.                                                                      _,
l
: 3.      Identify _the players by name and function.-                                                          'j
: 4.      Identify yourself at all times to.all players. Wear' ball-                                              ;
caps and/or Controller / Observer tags as provided;by P50.
: 5.      Identify the phone.(or radio for field teams) you will use to      maintain            communications-          with            the-            Lead Controllers / Observers.                                                                                ,
                                                                                                                                            ?
: 6.      Position yourself to' maximize your effectiveness in issu.ing                                          #
messages and observing the players.                                                                      ;
: 7. Be sure you understand the player's scenario script and the                                    '
3                                  master scenario.                                                                                        l
: 8. Keep the play on schedule by checking your script..
,                            9,    . Issue    the- message on time.
understand it.
Make 'sure the players-                            j -
V
: 10. Remember to call a Senior Controller / Observer or Lead-Exercise Controller. to report the status _of players'-                                                l actions if off schedule or if in-doubt about what to do.
Call for advice if players significantly: depart from the?
j                                    scenario script. These deviations could cause major _ delays-                                          i or could terminate the exerciseLprematurely. If;necessary,                                              ,
intervene with player action and put -players back on                                                  ;
scenario track.
: 11. Allow the players reasonable fle'xibility to: perform their_                                              i functions and demonstrate their skill, knowledge, and-                                                  .
initiative.
                                                                                                                                          -[,
: 12. Identify the federal- evaluator (s),- Make sure'they are.                                            .!
                                  ; reasonably aware of your actions.and those'of The ; players.                                          s
: 13. .Make-l notes on. good an'd-bad points-of p1_ayers'f actions, the=                                        i strengths'and weaknesses, and areas for* improvements,                                  Use            j
                                  -the Evaluation. Sheets.
                                                                                                                                <        l
: 14. ~ Attend the post-exercise critique session _to provide-your                                              l comments-and recommendations.--
                                                                                                                                          -l F
                                              ._    ._.-_ _ _ _            _ _ _ _ . _      _ _._ _,- -. _ , ,, _;_                    , ,i
 
4.3-4 15,  Identify    the  players'    leaders. Work with them as appropriate.
: 16. If a real emergency occurs and this affects the players, call off your portion of the exercise, and . notify a- Lead Exercise Controller immediately.
: 17. Be at your post at least 20 minutes prior to the beginning of any player actions. Set yourself up.
i
: 18. The federal . evaluators will not issue " surprise" messages or direct " surprise" actions at the players..      They must work through the Controller.        'This is essential for the success of the exercist.
l
          *19.. Controllers / Observers and federal evaluators, do not have      ~
i to follow simulated rad'iation exposure control practices.
: 20. Controllers / Observers will bg -exempt from accountability        i and have access to all necessary access areas. (except              l security areas).
DON'T's                                                                        4
: 1. Don't leave your post at key times.
: 2. Don't prompt the players to-take action.
: 3. Don't coach-the players.
: 4. Don't criticize the players' actions'during the play.
5.-  Don't forget to ' call the appropriate Senior or Lead              i Controllers / Observers to seek' advice or help as necessary.      ]
I
: 6. Don't allow external      influences to distract the players.        !
No interviews with players are allowed. .
: 7. Don't allow simulation with respect to radiation-. protection      3 practices or when equipment-ano . facilities =are-;available.      i However, don't allow any player to operate any' equipment which would impact plant operations.
i Note:
All participants will _' comply with~the radiation exposure control practices existing at the' station'at. the time of          ,
the exercise .                                                      '
I q
i i
k J
 
4.4-1                ,
l SECTION 4.4 EMERGENCY RESPONSE FACILITY DESCRIPTIONS l
l            The FSV Emergency Organization will function from a number of pre-established locations. This section of          the    Exercise      Manual identifies the six facilities which will be activated to assess and manage the accident conditions described by the            scenario.      All Controllers /Coservers should become familiar with their location and response function (s).
: 1. Control Room (CR)
Emergency assessment and control is initially dire:ted from the CH by the Shift Supervisor prior to activation of the Technical Support Center (TSC).
The CR, located adjacent to the Reactor Building, is designed to be haoitable during Design Basis Accioents.      The CR contains full plant instrumentation, technical crawings, protective breathing apparatus, radio, telephone, and intercom systems, Emergency    radiological monitoring equipment and protective clothing are located nearby,
: 2. Technical Support Center (T'SC)                                                '
Site emergency command activities will be centered in the Technical Support Center (TSC) located immediately adjacent to the Reactor Building and within short walking distance to the Control Room. The TSC is equipped with irrte rcoms ,        telephones, NRC      Emergency Notification System (ENS) telephone, Health Physics Network (HPN) telephone, telecopier, and radios for
;                communications with the CR, Personnel Control Center (PCC), and Forward Command Post (FCP).
The TSC is equipped with a CDC-1700 terminal for visualization l                of plant parameters and offsite dose calculations, essential drawings, specifications, and procedures. Radiation monitoring
(                equipment, protective      clothing, communications equipment, portable lighting, protective breathing apparatus, and first-aid equipment are located in Emergency Kits. -The TSC meets-habitability requirements similar to those imposed upon the CR, l
 
4.4-2
: 3. Personnel Control Center (PCC)
The primary and secondary locations for the Personnel Control Center (PCC) are the Security Administration Building and the Licensing    Trailer,  respectively.      Emergency  radiological monitoring equipment, first-aid and decontamination equipment, protective clothing, communications equipment, portable lighting and protective breathing apparatus are st.ored in emergency kits at both on. site locations. There are two designated offsite areas which may be utilized as the PCC if it becomes necessary to evacuate the onsite location (s). The preferred alternate off site location is the Johnstown County Shops.        The other alternate of f site PCC location is the Platteville Volunteer Fire Department. Routes to these locations are shown in RERP Implementing    Procedure    RERP-PCC,  Personnel Control  Center Procedure.
: 4. Forward Command Post (FCP)
The Forward Command Post is the focal point for the coordination of onsite and of fsite emergency response activities. Management and technical personnel assigned to the FCP are responsible for protective action recommendations and        liaison with offsite authorities and response facilities.          The FCP serves as the point from which the Corporate Emergency Director (CED) exercises    overall  control of the FSV Emergency Response Organization.
The FCP has work space allocated for PSC er.ergency personnel, state and local personnel, and the NRC. The FCP is adequately equipped with an NRC ENS telephone, HPN telephone, commercial phone lines, radio, and telecopy facilities to provide efficient communications with the TSC, ECP, SEOC, NRC, and the Weld County Communications Center.        Onsite-offsite communications are channelled through the TSC and FCP.
The FCP is      located at the PSC Customer Service Center in Ft.
Lupton, well out of the plume exposure EPZ.      The FCP will be activated and manned for an ALERT or more severe incident classification. The FCP is equipped with a CDC-1700 terminal to provide rapid access to plant parameters and to provide for off site dose calculations.
S. Executive Command Post (ECP)
The Executive Command Post (ECP) is located at the corporate headquarters building in downtown Denver.        Manned by senior corporate personnel with access to other corporate. resources, the ECP provides direct augmentation to the staffing. of onsite emergency functions by non-station personnel. The staff of the ECP is responsible for obtaining additional manpower            for repair / damage control    teams, survey teams, access control, and logistical assistance. The ECP will normally maintain- direct communications with the FCP and sne SE00.
 
4.4-3
: 6.            State Emergency Operations Center (SEOC)
The $[0C is the focal        point for the state of Colorado's                  l emergency response effort.          Essentially all coordination of state resources occurs at the SEOC. The facility is located in the basement of the Colorado National Guard Armory and Law Enforcement Training Academy, Build!ng 120, Camp George West,                  i Golden, Colorado.                                                              l I
1
                                                                                                                )
t i
4 t
                                                                                      <                + - * .
 
4,5                                          SECTION 4.5 EVALUATION SHEETS This section of the Exercise Manal provides the Observer Evaluation Sheets. Controllers /0D$ervers  should    remove the      appropriate evaluation sheets and be sure to complete the forms as the events occur. At the conclusion of the exercise, review the evaluation sheets. These documents will be used at the exercise debriefing and the formal critique. All of the documents should be given to the lead Exercise Controller at-the conclusion of the critique.
4 t
                                                ,,.              . _ - -  - - - - - - - - - - - - - - " - - * ^ - ~ ' - ^ - ' " ^ ^ ' " ' ' ' -    '
 
Page a FOSAVEX-90 OBSERVER CHECKLIST Location: CONTROL DOOM                                                  Name:
Time Frame:                to                                          Date:
CRITERIA                                                      EVALUATION
: 1. ACCIDENT ASSESSMENT Control            Room personnel                                                                                .
rapidly            and    correctly                                                                              I interpreted                  scenario related problem (s).                                                                                              '
Control            Room personnel' knew when to refer to FSV Operating                Procedures, Emergency Procedures, the RERP                Plan          and Implementing Procedures, and      other            applicable guidance.                                                  <
Plant process information
* was      available                when required.
Control              Room Operators responded to              simulated operational              events and properly classified the accident condition for:
(1) NOVE (2) ALERT (3) SITE AREA EMERGENCY.                                                                                    -
(4)GENERALEMERGENCY-Control              Room personnel assisted in determining extent of plant damage.
L _                            _.                                                -    -  . . _ . . . _ , .
 
Page 2 CONTROLROOMCHECKLIST(Cont.)
        ~ CRITERIA                                            EVALUATION
: 2. ACTIVATION OF FACILITIES Control          Room personnel responded          to      the escalating          severity of ever.t s and began call-outs for activation of the Emergency          Response Organization.-
The Technical Advisor was
* notified, teported to the Control            Room,      and provided assistance            as required.
Control          Room personnel aided in establishing the                  -
proper location of the PCC.                                                                        3 Transition                      of responsibilities,              as plant                  conditions            e degraded, was effectively executed.
: 3. NOTIFICATION / COMMUNICATION Notifications                  to State / Federal authorities were timely; and properly completed          per    RERP-NOTIFICATION for:
(1) NOVE (2) ALERT (3) SITE AREA EMERGENCY (4) GENERAL EMERGENCY All notifications were verified and logged per proper procedures.
Communication            networks-were          operational      and ef ficiently utilized.
 
Page 3 CONTROLROOMCHECKLIST(Cont.)
CRITThlA                                        EVALUATION Communication          flow was aceavate to ensure that information          was timely and accurate.
Phone          lists        were available and complete.
General                    status announcements were made and updated periodically                u by          the              $hift
                $vpervisor/ Control          Room
  .            Director.
        ,      Logs were maintained.
Data    flow between the Control Room and TSC was raintained.
Ambient noise level            in the Control Room was not a problem.                                    <
There              was          no interaction / confusion l
between        CR      operating personnel. "CR Players" CR Controllers / Observers.
Transfer of information within the Control Room was        clearly            and completely understood.
4    ORGANIZATION CONTROL The Shift Supervisor-in conjunction with            other l              Control        Room persennel i              evaluated          the      plant L              conditions                    and implemented          appropriate response actions.
1 Y  s -v
 
Page 4 CONTROL ROOM CHECKLIST (Cont.)
CRITERIA                                        EVALUATION The Shift Supervisor took over management control per the RERP Plan and procedures.
Transfer      of      control between        the      Shift Supervisor (acting as the Emergency      Coordinator) and    the    Control Room Director was        effective      ,
and in accordance with procedures.
The    proper      management chain of      command    was followed throughout the exercise.
Emergency    control      and authority                were effectively      transferred from the Control Room to the TSC.                                      .
Transfer and control of                                                  '
authority were announced and logged.
: 5. HEALTH PHYSICS / SECURITY The    Shift Supervisor performed and maintained Control                  Room accountability            per Procedure G-5.
Control Room! habitability was monitored.                                                          '
Access    to the Control Room was controlled per appropriate procedures.
I
 
_ . _ - _ . . _ -        ~ . _        ___              _            _ . -  ._ _        _ - - _ _  _ _ _ __
Page 5 CONTROLROOMCHECKLIST(Cont.)
CRITERIA                                                    EVALVATION
: 6. PROTECTIVE AftIONS/ MEDICAL Control      Room personnel supported              the      FSV emergency organization in developing                        and recommending              protective actions.
Supplies                such      as
* respirators,              protective clothing,          etc.        were available to Control Room personnel.                                .
HP        personnel            were available to Control Room
* personnel as needed.
Shift                    Supervisor requested                    medical transportation services.
Shift Supervisor notified hospital        of          victim's pending          arrival          and provided          details          of injury / contamination.
Shift Supervisor notified appropriate                      PSC management personnel per the FSV Medical Emergency Plan / procedure.
Shift        Supervisor          was periodically notified of victim's            status        -
information relayed                to TSC Director.
Shift Supervisor notified the Lead Security Officer (L50)            of          medical transportation arrangements.
 
Page 1 F0$AVEX-90 OBSERVER CHECKLIST Location:          TECHNICAL SUPPORT CENTER                                Name:
Time Frame:                to                                                Date:
CRITERIA                                                          EVALUATION
: 1. ACCIDENT ASSESSMENT Plant process information was            available        when required.
TSC personnel            responded
          +e simulated events and properly classified the accident conoition tor:
SITE AREA EMERGENCY GENERAL EMERGENCY TSC personnel assisted in                                            ,
determining the extent of plant damage.
2,  ACTIVATION OF FACILITIES
;        The first person arriving at            the    TSC      verified habitability            and began TSC activation.
The            first    management individual verified that habitability was checked-and                that            all communication                  systems were operable.
The TSC was activated in accordance with RERP-TSC.
l
 
Page 2 TSC CHECKLIST (Cont.)
4 CRITERIA                                          EVALVATION All    copies      of    the Emergency                Plan, Procedures,          Updated Safety Analysis Report, Tech. Specs., drawings, etc. were available for TSC personnel, r
: 3. NOTIFICATION / COMMUNICATION Communications            with        ,,
Control        Room        was established. Primary and secondary      communication links were available.
Communications with the Personnel Control      Center (PCC)    and the Forward Command Post (FCP) were established.
Plant      status        and/or-radiation          parameters                      ,
needed      to      determine existing conditions were available      via      Status Boards. Status      Boards                                              I were updated as required.
Information        regarding mejor changes in plant status was disseminatad                                                      i to      key        personnel effectively.
Information relative to Protective            ' Action Recommendations              was disseminated        to      key personnel effectively.
Communication with onsite monitoring      teams    were effective.                          ,
Logs were maintained.
 
  .      _-        ..              -    . _    _  -    ._.                        .      ~ _ - .    .-- _ ._-
Page 3                      -
TSC CHECKLIST (Cont.)
CRITERIA                                                  EVALUATION Ambient noise level                        in TSC was not a problem.
Transfer                  of      scenario information within                      the                                                          -
ISC    was              clearly      and completely understood.
: 4. ORGANIZATIONAL CONTROL Transfer of command from                            .
the Control                    Room    was effective.
Transfer of command from the TSC to the Forward Command                    Post        was effective.
The    proper                management chain of                  command      was followed throughout the exercise.
Transfer and control of authority was announced
!            dnd logged.
l l
Per    RERP-TSC,                the TSC                                                              i Director assumed overall responsibility                    for the coordination                            and direction of the opsite
                                                                                                                    )
emergency-                        response                                                              '
centers.
The          TSC                Director I
i recommended de-escalation-or initiation of post-
,            emergency                        recovery I            efforts              in      a    timely manner;      per            the      RERP (Sections 4 or 9).
I
                        . - , , - , . ,                      -  -        ,      ,,                  n.
 
l                                                                              Page 4 TSC CHECKLIST (Cont.)
            ~~~
I CRITERIA                                      EVALVATION If    required,        the TSC Director              requested additional support from the Corporate Emergency Director.
Radiological, Engineering,                  and Administrative personnel coordinated                their activities effectively.                  *
: 5. HEALTH PHYSICS / SECURITY i              HP coverage      in TSC (air sampling instrumentation and      dosimetry)          was adequate.
Initial      accountability and                    continued accountability                was performed satisf actorily.
l              In plant              Radiation Monitoring                    was coerdinated with TSC.
Offsite dose assessment evaluations                  were conducted per procedures (RERP-DOSE).
Initial    and subsequent dose calculations            were performed      in a timely manner.
Computing      aids        were properly utilized.
Exposure plume was well defined and tracked.
Communications              with monitoring      teams        were maintained.
 
Page 5 TSC CHECKLIST (Cont.)
                                                                                    ~~
CRITERIA                                        CVALVATION Dose      Assessment        Team Leader                ensured comparisons            between projected    and        actual field measurements were made.
Field survey teams were provided          sufficient information to perform duties.                                  .
Coordination          of    HP criteria      for exposure control with TSC Director was effective.
TSC        HP        personnel considered      implementing RERP-THYR 010.
TSC HP personnel obtained airborne      contamination and radiation survey: in                        ,
the Control Room and informed TSC Director or results.
TSC        HP        personnel coordinated        activities with      the      Protective Measures Manager at the FCP, 6,  PROTECTIVE ACTION TSC        HP        personnel coordinated        activities with- the "$C Director and l            Dose              Assessment personnel.
Protective eouipment and associated supplies were available          to        TSC personne!,
4
 
i Page 1 FOSAVEX-90 OBSERVER CHECKLIST Name:
Location:      PERSONNEL CONTROL CENTER Time Frame:              to                                                      Date:
EkJTERIA                                                                EVALUATION
: 1.      ACCIDENT ASSESSMENT e
Emergency Inplant Repair Teams      were    dispatched effectively.
Repair      tsams evaluated the      extent      of    plant damage        and      reported information to PCC and TSC personnel.
: 2.      ACTIVATION OF FACILITIES The proposed location of                                          ,
the PCC was known by all personnel.
Access to the PCC was well established arid did not hinder activation.
The PCC was activated in a timely          and    orderly taa nne r .
PCC          staffing              was adequate, and met                  the needs of the emergency organization.
The PCC was activated per RERP-PCC.
3,      NOTI FICATION/ COMMUNIC ATION .
L                  Communication        with the TSC or Control        Room was l                  adequate.
l
 
Page 2 PCC CHECKLIST (Cont.)
CRIT [RIA                                                EVALVATION Primary                and      secondary communication links with the TSC were available -                                                          I constant                  communication with TSC existed.
Communication links with onsite and offsite -teams was adequate.
Team briefings (priorto
* dispatch) were adequate.
Prior                  to    dispatching teams        -
the    TSC      HP Coordinator and the TSC Director were consulted.
Individuals                  living on plant                  troperty          were notified.
TSC was notified of need to                              transport                  < -
injured / contaminated personnel offsite.
St.      Luke's Hospital was properly notified of the medical situation.
Detailed                    logs        were maintained.
Plant.                    status          and emergtncy                      assessment information was readily l          available                    to          PCC                                    -
personnel.
4  ORGANIZATIONAL CONTROL l          The                    PCC        Director adequately supervised the activities of the PCC.
          ._..r-.      _ . . ~ . ,        .                ,,,                  -      -
 
Page 3 PCC CHECKLIST (Cont.)
                  ~ CRITERIA                                    EVALUATION The        PCC      Director coordinated        activities with the TSC Director.
The PCC Director utilized the checklist in RERP-PCC.
An    effective chain of command was established.
Team        formation      and briefings were completed Quickly      and accurately (see RERP-PCC).
: 5. , HEALTH PHYSICS / SECURITY HP coverage in PCC was adequate.
The Lead Security Officer (LS0)        dispected          a security        guard to the                  ,
PCC;          access        was controlled.
PCC Director coordinated access        to/from        the protected area with the LSO.
Accountability              was initially established and maintained throughout the emergency.                                                        ,
Habitability                was initially established and                                        ,
verified as appropriate                                            1 throughout the emergency.
Appropriate            briefing sheets    were    used      to inform teams of potential radiological areas.
F
 
9 Page 4 PCCCHECKLIST(Cont.)
CRITERIA                                      EVALVATION Maximum stay times were established .and relayed to survey / repair teams, An HP was assigned to each team.
: 6. PROTECTIVE ACTION Protective        equipment, clothing,              decon-            .
facilities,                and associated supplies wer)
            .                available          to      PCC personnel.        Specialized tools and equipment were                                                      ,
available,
 
I e                                                                                                                                                                    t
                                                                                                                                        -Page 1-                                    ;
FOSAVEX-90 i                                                                                  OBSERVER CHECKLIST i
t                                                                                                                                                                                    e t
Location:              FORWARD COMMAND POSTJ                                                    Name:                                                ;
e
;                            Time-Frame:                        to-                                                        -,  Date:                                                ,
p t
CRITERIA                                                                          EVALVATION i-1,        ACCIDENT ASSESSMENT
.                                      FCP personnel coordinated i
Accident                      Assessment activities                  with            TSC personnel.
: 2.        ACTIVATION OF FACILITIES L                                      FCP          was activated and                                                                                                              '
i                                      manned                  within                  a                                          >
i                                      reasonable                  time        after declaration of an ALERT'                        .-
Corporate-                      Emergency                                  .,
Director                          received briefing                    from            TSC i                                      Director-                  prior              to i                                      assuming                command            and control.                                                                                                                                    .
FCP personnel informed of
                                      -assumption =aof                    specific responsibilities.
                                      .Facsimili                          machines-functioned                      -properly,:
status                boards.            were available.-
Emergency _                  Plan            and                                                                                        ..
Implement                    _ Procedures,                                                                                                  '
Tech. ' Specs..                  etc. were available in current and                                                                                                                    ;
controlled copies,                                                                                                                        l y
Activation: per RERP-FCP                                                                                                                    '
was        .
accomplishedt effectively.                                                                                                                                ;
                                                            . = _ _                                                                              -                  - - - - .
                                                                                                                                                                                .s
:t
                                                                                                                                                                                  -t m e ... m -,,-,,,.4.~. J_-....a.a_,,,,..--.  ,.-,....,.-;..~.,-....---~-,,-_-_.
 
Page 2 FCPCHECKLIST(Cont.)
l                                                                      '
CRIThilA                                                EVALVATION 3,  NOTIFICATION / COMMUNICATION Communications                      were i              established with the TSC; both primary (telephone) and    secondary              (radio) commuaication lines were established-                        and maintained.
Communications with the                              e Executive Command                  Post (ECP)      and      the          State Emergency              Operations Center          (SEOC)              were established                        and maintained.
TSC    notified              FCP    of
* location and status of PCC.
Notification / Communication                                                      ,
between PSC,        local,        and                <
State        agencies              was effective.
Needed data was available from TSC and CR.
FCP      received              prompt information                          on radiological status, both l-            on and off site.
Pertinent information was quickly (15                  minutes) transmitted to offsite-l              groups.
Up-to-date meteorological data was available.
Plant status information was promptly available; status boards used and=
kept current.
l
 
Page 3 FCP CHECKLIST (Cont.)
CRITERIA                                            EVALVATION Communication              with offsite monitoring teams was adequate.
General                  status announcements and updates were      made        to    FCP personnel throughout the exercise.
FCP      coordinated        the        ,
supply of information to ECP      Media        Relations personnel, the        FCP          Public Information        Team      had sufficient        information (and      facilities)          to prepare and release news and        related        media releases.
Development                  and                    .
presentation of initisi media        briefing        was effective.
Development and release of initial press release were effective.
Development and release of follow-up          briefings and        releases          was effective.
Necessary              documents (logs,          etc.)      were maintained.
!          FCP/ECP-              interface effective.
Effective rumor control methods were employed.
 
Page 4 FCPCHECKLIST(Cont.)
CRITERIA                                  EVALVATION Spokespersons            were knowledgeable            about                                        ,
technical        aspects    of plant problems.
: 4. ORGANIZATIONAL CONTROL The            organizational structure and chain of command in FCP was clear.
Appropriate people made prompt      decisions      and recommendations.
Status boards were kept current.
Plume pathway was tracked                                          i and visil'.y displayed.
Emergency classifications and        action        level notifications transmitted                  ,
to proper authorities as required.
The Corporate Emergency Director (CED) utilized the        appropriate    RERP procedures efficiently.
The          CED      ensured-continuity of. emergency resources throughout the-exercise.
The CED ensured adequate administrative, technical and      logistical  support was available.
l    Plant status updates to
!    the ECP and SEOC were l    effective.                        .
i i
 
Page 5 FCP CHECKLIST (Cont.)
CRITERIA                                        EVALVATION The        CED        provsded direction        to,        and coordination for, the TSC Director.
The      CED      coordinated activities                  with state / local          response personnel.
The CED,      in conjunction              ,
with    other      emergency response          personnel,                                          ,
de-escalated                  the Emergency              Category according      to          plant conditions.
S. HEALTH PHYSIC'o/ SECURITY                                            -
Only assigned FCP people were present.
Security        Control        was                ,
l established                    and l      maintained.
Computer        aids        were properly utilized.
Plume      was defined and l      tracked.
Coordination        with TSC                -
Dose Assessment team was effective.
Vse      of    Radiological Status        Boards          was efiective.
: 6. PROTECTIVE ACTIONS Protective              Measures Manager /CED interface on Protective                Action Recommendations                was timely and effective.
 
.t                                                                              Page 6 FCP CHECKLIST (Cont.)
CRITERIA                                      EVALUATION Protective            action recommendations to the State were made clearly and in timely fashion.
N
                                                                'd l
l i
I
 
Y              ,
                                                                                                                                          -    .                                      t
                                                                                                                                            - Page-15
                                                                                  .          FOSAVEX                                                                                  - 0BSERVER CHECKLIST 4
1 Location:          EXECUTIVE COMMAND POST.                                                  ; Name:!
Time Frame:                    to                                                              Date:                                                -i CRITERJ. A.                                                                  - EVALUATION                                                              :[
t l.
                                -ACCIDENT ASSESSMENT-
                                  .ECPpersonnelcoordinatedL                                                                                                                          !
accident                      assessment-activities                  with                  FCP-
                                . personnel,                                                                                                                                        i 2,  : ACTIVATION OF FACILITIES The ECP-was activated-in
                                  -a timely manner.                                                                                                                                -
The ECP was staffed in a-timely fashion.                                                                                                                                    .
a :
j
                                                    ~
Information was received
                                -quickly from =the- FCP ancror.TSC,.                                                                                                                                    1 The-                  ECP              Director
* performed                  , ' personnel:
accountability to-assure.
                                -that. sufficient manpower was available to' staff the ECP.
Activation per):RERP-ECP; wasl            .
                                                            ~ accomplished:                                                                                                      -
effectively.
13,    NOTIFICATIO$/COMMUNICATIONi Established                                        and maintained:. communication-                                                                                                                          .
with:the FCP..                                                                                                                                .!
1 l                                                                                          '
ll l
                                                                                                                      .P
                      , ,                                      ,a,en,-,,-me-s-      ,,                          A      Y  '"
                                                                                                                                *W    P ~'Y          *      # '            '
 
u Page12 ECP CHECKLIST (Cont.)4
                                                                                                                    '. p CRITERIA                                              EVALUATION ~
r
                    .The    Manager , of -: Media ;                                                          ,
                    -Relations assisted. the ECP    Director.      and: PSC-Media Relations personnel.
in      preparing _ press.
releases, announcements,;                                      ,
vi E                    and interviews,-
Rumor    control. methods were used effectively.
1.-                                                  i Use of. status boards was'                                                                      .]
effective,.                                  =-
                                                                                                                  ~
4.-  ORGANIZATIONAL CONTROL
:.1 The ECP Director assumed                                                                        q
;                    control of the ECP,                                                                                ,
Major decisions were made-                                                                    'l by the ECp Director,o his                                                                        ,t staff and the Corporate Emergency Director-(CED),                                                        _-
4
                                                                      - o Tne CED was provided with required support.
The . onsite - emergency organization-                was.
supported as required.
Security operations were coordinatedL.with public.                                                                        '
law enforcement agencies.                                                                      4 Additional-        .-security.
provided asiroquired, 5,  HEALTH PHYSICS / SECURITY Only        -persons-        with-
                    . assigned            emergency:                                                                a responsibilitied            were permitted in the CCD.
E
                                                                                                                    --t
 
i Page 3 ECP CHECKLIST (Cont.)
CRITERIA                                  -EVALUATION ECP personnel were aware of    monitoring    team activities          being coordinated          from FCP/TSC/PCC.
ECP      personnel  were appraised on the. medical emergency and the status of the victim.
C PROTECTIVE ACTIONS
      . ECP personnel-were aware of recommendations being made at FCP.
i e
 
Page 1 FOSAVEX-90 0BSERVER CHECKLIST Location:  STATE EMERGENCY OPERATIONS CENTER            Name:
Time Frame:        to                                      Date:          i CRITERIA                                          EVALUATION
: 1. ACCIDENT ASSESSMENT SEOC              personnel coordinated        accident assessment      with    FCP personnel.
: 2. ACTIVATION OF FACILITIES PSC        representatives performed accountability to      ensure    adequate staffing.
Established                                    .,
communications with FCP informing them SEOC was                                                ,
manned.
Activation per RERP-SEOC was              effectively accomplished.
Information flow between FCP/SEOC was effective.
3.
NOTIFICATION / COMMUNICATION Establ!shed              and maintained communications with FCP.
Maintained communications with                    SEOC representatives.
Rumor    control    methods were employed.
 
  - - . ..          n.---.                  . , _        - , . - -        .      ...      -.                      . - . .    . .    .      .                  - .
                                                                                                                  ,            m
                                                                                                                                      -                                        :I l      Page 2-
_.4
:SEOCCHECKLIST/(Cont l)                                                                                                I CRITERIA-                                                                EVALUATION :
t Use      of status: boards,i meetings, and briefings-was effective.
Proper media coordination-was established, Logs were maintained.                                                                                                                                i' Up-to-date                              site                                                                                                        N  ~
information was..provided-                          La to    Public          Information Coordination Team.
                    '4.      ORGANIZATIONAL CONTROL; t
PSC            representatives.                                                                                                                        '
coordinated PSC emergency                                                                                                                              '
response activities with                                                                                                      ,
those        of        State / local officials, PSC technical' assistance                                                                                    '
e was available asirequired                                      e
                          -to -  support State / local                                                                                                                            !
representatives,                                                                                                                                    a" PSC                    coordinated.
activities                associated with        news.        ' releases, background                ' ma t e r.i a l ,
rumorcontroJ,etc.                                                                                                                                      $
                - 5,      HEALTH PHYSICS / SECURITY-                                                      4 i
:1 SEOC personnelcwere awareL of_monitoringLfactivities!                                    .
occurringLonsite/offsite.;                                  '
i
                -6.-      PROTECTIVE ACTIONS-
* a SEOCLpersonnel'were aware                                                                                                                              l m                        4 of-PARS being made atLthe                                      -
                                                                                                                                                                                ^1 FCP, SEOC personnel'were aware of-PAR status.
:l
                                                                                                                                                      't
                                                                                                                                                        ~*
I
                                                                                                                                                                                  ;- f t
                                                                                                                                                                                ~
i
                                                                                                                                                                                .i e  . .        -          ,, -      ~ ~ -        . . . -      .-a ~,r            . , . . . , - . . . ,  .--          , .-          ~
                                                                                                                                                          ,,,,,,,-...-.m..,,,,
 
4
                  -4                                                    "
                                                                                                  ,              .Page01
                                                                      -FOSAVEX-90.      ..
f 0BSERVER CHECKLIST-                                                    :
                                                                                                                                      ~!
I Location: FORT, ST, VRAIN SECURITY AREAS                                                                i Name:
t Time Frame:-            to                                                  Date: '
CRITERIA                                                      EVALUATION                              j
                                                                                                                                    -i
                                                                                                                                        . i.
I. ACCIDENT ASSESSMENT                                                                                  i
                                  'Se.arityL.            . -Officers..
recognized, the severity of .the event - and took-
: appropriate; actions _ per, the FSV security Plan,                                                                                '
: 2. ACTIVATION OF FACILITIES All    security facilities-were properly manned,                                          ,
All-    security personnel'        .
were aware .of appropriate-                              +
radiological        conditions,
                              . including'N0 SM0 KING,- NO
                                                                                                                                    .{
1 EATING,        NO        DRINKING during:            radiological-                                                                    ,
conditions,                                                                                          ,
i
                                                                                                                                      'i
: 3. NOTIFICATION / COMMUNICATION                                                                      l Communications                were                                                              __
established                  -and!                                                    '
maintained throughout the.                                                                          I security force, 4,  90RGANIZATIONAL CONTROL; The . Lead Security' Officer                                                                        i effectively' coordinated the Security Force-during                                                                            l emergency" conditions.
                                                                                                                                        -1 1
: l.                                                                                                                                        J I                      ..          .
 
Page 2-
                      -SECURITY FORCE CHECKLIST (Cont.)-
CRITERIA                                        -EVALUATION
: 5. ACCOUNTABILITY CAS/SAS          personnel effectively conducted and reported    accountability events to the Emergency Coordinator.
SG-05    was    completed accurately, ff f
1 y - .-
 
Page t          !
                                                            -FOSAVEX-90-1                                      1 OBSERVER CHECKLIST                                      -!
i Location:--ONSITELRADIOLOGICAL                                    Name:                            1 MONITORING                              _
i Time Frame:          to -                                          Date:                    ,
CRITERIA                                          >      EVALVATION-Onsite              monitoring-            ,>-
equipment    was        easily-accessible::and properly                                                                i
                  .          distributed.                                                                      ,
1 Equipment was checked for proper operability prior to its use, Actions by the- Onsite' Monitoring Teams to make:
initial    surveys -outside the plant buildings land                                                    ,
perimeter-      fence ' were                        r
                            - correct, cAs appropriate, the TSC HP Coordinator was notified.
Standard    HP      practices were employed--'for . entry
                            .into actual oripotential radiation areas.
Proper    survey records,.                                                              I dosimetry,      stay    time,-
etc. were        maintained during; entry.
Survey-    results        -
were reported.        .to        the-appropriate. personnel._in the TSC/PCC, Follow-up. actions were takenton survey- results.
 
                      ,                                                                  4 1
                                                                                                                                                                                                -t lPage 2~
: ONSITE- TEAM CHECKLIST '(Conti):
A 3          -
CRITERIA-
                                                                                                                          -EVALUATION--
                                                                                                                                                                          -      ,                c Pocket- dosimeters Were                                                                                                                                    .
                                      -frequentli chec ked -. andl
                                    -properly logged.                                                                                                                                            1 Team members _had adequate understanding- of.- proper                                                                                                                            .j' utilization of' equipment:
(survey              instruments, -                                                                                    ,
radios,;SCBA's,etc.).                                                                                                                                    '
survey .results
                                                                                    ~
                                      >Inplant                                                3.                                                                                                a were-            _. systematically ~                                                                                                                    .
collected;              appropriate-                                                            ,
1 datasheets of J,ERP-SURVEY
                                    -were used.
The correct procedure was-
                                    - used              -to        establish                                                                                                                  ;
emergency dose limits if                                                                                                                                  j needed.
Authorization -to exceed ~                                                                                              t 10CFR20 ' Exposure Limits was documented.                                .                      .<-
1-1 Use-        of- ysurvey.                and decontamination techniques: at designated
:contrcl            point :priorg to
                                    . entry'into the PCC,
                                    -Debriefing                . conducted,                                                        _
                                                                                                                                                                                              -i
                                    -records .              and              -
logs-                                                                                                      ,
j collected--                                                                                                                                            -
LAppropriate radiological!                                                                                                                                  ,
data- were' available to
                                                      ~
H                                        the teams as neededc l                                                                                                                                                                                                  >
o:
s e
e
      .                  - -                4.-. .          . . . . .                            .:._..---.. . , . . .    .,,,,.2.-.          , . _ , _ . _      ....  , ,.      , , .
 
'            ~
m                        j Page 1                                              d
                                                                  -      FOSAVEX                                                                                                            1 OBSERVER CHECKLIST Location: '0FFSITE MONITORING! TEAMS                                                                    -Name                .
Time Frame:                                                                                                  Date:
to f
CRITERIA                                                                              - EVALUATION-i Initial            team briefings-                                                                                                                                :
were                held.-            (See                  .,
RERP-PCC).
        .                    Teams . assembled.                    with                            .                  ,
field kits, vehicles,' and                                                                                          ,
communications equipment in a timely manner.
Contents            of . the Field                                                                                                                    -            s Trucks              were        -checked before leaving site.'(See
* RERP-FIELD)                                                                                                              m                  ,                      ,
Instruments checked for                                                                                  T                                      '
,-                                                                                                        /                                                            .
L                            proper operability                      and                                                                                                            c-i current calibration. (See                                                                                                                  ~
RERP-FIELD)'-
J Teams received explicit:                                                                                                                                            '
instructions-as to where to go and what-to sample, Teams            found'        sampling locations easily.                                                                                    ,                            ,
Procedures for conducting =                                                                                *
                            -'offsite ' monitoring 'were -      ;
                            - consulted and followed--                .
                          ' Vehicles - were                  readily--
                                                                  ~
available.
                                                                                                                                                                                                -i for
                          . Vehicles-              checked                                        ,    ,
contamination-                      after                                                    =                                                                      ;
survey was completed.
Sampling- locations' were                                                          ~
                                                                                                                                      ,                                i readily located;
                                                                                                                                                                              ~
i Y'
                                                    .g                                                                                                                ,
h t + t,          e                                          m            2--Ue      --                  =,                        *--d- b                      w  4+e
 
Page 2 OFFSII'E TFAM CHECKLIST-(Cont.)
                                                                              ~l CRITERIA                                      EVALVATION Samples      were    properly packaged, identified, and labeled.
Appropriate documentation                                              I was maintained, Pocket    dosimeters were                                              ;
periodically checked.                                                  '
Use      of      respirator          .
equipment and personnel monitoring                was appropriate.                                                            ;
Pocket dosimeter readings were    logged    in    upon                                          '
return to PCC.
Communications            were maintained with the TSC and/or    PCC    throughout sampl.ng activity.
Coordination with state field        teams        was                                          :
1 effective,                                                              i l
l l
l l
l
 
                                                                  ;Page 1 FOSAVEX-90 OBSERVER CHECKLIST Location: CORRECTIVE ACTION (REPAIR)                    Name:
TEAMS                                                              <
Time Frame:        to                                    Date:
CRITERIA                                        EVALUATION Need    for    Repair Team              a established;    activities-coordinated.
Team . members briefed in accordance with RERP-PCC and RERP-TEAMS.
Safety    and    first aid equipment available      as needed.
Team accountability was maintained.                                  ,
Radio checks performed.
Communications maintained during repair activities.
Log of activities kept.
Debriefing        conducted, records        and      log collected.
As applicable, RERP-EXP was followed by repsir team.
Personal dosimetry used, if needed, l
l l    TSC informed of results, l
l
* hy r .. ..
Page:11        _
FOSAVEX-90: ..                                                                                          !
OBSERVER.CHECKLISTz                                                                                                ~
n
                                                                                                                                                                                                .)
Location:                FIRST AID / SEARCH AND-RESCUE-                                            Name:
AT-FSV-                                                                                                                                                    #
Time. Frame:                            to-                                                          Da't e :-
                                                                                                                                                                                                  .i CRITERIA.                                                                                  EVALUATION                                                                              t t
j An          EMT            was--asked: to.                                ~                                                                                              i..
assist;                and            the: Firet                                                                                                                      j Brigade or First Aid Team-L assembly                      was              timely                  '
I following notification.                                                                      '                                                                            '
q-Fire Brigade /First Aid                                                                                                                                                    '
'                        Team assembled with the                                                                                                                                                    '
proper                        first                        aid                                                                                      '
O equipment.                                                                                                                                                                .
Accident / injury                                          ..
assessment' made by t he.-
Fire- Brigade /First Aid .                                                          < .                                                                                    i Team,
                                                                                                                                                                                              - t+
                                                                                                                                                                                              . h.
Level                and -- extent-                            of contamination-                                          was properlyidetermined.                                                                                                                                                  -l
,                      Decontamination measures                                                                                                                                                  1 were_              . Ltaken,                                  -i f                                                                                                        i L
,                      appropriate.
                      . Maintained communications                                                                                                                                                  l with1 Controll Room--(via v
radio: or 'Gaitronics'). '                                                                                                                                                j c
E                                                                              ..
1The            HP- escort-' reacted-                                                                                                                                        .
T properly to the simulated-                                                                                                                        - -
n                      event.                                                                                                                                                                      ,
n The.                ' request                          for-transportation                              by          :the Shift ' Supervisor was~-in
                                    ~
:                                                                                                                                                                                                  i accordance                                          'with                                                                                                                    '
procedures.                                                                                                                                                          '
i
                                                                                                                                          . . , . _ , , . .        , , , , , .      zw-,
 
Page 2 FIRST AID / SEARCH AND RESCUE AT FSV (Cont.)
l
                              '"~
i      CRITERIA                                      EVALVATION        !
1 i
Patient was made ready                                              ,
i l    for transport by the Fire Brigade /First Aid Team.
1
!    Appropriate methods were used to identify victim, t
the extent of injuries, contamination levels and locations,      first    aid administered, etc.
                                          ~                            !
Periodic status reports were proviued      to    the                                      '
  . Shift            Supervisor regarding    the    injured individual's status, l
l i
1 1
 
5.0    .
i SECTION 5.0 EXERCISE SCENARIO _
Section                                .
5.1    Narrative Summary.
5,2    Initial Conditions 5.3    Detailed Scenario a
5.4  Scenario Time Line I
f e
 
9 5.1-1 s
L FOSAVEX-90 NARRATIVE
 
==SUMMARY==
 
I      FOSAVEX-90 has been designed to test the emergency organization
)      in a number of different ways.      It will begin during normal working    hours    with limited State and local        participation expected, Fuel Deck personnel are-in the process of lowering a spent fuel l    shipping cask loaded with six region 34 spent fuel elements to I
the truck bay trailer located on level 5 of the Reactor Building.
!    While the cask is still on level 11 Refueling Floor, hanging over the truck bay, the Turbine Building Train Bay Doors are opened.
The sudden large temperature reduction, due to the extremely cold-outdoor temperature, causes the deluge system for the Unit Auxiliary Transformer (UAT), Reserve Auxi,liary Transformer (RAT),
and the Main Transformer to operate.            This in turn causes flooding of a junction box on the north side of the RAT-resulting in damage to control wiring and terminal boards. Tripping of the RAT produces a-loss of offsite electrical power (L0EP) (TI). - A few minutes after the LOEP, Control Room personnel receive a report from the fuel deck that the spent fuel shipping cask is suspended over the truck bay with no power to the Reactor Building crane. The crane is powered from non-essential 480 VAC Bus No. 4. A Notification of Unusual Event should be declared due to a loss of offiste power or onsite AC power capability (C11.8).
Upon automatic initiation, "B'i Diesel Generptor starts and immediately trips on overspeed (electrical control power to the governor    malfunction).      "A" Diesel Generator automatically starts, its output breaker is automatically closed, energizing l  480 VAC Essential Bus No. 1 and the Bus 1 - Bus 2 tiebreaker-automatically      closes. However,    service  water    pump  1A malfunctions and is not automatically started by the load sequencer. Therefore, "A" Diesel Generator is operating with    no cooling to- its heat exchangers.
In this condition, firewater should be automatically introduced to "A" Diesel Generator heat exchangers,    but the operator on the pressure reduction firewater valve (PCV-4266) has separated from the valve stem and does not open, causing "A"-Diesel Generator to trip on high temperature 5 i
minutes after initiation (T1+:05). "A" Diesel Generator can not be restored until      it has sufficiently cooled down so that the high temperature trip resets. PCV-4266 must first be repaired in order to assure proper cooling. The repair action on PCV-4266 and cooling of "A" Diesel Generator will require approximately 45 l  minutes. The Control Room should declare an ALERT due to loss of
)
offsite electrical power and vital AC power for up to 30 minutes-i (C11.3).
 
5.1-2L
    " t"  Diesel Generator: will be' restarted within approximately;45 m'nutes (T1+i45) and the junction box- on the RAT will be repaired, allowing offsite power res_toration , _w ithin an-hour (TI+1:00). This in turn will allow recovery of 46 system cooling' a.td restart of a helium circulator-approximately-15 minutes after offsite power recovery. Fuel Deck operations will resume shortly;                              ,
after, depending- upon performance of site accountability during the L0EP.
Once Fuel' Deck - operations are- resumed, the - Fuel- Deck Cranc Operator commences lowering of the loaded spent _ fuel, Lshipping cask.        The scissors _on the crane had not engaged properly and                          <
when movement is initiated, the. loaded cask free falls -from' the Refueling Floor to- the-Reactor Building Sump Key Way, smashing-the truck bay trailer and level. 5 concrete floor plug on its' way-down (T2).        The sump key way contains approximately 1 foot of water. Control Room personnel hear a . loud noise and movement zis felt, resulting in:the operation of the s,eismic recorder.
  ~0pon landing, the cask ruptures dispersing =all 6 fuel elements into the pit. The fuel elements are damaged but remain somewhat i
intact.      No: criticality occurs as-the elements are-spread out.
However, hydrolysis of the.. failed _ fuel particles does occur over a two hour time. period. _All noble gas'is released all.1-131 has previously decayed away, and the solid fission products remain in' the fuel particies with -the exceptioniof a-small' amount which
* escape and contaminate the water in the pit -
Area radiation monitors in- the Control-Room alarm. Within 5' minutes, the Control Room receives- a report. from Fuel Deck                      ,
personnel that the shipping cask _has fallen through level 5 and that there may be some' injured victims in: the truck _ bay.=
Accountability should be performed at this time, if..notLalready done so, and a SITE AREA EMERGENCY declared due-t'o1 major damage                              ,
to spent fuel due to severe cask damage-resulting in release-of?
radioactivity to plant environs (C6.3).
Two persons        weres located in the level 5 truck bay area'when the-cask disengaged and fell, injuring both parties. . Search -and rescue operations will have to be. performed as well as.first' aid measures for contaminated individuals.
The exercise will continue to the pointLthat emergency response-personnel are discussing long term recovery actions,'.i.e.,
re noval of the fuel blocks from. the Key Way,_. removal of_the contaminated Key Way water, plant' clean up, etc.
 
. . . - . - . _ . . .            .    . . . . .              . . . ,  . - . - . . . - . ~ . .    .  .                  . - . . . . .        . . -    -- --,                                -  . .-
                                                                                                                                                                                                              -1  ~
5 . 2- 1 --
lI
                        ~
FOSAVEX-90!-
y
                                                                                                                                                                                                                  )
                                                                                                                                                                                                              -1 INITIAL-CONDITIONS:
:y Outside. temperature:                          -20 *F                                                                                                                              1
                              -Defueling and sh'ipping acti_vities'in progress,.
                                                                                                                                                                                                        .t Loop 2_46 system in' operation :
Loop 1 46 system 00S for' surveillance testing.1 _                                                                                                                        'i Loop 2 46 system pump,'.P-46025,-cleared.out -  -
ACM torn! apart for maintenance.:                                              .,.>
l Main transformer 005 for maintenance fhouse power offithe(RAT 4
                                                                                                      ~
The. reactor -has :been shutdown for .400- days. :                                                                                                                          1 l
                                                                                                                                                                                                                ?
i
:j
: t.                                              t-1 J
                                                                                                                                                                    ^
:)
:q 2
d I~
:i
                                                                                                                  . e.                ',                                                                      i 5
              .      _    ,                    . , _ , , , -      .m                        ,.      ._ . , . ,                  .,_.a..--.-                , - . . . .      . . . . . . ,    .a.
 
    -.        . - .-          .  .-  .  - . . -        -_ .~                    _. . -            .. ,        ... .-  - - ...
I L
                                                                    -DESCRIPTION OF.
NEDICAL EMERGENCIES PERSONNEL CONTROL CENTER VICTIM:-                                                                            -    I r
Insulin Shock:
Signs and Symptoms.of Insulin Shock -
l                          1. Normal Breathing                                            Respirations of 12.                      _
: 2. Full, Rapid Pulse                                            Pulse of 94                              !
l                          3. Moist, Pale' Skin.                                          B/P 140/85-                              3
: 4. Headache, Dizziness 5.-Severe Hunger Pangs
: 6. Shaking, Trembling
: 7. Disorientation, Fainting. Seizures -
: 8. Coma The victim is in the PCC when he/she begins experiencing-the above1 signs and:
symptoms. . Insulin 1 shock patients-are often mistaken _for someone suffering from:
alcohol intoxication.            Insulin shock is a life-and-death emergency, i
TRUCK BAY-VICTIMS:
First-Victim -
                                                                                  ~
Victim is face down and unconscious onLthe bed'of.the' tractor. The victim-is having difficulty breathing :There is a.small amount ofl blood coming L
from the victim's left ear.and'a small indentation:on-the left side of-the victim's head.      TheLvictim is LOC x 00 ;His pupils: are dilated:and -
non-responsive.      There is no responsetto pain'..
                        .Second Victim -
                                                                                                              ~
                          'The victim-is face'down.and. semi-conscious-beside the trai1er. His:right-arm appears:to be broken,at the elbow. cThere'is a largetgash:above?the:                                    ,
Victim's!right: eye. Thel victim is :very- shocky and ~has lost 'a large amount
                        -of. blood. 'The victim is LOC'x.1. The respirations'are rapid'and= shallow,                                '
pulsefis 125, blood ~ pressure is__150/90.                                        '
[
L
                                                                                        - -    - _ ._          _m_...z    . - _ .
 
      .L 5.3 A11
                                                                      ~~--.l.                      ,
FOSAVEX                                                -
I DETAILED SCENARIO-
                                                                                        . Rea'l        Emergency
                                      -Event                                              Time =        -Class-~                      xi Controller briefing                            ,-0730;                                              ,
Controllers at' assigned stations-              '0800                                              j Train Bay Doors are opened causing 1              0830          NOVE deluge system to fire and~ damage-RAT resulting--in a Loss of Offsite Electrical Power.-(TI)-                    3 "B" Diesel Generator starts and                    T1            *
                                      .immediately. trips on overspeed..
A report is received from the.                      T1+:02 Fuel Deck that a loaded spent                                                                    <
fuel shipping cask:1's-suspended                  ,
                                      'over the truck bay with nc power                                                                        ,
to the crane.
                                        "A" Diesel Generator trips on-                    ;T1+:05-
                                        'high temperature;                                                                                O;
                                                            .                                I 't    .
Operator on PCV-4266 is separated _              -T1+:05                                          .i from valve stem and must be-repaired'in order to ensure sufficient-cooling to "A" DG, LOEP has been sustainedLfor_up to:  _
                                                                                          .T1+:30: ALERTi 30 minutes.
PCV-4266,has been repaired. "A" DG:              :T1+:45 can be restarted.'
The' junction box- on the RAT has
                                                                  ~
J--
T1+1iOO-been repaired and--offsite power.
can be restored.
System __46 PCRV'l_iner cooling and?
T1+1:15:
a helium circulator have been recovered.
                                        -Fuel Deck operations are resumed.                  T1+1:30
 
15.3                                                                                                                                                                                i Event Real
                                                                                                  - Time'
                                                                                                                      . Emergency Class j      J Loaded cask ~freeifalls from the,                                      - T2                        SAE                                              I Refueling floor to the Reactor                                                                                                                      '
Building Sump. Key Way.                                                                                                                              .
1
                                                  ~
Control Room personnel l hear:a loud                                      T2-noise and movement ofrthe building                                                                                                                  3 is felt. Seismic recorder operates.
Area Raciation Monitors' alarm. Site-accountability: should be: performed.
                            ~
Control Room receives a-report.from-.                                      72+ 01t                                                                  ,
the Fuel-Deck that the cask.has fallen' and there may.be: injured parties o,n=
level 5<in.the. truck bay.
Search and rescue as' well' ast first                                    T2+:3'; 0                                          ,
aid treatment for. contaminated / injured-victims must be performed.
Hydrolysis of the' fuel is complete.                                      T2+2iOO Release of radioactivity will end.                                                                                                                  3 Technt:al-evaluation will continue.
No new events will: occur'.. However,            -
data will continue to be provided.
                                                              ~
Emergency response-personne1:are                                        , T2++-            . Site objectives' to the point.of discussing llong                                                            -met.
                      - recovery actions.              FOSAVEX-90-will-be' concluded.,
                                                                                                                                                                      .-t s
e t
  , +                                    -m., , . - ,          ,        ,    -    g  --,--rn        ,  -.'    -ry    -,,,,y    -w.---c-- , - ,- v  v - , - -
 
5 4'^          h
                                                                                                                                                                    ~r
                                                                                                                                                                      )
                                                  . SCENARIO TIME. LINE:
FOSAVEX                                                                                          -
g
                                                                                                                                                                , s
                      .0830- T1;            NOUE      -? Train Bay Doors are opened.>.- Deluge: system; J.! i re . RAT damagediresultingfin a LOEPA "B" D/G statts:and1immediatelyJ trips on.
0830-  T1 Ji overspeed..
0832    Tl+ 02;                - Fuel D0ckcreports loss offpowerito.therReactorJ              _
Bldg crane with a~suspendedctuelcs hipping;caski-0835    Tl+:05                    "A"?D/G trips ^on high? temperature.x PCV-4266
                                                      -operator separated-from valve stem.; Valve must; be repaired.:                        -
                                                                                                                                                                  'i 0900    T1+:30    ALERT-    - LOEP sustained for thirty minutes.                                                                              4 4
                      ~0915    T1-:45                - PCV-4266' repaired. "A"_D/GLrestarted..
0930  T1-1:00                - Offsite electrical. power restored.
                                                                                                                                                                    ^
                            . T1-1:n                    Fuel Deck. operations? resumed.
                                                    - Loaded cask disengages-from crane and-falls too
                                                                                                                  ~
T2            SAE
                                                      . Level?1 Sump KeytWay.              ,
                            ~T2                      -ControlRoom'personnellheara^.ioudnoise~and:
l                                                        feel movement'of the buildingJArea radiations' monitors alarm.: Perform site! accountability.;
T2+:01                  ' Control'' Room?rebelves report'that4 shipping' cask
:has~ fallen.--
t T2+:                      : Search and Rescue Team must' be ' dispatched toLaid:                                                        I
                                                      ' injured victims.1                >          - -
1T2+2:00                -iHydrolysis:of:the'fuelMis complete.rNo.-newJevents willLoccur. Technical: evaluation vill 4 continue.-
or T2++-                  - Leergency:: Response personnel _are totthe pointfof 1                                                            -
discussing long' term recovery actions. FOSAVEX-90
                                                      -concluded. .
1 1
rh
 
_. _        _ - __.._. _ ._ __ _                        _ _.. ,.          _. __    ..            _ ~ .            ,_          . . . . _ _ . _ . . . _ _ _ ._
        ' ~
FOSAVEX-90
                                                                                                                            . PAGE:5--
                                                                                              - SCENARIO TIME: va e e%45''
CLOCK TIME:'-
1RpARYAUXILIARIES'
                                ..........................**** BOARD I-13 ********************************
PENETRATION INTERSPACE-aP                                                    : 0'PSIO.                                                        ,
REACTOR BUILDING SUMP DISCHARGE FLOW-                                          0/GrM'                                                          -,
                              - HELIUM CIRCULATORS                      System 21                          l NORMAL-
                              - ...................********** BOARD.!-15 *****************************"**
j
                              . REACTOR BUILDING STACK. FLOW                    ,                              -29.9-KCFM-REACTOR BUILDING AMBIENT AP-                                                    -0,25 Inches H2O-CONTROL ROOM TEMPERATURE                                                              75- F-                                                          t y
                                ..............................B0ARDI-7507X""*"""*"*""*"*"""
1
                                                                                                                                                      ~
480V ROOM TEMPERATURE-~
                                                                                                                  ' = 75:'F '
fi                                              .
h 7
I Y
    ,e.              ,                  <,        7      , , -~ v ,        ,    -,.,.-s      -.e- --g v.        ,~      .,            -4                y e q    --4  y
 
6.0-1 x
SECTION 6.0 SCENARIO DATA PACKAGE
* t o Plant Messages o Offsite Messages o Plant Parameters                            ,,
                                        <            4 i
l 1
 
t i.
t E
EOSAVEX-90; t
FOR:            Contral Room Operators'                            MESSAGE NO.
LOCATION:        control Room                                      SCENARIO TIME:. T1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS-IS A DRILL                                                              !
00 NOT: INITIATE ACTIONS AFFECTING. NORMAL PLANT OPERATIONSi I
XXXXXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXxXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX.X.XXXXXXXX MESSAGEi The following alarms-sound:                                                                        ,
AuN. Trans. Fire-I'-06      H-2-5
                                                    .I-06      E 4-4      Trs f er - Rel at- Trip'-
I-06        E 3    -4KV Bus Undervoltage I-06        E 4-6      Aux Trefmr .Undrvltg.
I-06        E 5-6      Trafr~Lossiof? Power-I-06        E 3-7      '480 V Bus Undrvlt:
I-06        E 3-4      AuxiTrsfmr TroubleL I      F 1-2    'Stdby-Diesel' Trouble I-06        F 2-3      Stdby Diesel Fail to. Start                            '
I-06      .F. l3-2 ' . Gen--1B Eng IC_Gng. 1D Troub1_e
                                                                                                                                                        '.i 4
xxxxxXxxXxxXXxxxxxxxxxxXxXxXXXXXXXxxxxxxxxxXxxxxxxxxxxxxxXxxxxxxxxxxxXxxXxt i
THIS(ISA.0RILLE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXxXXXXXXXXXXXXXXXXX 4
 
                                                                                                                                                                            .1
                                                                                                                                                                            -j r
F05AVEX-901 a
p CONTROLLER:INFORMATION ONLY.
                                                                                                      .                                                                        {
LOCATION: FOR TE COURORER AM                                                SCENARIO TIMEi XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-
                                                                                        .                                                                                ~i THIS IS A ORILL,                                                                                    _;
DO NOT-INITIATE ACTIONS AFFECTING NORMAL-PLANT OPERATIONS-                                                                                ,
                            -XXXXXXXXXXXXXXXXXXXXXYLXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-
                            ' MESSAGE:                                                                                                                                          ,
1 The foll?> wing alarms sound: .                                                                                                                1 I-06        Mc2-5'        Aux.=Trans. Fire                                                                                          l I-00        E 4-4          Trsfmr. Relay Trip--
I.06        E 3-6          4KV Bus Undervoltage'                                                                                  j I-06        .E-4-6          Aux Trstmr Undrvltg-                                                                        >
I-06~        E 5-6          Traft: Loss of Power I-06        E 3-7:          480 V?Bu's Undrylt I        E 3"4          ' Aux Trstmr Trouble I-06        .F 1-2'          Stdby' Diesel 1 Trouble            i I-06        F ' 2 - 3'      Stdby-Diecel.Fai-1 to' Start;                                                                            j
                                                                ' Gen 1B Eng 1CiEng 1D~ Trouble I-06        - F.3-2 t
                          . EXPECTED ACTIONS:
a
                                  -Operators should survey electricallpanelcindicationo'to dstqrmi, i the status-of 4160KV and 480V buses. 1 Dispatch-Equipment.np-:a                                                i            n investigate B= diesel generatorVand-. Aux. Tender;tu-investigate / isolate deluge' fir.ing system.:
a l
4 q
i XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A ORILL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                  R r
,            . - . . - -                          ~.      .  ,      ..            .      . - . _        . . , . .    . - - -            -.~ -        .        - .,
 
i q
(
FOSAVEX-90
                                                                                                                          .-i FOR:
C ntrol-Room-operators                          IMESSAGE NO.                                !
LOCATION: Control iRoom                                        -' SCENARIO-TIME: Tl?
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                .!
THIS-.IS A ORILL 00 NOT INITIATE ACTIONS.AFFECTING NORMAL PLANT.0PERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX:                                  ,
MESSAGE:                                    ,
The following indications are noted on I-06:'
4160 KV buses indicate'O.
480 V. buses 3,        4,-5,  6  -7 &-8? indicate.0.-                                            -
480 V buses.1 & 2 indicate 480 Volts B Diesel Generator indicates-no-' lights.                                .
High side -&- Low sidelRATr Bl;r.. indicates green and white light s                                  ;
with'a red target.
A Diesel Generator running and atarting-to pick up-1 pad;un                                            ,
sequencer.
I '
e 9
tr i
i 4
e
              <XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX'XXX=
                                                'THIS IS A DRILL-
                                                                                    .                                    i
              .XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
:)
w = -,    ,
 
                                                                                    -4(    -
ii I
                                                <FOSAVEX-90                                                                          i q
FOR::              cnvTontirp 3 ernnutTne nyt v                  MESSAGE,NO.                  ,
3 t
LOCATION:          rno    ur c.nvrt.n.a rn nety                  SCENARI0' TIME: 1 yc                                          ;
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXxXXXXXXXXXX                                              9 THIStIS A DRILL f
00 NOT INITIATE ACTIONS AFFECTING NORMAL; PLANT OPERATIONS 3
* XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXXXXXXX-l MESSAGE:,
8 9
The following indicationsJtr- noted on11 06:-
4160 KV buses indicate 0.                                                                                              !
480 V buses 3,              4, 5,.6,17 &=8 indicate-0.-..
480 V buses 1 &.2 indicate 480 Volts                                                                                    _
B Diesel-Generator indicates no-lights.                                                                              "j High side-& Low side P.ATLDkr.Lindicates green andEwhite light >
with a red, target.                    ..
(
A Diesel-Generator' running.andLstarting.lto:pickLupfload:en-l sequencer.
l-  EXPECTED-ACTIONS:
1
[          Operators should attempt va rious - means - to - r ecove r .ou t si d- ;p. >..g 1
l using approved' procedures-(EOP-6,-AOP-F)', Cons ide ra t i on -_: shou l l -
be given to LOFC in progress.=
3'
                                                                          \
s xxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx'xxxxxxxxxxxxxxxxxxxx.xxxx THIS ISJA' DRILL-                                                                  u XXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXXXXXXXXXXX I,
s
                                                                                      , - - , ,,.      -,    _-    _ 's-',.  -
 
[                                                                                                                                                                                .I t
1 l
F,05AVEX-90 l
FOR:                        control Room operator                                                MESSAGE NO.
-                              LOCATION:                    ruel D e c P,        to control Room                              SCENARIO TIMEt,11 :02_                            t i                              XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX' t
li i                                                                                      THIS 15 A ORILL                                                                            ,
00NOTINITIATEACTIONSAFFECTINGNORMALPLANTOPERATIOM                                                                                !
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                          I r
MESSAGE:                                                                      ,                                                                      !
1                                                                                                                                                .
d
)              .        A loaded spent fuel shipping each is suspended ovel the truck bar un level 11 with no power to the crane.-                                                                                          ..
i t
l il t
t o
'I XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX'                                                                        ,,
                                                                                                          ~      '
THl$-IS A DRILL--                                                                          .
;-                            XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                        ,
                                                                                                                                          ..              ._    _w___
rw.,+.s,,,.,    ,.c. . . . , , - , ,    , ,,                    ,Y~~      n-c.,,,.  ,,.,v,,,  . . , , ~ -        - + ,,,+        w      -  - + , ,    ,-,      w-< .a.
 
F05AVEX-90 l
FOR:                  Control Room Operators MES$ AGE NO._ _
LOCATION:            r'ontrol Room                                          SCENARIO TIME: T1-:05 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THl$ IS A 0 RILL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS
.                                      XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                          !
MESSAGE:
                                      '! h o f e..llowing alarms and iridica tioils are received:
I 06        f 2  Gon ,.A Eng 1A Eng 1B Ttouble Lighting switchn 10 DF, 480 V bu8es 1 & 2 1.alcatv 0. i Battery buses and instrument. buses are normal.
A Diesel Generator indicat es rio light n.
i.
r I
m XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS'I5 A DRILL-XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXYYXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
  .-        -,          . .. c_ . . . _ _ . . . . . _ . _          .,.  -  a_ ., ,_    , , _    . _ - . . _ . . . -  . . _ - . .  ..            _ . . , _ . _ . _ . . _ . , . , _  .
 
                                                                                                                                                                                                                                  )
4 F05AVEX                                                                                                      ,
1-i                                                                                                                                                                                                                                  :
;                                                                                                                                                                                                                                  a FOR:                CONTROLLER INFORMATIN ONLY                                                        MESSAGE NO.
l                                                LOCATION:              FOR Tilt rONTROLLER ONLY                                                          SCENARIO TIME: T1-:05                                                  l xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxXxxxxxxxXxxxxxxxxxx THIS IS A DRILL-                                                                                                            1 DO NOT INITIATE A0710NS AFFECTING NORMAL-PLANT;0PERATIONSl XXXXXXxXXXXXXxXXXXxxxXXXxXXxXXXXxXXXXXXXxXXXXxxxXXXxXxXXXxXxxXXXXxXXXXxXXx 1                                                                                                                                                                                          ,                                      ;
~
MESSAGE:                                                                            ,
i The f ol;owing. alar ms arid indicativns= are received:                                                                                                                              ?
I-06    r 2 -2            Gen 1A Eng 1A Eng 1B=Troub1'e.
Lighting switcher to DC..
480 V buses.1 & 2 indicate 0,                                                                                                                  '
[
,                                                                Battery buses and-instrument buses are normal.                                                                                                                  l A Diesel Generator indicates-no light 8.                                                                                                    '
EXPECTED ACTIO.NS:                                                                                                                                                                  I i
Dispatch or call'EO to investigatA trip on 1A Diesel Gen t .it                                                                                        . .        }
o                                                                                                                                                                                                                                  !
                                                                                                                                                                                                                              -t i
f
: l.                                                                                            -t                                        -
j i
                                                                                                                                                                                                                                't XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX.
i THIS IS A DRILL i
l XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxXX                                                                                                      j E
      ,_..e.  . , _ , ,,_ . - , - - ,          ..._.,.-,,_....r.,          ..-...,,-,....,.s  ,.._-,.,.,,.,..-...,_,.--,,,m.--                                    .__.-- ... ,,.- ,,
                                                                                                                                                                                                              ,..,---,,._,._-.f  '
 
                    ..- . .- - .                    . - . . - . . .    --. . .            _ . . . . ~ _ . .- . . . - . .    - . . , .
(.__.-.-...                                                                                                                                  . - - ..- -- .._,
i                                                                                                                                                            !
f l                                                                                                                                                            i 3
FOSAVEX-90 l                            .                                                                                                                                [
i                FOR:                      Equipment Operator                                            ME$$ AGE NO.
LOCATION                  Diesel Generators                                          ~
                                                                                                          $CENAR10 TIME: T1~
,                XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                    1 THl$ IS A DRILL r
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS r
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX HES$ AGE:                                                          ,
The opera tor vri PC\'-4206 has nepara t ed f r om . t he,Td ve s t em.
l I
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
                                                                    -THIS IS A' DRILL:                          ,
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX l-
      -~i-, y +,                ,..i+.,. -
                                                  .*      , .-      3 -w.0.%-- cv- e                  v              s=  + +          d-+=    6-w- + * ~
 
F05AVEX_90 FOR:                    Control Room operator ME$$ AGE NO.
LOCATION: control Ronm                                '
                                                                                  $CENAR10 TIME: I1**10    -
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THl$ 15 A ORitt.
00 NOT INITIATE ACTION $ AFFECTING NORMAL PLANT OPERATION $'
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:-
The following alarm 10 r e,'e i v ed t -
I-06                  11 4 - 6 Air Preos Lu.
PI-8212 indicates'75 ris10 PI-8254 indicates 75 psig.
FCV-8218 indicates open.                                                                      1 TCV-8255 indicates open, j
i X
XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A-DRILt.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX'XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
i l
i F05AVEX-90 l
l                FOR:      control ennm n:wratnr                    MESSAGE NO.
LOCATION:  contrni Rnnm                            SCENARIO TIME: T1-:45
;                XXXXXXXXXYYXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS'!S A DRILL
!                      DO NOT INITIATE ACTIONS AFFECT 1hG NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
dC Dieul oener. tor inch t emperatur e aiarm has reset .
0 1
a XXXXXXXXXXXXXXXXXXXXXXXXXXXX'XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A.0 RILL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXu xXX-
 
i i
FOSAVEX-90 FOR:                                  Control Room Operator                            MESSAGE-NO.                                          <
:                                      LOCATION:                            control Roce                                    .SCENARI O TIME:                m..s    .
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX t
THIS IS A ORILL 00 NOT INIT! ATE' ACTIONS AFFECTING NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
The Junction boS Ni the nort h side of the R A T ! b a s b e *2 n 1 .ti m i r ..<1 dhd the P.AT shog}d b9 Jpefdtichdl in about j $ miHULOU. :
p-4 l
t
                                  'XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A 0 RILL                                                                        i XXXXXXXXXXXXXXXXXXXXxXXxXxXxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 4
 
FOSAVEX-90 FOR:        Control Room operator MESSAGE NO. _
LOCATION:    Control Room                            SCENARIO TIME: T2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A ORILL DO NOT INITIATE ACTIONS AFFECT!NG NORMAL-PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX f
MESSAGE:
The following alatmo and indleatjons are received:
The building shakes and a loud noise is heard.
          .I-06 E 5-5 Seismic Recorder Operat'e                                ,
1-03 A 4-6 Gas Waste Act Hi #2                                      {
I-01  C 4-1    Monitor Rad Hi                                    1 1-01 C 5-1 Acknu I-13 Alarm                                        4 I-03  A 2-6 Liq Want Act 1 Hi I-06 G 5-7      Trnsfr Pumps Trip I-13  C 1-5 Gas Wae', Act Hi #1 1-01 C 2-2 Pipe Act High                                        >
Area Monitor 93250-5 is alarming at 1 mr/hr.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS'IS A ORILL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXx.
 
F0$AVEX-90 FOR:        cnvTpot!rn ixrnps1ATinN'nN1Y                              MESSAGE NO.
LOCATION:  rno cnnent i rp n*:t y                                    SCENARIO TIME: T2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THl$ IS A ORILL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
Tlie following alarms and indications ate ryceived:
The building shakes and a loud noise it heard.
                                        .I-06    E 5- 5 Geismic Recorder Operate I-03    A 4-6 Gas Waste Act 111 #2 1 01 C 4-1 Monitor Rad 111 1-01 C 5-1 Ackno I-13 Alarm I-03 A 2-6 Litt Kast Act 1 lij I-06 G 5-7 Trusfr Pumps Trip I-13 C 1-5 Gas Wast Act Hi #1 1-01 C 2-2 Pipe Act High                                  i Area Stonitor 93250-5 is alarming at 1 mr/hr.
EXPECTED ACTIONS:
Operators should-respond to AOP-K, AOP-H, and.EOP-5 ta
* determine what actions to take.                            One operator should check out the radiation levels on 1-14.-
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                  ;
l-                                                              THIS IS A ORILL                                                              '
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX i
  ,-m-    ,            a      ,          -              ,
n-,,---            --
                                                                                                        -.  ,a    ,-. , , ~ ,  e -&    ,
 
1 1
i q                                                    FOSAVEX-90                                                                ;
i FOR:        control              Room nn araer.re                    MESSAGE NO.
i                                                                                                                              >
LOCATION:    rual Dack to the t'ein t en1 p n c,n,                    SCENARIO TIME:        - e nt -
l XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THis IS A DRILL.
DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS                                                      a XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX:XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
The    sh2 pping through    the plugc.is);  ondisengagad level 5. fruin the trane and has fallen We cin hear yelling and screaming coming from level 5 and believe that the guys dr+n there may be hurt.                                                          ''
i
                                                                                                                              +
4 1.
i i
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-.
                                            .THIS IS A DRILL.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX' 9
            ,          ,  ._._-,,m.___    . _ ..-.    , ._  , _ . - .          - -
                                                                                          ,  - . , ~ . ,    , , , ,_, _
 
F0$AVEX 90 l
FOR:                            Pcc Peronnel                                                              MESSAGE NO.
LOCAT10N:                      parnnnnel c t,n t r M rone.o-                                      =,_    . SCENARIO TIME:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TH!$ !$ A ORILL                                                                                t DO NOT ! NIT! ATE ACT!OL$ AFFECTING NORMAL DLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXhXXXXXXXXXXXXXXXXXXXXXXXxXXXXXXXXXXXXXXXXXXXXXX MES$ AGE:
                                          . Respi t a t ions c.f 10 Pulse of 94
: 3. B/P 140/85
                                      . 4.      Moiut, Pale skj n                                                                                                              ,
: 5. Disurlentation l
XXXXXXXXXxXXXXXxXXXXXXX),XXxXXXXXXXXXXXXXXXXXXXXXXXXxXxXXXXXXXXXXXXxXXXXXXX THIS IS A DRILL xXXXXXXXxXXXxXXxXxXxXXxxxxxxXXxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxx L
l
[
l y        , - . . - . . .    -..-c.          ,                      -.,.+,.g,.  , , ,                      - , . , .    - ,
                                                                                                                                      . , , . . _  . - +    - . ,
 
F05AVEX 90 FOR:        Search and Rescue Team                  MESSAGE NO.
LOCATION:  Reactor Building Trueli Bay              SCENARIO TIME: _T2-XXXXXXXXXXXXXXXXXxxXXXXXXXXXXXXXXXXXXXXXXXXXXXxxxXXxXxxXxXXxxxxXXXXXXXXXXx THIS IS A OR!LL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS XXXXXXXxxXXXXXXXXXXXXXXXXXXXXXXXXxxXXXXXXXXXXXXXXxxxxxXXXXXXXXxxXXXxxxxxxx MESSAGE:                        FIRST VICTIM Umall aniount.of tilood coming frem the left en .
l cina l l indentation on the luft side of head.
Di!fIcultdes breathitig.
Pupils are dilat.ed and non-responsive.
Sa response to pain.
5 LOC x 0 e
i xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx-THIS'IS A ORILL xxxxxxxxxxxXXxxxxxxxxxxxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxixxxxxxxxxxxxxx j
 
j e
i F0$AVEX-90 FOR:        Search and pncut. T a a r"                                  MESSAGE NO.
LOCATION:    o.n,-tor r                  Buildino Truck Bar                      $CENAR10 TIME: _    T2-XXXXXXVXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-                                                        .
THl$ 15 A ORILL t
00 NOT INITIATE ACTION $ AFFECTING NORMAL-PLANT OPERATIONS                                                                    i XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
e
:trros:p vir'T P1:
Exh21;its siglas of shuck.
Lost a large amount of bleiod.
Respirations sre rapid and shallow.                                                                                                  t Pulse is 125,                                                                                                                      7 Blood pressure is 150/90.                                                                                    ,
LOC N 1.
E-4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS'15 A ORILL.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX i
      ,- . - - . .. . . _s  - _
                                          ,,    ,,,,_...,m.m        ._,m                              ,,  ,    .,  y  _. .,    , - . , , ,                ,_. - ,
 
FOSAVEX-90                                                    <
FOR:          Control Room Operator                                                                                  MESSAGE NO.        c LOCATION:      ONLY -IT PERSOXNEL . DISPATCHED -TO B68NAR10 TIME: = T1 :02 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THis 15 A ORILL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERAfl0NS                                                                                    I XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                        -I MESSAGE:                                                                                                                                            I The deluge sistem has fired.                                                                            The deluge. valve-is dl..ised.
There appears to be damage tu the junctivn bux'on the north side of the RAT.
i
                                                                                                                    ,                                    l 4
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS 15.A DRILL-        .
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX.
._    ..    ---a'  - - - _ _ _ _ _ - . - - - - - - - - . - - - _ _ _ - . - - - . -
 
r FOSAVEX-90 control Room Operator-                                                                            c*
                            .                  FOR:                                                                                                MESSAGE NO, ONLY IF PERSONNEL DISPATCHED TO                                                                                        i-LOCATION:              nirnr' n rvre gney                                                          SCENARIO TIME: T 1 *.-
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A DRILL-i 00 h'TJ INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
,                                            MESSAGE:                                                                        ,
B Diesel Generator, engines 1 & 2, t ripped on OVer speed.
In A Diesel Generator room, engine cool' ant la all user the                                                                                        i floor and is still coming out of'the eNpansion tanha. Alarms indicate.that A Diesel Genetator engines tripped on high temperature.
                                                                                                                                        <                                                    i i
i i
t I
I l
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-
                                                                                                                                                                                            'f
                                                                                                      -THIS IS A 0 RILL                                                                      I XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
                                                                                                                                                                                              +
j-                                                                                                                                                                                        .. !
'.                                                                                                                                                                                            4
~                                                                                                                                                                                            ,
    ..    . , , . - - . .    -.,_.J , , - . .                ,.,.r-,    ,,.._..,M,-4.,,,c,.,__,..        -,,..,~...m.-_..          ,  #        ,    _s    , _.,  4-..1.,,_ ---..,_L. ,
 
ff F05AVEX-90                              j FOR:
contrel Room operator                        MESSAGE NO. c LOCATION:    Control Room - (ONLY IT ASKED FOR) SCENARIO TIME: T1-
)                      XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX::XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX    i
                                                          --TH15 15 A DRILL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT-OPERATIONS-XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-
;                    MESSAGE:-                                        ,                            j Service water precsure is 0, i
o i
i XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxxxxxxxxxxxxxxxXxXxx'xxxxxxxxxxxxxxx_    ,
THIS-15 A DRILL-
                    -XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX l                                                                                                    l
 
i i
l                                                                                                        F0$AVEX-90 i                                                                                                                                                                                    -n FOR:                      control Room operator                                            MESSAGE NO.                              c-1 LOCATION:- contrni Room                                                                      SCENARIO TIME: 71- 1:9o XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS.IS'A DRILL 00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERAT10NS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:                                                                      ,
The loaded opent fuel chipping cash is a*.ill hanging Irom                                                                                                              ,
Iwel 11. We need to get it duwn as quickly as pourtble.
i
                                                                                                                                                                                                          )
i o
L i
I i
                                                                                                                                                                                                          +
f XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS 15 A'ORILL" XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                                                            !
                                                                                                                                                                                                        -f
      . .- .-                                      -                                  - ._w-.,.,,....,-m,....._, -. i  . , , .    . , _ , , . , - , . . . . . . - - - -  . ~ - -  , -,_~,- - , --.. ,'
 
t F05AVEX-90 FOR:              contr01 Rcom noeratorc                                        MESSAGE NO.        c LOCATION:          cc,n t roi noom                                              SCENARIO TIME:    -t1                      !
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A DRILL                                                                !
00 NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATION 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
e IT OPERATORS ATTEMPT TO RESTORE POWER TO THE CRANE PFIOR Ir-I<ECTOFATION OF OFFDITE POWER--
The 1.owside breaker on 180\' bus S has failed.
i
,                                                                                                  e 1
l l
i i
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX -
l THIS-IS A DRILL                                                                .
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                  i-
                    --e  . - . - ,    rr r  s                ,.o.nm---,-.c      ,----r    . - - - = ~
wa  ya-    -    v        - - , w- ,,
 
FOSAVEX-90 FOR:              Eningeering Tech. Analysis Team      MESSAGE NO.    -
LOCATION:          Technical Support Center            SCENARIO TIME: .g XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A DRILL 00 NOT INITIATE ACTIONS AFrECTING NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MESSAGE:
T F MT E D The spent. fuel shipping eduk was loaded W4th 6' spent tuel elemerits f rom segment          4,  region 34.
i i
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS-IS A. DRILL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX:
 
FOS _AVEX  FOR:      Inspection Team                        MESSAGE NO.            c LOCATION:    Reactor Building                    SCENARIO TIME:          te XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THis IS A DRILL DO NOT INITIATE ACTIONS AFFECTING NORMAL PLANT OPERATIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-MESSAGE:
1 IF AND WHEN A VISU At T NDPE''TinN of T HE RE APTnP DUTLDING-MEY Wu 18 01ADF -
1
[
The six spent tuel elements are dispetsed=in-the Reactor Building Key Way,                          i The elements appear to be spread out and anmewhat intant.
The Key Way appears to contain approximately 1 f oo t _. o f t wat:t, The fuel elements are not submerged.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX THIS IS A:0 RILL
  .XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX'XXXXXX~
 
_.    . _ _ . _ . _ . _ . ~ . _ _ _ _ _ . _ _ _ - _ . _ . _ . . - - _ _ _ . _                                                                          ._
(.
F0$AVEX-90                                                                                              :
4 SCENARIO TIME:          ~77-/ #
CLOCK TIME:    _,_                                            !
RADIAi!ON M 11 TORS:
I                  NUMBER                                        VALUE                              ALARMING                $ENSITIVITY I
RT-6212                                  7.0 X 108 CPM                                      N                  2.2E-8                                                  .
i i                  RT-6213                                  8.0 X 101 CPM                                      N.                2.2E-B RT-7312                                      005-    CPM                                                    N/A                                                    +
RT-7324-1                                2.0 X 101 CPM                                      N                  1.57E-8 RT-7324-2                                2.0 X 108 CPM                                      N                4.36E-7 RT-7525-1                                1.0 X 108 CPM                                      N-                1.49E-5'                                                [
RT-7325-2                                1.0 X 105 mr/br                                    N                N/A                                                    ;
RT-73437-1                              1.5 X 10' CPM                                    'N                  2 51E-10 RT-73437-2                              4.0 X 10$ CPM                                      N                2.73E-10 RT-9301                                      005      CPM                                                    N/A -
RT-93252-12                              1.0 X 108 m'r/hr                                    N,                N/A AREA MONITORS                                                                                                                                                          !
t i
RT-93250-1                              1.0 X 102 mr/hr                                    N RT-93250-2                              1.0 X 10 mr/hr                                      N                                                                        r RT-93250-3                              1.0 X 101 mr/hr                                    N                                                            .
RT-93250-4                              1.0 X 108 mr/hr                                    N RT-93250-5                              1.0 X 108 mr/hr                                    N RT-93250-8                              1.0 X 105 mr/hr                                    N RT-93250-13                              2.0 X 108 mr/hr                                    N k
RT-93250-14                              4.0 X 108 mr/hr                                    N RT-93251-1                              2.0 X 10' mr/hr                                    N                                                                        i
;                  RT-93251-3                              -2.0 X 101 mr/hr                                    N                ,                                                      ,
i                  RT-93251-4                              1.0 X 105 mr/hr                                      N l
RT-93251-5                              1.0 X 101 mr/hr                                      N                                                                        !
RT-93251-6                              1.0 X 108 mr/hr                                      N                                                                        l RT-93251                              3.0 X 108 mr/hr                                      N                                                                        ,
RT-93251-8                              1.0 X-101 mr/hr                                      N                                                                        ,
RT-93251-9                              2.5 X 105 mr/hr                                      N'                                                                      :
RT-93252-1                              2.'5 X 108 mr/hr                                      N                                                                      !
RT-93252-2                              1.0 X 10' mr/hr                                      N                                                                      i RT-93252-4                              1.0 X 10''mr/hr                                      N                                                                      i RT-93252-6                              1.5'X 108 mr/hr                                      N                                                                      i RT-93252-7                              1.0 X 108 mr/hr.                                      N-                                                                    :!
r EQUIPMENT-MONITORS                                                                                                                                                    t RTs6314-2                                1.0 X 108 CPM                                      -N RT-46211 '                              5.0 X:101 CPM.                                        N RT-46212                                7.0 X 105 CPM                                        N                                                                      i METEOROLOGICAL DATA
                        . Wind: Speed .                                                                            .        3.0 MPH -                                                    i Wind 10irection                                                                            From 315 Degrees                                                    :
Plume Deviation / Sigma Theta                                                                      4.0 Degrees Differential Temperature                                                                          2 . 2
* F, i
 
_ . . _ _ _ . _ . _ . - . _ . _ _ . ~ . - _ . _ _ _ . _ . . . .                                                            . _. _ .. _ .. _ . _ ..-.. ..                      .
                                              ..                                                                                                                                      j  ,
s F0$AVEX-90                                                                                I
                                                                                                                                                    'PAGE 1-                            !
SCENARIO TIME:                N/r
!                                                                                                                  CLOCK TIME:
f 1                                                                                        OVERALL PARAMETERS  -
Reactor Shutdown                                                                      YES                                                  i Decay Heat Power                                                                        0,05 MW I
PRIMARY COOLANT                                                                                                                            -:;
Pressure                                                                    10 PSIA                                                ,
Temperature Circulator Inlet                                                  95 'F                                                "
Core Inlet                                                      '105''F                                                t Core Outlet                                                      125 'F Calculated Bulk Core -(CBCT)=                                    N/A                                                  !
;                                                                Haximum Region Differential-(AT)                                  28 'F
                                                                                                                                                                                        ^
Helium Flow Circulator C-                                                    10 X 108 Circulator 0                                                      0 X'102                                            r TOTAL                                                            10:X 108                                              r
,                                                  Cire.ulator Speed                                                                                            '
Circulator C                                                    2900 RPM 4
Circulator 0                                                            0 RPM Moisture (Dew Point)
ME-9306                                                          41t*F                                                  '
ME-9307                                                        ~ 3 9 -.' F-SECONDARY COOLANT.
Emergency Condensate Header                                                                                                      j Flow Loop 1                                                        . ..        '0ilb/hr-Loop 2                                                    1.0 X: 10'ilb/hr EES Inlet Temperature-                                                            85- 'F-EES Outlet Temperature                                                          1003'F Pressure-                                                                    -350 PSIA 1
H                                                  PCRV LINER COOLANT, (In Service)-
Loop 1                                                            NO:                                                  -
Loop 2'                                                          YES-l                                                                                                                                                                  .                  {
:-l
      ,    ..        , _ . _ _ . _ _ . _ . . . - , , , . - , - , . , _ , _ _ . . -,-...._...a        , ,; _ . ~ . 2 ._ . _ -. _ . .aa_ _ ,                  ,    _ , _ - . . .
 
F05AVEX-90 PAGE'2
                                                                                  $CENAR10 TIME: 7- 0C/S
                                                                                -CLOCK-TIME:-
PRIMARY AUXILIARIES
              . . . . . . . . . . . . . . . . . . . . * * * * * * * *
* B O A R D I - 01 " " " * " " " " " " * " " " " " "          ,
GA$ WA$TE                                        System 63 Inlet Pressure                                                                10 PSIA Vacuum Tank-Pressure                                                            8 PSIA-Surge Tank "A" Pressure                                                      200 P5JG Surge Tank "B"' Pressure                                                        O PSIG -
L10010 WASTE                                      System 62                    - NORMAL:
REACTORPLANTCOOLINGWATERl                        $ystem 46:                                                          ;
Loop 1 P-4601                                                                CLEARED OUT P,46015-                                                              CLEARED OUT Header Inlet Temperature                                              CLEARED.0UT Barrel and Top Head Outlet _ Temperature                              CLEARED OUT Top Penetration inlet Temperature.                                . CLEARED OUT Loop 2                                                                                                          i P-4602-                                                          - ON                                1 P-4602$                                                              CLEARED OUT-                    '
Header-Inlet Temperature-                                          -115 'F                          ,
Barrel and Top Head Outlet Temperaturei                              115''F'                          '
Top Penetration Inlet Temperature                  '
115t*F.
Surge Tank Level "A"                                                            0 INCHES                        ;
Surge Tank' Level "B"                                                      . 45 INCHES                        1 i
1 i
1 l-l:
i
_              _;_1
 
.                                                                                                                                                                                          'l FOSAVEX 4 PABE 3          l i                                                                                                                                                                                            !
                                                                                                                                    $CENAR10 TIME: -r/ - ce T l
CLOCK TIME:
I
!                                                                                                PRIMARY AUXILIARIF_$
3                                        ...................***"a****                                  BOARD l-02 """""" * """""""""
* i HELIUM STORAGE                                                System 24                                                                            ,
Low Pressure Bottles                                                                              270 PSIG High Pressure Bottles                                                                            575 PSIG
{
HELIUM CIRCULATOR ~ AUXILI ARIES -                                        System 21 Circulator C-2103 (C)
Bearing Water Flow                                                                              170 GPM Bearing Water Inlet Temperature                                                                    78 'F Main Drain AP                                                                                    2.5 PSID Buffer /Mid-Buffer AP                                                                                B PS10                        t Buffer Helium Flow                                                                            7.40 ACFM Buffer Helium Return Flow                                                                    3.79 ACFM~
Circulator C-2104 (0)
Bearing Water Flow                                                                                    0 GPM Bearing Water Inlet Temperature                                                                    78 'F Main Orain AP.                                                                                        4 PSIO.
Buffer /Mid-Buffer AP                                                                                  0 PSID              s' Buffer Helium Flow                                                                                'O ACFM-Buffer Helium Return Flow                                                                          'O ACFM
                                        ..............u.............                                  BOARD l -0 3 """"""""""" " " " " "
REACTOR CORE                                                  - System 12 All Systems                                                                                        NORMAL
                                        ..................n.......**
BOA R D - I -0 5 " "" " " " " " " " " " " "" * "
s HELIUM CIRCULATORS                                              System 21 Circulator C-2103 (C)                                                                                    ..
Rotor Speed                                                                                    .2900 RPM Helium Flow (Low Range)-                                                                      -0,019 PSID-Helium Flow-(High Range)                                                                                  0 ?e t                                                  Circulator C-2104 (0) l                                                        Rotor Speed'                                                                                              O RPM-l                                                        Helium Flow (Low Range)                                                                      -0.003 PSIO l
Heli _um Flow (High . Range):                                                                            0 14 --
MAIN TURBINE                                                    System 51                                    . NORMAL s.-                          ;
    - , , . . ~ .                                                                                  ..,.s,..
 
F05AVEX-90 PAGE 4 SCENARIO T!ME: -r/ - oM CLOCK TIME:
PRIMARY AUXILIARIES
            ......n..........*********"        BOARD l -0 6 " * " * " * "" """" " "" " * "
MISCELLANEOUS Bypass Flash Tank Pressure                                O PSIG PLANT ELECTRICAL                    System 92 Essential                            Bus 1      Bus 2    Bus 3    N/I Bus 3 480 VAC                        485-      =485        485 120 VAC                      -118        118        116    118:
120 VOC                        130.      130
                                                                            ' "A"    "B" Standby _ Diesel Generator                        NORMAL  NORMAL-ACM Diesel Generator                              CLEARED OUT Non-Essential Switchyard                                        NORMAL Bus:1    Bus 2    Bus-3 4160 VAC                                  4160      4160    4160 480 VAC                                          NORMAL MAIN TOWER                            System 41                  DRAINED SERVICE WATER TOWER                  System 42                  NORMAL-FIRE WATER-                          System 45'                NORMAL INSTkUMENT AIR                      System 82                  "A" HOR    "B" HOR 93      ;93 SERVICE AIR                          System 82                -95'PSIG-
          ...........................** BOARD I-10 ********************************'
PLANT-PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGH Bay 100                                                    80 'F Bay 200-                                                    80 'F-Bay 300                                                    80 'F
          - REHEAT' ACTIVITY MONITORS                                      -005' BUFFER.5EAL MALFUNCTION                                          NORMAL r  - e v              ~
 
J FOSAVEX-90 1
PAGE S
:                                                                                                                          SCENARIO: TIME . 7/- ce/5
!                                                                                                                                                                                  I CLOCK TIME:
,                                                                              PRIMARY AUXtLIARIES
                                    ..........n...............** BOARD I-13 * "" * """ * """""" * """
3 a
PENETRAT!0N INTER $ PACE AP                                                                          0 P$10'                                ^
REACTOR BUILDING $ UMP 0!$ CHARS.* FLOW                                                              0 GPM-HELIUM CIRCULATORS                                      System 21                                    NORMAL
                                    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B O A R D .1 - 15 * " " " " " " " " " " " k " " " "
R REACTOR BUILDING STACK FLOW-                                                                            29.9 KCFM                              ,
4 1
;                                  REACTOR BUILDING AMBIENT AP                                                                            -0.25 Inches H2O-                        -
CONTROL'R00M 1EMPERATURE                                                                                    75 'F
                                  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B O AR D I - 7 5 0 7 X " " " " " " " " " " " " * " "                                l
                                - 480V ROOM TEMPERATURE                                                                                        75 *F              s-1 3
Y b
o
                                                                                                                                                                                  .i s
y v
P we * = -ww e - w [ r * *- + "'
c '-s v- v -- 4 ,  r w -www                                  t'-r  e    * * - * - - - -    -4'- -*--v------+= e--    4 h m,eIw- w  n- M *    *w w --' ~+~-m  r
* ww.---w**
 
                                                                                                                                                                                                                                  +
!                                                                                                FOSAVEX-90 i
1                                                                                                                          SCENARIO TIME:                                      f/
;                                                                                                                                      CLOCK TIME:
I 4
RADIATION MONITORS:                                                                                                                                                                                    ,
NUMBER                                    VALUE.                          ALARMING                        SENSITIVITY                                                                                ,
o RT-6212                            7.0 X 101 CPM                                N                            2.2E-8
:                            RT-6213                            8.0 X 108' CPM                                N                            2.2E-8
!                            RT-7312                                    005            CPM                                                  N/A RT-7324-1                          2.0 X 105 CPM                                N                              1.57E-8 r
RT-7324-2                          2.0 X 10' CPM                                N                              4.36E                              RT-7325-1                          1.0 X 108 CPM                                N                              1.49E-5 RT-7125-2                          1.0 X 102 mr/hr                              N                              N/A                                                                                  q 2.51E-10
,                            RT-73437-1                        1.5 X 10' CPM                                N                                                                                                                  'i RT-73437-2                        4.0 X 10 CPM                                  N                              2.73E-10 RT-9301                                    005            CPM                                                  N/A -
;                            RT-93252-12                        1.0 X lot mr/hr_                              N,                            N/A AREA MONITORS l
RT-93250-1                        1.0 X 108 mr/br                              N RT-93250-2                        1.0 X 105 mr/hr                              N
!                          RT-93250-3                        1.0 X 108 mr/hr                              N I                            RT-93250-4                        1.0 X 10 mr/hr                                N                                                                                                                    .
RT-93250-5 '                      1.0 X 101-mr/hr                                N                                                                                                  -
RT-93250-8                        1.0 X 102 mr/hr.                              N
,                            RT-93250-13                        2.0 X 105 .m r/hr                              N l                            RT-93250                      4.0 X 108mr/hr                                N RT-93251-1                        2.0 X 108 mr/h'r                              N=
RT-93251-3                        2.0 X 108 mr/hr                                N                            ,
RT-93251-4                        1.0 X 108 mr/hr                                N RT-93251-5                        1.0 X 10 mr/hr                                N RT-93251-6                        1 0 X 105 mr/hr 4                                            N RT-93251-7                        3.0 X 108 mr/hr'                              N RT-93251-8                        1.0 X 101-mr/hr                                N i                            RT-93251-9                        2.5 X 10$ mr/hr                                N RT-93252-1                        2.5 X 105 mr/hr                                N RT-93252-2                      - 1.0 X 10' mr/hr                                N RT-93252-4                        - 1.0 X 10 mr/hr                                N RT-93252-6                        1.5 X-108 mr/hr                                N                                                                                                                  '
I                            RT-93252                      ' 1.0 X 108 mr/hr                                N-                                                                                                                  -
i l-                          EQUIPMENT MONITORS                                                                                                                                                                                    !
RT-631'4-2                        1.0 X 108 CPM'                                N-RT-46211                          5,0 X 101 CPM                                :N RT-46212                          7.0 X 108 CPM                                  N-                                                                                                                    ,
METEOROLOGICAL DATAL Wind Speed                                                                                            3.0 MPH Wind Direction.                                        _
From- 315 Degrees-                                                                                                =
Plume Deviat_ ton / Sigma Theta                                                                    4.0 Degree s'.-
Differential. Temperature                                                                            12 'F .                                                                            _.
  --.,,4.--,.,vd- r-  ew E  e m m+ ,#sy- ,s u d.> . 'w,-wm_.#-    .. h>_, , hw- , , - ,                  .-    , f .., , p .w wwpn o        ,.,.,,,,,,.p,.,    y,y,,w,3--,,. w. pm e-w -m , - + go %, - , . g  e ., wer-,.
 
t i
F0$AVEX-90 j                                                                                                                                                PAGE 1 1
                                                                                                                ' SCENARIO TIME: -r/
                                                                                                            ,      CLOCK TIME:
OVERALL PARAMETERS.
Peactor Shutdown                                                                                  YES Decay Heat Power                                                                                  0.05 MW                                                  !
)
PRIMARY COOLANT Pressure                                                                                      10 PSIA' 1
Temperature                                                                                                                                            -
Circulator Inlet                                                                    95 'F 2                                                Core Inlet                                                                        N/A                                                      4 Core Outlet                                                                        125 'F Calculated Bulk Core (CBCT)                                                      :110.'F :
Maximum Region Otfferential (AT)                                                  P/A                                      -
r Helium Flow Circulator C                                                                        0 X 10' Circulator 0                                                                        0 X 103
,                                                TOTAL                                                                              -OiX 108:                                              ,
Circulator Speed                                                          ~c l                                                Circulator C                                                                          -0 RPM Circulator D                                                                            0 RPM:
Moisture (Oew Point)
ME-9306                                                                            41 'F ME-9307                                                                          '39 'F L                                SECONDARY COOLANT Emergency Condensate Header                                                                                                                            ,
Flow Loop.1                                                                                    Olib/hr-                                  -
Loop 2                                                                                    0 lb/hr                                  .
EES Inlet Temperature                                                                            85 *F-L                                                EES Outlet Temperature                                                                          100L*F:
Pressure                                                                                        350 PSIA'
                                                                                                        &                    u                                                              .
PCRV_' LINER COOLANT (InSerfice)                                                                                                                        ;
Loop        1..                                                                  ,NO:                                                  .
Loop 2-                                                                          =NO                                                      s
__,._......r.,                  ...,;._,              - . . ,    _.-.._.,,_..__.-m,__.          _ . . . . ,  . . ~ . . . . ..  . . . , , . . . _ , _ _ _ . - ._
 
                      -~_-.-.                    - - - , _ . . . . - . - - , ,                                        . .-          .-                                    -.          - - - .
7-..__..--
                                                                                ~
FOSAVEX-90i
                                                                                                            <                                              , AGE ~2;                              !!
4
                                                                                                          . SCENARIO TIME:                                7'/
                                                                                                          . CLOCK TIME:-
* PRIMARY AUXILIARIES-i
                - . . . . . . . . . n . . . . . . . . . . . * * * * * " , BO A R D I - 01. " " * " " " * " " " " * " " * " " " '
GAS WASTE                                                . system 63'                                                                                                                'i Inlet Pressure =                                            .
                                                                                                                                  ' 12.3 PSIA 1
Vacuum Tank Pressure-                                                                                    12.3 PSIA)                                                            '
Surge Tank "A". Pressure                                                                            '
200 PSIG Surge ' Tank "B" Pressure -                                                                                        0 PSIG--
LIQUID WASTE                                              System 62                                        .
                                                                                                                                - N0'RMAL; REACTOR PLANT. COOLING-WATER                              Systen.46'                                                                                                                    !
Loop 1                                                                                                        -        -
P-4601-                                                                                        iCLEARED 0UT P-46015t                                                                                          CLEARED 0UT-Header Inlet Temperature                          .
                                                                                                                          ,        CLEARED.0VT Barrel and Top Head Outiet Temperature'                                                            CLEARED OUT'                                                            '
Top Penetration Inlet' Temperature                                                                CLEARED OUT-Loop 2 P-4602                                                                                            0FF, .    -
P-4602$                                                                                            CLEARED OUTr                                                        i Header Inlet Temperature;                          .
J115 i
* F _~
Barrel and~ Top; Head Outlet Temperaturei                                                          115' - ' F                                  -
Top PenetrationiInlet Temperature? '-                                                              115 'F -                                                              !
Surge Tank Laval "A"                                                                                            0 INCHES-                                                      i Surge Tunk                  "B"                                                                          45i!NCHES 4
a i
L a
l 1
i i-
                                                                                                                                                                                                    .}
i
:p                                                                                                            +
f r            ,    -      -                  -      .m  . . , - , ...                    . ~ , - - , -    .r.,m..              *w.            + - - , - , , - - - - ~ ~ , - - . . -        . . . -+
 
_-          -            - _ .  -.  .    .-                  .-          _-        .              _ .-    . _ . . = . .
FOSAVEX-901                                                                      ~, '
PAGE:3
                                                                                                                                      ~'
                                                                        . SCENARIO TIME: 7/-
CLOCK TIME:-
i PRIMARY AUXILIARIES-
            ............*****************BOARDI-02'"""**""""""*""*""*                                                                  i HELIUM STORAGE-                        System 24 Low Pressure Bottles                                            270 PSIG High Pressure-Bottles                                            S75 PSIG-HELIUM CIRCULATOR AUXILIARIES                      System 21 Circulator C-2103 (C)-
                                    ~
Beering Water Flow                                                  0 GPM 78 'F                                      ]j Bearing _ Water Inlet Temperature Main Drain 6P                                                      4 PSIO.
* O PSID Buffer /Mid-Buffer-aP
                        ' Buffer Helium Flow                                                0.ACFM Buffer Helium Return Flow                                          0 ACFM Circulator C-2104 (0)-
Bearing Water Flow                                                0-GPM Bearing: Water Inlet Temperat'ure                                -78 'F Main Orain 6P                                                      4 PSID Buffer /Mid-Buffer 6P                                              0 PSID                                  1 Buffer Helium Flow-                                                0 ACFM'                                    ;
Buffer Helium Return Flow                                        s0 ACFM                                    l
            ..*********"****"*****"*****BOARDI-03"""""""""""**""""
REACTOR CORE-                            System 12 All Systems
                                                                                              'AL
            .............n.............* BOARO LI-L S """ * * """ " ' """"""""
HELIUM CIRCULATORS-                      System 21' Circulator C-2103 (C)
Rotor-Speed-      .
0 RPM Helium Flow -(Low Range). .                                        -0.PSIO Helium-Flow-(High Range)                                            .0%
                    . Circulator C-2104 (0)'                                                        .
                            . Rotor Speed-                                                        .0-RPM .
Helium Flow (Low Range)'                                    -0.003'PSID Helium Flow (High Range).                                            O%-
p MAIN TURBINE                            ; System 51                        . NORMAL 1.
i-l'      ,,        -                      _                - - .            ,.                        ,      .  --              1 -
 
FOSAVEXa90
: PAGE'5
,                                                                                                SCENARIO TIME:- 7/
CLOCK TIME:
PRIMARY AUXI'LIARIES'
                      .............................BOAROI-13*"""*"""""***"""""*'
PENETRATION INTERSPACE AP                                                            0- PSID ;-                                          -j REACTOR BUILDING SUMP DISCHARGE FLOW                                                  0 GPM--
HELIUM CIRCULATORS                                      System 21                    NORMAL
                      . . . . . . . . . . . . . . . . . . . . . . . . . . .
* B OA R D I - 1 5 " " " " " " * " " * " " " " " " "
REACTOR-BUILDING STACK FLOW                                                                    6 KCFM                                      s REACTOR BUILDING AMBIENT.AP-                                                                    0~ Inches H20' CONTROL-ROOM TEMPERATURE                                                                      75 'F-                                        l
                      ...o......................**                            BOARD I -7 50 7 X '""" * "" """" " * """"
8""      ROOM TEMPERATURE -                                                                    75 *F
                                                                                                                                                                =i i
4 i
i
's
                                                                                                                                                                .-j 97 -  YP                          vv*"  iwT- Wi-- w w    a=  %T s                        4 6e-  6- - 7          %      s-            e
 
LCD 4.1.9 COMPLIANCE SYSTEM 12 DVERVIEV HENU                                                                                                                                ALARM INHIBITS
[ START'
                                                  -f' _IS DATA DK FOR FLDV CALC                                                                                                    [          > FLOV > 0 7 .;;ND                                    "
                                                                                                                                                                                    "" YES ND ND          y                                                              YES DENSITY    4_        DENSITY        -                                                      >= 27 DRIF. p                                              -                                                                          -
                <=107.5% ==
                          ..ND          <= 60%                                                  IN EQ FLOV ?.=
                                                                                                                                                                                  '                          IS REMAINING
                                                    ..YES
                                                    =
                                                                                                                                  .                                        ~'.i.,'+
DATA DK 7 q, E ND                                            I yYES                      yYES                                                                      y  ND REACTOR            DOES REACTOR                                        DDES REACTOR                                                                                                                                    4 PVR EXCEED            POVER EXCEED                                    P'3VER EXCEED                                        -
RX PRESSURE > 50 PSIA LCD4.1.9-1            LCD 4.1.9-3                                                        LCD 4.1.9-5                    YES                                                                                                          El ND CURVE 7 "..              CURVE 7        ..
CURVE 7    ..
V ARE ALL 37 DRIFICES ND  YES V                ND    YES V                                                              ND YES V                                                        IN EQUAL FLOV 7                                                    ..
N/A                          N/A                                                                    N/A                                                                                                                i      =
V                        V                                                                      V                                                                  VYES                                                    ND V IS FLOV - >=        l    IS FLOV ->=                                                                ARE AT'S <=                              ARE ALL.                          l        f ARE ALL
  .            LCD4.1.9-1              LCD 4.1.9-3                                                                LCD 4.1.9-5            REGION AT'S                                                                      REGION AT'S CURVE 7        .,          CURVE 7      .,                                                          CURVE 7 .,          <= 600 DEG F.                                                            <= 350 DEG F yYES    ND              yYES        ND                                                              yYES' ND                yYES                                    ND                                        yYES              ND IC                        IC                                                                        IC                          IC                                                                                IC V                            T                                                                      V                                                          Y_                                                        V 4 M    i IS REACTOR SHUTDD'<N 7
_                                        . . _ _ . _                                                            gg 4-V                W                              37 DRIF                                                              CAN REQ FLOV                                                          ENDUGH FLOV NIC. ,      FLOV > 0 7                .      EQ FLOV7. .                                                          BE DETERMINED g                                                        FOR CMG-25 7                                        .
MrND                                                    y ND                                      y ND ND                                              YES
    ; O F n: U IP'E g4-              IS- INITIAL DECAY HEAT AVAILABLE 7                                                                                                          ,  ,4                                              .y ND Y
V U E'S                                                                                                                              < 760'DEG F ?.d EXECUTED:                                                                                                                                                                                                                                      -
11/ 07/ 90                              CMG4 TIME' TD 760                                                          I    "
N/A FOR                                              PES                                      ND y 8: 34i 14                  p 4--        DEG F EXPIRED 7                                                                      335.6 HRS =.                                    ,      N/A                                            NIC. ,
: 4. .
YES
                                                                                                                              ,NU
                                                                                                                              -                                                                                                                      ==
 
                                                                                                .. y
                                                                                                    -d
:FOSAVEX                                                              SCENARIO TIME:      7N-: /6 ~
CLOCK TIME::
RA0!ATION MONITORS:
NUMBER                  VALUE              ALARMING          SENSITIVITY RT-6212          7.0 X:105 CPM                N -'              .2.2E                        {
8.0 X-108 CPM RT-6213                                        N                  2.2E      RT-7312                005' CPM                                  N/A.                          '
RT-7324-1        2.0 X 108 CPM                N                  1.57E-8 RT-7324-2      -2.0 X-105 CPM                N              - 4.36E      RT-7325-1        1.0 X 10* CPM                N.                1.49E-5                      1' RT-7325-2 .      1.0 X 105-mr/hr              N                  N/A1 RT-73437-1      :1.5 X-102 CPM                N              '2.51E-10'                        i RT-73437      4.0 X:108 CPM                N.                2.73E~10 RT-9301                005    CPM                                N/A" RT-93252 12      1.0 X 101 _mr/hr.-          N      ,
4 N/A AREA MONITORS                                                            ,
i RT-93250-1        1.0 X 105 mr/hr            .N'                                                  i RT-93250-2        1.0 X 101mr/hr-              N RT-93250-3        1.0 X 108 mr/hr              N RT-93250-4      -1.0 X 108 mr/hr                N                                                  i R1-93250-5'      1.0.X 105. mr/hr              N RT-93250      1.0.X 108 mr/hr              N RT-93250-13        2.0-X 10* mr/hrL              N RT-93250 14      4.0 X 108 -mr/hr            .N RT-93251        2.0 X-108 mr/hr                N                                                ,
RT-93251      2.0 X 101'mr/hr                N              ,                                  i RT-93251-4        1.0 X 102-mr/hr                N y
RT-93251-5        1.0 X 102'mr/hr            .N RT-93251-6        1.0-X 101 mr/hr                N RT-93251-7        3.0 X 101 mr/hr                N-                                                ,
RT-932;1-8        1.0-X 102 mr/hr-              N                                                <
RT-93251-9      '2.5 X-?105 mr/hr                N-RT-93252-1        2.5'X 101 mr/ hr. -            N
    -RT-93252-2        1.0 X:10' mr/hr                N' RT-93252-4        1.0:X 101 mr/hr                N'        "1 RT-93252        1.5 X 108 mr/hr            -N RT-93252-7        '1.0 X 101 mr/hr
                                                    -N-
~
EQUIPMENT MONITORS-RT-6314-2          1.0 X 108 CPM                    N
                                                                                                      ^
RT-462111          5.0 X 102 CFM                    N-
    -RT-46212:        ;7.0 X 101 CPM                    N
    -METEOROLOGICAL DATA-Wind Speed                                              :3.0: MPH Wind Direction                  .              - From ,315 Degrees :
Plume'0eviation/ Sigma Theta                            4.0.0egrees Differential Temperature                                2.2-*F~
J l
 
_ - . . _ . _ _ . ~              . - . - .... __.        .        .        ~ _ . _ _ _ . _ .                                . . . . . _ . . .                -. _.
a; FOSAVEXe90!
PAGE 1                    ,.
SCENARIO TIMEi T/+ cos-                                        li CLOCKiTIME:                                                      .
                                                                          'OVERALL' PARAMETER [                                                                                    ;
t l                              Reactor Shutdown.                                                                                  YES-Decay Heat. Power                                                                                  0.05 MW.
PRIMARY COOLANT
: Pressure-                              ,
                                                                                                                                  ~10 PSIA Temperature:                                        -' '
Circulator Inlet                              '
95 'F =
Core Inlet                                                                        N/A; Core Outlet.                                                                      1251*F                                        :
Calculated Bulk Core (CBCT)_                              .                      111 'F=
Maximum Region Differentialg(AT);                                                -. N/A ;                                        ;
Helium Flow:                                                                                                  ,
Circulator C                                            '
                                                                                                                                    - 0 X:l10 8                                  ;
Circulator 0                                                                        0 X1108-TOTAL                                                                              JOLX :103; i
;-                                      : Circulator Speed                                                                                                                      1
                                                -Circulator C                                                    #                      '0! RPM-
: l.                                                Circulator D-                                                                      ,  -0 RPM:
Moisture (Oew Point)                                                                                                                    ;
M ME-9306-                                                                          41 -.
* FJ ME-9307                                                                            39 *Fi
                                                                                                                            -1.
SECONDARY COOLANT-
;                                          Emergen'cy Condensate. Header._
Flow                              ~
Loop 1                                                    <
0.- 1 b/hr.
Loop:2                        '
:0.lb/hr'
                                                -EES Inlet Temperature-                                                                                  85    *F-EES Outlet _ Temperature
                                                                                                                                                    ;-100 'F L                                                  Pressure                                                                                          :350 PSIA--
                                          -PCRV LINER COOLANT- (In Servise)
: Loop =l-NO Loop-2                                                                              NO-                                          -
w
                                                                                                                          =-
    - - - - .                  -        ,                -    . , . ~ -
 
                                                                        'FOSAVEX-90 PAGE 2
                                                                                                                                                    ]
                                                                                              - SCENARIO TIME: -r/ s cc/f                            l 4
CLOCK TIME:
* PRIMARY AUXILIARIES
                                                                                                                                              'l
                    . . . . . . . . . u . . . . . . . * * * * * * * * * *
* B O A R D 1 - 01 * " * " * " * * * " " " " " " " " " "
                                                                                                                                                -I GAS WASTE-                                        : System 63' Inlet Pressure                                                                  12.3 PSIA'                          vi Vacuum Tank Pressure-                                                          12.3 PSIA _                          1 Surge Tank "A" Pressure                                                        -200 PSIG                              i Surge Tank "B" Pressure                                                              0 PSIG LIQUID WASTE                                      : System 62                          NORMAL =
REACTOR PLANT COOLING WATER                          System 46                                                              :l
                                                                                          ,                                                        c Loop 1
                                  -P-4601-                                                              - CLEARED:OUT P-460lS                                                              . CLEARED OUT-Header Inlet Temperature
                                                              ~
CLEARED 0VT                            >
Barrel and-' Top Head Outlet Temperature
                                                                                                        ' C LEARED' 0VT-          ,
Top Penetration Inlet Temperature!                                    CLEARED OUT.                          >
Loop 2 P-4602                                                                0FF P-46025                                                              L CLEARED -0UT; Header Inlet-Temperature                          .                  115 'F Barrel and Top: Head Outlet Temperature-                            ~115''F                -                '
Top Penetration- Inlet Temperature '-
                                                                                            -            '115 *F Surge Tank Level "A"                                                            OLINCHES Surge Tank Level "B"                                        ,-                  45 INCHES-                      _
L                                                                                                                                                :
i b                                                                                                  ,
6 --
 
                                                          'FOSAVEX-90'
                                                          ~~                                                                  :
PAGE 3:
SCENARIO: TIME: - r / s o e x';-
CLOCK TIME:                                        ,
PRIMARY AUXILIARIES
              ...........****************** BOARD I-02 ********************************
HELIUM STORAGE                            . System 24 Low Pressure Bottles                                              270 PSIG-High-Pressure Bottles                                              575 PSIG HELIUM CIRCULATOR AUXILIARIES                      System 21 Circelete- C-2103-(C)
Bearing Water' Flow                                                0 GPM-Bearing Water Inlet. Temperature      '
78 'F Main Orain AP                                                      4 PSID Buffer /Mid-Buffer AP
* O PSIO Buffer Helium Flow                                                  0 ACFM Buffer Helium Return Flow                                          0-ACFM Circulator _ C-2104'(0)_
Bearing Water Flow                                                  0 GPM Bearing Water Inlet Temperature                                    78 'F-Main Drain AP                                                      4 PSID-Buffer /Mid-Buffer AP'                                              O PSID:                  ,
Buffer Helium Flow                                                  0 ACFM Buffer Helium Return: Flow                                          0 ACFM Ns                                                                ..
4
              .........................**** BOARD I-03 ********************************
t REACTOR CORE                                System 12-      '
All Systems                                                        NORMAL
              ...........................** BOARD-I-05 *********************************
HELIUM CIRCULATORS                          System 21                                                          ,
Circulator C-2103 (C)-
                        -Rotor _ Speed,                                                      O RPM Helium Flow (Low Range)-                                            0 PSID-Helium Flow (High Range)                                            0%
Circulator-C-2104 (D)
Rotor Speed                                                          0 RPM Helium Flow (Low Range)                                        -0.003-PSID-                      :i' Helium ~ Flow (High Range)_                                          0%
w .
MAIN TURBINE                                System 51                    NORMAL 1
  -                                      -                          ,        ,      ,    ,      . - - . . - . n ,  , ,
 
T "-
FOSAVEX-902                                                                        t PAGE 4 i
SCENARI0          TIME: 7 / oc/r -
                                                                                                                                                                ]
CLOCK TIME:
                                                                                                                                                              -1 PRIMARY AUXILIARIES
                            .............****************BOARDI-06""**""""""""*"*""**
MISCELLANEOUS-Bypass Flash Tank Pressure-                                                0 PSIG-PLANT ELECTRICAL                                  System 92 Essential          .                                Bu~s 1    Bus 2      Bus 31            N/I_ Bus 3 480 VAC                                      -0            0          :0 120 VAC                                    -115        115            .0-            1151
:120 VDC                                      119        -117 "A"              . B'!                          ;
Standby Diesel Generator-                                          FAILED            FAILED ACM Diesel Generator'-                                              CLEARED OUTc                    ,
Non-Essential                                                                                                                  ,
Switchyard:                                                        NORMAL                                            !
Bus,1      Bus 2              Bus 3                          a 4160 VAC                                                  0            10                O.
480 VAC.                                                            ~0 1
i MAIN TOWER                                          System 41:                      DRAINED                                          4 SERVICE WATER TOWER-                                System!42                      . NORMA'L '
FIRE-WATER-                                        System 45.                      NORMAL INSTRUMENT AIR                                      System 82                        "A" POR .          "B" :HDR-                  '
:75                '75                -
L L                          SERVICE AIR                                        System 82:                      95 PSIG.
L
                          . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* B O A R D 1210 " " " " * " " * " " " " " " " " " "                          :
                                                                ~ PLANT' PROTECTIVE SYSTEM REACTOR BulLDING TEMPERATURE                          HIGH-                                  _
                                ' Bay 100s                                                                  _.r80''FJ        <
                                . Bay 200'                                                                  -80 *F?                                          -i
: Bay:300                                                                      80 'F-REHEAT ACTIVITY MONITORS                                                            1005:                                              ;
                                                                                                                                                                .T
                          ' BUFFER SEAL MALFUNCTION                                                            NORMALD L
i 4t
                  .: ;, = .      .
                                          , _                                                .f..      .        . , .    .            ..    , - . -
 
                                                                                                                                                          . . ._ . . . y; FOSAVEX-90.                                                  ..
j
                                                                                                                                              .PAGE 5:
                                                                                                                  . SCENARIO TIME:'T-/ #co6
        ,                                                                                                          CLOCK TIME:
                                                                          ..                                                                          ,                    j PRIMARY AUXILIARIES-
                          . . . . . . . . . . . . . . . . . . . . . . . . . . * *
* B C A R D ' I e 13 ~ " * " * * " * " " * " " * " * " " * " "-
PENETRATION INTERSPACE AP                                                                          :0 PSID i
REACTOR BUILDI'NG SUMP DISCHARGE FLOW                                                                0 GPM-                                    I HELIUM CIRCULATORS                                      Sy5 tem 21:                                  NORMAL-                                    !
                          ............................. ,0ARD 1 15 ................................
l REACTOR BUILDING STACK FLOW                                                                                  0-KCFM
                    -REACTOR-BUILDING AMBIENT.4P.                                                                                      ~0 Inches H20-CONTROL ROOM TEMPERATURE                                                                                -75''F
                          . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - BOA R D l - 7 5 0 7 X " " " " " * " " " " " " * " " "
480V-ROOM TEMPERATURE                                                                                      75 'F s
              . . _ . . _ . _ . . . .          ___.__2-_-.am.a
 
  .      ..      -                            .      .                . - _ = . .                  .  .  . - . . . ..
F FOSAVEX-90!
I SCENARIO TIME:                    ru.30                i CLOCK TIME:            1                        :1 i
RADIATION MONITORS:
NUMBER                    VALUE-                ALARMING                SENSITIVkTY-:        .
L RT-6212            7.0 X 101 CPM                      N                      2.2E-8:
RT-6213            8.0 X 102 CPM'                      N'                    2.2E-8                                !
RT-7312                    005        CPM                                    N/A-                                    '
RT-7324-1          2.0 X 108 CPM.-                    N                  11.57E        RT-7324-2          2.0:X=102 CPM                      N                      4.36E-7o RT-7325-1          1.0'X 10' CPM-                      N                      1.49E-5^
RT-7325-2          1.0 X-104 mr/hr..                  N                      N/A-RT-73437        1.5-X'102 CPM-                  .N.                    -- 2 . 51 E .10 -
RT-73437-2          4.0 X 108 CPM                                              2.73E                                                                                                    -
N RT-9301'                  005    . CPM              -                    - N/A -
RT-93252-12        1.0 X 10''mr/hr.                    N.,.                .N/A AREA MONITORS-RT-93250-1.        1.0 X:10Vmr/hr:                    N RT-93250-2          1. 0.-X '.10 8 mr/hr=
N RT-93250-3'        1.0 X 108'mr/hr                    N
:RT-93250-4          1.0 X.10$ mr/hr                    N
      -RT-93250-5          1.0 X 10''mr/hr-                    N RT-93250-8          1.0 X 105 -mr/hr:                  N.
      -RT-93250-13        2 0 X IF mr/hr
                              .                                N                                                            i RT-93250-14        4.0 X 105 mr/hr.                    N RT-93251-1          2.0 X 10' mr/hr'                    N RT-93251-3:        2.0'X.102 mr/hr-N                  y RT-93251        1.0 X l'31 mr/hr                -N RT-93251        1.0-X 105 mr/hr                '. N                                                            ,
RT-93251-6          1.0 X 105 mr/hrL                    N:                                                          '
,      RT-93251-7          3.0-X 10' mr/hr                    N                                                            "
: 1.      RT-93251-8          1.0:=X 102 mr/hr.:                  N                                                          i L
L
      /RT-93251-9          2.5 X .'.0Fmr/hr                -N' RT-93252-1          2.5'X 10~'.mr/hr--
N RT-93252-2          1.0 1 -10'imr/hr'                  N RT-93252-4          1;. 0 : X ; 10 2 mr/hr N
RT-93252-6.        1.5'XL108 mr/hr                    N RT-93252-7          1.0 Xl105 mr/hrJ                'N' L
EQUIPMENTsMONITORSl                                                                  4 7
RT-6314-2=          1.0'X 108 CPM.                      N --
RT-46211:          5.0 X -- 10 8 -CPM.-
                                          .                    N RT-46212;          (7.0 X 108 CPM                      N=
METEOROLOGICAL: DATA.
Wind Speed'                                                    3.0 MPH =
l          Wind Direction-                                      From 315 Degrees Plume Deviation / Sigma.,Thetai                              - 4.0 Degrees i
Differential. Temperature                                      2.2:'F 1
 
                                                -LFOSAVEX                                                  1
                                                                                            'PAGE 1            ,
  .                                                                SCENARIO TIME: /~/ > cosci CLOCK TIME:-
:0VERALL PARAMETER $'
Reactor Shutdown                                                YES Decay Heat Power                                                0.05 MW PRIMARY COOLANT-l i
Pressure                                                      10 PSIAj Temperature                              *
: Circulator. Inlet!                                      95 'F:
Core-Inlet                                              N/A Core Outlet-          .        .
125 'F.
1 Calculated Bulk Core (CBCT) _                          112:'F Maximum Region Differential (AT)                        N/A l
Helium Flow Circulator C                                            0 X 108 Circulator 0=                                            01X-102'        -
TOTAL                                                    0 X 108 Circul'ator Speed                                                                      i-Circulator C                                '-                  ,0~ RPM!
Circulator 0-                                                    0. RPM; Moisture (Oew Point)                                            __
ME-9306'                                                41 'F
                    ;ME-9307:                                              :39 'F SECONDARY COOLANT Emergency Condensate Header:
Flow            '
                                  -Loop 1                                                      10-lb/hr;
                                  -Loop 2                                                      -OElb/hr.
EES Inlet Temperature 1
851'F
    ~
EES Outlet Temperature                                                1100 *F Pressure                                                              350;iPSIA I
PCRV LINER COOLANT (In Servic'e)                                          ,
Loop.1                                                  N0'
                    . Loop 2                                                NO
 
_t                                  -
gl FOSAVEX-90'                                                                          !
PAGE-2=                        i SCENARIO TIMEi r / 4 ccao                                              !
CLOCK TIME:~                                                          !
PRIMARY AUXILIARIES                                                                      -j BOARD.1-01""""*"*"*"""""**"***-                                                      !
GAS-WASTE                          System-63 Inlet.Sressure                                            12.3 PSIA.-
Vacuum Tank. Pressure                                      12.3: PSIA Surge Tank "A" Pressure                                      200 PSIG
      . Surge Tank "B" Pressure                                      :0 PSIG'                                              l:
LIQUID WASTE                        System 62                  NORMAL REACTOR PLANT COOLING ~ WATER      System 46                                                                            l Loop 1 P-4601                                              CLEARED OUT P-46015--        .
                                                              -CLEARED.OUT Header Inlet Temperature                        ' CLEARED OUT Barrel and Top Head Outlet.Temptrature              CLEARED OUT-Top Penetration Inlet Temperature                  CLEARED OUT Loop 2 P-4602                                              0FF' P-46025                                              CLEARED OUT Header Inlet Temperature -                          115 'F Barrel and Top. Head Outlet Temperature              115''F Top-Penetratio'n Inlet Temperature -'              1115  'F--
Surge Tank level "A"                                        0-! INCHES                                                i Surge Tank Level "B"-                                      45' INCHES i
r i
I
____---__,---_-.-----_1.    - _ . - - - - - -
 
k FOSAVEX-90:
PAGE:31 SCENARIO TIME: 7'/sceM CLOCK TIME:                                .
l PRIMARY AUXILIARIES'
                                                                                                                  ]
    . . . . . . . . . . . . . * * * * * * * * * * * * * * *
* B OA R D I - 0 2 " " " * " " " " " " " " " " * " " : 1 HELIUM STORAGE                                  System 24 Low Pressure Bottles                                                    270 PSIG                        l High Pressure Botties                                                  575 PSIG-                      j<
HELIUM CIRCULATOR AUXILIARIES                            System 21                                            ;
1 Circulator C-2103 (C)                                                        .-.
Bearing Water Flow                                                    -0 GPM Bearing Water.-inlet: Temperature 78 *F Main Drain AP                                                              4 PSIO Buffer /Mid-Buffer AP
* 0-PSID Buffer Helium Flow-'                                                        0 ACFM-Buffer Helium Return Flow;                                                  0.ACFM Circulator. C-2104 (D)
Bearing Water Flow                                                      -O-GPM:
Bearing Water Inlet Temperature                                        78 'F Main Drain AP                                                          -4 PSID-Buffer /Mid-Buffer AP                                                      0-PSID Buffer Helium-Flow.                                                        O ACFM Buffer Helium Return. Flow                                            -:0 ACFM
    .................n....******
BOAR D I - 0 3 " * " * " " a * " * " " * " " * " " "
* REACTOR CORE                                    System 12        <
a All Systems                                                              NORMAL
    ............................" BOARD I-051*********************************
HELIUM CIRCULATORS                              System 21 Circulator C-2103 (C)'
Rotor Speed                                                                ODRPM Helium Flow (Low Range)                                                    0;PSID Helium-Flow (High Range)                                                  0%
Circulator C-2104 (0)
Rotor Speed                  .                                            0; RPM.
Heitum Flow (Low Range)                                          -0.003'PSIO Helium Flow-(High Range)                                                  -0 %
MAIN TURBINE                                    System 51                    T
                                                                                  . NORMAL
                                                                                                                      '1
 
FOSAVEX-90 PAGE: 4~
SCENARIO TIME:- > / 4 C c3 o i
CLOCK TIME:
PRIMARY AUXILIARIES
                  ..................*********** BOARD-I-06        ************************a*******
MISCELLANEOUS            _
Bypass Flash Tank Pressure-                                .0 PSIG PLANT ELECTRICAL                    System 92 Essential                          Bus 1      Bus 2        Bus 3        N/I Bus 3-480 VAC                        0            0              0 120 VAC                      115        115                0      115-120 VDC                      119        117
                                                              *                          "A"        "B"                        ,
Standby Diesel Generator                            FAILED        FAILE0 ACM Diesel Generator                                CLEARED OUT I
Non-Essential Switchyard                            .            -NORMAL' Bus 1        Bus 2          Bus 3                      a' 4160 VAC                                  0              0:            0-480 VAC                                                  0 MAIN TOWER                          System 41                      DRAINED-SERVICE WATER TOWER                System 42.    ''-
NORMAL                                      !;
i l
FIRE WATER-                        System 45-                    NORMAL INSTRUMENT AIR                      System 82                      "A":HDR        ="B" HDR 75-            .75' SERVICE AIR                        System 82                      95 PSIG'
                  - ............................* BOARD I-10 ********************************
PLANT PROTECTIVE SYSTEM l
REACTOR BUILDING TEMPERATURE --HIGH Bay 100                                                      80 'F-Bay-200                                                      80 *F Bay 300                                                      80 *F:
I REHEAT-ACTIVITY MONITORS-                                          005 BUFFER SEAL MALFUNCTION                                              NORMAL
                                                                                  +        --,. ,            -em.-+    - , ,
 
FOSAVEX        '
PAGE 5 SCENARIO- TIME: T/ *CO30 CLOCK TIME:-                                              ,
PRIMARY AUXILI ARIES:
                    ....................********* BOARD l-13 ********************************
                                                                                                                                                                .t PENETRATION. INTERSPACE AP-                                                                            0 PSID-s REACTOR BUILDING' SUMP DISCHARGE FLOW                                                                  0 GPM                                  ,
HELIUM CIRCULATORS                                  ' System 21                                        NORMAL-                                l
                    . . . . . . . . . . . . . . . . . . . . . . . . . . * *
* B OA R D .1 - 15 . " " i" " " * " * " " * " " * " " * "
REACTOR. BUILDING STACK FLOW.                                            .
0-KCFM
                    . REACTOR BUILDING. AMBIENT-AP                                                                                    0-IncFes H20          ,
CONTROL ROOM TEMPERATURE                                                                                      -75L*F t
                    . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* BOA R D 1 -7 5 0 7 X " " " " " * " " " " " " " " "
                  -480V ROOM TEMPERATURE                                                                                            75 'F -
o r                                                            !
l.
                                                                                                                                                                .r a
i 3
: l.                                                                                                    i z_
                                                                                                          ~f-j'                                                        i t
l-                                                                                                      , '
  - .    .                                                                  ,        . . . ~ . . .            , . . _ . . - . _
 
a                                                                                    ..
LCD 4.1.9 COMPLIANCE SYSTEM 12 DVERVIEV HENU                                              ALARM INHIBITS
                                                                                                                                                              ~
l START                                b        IS DATA DK FOR FLOV CALC                        ,,        7        FLOV > 0 7 i_ ND j                                                                                                                      .. yes ND }f                          yYES NO        DENSITY      +          DENSITY        =          >= 27 DRIF.        p                                        IS REMAINING
                        <=107.5% ..--NO          <= 60%      ..YES        IN EQ FLOV 7,
                                                                                                .                'i .iEk. +                DATA DK ?    ..
g ND y YES                      yYES                        y ND REACTOR              DDES REACTOR              DDES REACTOR                                                          V*
PVR EXCEED              POVER EXCEED              POVER EXCEED                              RX PRESSURE > 50 PSIA "
LCD 4.1.9-5                YES
'                        LCD4.1.9-1              LCD 4.1.9-3 CURVE 7 ..                CURVE 7          ..        CURVE 7        ..                                                V ND ND    YES V              ND      YES V                ND    YES if                            IN EQUAL FLOV 7                  ..
LN/A                        N/A                        N/A                                                              --
V                          V                          V                                        VYES                    ND V IS FLDV >=                  IS FLOV >=                  ARE e T'S <=                    ARF, ALL                      ARE ALL LCD4.1.9-1                LCD 4.1.9-3                LCD 4.1.9-5                  REGION AT'S                    REGION AT'S CURVE 7                                                CURVE 7 ,,              <= 600 DEG F,"                  <= 350 DEG F,
_' CURVE-?            ,,
            ~
ND                        ND                        ND                              ND                          ND yYES                        3 RYES                      3 RYES                        3 fYES                          fYES V                          V                          V                        _j f _ .                        V      4
              ->                                                      IS REACTOR SHUTDOVN 7                                                                4-
!                                                                                                                                                        E y ND              -hym                            37 URIF                CAN REQ FLOV                                ENDUGH FLOV NIC, ,        FLDV > 0 7                                                BE DETERMINED,.YES                          FOR CMG-25 7        .
g ,g. N.YES        EQ FLOV7..YES ND l r.lF.CK H!Pu r                    IS. INITIAL. DECAY HEAT AVAILABLE 7                                  ,
                                                                                                                              ,4                  y gg "V
YES                                                  < 760 DEG F 7,d EXECUTED:
11/ 07/ 90                              CMG4 TIME TD 760                i            N/A FOR                  p          ND y 8:    34: 14            tgp      4---  DEG F EXPIRED 7
                                                                                          ,,    NU 335.1 HRS ,,lN/A                        NIC, ,
YES
 
  . . . _      ._      . _ _ . . _ _ _ -                    __ .                                      _ . _ _      m.          .  .
              .                                                                                                                                                      4 FOSAVEX-90 SCENARIOiTIME:                          ~
Thih-        '                  "
CLOCK TIME:-
t RADIATION MONITORS:                                                                                                                          ,
                                                                                                                                                                    .J.
                                                  'VALUE'                    ALARMING' -SENSITIVITY:                                                              -.
NUMBER.
7,0 X 108 CPM                        N-                            2,2E-8 RT-6212                                                                                  E2,2E-B-8.0 X 108 CPM'                        N RT-6213                                                                                                                                            i AT-7312                        005      CPM                                                N/A.
2,0 X 105 CPM                        N                              1.57E-8 RT-7324-l'                                                                                -4.36E-7 RT-7324-2                2,0 X 105 CPM:                        N'
                                                                                                                '1,49E                    RT-7325-1                1.0 X 108 CPM                        N 1,0 X 101~mr/hrL                    -N                            EN/A-
                    .T-7325-2                                                                                    2.51E                    RT-73437-1              1.5 X 102 CPM,                        N 4.0 X 1;2  0 CPM                    N-                            2,73E                                              ,
RT-73437                                                    005      CPM                                                N/A -
RT-9301 LN/A 1.0 X 105 mr/hr -                      N-.
RT-93252-12 AREA MONITORS RT-93250-1              l',0 X 108 mr/hr                      'N l
RT-93250-2              1,0 X 101 mr/hrf                    'N-RT-93250-3              1.0 X-10' mr/hr                        N" RT-93250-4              1.0 X 108 mr/hr                        N-                                                                                i RT-93250-5              1,0'X-101:mr/hr;                      N!
RT-93250-8              1.0 X 101 /mr/hr                      Ji RT-93250-13              2.0 X 105 -mr/hr                    iN RT-93250-14              4,0 X 105 mr/hr                      - N --
a.
RT-93251-1              ~2,0 X'108 mr/hr                        N.
RT-93251-3                2;0 X-10*!mr/hr-                      N                          #
RT-93251-4                1.0;X~102 mr/hr-                      N RT-93251-5                1.0 X 105 mr/hr'                      14 '
RT-93251-6                l'.0*X 105 mr/hr                      N RT-93251-7              -3.0 X.102 mr/hr                      .N1 RT-93251                1,01( 105 mr/br                    :N-RT-93251-9                2,5 X 102 mr/hr                      :N-RT-93252-1                2.5X 105 mr/hr:                      11-
                                                                                                                                                                  't RT-93252-2                1,0;X 10' mr/hr -                    11 RT-93252-4:              1.0 X 10l mr/hr.                        N RT-93252-6                1.5 X 105 .mr/br:                    44
"                                              1.0LX-10 mr/hri                        N; RT-93252-7
                    = EQUIPMENT MONITORS                                                                                                                              ,
RT-6314-2'                1.0-X 108 CPM;
                                                    -                                N
                                              -5.0 X 105 CPM-                          N RT-46211
                                              .7.0 X 10 : CPM                          N RT-46212
                                                                                                                                                                  ]
METEOROLOGICAL-DATA                                                                                                                              ,
Wind Speed                                                                      .3.0 MPH Wind Direction                                                From; '315.0egrees Plume Deviation / Sigma Theta                                                  4.0 Oegrees Differential Tempe ature      r                                                ~2.2 *F,'                                                  ,
a r ., .-                                              ,      , , , , . ,      ,      . . . , - .                .. . , .,.,      n -. ,,-      .  ,.
 
l q
                                                                        =FOSAVEX-9b=                                                                  .
i PAGE l'
                                                                                                                                                                            -l SCENARIO TIME: T/-oovy                                                            l
                                                                                                                                                                            -l CLOCK TIME:                                                                    q 9
OVERALL PARAMETERS--                                                                                            ,j Reactor Shutdown                                                                                          -    YES Decay Heat Power-                                                                                              0.05 MW q
PRIMARY COOLANT t
Pressure                                                                                            10,5< PSIA-Temperature Circulator Inlet                                                                          95.*F Core Inlet                                                                              N/A Core Outlet                                                                              125.*F.
Calculated Bulk Core (CBCT)                                                              113 *F' Maximum Region Di_fferential (AT)-                                                      N/A-Helium Flow                                                                                                                  .            .                ;
Circulator C                                                                              0 X-103 Circulator-D                                                                              'OLX 103 TOTAL                                                                                      0,X1108 Circulator Speed                                                    ,
Circulator C
                                                                                          ~
l0 RPM.
Circulator D                                                                                          0 RPM--                          c- j
                                                                                                                                                                              -i Moisture-(Oew Point)                                                                                                                                        i HE-9306                                                                                  41 *F
                                  -ME-9307                                                                                  39;* Fi                                              !
SECONDARY COOLANT Emergency Condensate = Header Flow-Loopc1                                                                                                0-lb/hr Loop 2                                                                                                0-lb/hr-EESl Inlet Temperature ~                                                                                      '85-*F-EES Outlet Temperature                                                                                      4100:*F
                                    ' Pressure-                                                                                                  -350. PSIA-PCRV_ LINER COOLANT -(In Service)
Loop 1                                                                                  ~NO Loop 2                                                                                  NO
                                                                                              ' [' 'S _'_
____i_______i________._1_'___            ._
 
  - . . .          . - . - . - . . . . ,                            .                  - ~ . -                    -.          . - . - -.                    .. .
                                                                                                                                                                                      ~.          . . . ..
                                                                                              --FOSAVEx-903 PAGE'2-
                                                                                                                          -SCENARIO TIME: r/+o64-'                                                      Ci
                                                                                                                            . CLOCK TIME:.                                                                    !
y PRIMARY AUXILIARIES                                                                                                      l
                                      . . u . . . . . . . . . . . . . . . . . . . . . . . * * - B O A R D - I - 01 ' * " " " * " " " " " " " " * " " "
r
: System 63 GASJWASTE                                                                                                                                                              :
Inlet: Pressure                                                                                  12.3 PSIA:                                                  :*
Vacuum Tank. Pressure                                                                        ~12.3 PSIAi Surge' Tank ''A" Pressure                                                                        200:PSIO
                                            . Surge Tank "B" Pressure.-
04PSIG:                                            W A
                                    . LIQUID WASTE                                          _ System 62:                                  ' NORMAL :-
REACTOR PLANT. COOLING WATER > JSystem 46 -
1 Loop 1 i
                                                    ' P-4601:
: CLEARED OUT :
P-46015-                                                                              CLEAREDLOUT                                              j Header Inlet. Temperature.                                                        : CLEARED OUT Barrel and Top' Head Outlet: Temperature =                                        1 CLEARED OUT Top Penetration-Inlet Temperature CLEARE0;0UT.
s
                                                                                                                                                        'l
                                          -Loop 2 P-4602                                                                            10FF P-46025 .                                                                              CLEARED OUTi Header. Inlet Temperature                                                              115 'F-                                                      '
                                                        ' Barrel and-' Top Head Outiot Temperature                                          :115.'F Top: PenetrationfInlet(Temperature '-                                                .115i'Fu                                                        i Surge Tank Level "A"                                                                                0 INCHES; SurgenTank Level "B"                                                                              45 INCHES:
                                                                                                                                                                                                              )
I 3
9 l
                                                                                                                                                                                                            -e
                                                                                                                                                                                                              )
          ,    ,,                    w      y  -          ,- , ,                - , - .      .# J- _ , ,,.m.4,.    . -.4-          . , ,        ,  ,  ,r      . . . . . . - ,      .1,,.. a  -,
 
      . ~ . .~ .        --              -        .    .  - .                                  - . .    . -  , . ,                                  .~ .  . .  ,
FOSAVEX-90)
PAGE                                                                                                          SCENARIO TIMEi rf, c<Nh
  ,                                                                                                      CLOCK TIME:
PRIMARY AUXILIARIES
                  ......................*****"BOARO.I-02"*"""*"""**"""""""
HELIUM STORAGE                    -
System 24 Low Pressure Bottles.                                                                      270'PSIG High Pressure Bottles                                                                        575 PSIG HELIUM CIRCULATOR AUXILIARIES.                                            - System 21                                                        !
Circulater C-2103 (C)                                                                                                                  -
Bearing Water Flow                                                                          0.GPM Bearing Water Inlet Temperature                                                            78 *F Main Drain AP                                                    ''                          4.PSID.
Buffer /Mid-Buffer AP                                                                        0 PSID Buffer-Helium Flow                                ,                                          O ACFM Buffer Helium Re+ urn Flow                                                                    0 ACFM' Circulator C-2104 (D)
Bearing Water Flow                        .              _
                                                                                                                          -0 GPM                                i Bearing Water Inlet Temperature                                                            78''F Main Drain AP                                                                                4 PSID Buffer /Mid-Buffer-AP                                                                        O PSID--
Buffer Helium Flow                                                                          10 ACFM Buffer. Helium Return Flow-                                                                  0-ACFM
                . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* B 0 A R D ' I - 0 3' * " " " " " " " " " " * " " * " * "
REACTOR CORE                                                  System 12-                              <                                      l All Systems                                                                                  NCRMAL
                ...................********** BOARD I-05 *********************************
HELIUM CIRCULATORS                                              System 21 CirculatorC-2103(C)
Rotor Speed -
0 RPM-Helium Flow (Low Range)        _
0 PS!D'                          i Helium _ Flow (High Range)                                                                  0 *.'
Circulator _C-2104-(0)                                                                                                                  '
Rotor Speed                                    ..                                        '0-RPML Helium Flow (Low Range)                                                            -0.003 PSID
                                ' Helium Flow (High Range)-                                                                    OS MAIN' TURBINE                                              ' System 51                            -NORMAL
                      ~
w        -
rk    i            *r- ei - --      4                              -                  e 'w - * - * - ie = t
 
FOS AVEX-90 '-
PAGE 4,              -,
                                                                                  . SCENARIO-TIME: 7~/
* Sob CLOCK TIME:
PRIMARY AUXILIARIES
      . . . . . . . . . . . . . . . . . . . . . . . . . . *
* BO A R D ' I - 0 6 " " " " " " " " " " " a a " " * " * -
MISCELLANEOUS --                                                                                                        '
Bypass Flash Tank Pressure                                                      O PSIG              ,                  i PLAkT ELECTRICAL.-                                    System 92                                                              _l 1
N/I Bus 3-Essential          _.
                                                                  ' Bus 1-      ' Bus 2-      Bus 3-
* 480 VAC                                          485        :485:              .            ..
120 VAC.                                        -- 118 :      115-              118-    -118-                    !
120L:VOC-                                        125'        117--
                                                                        .                          . "A"        "B"J      =
Standby Diesel Generator                                                  NORMALx -FAILED ACM Diesel Generator                                                  '
CLEARED OUT Non-Essential Switchyard                                                    .          NORMAL LBus-1      iBus 2--        Bus 3 4160 VAC                                                        0-                0          0                1 480 VAC-                                                                          0                            l MAIN TOWER                                          -System 41-
                                                                                              ~0
                                                                                                .- RAINED-                                ,
1 SERVICE WATER TOWER                                  System 42-        _<_              NORMAL                                  !
i' FIRE WATER                                            System.45                            NORMAL:
INSTRUMENT AIR                                        System 82                              "A"iHDR        "
B"-HDR.
193'        '75                1 SERVICE AIR                                          System-82'                            95 PSIG.
      ..............................B0ARD:1-10 ********************************                                                          '
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGHT                                                      ~
Bay 100                                                                          '80 *F:
l Bay 200:                                                                              80 *F Bay 300.                                                                                80 'F
      ~ REHEAT ACTIVITY MONITORS                                                                      005 BUFFER SEAL MALFUNCTION                                                                        NORMAL =
i
 
o FOSAVEX-90                          'ic                                          _
                                                                        -                                                              PAGE 5~
                                                                                                  -SCENARIO TIMER y /,a c d r CLOCK TIME:
I
                                                                  'a. MARY AUXILIARIES
                  ........n.................**                          BOARD 'I - 13 ' " " "" " " "" * * "" * "" " " * -
                  - PENETRATION INTERSPACE 6P    -
O PSIO                                                                    ,
REACTOR BUILDING SUMP OISCHARGE . FLOW                                                      0 GPM HELIUM CIRCULATORS                                    System 21                            NORMAL-
                    .........................**** BOARD                        I-15.********************************                                                                  ?
REACTOR BUILDING STACK FLOW                                                                  -15.0 KCFM-REACTOR BUILDING-AMBIENT AP'                                                              J-Oi25InchesH2O~                                                      -r n
i CONTROL ROOM TEMPERATURE                                                                            75 'F l
                    . . . . . . . . . . . . . . . . . . . . . * * * * * * *
* BOAR D ' I - 7 5 0 7 X " " " " " " " " " " " " * " " ~
                                                                                                                      - 75 'F                                                        2 480V ROOM TEMPERATURE-                                                      [
I e
                                                                                                                                                                                      -l i
i
                                                                                                                                                                                      -t 9
{
r
  -.r-      ,      ,                ,            , - ,      _
                                                                            .      ,              .            .m.    - - , . . _ , - , , , , . . - . - - . . . . , , . , - .
 
- - . ,. ..-                    - .- . - - . ~ . .
                                                                    . . -. . -...~ .-                      -                    -
                                                                                                                                            ~. -                      .- . . -          .
L
                                                                                                                    +
                                                              .FOSAVEX-90:                                                                                                                  i
                                                                                                              ~
SCENARIO TIMEi            - -rMAoo:
                                                                                                -CLOCK TIME:-
RADIAT!0N MONITORS:
NUMBER'                        VALUE                          -ALARMING              SENSITIVITY-                                                                    'l RT-6212-              7.0 X-108-CPM:                                IN                  ~ 2.2E-8 :
RT-6213            - 3,0 X 108 CPM                                    Ni              '2.2E-8 RT-7312                        005      CPM'                                              N/A.                                                                            4 RT-7324-1        -
                                    . 2.0 X 108. CPM                                    N.              J.1. 57 E-81 RT-7324-2        ' 2.0 X 101 CPM-                                      N                -4.36E-7                                                                    J RT-7325-1            1.0 X 108 CPM ,                                -N          ,      .1,49E-5                                                                      4 RT-7325            1.0 X-108 a r/hr                                  N-                N/A RT-73437-1            1.5 X 108 JCPM-                                -N                  '2.51E-10 RT-73437-2          4.0 X.101 CPM                                      N                  2.73E-10                                                                    .
RT-9301                        005- CPM                                                    N/A~                                                                      .i RT-93252          1.0 X'105 mr/hr                                  N D, -              N/A                                                                        ]  .
AREA MONITORS                                                                                                                                                          y RT-93250-1            1,0 X 105 mr/hr                                  N-RT-93250-2            1.0 X 108 mr/hr-                                  N RT-93250-3            1.0 X 105 mr/hr-                                11                                                                                              '
RT-93250          1.0 X-103 mr/hr-                                  N' RT-93250-5            1.0 X 108 mr/hr'                                  N.
RT-93250-8          - 1.0 X 108 mr/hr:                                  N; RT-93250          2.0 X 105 -mr/hr                                ,N RT-93250-14.          4.0 X 105 mr/hr-                                =N:
RT-93251-1            2.0 X 102 mr/hr                                !N RT-93251-3            2.0 X 108 mr/hrL                              ~N                  ,
RT-93251-4              1.0LX-102 mr/hr!                                Ns RT-93251-5              1.0.X 102 mr/hr N'                                        i-RT-93251-6          - 1 .0 'X liO5 mr/hr=                            .N
                -RT-93251-7:          3.0 X 105 mr/hr                                  14 RT-93251-8              1.0 X 101~mr/hr'                                  N RT-93251-9            2.5 X 105 mr/hr                                    N RT-93252-1            2.5 X-105 mr/hr                                  ins                                                                                              >
RT-93252-2          - l'0-X:10' mr/hr-                                11J                                                                                            J RT-93252-41            1.0 X 102 mr/hr                                14 RT-93252-6          : 1.5 X:10' mr/hr                                      Ni                                                                                          ;
RT-93252-7              1.0 X 1051mr/hr                                    N EQUIPMENT MONITORS 3
RT-6314-2              1.0-X.108. CPM:                                14 RT-46211                5.0 X-101 CPM-                                    N                                                                    -
RT-46212-              7.0 X 10! CPM                                      N METEOROLOGICAL DATA' Wind Speed                                                            ,
3.0 MPH From:;315 Degrees                                                                          '
Wind DirectionL Plume Deviation / Sigma Theta                                                      4.0 Degrees Differential Temperature.                                          >
2i2 ?F:
f t
s                              er > ve  n - - m                b            ~                c g  e--ere aer-s*
* wv- x f x -- e a ,        t  w + N --
 
r -                        _              _
                                                                                                                                                                                                                          ;i FOSAVEX-90    '
PAGE:1:
                                                                                                                      , SCENARIO TIME:                            7-/,, o <oo ;                                                  ,
                                                                                                                      ; CLOCK T_IMEi:
L                                                                                        OVERiLL PARAMETERS:                                                                                                                -;
Reacter Shutdown                                                                                          YES Decay Heat Power _                                                                                          0.05 MW~
PRIMARY-COOLANT' ll: PSIA-                                                                    !
Pressure Temperature-                                                                                                  _      _
Circulator Inlet                                                                                95;*F:
Core-Inlet-iN/A' Core Outlet 1                                                                            .
125 'F                                                                      ,
Calculated Bulk:-Core' (CBCT)                                                            .'114 'F'                                                                      ,
Maximum Region' Di f ferenti_al_--( AT).                                                    N/A                                                                          ;
Helium Flow                                                                              '
Circulator-C-                                                                                (01X 108_-
Circulator D                                                                                '0iX 10'                                                                      .
TOTAL                                                                                  1 0"X1108                                                      ,
Circulator Speed
                                                                                                                    .,                                                                                                        7 Circulator C.                                                                                      ;0: RPM Circulator D                                                                                          0. RPM'                                                              .
Moisture (Oew Point)-                      '
ME-9306                                                                                  i 41.
* F -                                                                    l ME-9307                                                                                  l 39f
* F L:                                                              1 SECONDARY'C00LANT' Emergency Condensate H uder-
                                                    , Flow                                                                                                                                                                    .
Loop 1;                                                                                                        OLib/hr
                                                            - Loop.2-                                                                                                    '0 lb/br--
EES In,.let' Temperature                                                                                        --85      'F-EES Outlet Temperature:                                                                                        100 *F
                                                    -Pressure                                                                                                      --350 PSIA:                                            'j e
:)
PCRV LINER COOLANT                          _(In_ Service)
Loop 1-                                                                                        NO Loop 2'-                  '
YES a
                                                                                                                                                                                      ,?*
                                                                                                                                                                                                'J:'
t
                      -.s.                                                                                  *    -
                                                                                                                                                                                                                        ]l
                            '"                                                            .; .                  w  . .- ;J .              i k ,-                    ,.        ; , i d , 44 -, ... . , , - ..~ ..-, ,.:.d
    ., *                      . - .              ,  -                -        .                    ,                                                  .-.-m
 
s FOSAVEX-90L                                                                  s lPAGE 2                            H J
                                                                                                  ~ SCENARIO TIMEi v f o/cc ;                                      -i
  ,                                                  ,                                            CLOCK TIME:
                                                              ' PRIMARY AUXILIARIES-                                                                                ,
    '                                                                                                                              ~
                    .....u........******"******                        BOA RD I -01. " * " " " " * "" " " " " * " ""
* i GAS WASTE                                            System 63                                                                              q Inlet Pressure                                                                        10 PSIA _                          m 'a l Vacuum Tank: Pressure-                                                                    8 PSIA                                j Surge-Tank."A". Pressure                                                            205 PSIG'                                    a Surge Tank .''B" Pressure.
                                              .                                                                        :0 PSIG=                                q i
LIQUID WASTE                                        System 62                          JNORMAL'                                          u REACTOR. PLANT- COOLING WATER                        System .46' .
Loop 1 P-4601                                                                CLEARED OUT P-4601S        -                                                      CLEARED 0UT Header Inlet Temperature-                    _.
                                                                                                              ' CLEARED OUT.
Barrel and Top Head Outlet TemperatJre                              : CLEARED OUT-                    ,
Top Penetration Inlet Temperature'
                                                                                                                                                          ~
CLEARED-00T.                                        .
                                                                                                                                                                ]
Loop 2 P-4602                                                              'ON                                                      _
P-46025:                                                                CLEARED OUT                                  J Header l Inlet Temperature              .
115 *F-                                      0 Barrel and Top Head' Outlet _ Temperature-
                                                                                                              --115 'F-                                            ,
                                    ' Top Penetration: Inlet Temperature                        '
115 *F                                              :
Surge Tank. Level'"A"                                                                '0-LINCHES -
Surge Tank Level '.'B"                                                            45 INCHES'.                                        s q
t r
h
                                                                                                                                                                ^I L
T I                                                                                                                                                              .
a
                                                                                                                                                              .)
            .s..                    . _ , -                      ,.              4.-.        ,--              -                ,-
 
                                                        -Fv5AVEX-90'
                                                                                                                  . PAGE-3
                                                                          ' SCENARIO TIME: c / + c oc-CLOCK TIME:-
PRIMARY AUXILIARIES                                                            j
          .......................****** BOARD I-02 ********************************
HELIUM STORAGE'                                System 24-Low Pressure Bottles                                                    270 PSIG High Pressure Bottles-
                                                                                      .575 PSIG l
HELIUM CIRCULATOR AUXILIARIES                          System 21                                                        !
1 1
Circulator C-2103-(C)_                                                                  .
Bearing Water Flow-                                                          0 GPM Bearing Water-Inlet Temperature                                      ~ 78 'F:
Main Drain AP                        '
4 PSID Buffer /Mid-Buffer AP                                                      .0 PSIO-Buffer Helium-F'ow.                                                          0-ACFM-
                              .Buf fer Helium Return Flow                                                  0 ACFM-
              . Circulator C-2104-(D)
Bearing Water Flow                                                          0 GPM-Bearing Water Inlet Temperature                                      =78 'F Main Orain AP 4 PSID Buffer /Mid-Buffer AP                                                        0 PSID Buffer Helium Flow                                                          ACFM Buf fer Helium: Return Flow                                                10 ACFM                    ,
          ..............n......n.....                    BO ARD I-0 3 ' " " * "" * * """ " "" " * * " " "
4 REACTORcCORE                                    System-12'                                    .
All Systems                                                                NORMALi                                ,
          ............              ..n.........."*
BOARD!:205"""*"""""""""""""
WELIUM CIRCULATORS                              Sys?.es ?.(
V                                                                \
Circulator        C-2103=(C)                                                                .
Rotor Spe2d                                                                    0 RPM:
Helium- Flow f(' Low- Range)                    +-                            0-PSIOL            n Helium Flow (Hign; Range)l                                                    0 4% -                  !
Circula:or C-2104 (0)
Rocor Speed '                                                                  0: RPM-Helium'' Flow (Low: Range)-                                      -0.003 PS10-                        '
Helium Flow-(High' Range)                                                    -0%
MAIN TURBINE                                    -System 51)                            NORMAL
                                                                              .t 1
l
 
    . .    . - ..                              ~-      -.      . . -                . -        .- .            . - .          .          -    .. . ,
5
                                                          .FOSAVEX-90--
          ,                                                                                                                'PAGE 4'
                                                                                                                                                                  --l SCENARIO TIME: 7 / + o/co CLOCK TIME:
PRIMARY AUXILIARIES                                                            ,
l
                    ................************* BOARD 1-06"""""*""""***"***"*"
MISCELLANEOUS-                                                                                                                                    -
Bypass Flash Tank Pressure-                                                0.PSIG PLANT ELECTRICAL-                .      -System 92
                        ' Essential'                                Bus l~            Bus: 2.;      Bus.3:  2 N/I Bus 3 480: VAC-                            435=              485:              485--                  .
Y          9 120 VAC 118              118'          '118                    118-120 VDC-                            -125              125-                                                                        i v                                    "
A""
                                                                                                                                " B'?
Standby Diesel Generator                                              NORMAL                  FAILED-ACM Diesel Generator-                                                CLEARED 0UT Non-Essential 1
Switchyard                                                            NORMAL Bus 1-        Bus.-2                  Bus 3                                !
4160 VAC                                                4160-            4160                41601 480 VAC                                                              NORMAL MAIN TOWER                                  System 41                                OAINED)
                                                                                                                                                                      ~
SERVICE WATER TOWER                        System.42              '-
NORCAL FIRE WATER                                  System 45-                                NORMAL INSTRUMENT AIR                              System 82                                n"A"'HDR                i"B"3HDRE
:93 -                    93.
SERV'CE AIR                                System 82                                95.PSIG '
                ............................. B0ARD-I-10 ********************************
PLANT.-PROTECTIVE. SYSTEM REACTOR BUILDING TEMPERATURE - HIGH Bay-100-                                                                        80 'FJ                                                    1 Bay.200                                                                        80 'F.
l-                        Bay-300 80 *F REHEAT ACTIVITY. MONITORS                                                              005:                                                    ,
BUFFER SEAL' MALFUNCTION                                                                NORMAL l                                                                                                                                                                  1
                                                                                                                                                                    .i l                                                                                                                                                                    .
3 5
        ,        ,,                          .                          , . ~ . ,      +.                          _, -            ~,-x  - g        -,,,n
 
FO$AVEX-90 PAGE 5 SCENARIO TIME: -"/
* c e c CLOCK TIME:
PRIMARY AUXILIARIES
                .......... ...............*** BOARD I-13 ********************************
PENETRATION INTERSPACE AP                                      0 PSID            ,
REACTOR BUILDING SUMP DISCHARGE FLOW                            0 GPM HELIUM CIRCULATORS                    System 21                NORMAL
                ............................. BOARD I-15 ********************************
REACTOR BUILDING $ TACK FLOW                  ,                  29.9 KCFM REACTOR BUILDING AMBIENT AP                                    -0.25 Inches H2O CONTROL ROOM TEMPERATURE                                            75 'F
                ............................. BOARD I-7507X *****************************
480V ROOM TEMPERATURE                                                75 'F
 
      /
LCD 4.1.9 COMPLIANCE SYSTEM 12 DVERVIEV MENU                                              ALARM INHIBITS
[ START.
                                              - - b      IS DATA DK FDR FLDV CALC d_ yes> FLOV > 0 7_m                                      i W V                          VE E      DENSITY        +        DENSITY      -          >=  27 URIF.        p
                <=107.5% ., Na
                                        <= : 60% H YES        IN EQ FLDV 7 ..,
: ['          4- IS REMAINING g ND    DATA UK ? g VM                      V "                      VW REACTDR          DDES REACTOR            DDES REACTOR                                                        Y PVR EXCEED            POVER EXCEED            POVER EXCEED                                  RX PRESSURE > 50 PSIA LCD 4.1.9-5                    YES LCD4.1.9-1            LCD 4.L9-3 CURVE 7 ..                CURVE 7      ,,      CURVE 7                                                          V W ARE ALL 37 DRIFICES m mV                    ta    m V              ND    m V                                      IN EQUAL FLOV 7            .,
N/A                    N/A                      N/A                                                    1 j
V                        V                      V                                                VYES              70 Y IS FLOV >=                IS FLOV >=              ARE AT'S <=                        ARE; ALL                    ARE ALL
    -          LCD4.1.9-1              LCD 4.1.9-3            LCD 4.1.9-5                    REGION AT'S                    REGION AT'S CURVE 7      ,,          CURVE 7      ,,        CURVE 7 ,,                  <= 600 DEG F." ,              <= 350 DEG F." ,          l yYES      70                  yYES            ND          yYES    ND
              ~yYES ND            yYES      NO
                                                                                                ~
IC                      [ICl                      IC                              IC                            IC        y y                                            _ . .        _ _ _ _              __ _
______._.____4 p, #
:                                                          IS REACTOR SHUTDOVN 7                                                              4G-
      - >1                                                                                        --
E
  'V                            T                      37 DRIF                CAN REQ FLOV                                ENDUGH FLOV NIC, ,        FLOV > 0 7              .N    EQ FLUV7 -. "  N                                                                g- CMG-2
                                        +y m- "              y Na              BE +DETERMINED.,N"No
                                                                                                                                        ,,FOR d4 IS INITIAL DECAY MEAT AVAILABLE 7                                                        y l CliEi?K IMPUI        a& No YES
                                                                                                                            < 760 DEG F 71
                                                          #V                                                                              -
EXECUTED:
CMG4 TIME TU 760              i              N/A FOR                  1P      WV 1_ ___ ___-
11/ 07/ 90                                                                "
8:    34: 14                  4-    DEG F EXPIRED 7                            334.6 HRS , ,            N/A          NIC1
                                      .N.p
                                                                                ""    IU                              "                    -
YES
 
        . . _ - . ~ . . - . - - . _ - . - - . _ . ~ - . . - - - . - . - - . - - - -                                                                                    . . -      - .
                                                                                                                                                                                          \
F05AVEX-90                                                                                              <
i                                                                                                                                                                                        i
!                                                                                                            SCENARIO TIME:                        77 t/zzr                              l CLOCK TIME:                                                          i i
RA0!ATION MONITOR $:                                                                                                                                            !
NUMBER                                      VA!.UE                  ALARMING . SENSITIVITY--                                                                    !
2.2E-8                                                      !
!                        RT-6212                        7.0 X 105 CPM                                N RT-6213                        8.0 X 108 CPM                                N                      2.2E-8                                                      ,
RT 7312                                    00$    CPM                                              N/A                                                        #
RT-7324-1                      2.0 X 105 CPM                                N -.                  1.57E-8                                                      1 RT 7324-2                      2.0 X 108 CPM                                N                      4.36E                                                  .i RT-7325-1                      1.0 X 108 CPM                                N-                      1.49E-5 1.0 X 108 mr/hr                                                    N/A RT-7325-2                                                                    N                                                                                  '
RT-73437-1                      1.5 X 108 CPM                                N                      2.51E                                                                                                                                                                                          :
i RT 73437-2                      4.0 X 105 CPM                                N                    -2.73E-10                                                    ~
RT-3301                                    005- CPM                          .
N/A +.
:                        RT-93252-12                    1.0 X 108 mr/hr                              N,                    N/Al AREA MONITORS                                                                                                                                                  i 1.0 X 10 mr/hr RT-93250-1                                                                    N RT-93250-2                    -1.0 X 108 mr/hr:                              N RT-93250-3                      1.0 X-108 mr/hr                              N                                                                                k RT 93250-4                      1.0 X 105 mr/hr                              N RT-93250-5                      1.0 X 108 w/hr                                N                                                                        -
l RT-93250-8                      1.0 X 101 inr/hr                            N RT-93250-13                    2.0 X 108 mr/hr                              N RT-93250-14                    4.0 X lui mr/hr                              N                                                                                i RT-93251-1                    -2.0 X 105 mr/hr                              N RT-93251-3                      2 u X 102 mr/hr                            .N                      ,.
RT-93251-4                      1.0 X 108 mr/hr                              N                                                                                .
                        -RT-93251-5                      1.0 X 105 mr/hr-                            N                                                                                l RT-93251-6                      1.0 X 108 mr/hr                              N--
RT-93251-7                      3.0 X 102 mr/hr                              N RT-93251-8                      1.0 X'101 mr/hr                              N
, -                      RT-93251-9                      2.5 X 102 mr/hr'                            .N RT-93252-1                      2.5 X 103 mr/hr.                            N                                                                                -
RT-93252                      1.0 X"10' mr/hr                              N RT-93252-4                      1.0 X 103 mr/hr                              N RT-93252-6                      1.5 X~108 mr/hr                              N RT-93252-7                      1.0 X 105 mr/hr                              N
;                        EQUIPMENTliON! TORS RT-6314                      1.0 X'108 CPM                                  N                                                                            .
RT-46211                      '5,0 X-10n CPM-                                  N RT-46212                      :7.0.X: 103. CPM.                                  N'                                                                            L t
METEOROLOGICAL DATA                                                                                                                                            t i
Wind Speed                                                                            3.0 MPH Wind. Direction                              -
From 315 Degrees                                                                i Plume-Deviation / Sigma _ Theta;                                                    ~4.0 Degrees-                                                        !
Differential Temperature                              ..-          ,                _2.2.'F:
                                                                                                                                                          ~
                                                                                                                                  ~
s t
1
 
    .    - - -      _            _            .          ~.        -
FOSAVEX ~'
c?
PAGE 1 SCENARIO TIME: 7i+c^'
CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                          YES Decay Heat Power                                            0,05 MW PRIMARY COOLANT Pressure                                            11 PSIA Temperature                        "
Circulator Inlet                                98 'F Core Inlet                                      105 'F Core Outlet                                    128 'F Calculated Bulk Core (CBCT)                    N/A Maximum Region Differential (AT)                2B 'F Helium Flow Circulator C                                    10 X 108 Circulator D                                    0 X 108 TOTAL                                          10 X 108 Circulator Speed circulator C                        '
2900 RPM Circulator 0                                        0 RDM.
Moisture (Oew Point)
ME-9306                                        41 "F ME-9307                                        39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                0 lb/hr Loop 2                                    2.0 X 10' lb/hr EES Inlet Temperature                                    S5 'F EES Owtlet Temperature                                  100 'F Pressure                                                350 PSIA PCRV LINER COOLANT  (In Service)
Loop 1                                          NO Loop 2                                          YES v
 
F05AVEX-90 PAGE 2 SCENARIO TIME: T/ + c w r
        -x                                                        CLOCK TIME:
PRIMARY AUXILIARIES i
              ............................. BOARD I-01 ********************************
GAS WASTE                          System 63 1
Inlet Pressure 10 PSIA Vacuum Tank Pressure                                      8 PSIA Surge Tank "A" Pressure                                205 PSIG Surge Tank "B" Pressure                                    O PSIG LIQUID WASTE                        System 62                NORMAL REACTOR PLANT COOLING WATER        System ,46 Loop 1                                                                                i P-4601                                            CLEARED OUT                    .
F-46015                                          CLEARED OUT Header Inlet Temperature                          CLEARED Ol'T Barrel and Top Head Outlet Temperature            CLEARED OUT Top Penetration Inlet Temperature                CLEA9ED OUT Loop 2 P-4602                                            ON P-46025                                            CLEARED OUT Header Inlet Temperature                          115 'F                        ,
Barrel and Top Head Outlet Temperature            115 'F          '
                                                                                                        ~
Top Penetration Inlet Temperature      '
115 'F i
Surge Tank Level "A"                                      0 INCHES Surge Tank Level "B"                                    45 INCHES i
l
 
f05AVEX-90
                                                                                          -PAGE 3'                ,
SCENARIO TIME:
T"/- o- {
CLOCK TIME: _
PRIMARY AUXILIARIES
      ............................. BOARD'l-02 ********************************
HELIUM STORAGE                      System 24 Low Pressure' bottles-High Pressure Bottles                                              270 PSIG 575-PSIG HELIUM CIRCULATOR AUXILIARIES-            System 21                                                              '
Circulator C-2103 (C)
Bearing Water Flow-Bearing Water Inlet Temperature                                  170 GPM Main Drain AP                                                    78 'F Buffer /Mid-Buffer AP
* 2.5 PSIO Buffer Helium Flow                                                8 PSID Buffer Helium Return Flow                                      7.40 AC/M.
3.79 ACFM
  +        Circulator C-2104 (0)
Bearing Water Flow Bearing Water Inlet Temperature                                    0 GPM Main Drain AP                                                    78 'F-Buffer /Mid-Buffer AP-                                            4 PSIO.
Buffer Helium Flow                                                0 PS10 0 ACFM Buffer Helium Return Flow                                                                          .
0 ACFM                          I
    -............................. BOARD 1-03""*""*"""*""""*"""-
REACTOR CORE                        System-12              '
All Systems NORMAL
    ............................. BOARD-I-05 *****************************"'**
HELIUM CIRCULATORS                    System 21                                                                  !
i Circulator C-2103 (C)                                                                                      i Rotor Speed                                                                                          ,
Helium-Flow (Low Range)-                                        2900 RPM-                            '
Helium Flow (High Range)                                      0.020 PSID 0W                              '
CirculatorC-2104(0)
Rotor Speed      -
Helium Flow Low Range).                                            'O RPM                            ,
Helium Flow.((High Range)-                                -0.003 PSID-i 0i                                i MAIN TURBINE                        System 51                                                                      '
NORMAL.                              .
____ 1q    .
 
FOSAVEX-90 PAGE 4 SCENARIO TIME: -r/- C' f CLOCK TIME:
PRIMARY AUXILIARIES
                            ....u.....u...............*                        BOARD I t06 " * " """ *""""""""""
MISCELLANEOUS Bypass Flash Tank Pressure                                                                      ' O PSIG i
PLANT ELECTRICAL                                    System 92 i                                Essential                                              Bus 1                Bus 2                  Bus 3-        N/I Bus 3 480 VAC                                        485                  485                      485 120 VAC                                        118                  118                      118        118-120 VDC                                        125                  125 "A"        "B" Standby Diesel Generator                                                                  NORAAL        FAILE0-ACM Oiesel Generator                                                                      CLEAREO OUT-
?                                                                                                                                                                                    a
;                              Non-Essential Switchyard                                                              .
                                                                                                                                  . NORMAL        .
Bus 1                  Bus 2          Bus 3 4160 VAC                                                            4160                      4160-      4160 480 VAC                                                                                    NORMAL-MAIN TOWER                                          System 41                                            ORAINEO SERVICE WATER TOWER                                  System 42                                            NORMAL FIRE WATER                                          System 45                                            NORMAL-INSTRUMENT AIR                                      System B2                                            "A" HOR        "B" HOR 93            93; a
l SERVICE AIR                                          System 82 1                                        :95 PSIG
                            ............................*-BOARO                          I-10=********************************/
                                                                        ' PLANT PROTECTIVE-SYSTEM ~
REACTOR BUILDING-TEMPERATURE - HIGH!
;                                Bay 100                                          +                                                  -80 *F m
Bay 200                                                                                                80 'F B3y 300-                                                                                                80 *F-j                            REHEAT ACTIVITY FONITORS                                                                                    005 l
p                            BUFFER SEAL-MAGUNCTION                                                                                      NORMAL                                      l
                                                                                                                                                                                    ~~
A
 
FOSAVEX-90 PAGE 5 SCENARIO TIME: -/ -re6 CLOCK TIME:
PRIMARY AUXILIARIES
    ............................* BOARD I-13 ********************************
PENETRATION INTERSPACE AP                              O P510 REACTOR BUILDING SUMP DISCHARGE FLOW                    0 GPM HELIUM CIRCULATORS            System 21                NORMAL
    ............................* BOARD I-15 ********************************
REACTOR BUILDING STACK FLOW                              29.9 KCFM REACTOR BUILDING AMBIENT AP                            -0.25 Inches H2O CONTROL ROOM TEMPERATURE                                    75 'F
    ............................' BOARD I-7507X *****************************
480V ROOM TEMPERATURE 75 'F l
I l
l I
                          =
 
LCD 4.1.9 COMPLIANCE SYSTEM 12 DVERVIEV MENU                                    ALARM INHIBITS
[ START
                                                                              +          IS DATA UK FOR FLOV CALC i ,gg
                                                                                                                                    -            FLOV > 0 7 .,..NU E      DENSITY                      DENSITY                      >= 27 DRIF. p NU y                      ,y y    YES
                                                      +                            m 4_    IS REMAINING
                                    <=107.5% ., ND              <= 60%          . ,'YES    IN EQ FLOV 7 ..    ,
                                                =                              ..                                          2    '
E ND      DATA UK ?      .,
yYES                          yYES                          y ND                                                                                              t REACTOR                DDES REACTOR                  DOES REACTOR                                            V V PVR EXCEED                POVER EXCEED                  POVER EXCEED RX PRESSURE > 50 PSIA "
LCD4.1.9-1                  LCD 4.19-3                  LCD 4.1.9-5            YES CURVE 7 .,                  CURVE 7            .,      CURVE 7      g                                        VN ARE ALL 37 DRIFICES ND  YES V                    ND        YES V              ND  YES V                          IN EQUAL FLOV 7                .,
N/Al              V              lN/Al                    N/A V                                                          V                                  VYES                  ND V Y-IS FLOV >=                    IS FLOV >=                    ARE AT'S <=                ARE ALL                    ARE ALL LCD4.1.9-1                    LCD 4.1.9-3                  LCD 4.1.9-5            REGIDN AT'S                REGIDN AT'S CURVE 7            .,        CURVE 7            .,        CURVE 7 .,          <= 600 DEG F." ,            <= 350 DEG F,        ,
y RYES      ND                3 yYES'        ND            3 yYES    ND            3 yYES        ND              YES    NU lIC            lf IC l                          IC l                    IC l                        IC lf                      lf                          lf                      lf I
                    ->1                                                                  IS REACTOR SHUTDOVN 7                                                        l4-g UND                        yYES                        37 DRIF              CAN REQ FLOV                        ENDUGH FLOV NIC.  ,      FLOV > 0 7                      .        EQ FLOV7 -            BE DETERMINED                      FDR CMG-25 7          ,
VND                      y ND                    y NU                                    YES g
                            ; CHECK II:PUT ,4 -                    IS INITIAL DECAY HEAT AVAILABLE 7                                ,f                  y ND YES                                            < 760 DEG F 7 EXECUTED                                                    V                                                                  --
                                -11/ 07/ 90                                      CMG4 TIME TD 760                  m    N/A FOR                PES      ND y 4
9: 32:    37                t@ 4-              DEG F EXPIRED 7                      #### HRS ..    . ,    N/Al        l NIC...,
yES                                  ,,
                                                                                                            .. ND
 
        - - . ~ . - - _ -....~..-. - - -                                                                  ...- -_-. - .- - - -                              .. - . -... - .. - .                        ,
                                                                                                                                                                                                    -1 FOSAVEX-90
!                                                                                                              - SCENARIO TIME:--              r/4 / 30                                                I
: CLOCK TIME:-
RADIATION MONITOR $:
                    .      NUMBER                    VALUE                                      ALARMING                          $ENSITIVITY RT-6212            - 7.0 X 108 CPM                                            N.                          2.2E                                                          l
!                          RT-6213              8.0 X 108 CPM                                            N                            2.2E-8 RT-7312                    00$              CPM                                                        'N/A-                                                              )
RT-7324-1          2.0 X 108-CPM                                              N                            1.57E                            RT-7324 2-          2.0 X 108 CPM                                              N                          ~4.36E                            RT-7325-1            1.0 X 108 CPM                                            N                            1.49E-5 RT-7325-2          .1.0 X-108 mr/hr.                                        . N-                          N/A RT-73437-1            1.5 X.108 CPM                                            N                            2.51E-10 RT-73437-2          4.0 X 108 CPM                                              N                            2.73E-10 1
RT-9301                    00$              CPM,                                                          N/A -
RT-93252-12          1.0 X 108 mr/hr-                                          N      .                    N/A-1 AREA MON! TORS-
]
RT-93250          1.0 X 108 mr/hr                                          N RT-93250-2          1.0 X 108 mr/hr                                        .N
                      - RT-93250-3            1.0 X 108 mr/hr                                            N RT-93250-4          ~ 1.0 X 108 mr/hr                                        . N:                                                                                            -
;                        RT-93250-5            1.0 X 108 .mr/hr -                                        N.                                                                  o-
!                        RT-93250-8            1.0 X 108'mr/hr                                        -N RT-93250-13          2.0 X 105 mr/hr                                            N RT-93250-14.          4.0 X 108 mr/hr                                            N RT-93251-1            2.0 X 108 -mr/hr-                                          N.
RT-93251-3            2.0 X 10l                                                  N:                          ,
l RT-93251-4            1.0 X 108-            mr/hr    mr/hr                    N RT-93251-5            1.0 X 108 mr/hr                                          N-                                                                                          '
i RT-93251-6            1.0 X 108'mr/br                                          N l                        RT-93251-7            3.0 X 108 mr/hr                                            N RT-93251-8            1 0 X 108 mr/hr                                          N RT-93251-9            2,5 X 108 mr/hr                                          -N RT-93252-1            2.5 X 108 mr/hr                                            N RT-93252-2            1.0'X 10' mr/hr                                          N RT-93252-4            1.0 X 108 mr/hr                                        :  N
                      - RT-93252-6          . 1.5 X 108 mr/hr-                                            N-RT-93252-7          :
1.0 X 108 mr/hr.                                          N EQUIPMENT. MONITORS RT-6314-2              1,0 X 108 CPM                                              N RT-46211            - 5.0 X 10.8 - CPM                                            N-RT-46212-            - 7.0 X 108~ CPM                                            - N-METEOROLOGICAL DATA                                                                                                                                                          :
Wind. Speed _                                                              .-                3.0 MPHL
                            ' Wind'Oirection-                                                              From--315 Degrees Plume Deviation / Sigma Theta-                                                                4-0; Degrees;
                              -Differential Temperature:                                                                    - 2.2 'F m+ 4ses-e--=&---  e m.      -,...v+ .me        -  -e e es.v e d- -, e,- w ww. ar w w w ee.- ww -ww    r  -o
* V r ee  e++='  * * =  *  - y s**J9-- v6 ww'*ee~  9  . t1 + N W P-~ tv+r----k
 
FOSAVEX-90 PAGE 1 SCENARIO TIME: 7 / s c> to CLOCK TIME:
OVERALL PARAMETERS Reactor Sh';tdown                                              YES Decay Heat Power                                                0.05 MW PRIMARY COOLANT Pressare                                              11 PSIA Tempe ra ture Circulator Inlet                                  98 'F Core irlet                                      105 'F Core outlet                                      128 'F Calculated Bulk Core (CBCT)                      N/A Maximum Region Differential (AT)                  28 'F Helium Flow Circulator C                                    10 X 108 Circulator 0                                      0 X 108 TOTAL                                            10 X 108 Circulator Speed                          ,
Circulator C                                    2900 RPM Circulator 0                                          0 RPM Molsture (Dew Point)
ME-9306                                          41 'F ME-9307                                          39 'F SECONDARY COOLANT Energency Condensate Header Flow Loop 1                                                  0 lb/br Loop 2                                      2.0 X 10' lb/hr EES Inlet Temperature                                      85 'F EES Outlet Temperature                                    100 #F Pressure                                                  350 PSIA PCRV LINER COOLANT (In Service)
Loop 1                                          NO Loop 2                                            YES i
:                                                                                                                            F05AVEX-90                                                                                      !
PAGE 2
)                                                                                                                                                                                                                            l l                                                                                                                                                                        SCENARIO TIME: r /
* cw                              i 1
            .                                                                                                                                                          CLOCK TIMEi                                          i PRIMARY AUXILIARIES
                                                                                                                                                                                                                              +
i
                                        . . . . . . . . . . . . . . . . . . . . * * * * * * * *
* B O A R D I - 01 " " " " " " " " * " * " * * " " " "
* f GAS WASTE                                                                            System 63                                                                                        ,
Inlet Pressure                                                                                                                                    10 PSIA                l Vacuum Tank Pressure                                                                                                                                  8 PSIA            o Surge Tank "A" Pressure                                                                                                                        205 PSIG-                  4 Surge Tank "B" Pressure                                                                                                                                0 P$10              ,
t LIQUl0 WASTE                                                                          System 62                                                            NORMAL                      l e                                      REACTOR PLANT COOLING WATER                                                          ' Sy s tem.,46 -
Loop 1                                                                                                                                              . .
                                                                                                                                                                                                                            !~
P-4601                                                                                                                            CLEARED OUT-P-46015                                                                                                                        - CLEARED OUT.
1                                                                Header Inlet Temperature                                                                                                          CLEARED:0UT'              ,
Barrel and Top Head Outlet Temperature                                                                                                                    _'
i
                                                                                                                                                                                                . CLEARED 00Ti          -
Top Penetration' Inlet Temperature,                                                                                              CLEARED.0UT '
Loop 2 i                                                                P-4602                                                                                                                            ON-                        .
P-46025                                                                                                                            CLEARED OUT              i Header Inlet Temperature                                                                                                          115.*F-115 'F' Barrel and Top-Head Outlet Temperagure Top Penetration Inlet Temperature                                                                                                  115 'F.
Surge Tank Level "A"                                                                                                                            .'0LINCHES Surge Tank Level "B"                                                                                                                            45 INCHES.              <
s ir.
i k
k i
 
  - . - . - - - .                  . . . _ . . . - . - . . - - . . _      . . . - . . . _ . - . ~ . . . - . . . - . - . - - - - _. .                                        . . -
FOSAVEX -
PAGE 3 i
                                                                                                                                                  .                                    1 i                                                                                                                      SCENARIO TIME: nr/+cvMy 4
j                                                                                                                      CLOCK TIME: __                  _
l                                                                        PRIMARY AVXILIARIES
                            ..........................*** BOARD ~I-02 ********************************
:                            HEL!UM STORAGE                                        System 24                                                                                            ,
Low Pressure Bottles                                                                                  270 PSIG High Pressure Bottles                                                                                  575 PSIG HELIUM CIRCULATOR AUX!LIARIES                                        System 21 Circulator C-2103 (C)                                                                                                                            i Bearing Water Flow                                                                                170 GPM Bearing water Inlet Temperature                                                                        78 'F -
2.0 PSID
~
Main Drain AP                                          '
Buffer /Mid-Buffer AP                                                                                    8 PSID-Buffer Helium Flow                                                                              7.40 ACFM Buffer Helium Return Flow                                                                      3.79 ACFM
                                  . Circulator C-2104 (0).
Bearinn-Water Flow                                                                                        0 GPM-
<                                          Bearing Water-Inlet Temperature                                                                        78 'F-Main Drain-AP                                                                                              4 PSID~
Buffer /Mid-Buffer AP                                                                                      0 PSIO Buffer' Helium Flow                                                                                        0 ACFM Buffer Helium Return Flow                                                                                  0 ACFM i
                            ............................. BOARD I-03 ********************************                                                                                m REACTOR CORE                                          System 12 All Systems                                                                                            NORMAL
                            ............................. BOARD I-05 *********************************
HELIUM CIRCULATORS-                                    System 21                                                                                        ;!
                                                                ~
Circulator C-2103-(C)
Rotor Speed                                                                                    '2900 RPM 0,020 PSID
                                                                  ~
1+elium Flow (Low Range)                                                                                                              -
Helium Flow (High Range)                                                                                0%
Circulator C-2104 (0)-
Rotor Speed'          .
O RPM Helium Flow.(Low Range)                                                                    -0.003 PSIO:
                                                -Helium Flow (High Range)                                                                                .0 %
i MAIN-TURBINE-                                          System 51                                                NORMAL
                                                                                                                                                                                    -t s                                                                                                                                                                                    .
4                                                                        %
      . - , .    , - - - .,  _.          . . . .            .;    -      -,,.-.,,;._._._._.m..                                    - .,- -,---.._..._          . ,.~.m .-  ..'
 
    ,      __ _ ___._ ._... _ -... _ _ . _ - _ _ _._.- _ _ _ _._.                                                            . _ _ . - . . . . . _ _ _ . ~ . _ _
;                                                                                            FOSAVEX-90                                                                    ;
{
                  -                                                                                                                      PAGE 4 I                                                                                                            SCENARIO TIME: r-/ r o/fo '                                    .
J CLOCK TIME: _
PRIMARY AUXILIARIES
  ,                            ...........................**BOARDI-06""""""""*"*""""""                                                                                  ,
-                                                                                                                                                                            i MISCELLANEOUS .-                          -
[                                    -Bypass Flash Tank Pressure                                                        O PSIG..                                          ) i PLANT ELECTRICAL                                            System 92                                                                      j
[
                                    - Essential                                                    Bus 1  -Bus 2    Bus 3'            N/I Bus 3                          l'
)                                              480. VAC                                              485      485-      485 120 VAC                                              -118      -118        118            '118:
120 VDC                                                125      125-l "A"              "B" Standby 01esel Generator                                                NORMAL            FAILE0                          i
                                                                                                                                                                      =i ACM Diesel. Generator                                                    CLEARED OUT-j Non-Essential Switchyard                                                              NORMAL Bus 1      Bus 2            Bust 3 4160 VAC'                                                      4160      4160              4160 480 VAC                                                                  NORMAL =
MAIN TOWER                                                    System 41              .0 RAINED SERVICE WATER TOWER                                          System 42  *
                                                                                                                      . NORMAL                                          ,
FIRE WATER                                                    System 45              = NORMAL INSTRUMENT AIR                                                System 82                  "A"    HOR        "B" HOR 93                  93 SERVICE AIR                                                  System 82                  6 PSIG
                                ............................* BOARD-I-10 ********************************
PLANT = PROTECT!VE-SYSTEM REACTOR BUILDING. TEMPERATURE - HIGH                            '
Bay 100                                                                            80 'F.                                        i Bay 200                                                                            801'FE Bay 300                                                                            80 'F                                        i
.                            -REHEAT-ACTIVITY MONITORS                                                                  -005 BUFFER SEAL MALFUNCTION-                                                                  NORMAL-
                                                                                                                                                                      -]
!-                                                                                                                                                                      j o-                                                                                                                                                                    .l L                                                                                                                                                                        ;
u
 
FOSAVEX-90 PAGE 5
                                                                  $CENAR10 TIME: r/ + o e CLOCK TIME:
PRIMARY AUXILIARIES
            ....................********* BOARD I-13 ********************************
PENETRATION INTERSPACE AP                                        0 PSID REACTOR BUILDING SUMP DISCHARGE-FLOW--                          0 GPM HELIUM CIRCULATORS                  System 21                  NORMAL
            ............................. BOARD l-15 ********************************
REACTOR BUILOING STACK FLOW                ,
29.9 KCFM REACTOR BUILDING AMBIENT AP                                      -0.25 Inches H2O CONTROL ROOM TEMPERATURE                                              75 'F
            ............................. BOARD 1-7507X *****************************              ;
480V ROOM TEMPERATURE 75 'F        '
i l
h
- i-    -
 
F0$AVEX-90 SCENARIO TIME:        v/v v &
CLOCK TIME:
RADIATION MONITOR $:                                                                    1 NUMBER                  VALUE            ALARMING        SENSITIVITY                      l RT 6212            7,0 X 105 CPM              N              2.2E-8                        ,
RT-6213            8.0 X 108 CPM              N              2.2E-B                    .
RT-7312                  005    CPM                          - N/A RT-7324-1          2.0 X 101 CPM              N              1.57E-8 RT-7324-2--        2.0 X 108 CPM              N              4.36E-7 RT-7325          1.0 X 108 CPM              N                1.49E-5 RT-7325-2          1.0 X 108 mr/hr            N              N/A-RT-73437-1          1.5 X-108 CPM-            N                2.51E-10 RT-73437        4.0 X 108 CPM              N-              2.73E-10 RT-9301                  00$    CPM                            N/A' RT-93252-12        1.0 X 105 mr/hr            N ,-            N/A AREA MONITORS RT-93250-1        1.0 X 108 mr/hr.            N RT-93250-2        1.0 X 105 mr/hr            N RT-93250-3        1.0 X 10 8.mr/hr            N RT-93250-4        1.0 X 108'mr/hr            N                                      <
RT-93250-5        1.0 X 105 mr/hr            N RT-93250-8        1.0 X 101 mr/hr'            N RT-93250-13        2,0 X 105 mr/hr              N RT-93250-14        4.0-X-10$ mr/hr              N RT-93251-1          2.0 X 105 mr/hr            N                                            .
RT-93251-3          2.0 X-105 mr/hr            N              ,                              I RT-93251-4          1.0 X 108 mr/hr            N                                            .
RT-93251-5          1.0.X 108 mr/hr            N                                            !
1.0 X 108 mr/hr-                                                      1 RT-93251-6                                      N RT-93251-7          3.0 X 105 mr/hr            N'                                            l RT-93251-8          1.0 X 101 mr/hr            N RT-93251-9          2.5 X 101 mr/hr-            N RT-93252-l'        2.5 X.102 mr/hr              N RT-93252-2          1.0 X 10' mr/hr              N                                        '!    '
RT-93252-4          1.0 X 105 mr/hr-            N~
RT-93252-6        -1.5 X 108 mr/hp              N RT-93252        1.0 X 105 mr/hr              N EQUIPMENT MONITORS                                                                            .
RT-6314-2          1.0 X 108 CPM                N.
RT-46211            5.0 X: 105 CPM              N RT-46212            7.0 X 105 CPM                N-1 METEOROLOGICAL DATA                                                                        1 Wind' Speed                                          3.0 MPH Wind Direction                .
From 315 Degrees.
Plume Deviation / Sigma-Theta                        4.0 Degrees
: Differential-Temperature                            2 . 2 ..
* F .                    3 i
 
I-F0$AVEX-90 PAGE 1
                                                            $CENARIO TIME: T c      s-CLOCK TIME:
OVERALL PARAMETER $
Reactor $hutdown                                              YES Decay Heat Power                                              0.0$ Md PRIMARY COOLANT Pressure                                                  11 PSIA Temperature Circulator Inlet                                  95 'F Core Inlet                                      105 'F Core Outlet                                      125 'F Calculated Bulk Core (CBCT)                      N/A Maximum Region Differential (AT)                  28 'F Helium Flow                                                                  ,
Circulator C                                      10 X 10' Circulator 0                                      0 X 108 TOTAL                                            10 X 108 Circulator Speed                              '
Circulator C                                      2900 RPM Circulator 0                                          0 RPM Moisture (Dew Point)
ME-9306                                          41 'F ME-9307                                          39 'F
        $ECONDARY COOLANT l          Emergency Condensate Header Flow l                      Loop 1                                                  0 lb/hr l                      Loop 2                                          2.0 X 10' lb/hr    ,
<                    EES Inlet Temperature                                      85 'F I                    EES Outlet Temperature                                    100 'F Pressure                                                  350 PSIA PCRV LINER COOLANT      (In Sarvice)
Loop 1                                            NO l-                  'oop 2                                            YES
 
  . - - -            . - . . - . _ . ~ .            . _ . -    . . . - . - - - - - . - - .. . - .. -..~ - .-. - - - - - . - - . .---
i 2
FOSAVEX-90'                                                                                              i PAGE 2 SCENARIO TIME: r/ . c <                                        l CLOCK TIMEi                                                    .
PRIMARY AUXILIARIES
                                      ...........................** BOARD                                                I-01'********************************
l                                    GAS WASTE                                                    System 63 Inlet Pressure                                                                                              10 PSIA' Vacuum Tank Pressure                                                                                        ,8 PSIA                                    ;
                                                  -Surge Tank "A" Pressure                                                                                    205 PSIG Surge Tank "B" Pressure                                                                                      O PSIG                                  q l
L10VID WASTE-                                                System 62                                                  NORMAL.                                      ;
!                                    REACTOR PLANT COOLING WATER                                  System'.46 Loop 1                                                                                                                                                  ;
3                                                        P-4601                                                                                            - CLEARED:0UT
                                              .-          P-46015'                                                                                            CLEARED OUT-Header Inlet Temperature                                    .                  .
                                                                                                                                                            ' CLEARED 0UT Barrel and_ Top Head. Outlet _ Temperature                                                        : CLEARED OUT:                                ;
Top Penetration ~ Inlet Temperature                                                                l CLEARED OUT                                  ';
Loop 2 P-4602                                                                                              OH-P-4602S                                                                                              CLEARED OUTJ Header Inlet Temperature                                                          .
115 'F:
Barrel and Top Head-Outlet Temperature                                                              :115 'F.
,                                                        Top Penetration Inlet Temperature '                                                                  115''F Surge Tank Level "A"                                                                                        :0 INCHES
                                                  -Surge Tank Level "B"                                                                                    L45:!NCHES                                    !
                                                                                                                                                                                                            ?
t a
1 d
                                                                                                                                                                                                        .p F
1 s                                                                                                                      ' i, r
(
4 11
                                                ~
l}                              ;                                                                                            .,                                                                        '?
          . .. _ .            - . . - - _ _ . - . _ - .      ..  . . _ ,              , _ _ , _      . - . _ . _ . _ _ - . , _ . - , .            _,.-..~...m.            ,- _ _ . , _ , . _ . , -
 
F0sAVEX-90
;                                                                                                                                                                PAGE 3 SCENARIO TIME: c '+ce 4                                              )
CLOCK TIME:
PRIMARY AUXit!hRIES
                                          ........................***** BOARD I*02 ********************************
r i
HELIUM STORAGE                                      System 24 Low Pressure Bottles                                                                              270 PSIG-High Pressure Bottles                                                                            575 PSIG HELIUM CIRCULATOR AUXILIARIES                                        System 21
;.                                              Circulater C-2103 (C)                                            '
                                                                                                                                                                                                )
:                                                    Bearing Water Flow                                                                              170 GPM Bearing Water Inlet Temperature                                                                  78 'F Main Drain AP                                              ,                                    2.5 P$ID Buffer /Mid-Buffer AP                                                                              8 PSID-Buffer Helium Flow                                                                            7,40 ACFM'                                    !
Buffer Helium Return Flow                                                                    3.79 ACFM Circulator C-2104 (0)
Bearing Water Flow                                                                                0 GPM Bearing Water Inlet Temperature                                                                  78 'F.
Main Drain AP                                                                                    ~ 4 PS10-Buffer /Mid-Buffer AP                                                                              0 PSID                      -
Buffer Helium Flow                .                                                                O ACFM L                                                    Buf fer Helium Return Flow                                                                        _0 ACFM                                  !
                                        . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* B OA R D I - 0 3 " " " " " " " " " " " " " " " ,"                                            i l                                                                                                                          '
REACTOR CORE                                        System 12                                                                                          ;
All Systems                                                                                      NORMAL-
                                        ............................. BOARD                                    I-05.***********************==****a                          **
HELIUM CIRCULATOR $                                  System 21L Circulator C-2103 (C).                                                                                  ..
Rotor Speed-                .
                                                                                                                                                    . 2900 RPM Helium Flow (Low Range)-                                                                    0,020'PSID-Helium Flow (High-Range)                                                                            0%
Circulator C-2104 (D)
Rotor Speed-                                                                                        0 RPM-Helium Flow (Low Range) L                                                                  -0.003 PSIO Helium' Flow (HighRange)                                                                            0%
MAIN TURBINE                                          System 51                                            NORMAL
                                                                                                                                    ?
                                                            ~ +a    d..r., Q ,na. ,      ,    !.A . . O , +:      .,n      ,.,,,:,,p.- - , , . ,  .,.,,.,n,i,,.,,.,    L,.4 -.  ,..,,-A,.~
 
F0$AVEx-90 PAGE 4 SCENARIO TIME: -r' - ods-CLOCK TIME:
PRIMARY AUXILIARIES
          ............................. BOARD l-06 ********************************
MISCELLANEOUS Bypass Flash Tank Fressure                                                              O PSIG PLANT ELECTRICAL                                                  System 92 Essential                                                            Bus 1    Bus 2    Bus 3      N/I Bus 3 480 VAC                                                        485      485        485 120 VAC                                                        110      118        118        118 120 VDC                                                        125      125 "A"        "B" Standby Diesel Generator                                                          NORMAt      FAILED 4 .
ACM Diesel Generator                                                              CLEARED OUT-_
Non-Essential Switchyard                                                                      NORMAL Bus 1    Bus 2      Bus                        4160 VAC                                                                4160      4160 .      4160.
480 VAC                                                                          NORMAL MAIN TOWER _                                                      System 41                  ORAINED' SERVICE WATER TOWER                                                System 42                ' NORMAL
                                                                                                                                              \
FIRE WATER -                                                        System 45                  NORMAL                                !
INSTRUMENT AIR                                                      System 82                  "A"  HDR  '"B"  HDR 93          93'                  j SERVICE AIR                                                        System.82                  95-PSIG
          ............................. sorgo i.10 ................................
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE -'HIGH -
              . Bay 100                                                                                  80 'FE Bay:200                                                                                  80 'F Bay 300                                            '
80 'F l
REHEAT ACTIVITY MONITORS                                                                        005 BUFFER 5EAL MALFUNCTION'                                                                        NORMAL-1
      \.
t
_m      ____.m__.-.__.
 
F0$AVEX-90 PAGE 5 SCENARIO TIME: T/ - C'+ r" CLOCK TIME:
PRIMARY AUXILIAR!E$
4
                ...............************** BOARD I-13 ********************************
I PENETRATION INTER $ PACE AP 0 PSID REACTOR BUILDING $ UMP 0!$ CHARGE FLOW 0u I
HELIUM CIRCULATOR $                System 21
                ............................. BOARD I-15 **********'-
REACTOR BUILDING STACK FLOW                ,
29.9 N FM REACTOR BUILDING AMBIENT \P                                          -0      4      H2O CONTROL ROOH TEMPERATURE                                                75 'F
                ............................* BOARD I-7507X *****************************
1 I
480V ROOM TEMPERATURE                              ,
75 'F
 
F0$AVEX-90 SCENARIO TIME:        r/g r oo CLOCK TIME:          . __
RA0;ATION MONITOR $:
NUMBER                  VALUE          ALARL.NG      $ENSITIVITY RT-6212            7.0 X 108 CPM            N              2.2E-8 RT-6213            8.0 X 108 CPM            N              2.2E-8 RT-7312                005  CPM                          N/A RT-7324-1          2.0 X 108 CPM            N              1.57E-8 RT-7324-2          2.0 X 108 CPM            N              4.36E-7 RT-7325-1          1.0 X 108 CPM            N              1,49E 5 RT-7325-2          1.0 X 108 mr/hr          N              N/A RT- 7.5 4 37 - 1  1.5 X 108 CPM            N              2.51E-10 RT-73437-2        4.0 X 101 CPM            N              2.73E-10 RT-9301                005  CPM                          N/A RT*93252-12        1.0 X 108 mr/hr          N ,,            N/A AREA MONITORS RT-93250-1        1.0 X 108 mr/hr          N RT-93250-2        1.0 X 108 mr/hr          N RT-93250-3          1.0 X 108 mr/hr          N RT-93250-4          1.0 X 108 mr/hr          N RT-93250-5          1.0 X 108 mr/hr          N RT-93250-8          1.0 X 108 mr/hr          N RT-93250-13        2.0 X 103 mr/hr          N RT-93250-14        4.0 X 108 mr/hr          N RT-93251-1          2.0 X 108 mr/hr          N RT-93251-3          2.0 X 108 mr/hr          N            ,
RT-93251-4          1.0 X 108 mr/hr          N RT-93251-5          1.0 X 108 mr/hr          N RT-93251-6          1.0 X 108 mr/hr          N RT-93251-7          3.0 X 108 mr/hr          N RT-93251-8          1.0 X 108 mr/hr          N RT-93251-9          2.5 x 108 mr/hr          N RT-93252-1          2.5 X 108 mr/hr          N RT-93252-2          1.0 X 108 mr/hr          N RT-93252-4          1.0 X 108 mr/hr          N RT-93252-6          1.5 X 105 mr/hr          N RT-93252 7          1.0 X 105 mr/hr          N EQUIPMENT MONITORS RT-6314-2          1.0 X 108 CPM            N RT-46211            5.0 X 105 CPM            N RT-46212            7.0 X 101 CPM            N METEOROLOGICAL DATA Wind Speed                                      3.0 MPH Wind Direction                            Frem 315 Degrees Plume Deviation / Sigma Theta                    4.0 Degrees Differential Temperature                        2.2 'F
 
FOSAVEX-90                                          l PAGE 1 SCENARIO TIME ~~~/ - e . c c CLOCK TIME:
OVERALL PARAMETERS Reactor Shutcown                                            YES Decay Heat Power                                            0.05 MW PRIMARY COOLANT Pressure                                                11 PSIA Temperature
* Circulator Inlet                                  95 'F Core Inlet                                      105 'F Core Outlet                                      125 'F Calculeted Bulk Core (CBCT)-                    N/A Maximum Region Differential (f.)
                                                    -                    28 'F            ,
Helium Flow Circulator C                                    10 X 108 Circulator 0                                      0 X 108 TOTAL                                            10 X 108 Circulator Speed Circulator C                                    2900 RPM Circulator 0                                        0 RPM Moisture (Dew Point)
ME-9306                                          41 'F ME-9307                                          39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                  0 lb/hr Loop 2                                        2.0 X 10' lb/hr
!                    EES Inlet Temperature                                    85 'F l                    EES Outlet Temperature                                  100 'F Pressure                                                350 PSIA' PCRV LINER COOLANT (In Service)
Loop 1                                            NO Loop 2                                            YES a
 
t 1
f FOSAVEX-90:
l                                                                                                                                              PAGE 2                              i i
SCENARIO TIME:' h C : T '                                                [
)
CLOCK TIME:
PRIMARY AUXILIARIES 3
                      - . . . . . . . . . . . . . . . . . . . n . . * * " *
* B O A R D I - 01 " " " " " * " " " * " " * " " " * " -                                              ,
GAS WASTE                                        $ystem 63-                                                                                              !
Inlet Pressure                                                                              '10 PS!A                                              !
Vacuum Tank Pressure                                                                              8 PSIAL Surge Tank "A" Pressure                                                                    205 PSIG Surge Tank "B" Pressure-i                                                                                                                                                                                  t 0 PSIG
                                                                                                                                                                                    +
,                    -LIQUID WASTE                                      System 62                                          NORMAL-1                      REACTOR PLANT COOLING WATER                      -System 46                                                                                                ,
Loop 1 P-4601                                                                              CLEARED OUT-                                            ,
P-4601$                                                                            ' CLEARED OUT-Header Inlet Temperature                                                        -CLEARED OUT                                              ;
Barrel and Top Head Outlet. Temperature
                                                                                ~
                                                                                                                          -CLEARED OUT Top Penetration Inlet Temperature                                                    CLEARED OUT' s
l                                Loop 2                                                                                                                                            ,
P 4602                                                                              ON                .                                  ;
P-46025                                                                          . CLEARED OUT Header Inlet Temperature                                                                                                            ''
115 'F i
Barrel and Top Head Outlet Temperature                                              115.*F,                    i~                      .
,                                        Top Penetration-Inlet Temperature                        '
                                                                                                                          ' 115 'F.
L Surge Tank Level "A"-                                                                        0 INCHES ~                                        l Surge Tank Level "B"                                                                        45 INCHES' 4
r
                                                                                  . _ _ ,          - _ _ -                    m---  ?
o                                                                                                                                                                                .
: l.              .
 
    .- - .~ -.-                              -- - ._-                - - -                  .        . . _ .                _ - -
1
                                                                                      'F05AVEX-90
                                                                                                                                                    'PAGE 3 SCENARIO TIME: ""/ - c a c c.
5
;                                                                                                                            CLOCK TIME:
I                                                                        PRIMARY AUXILIARIES
                                ...............************** BOARD l-02 ********************************
HELIUM STORAGE                                        System 24                                                                    ,
Low Pressure Bottles                                                                      270 PSIG                                        :
High Pressure Bottles                                                                      575-PSIG l
HELIUM CIRCULATOR AUXILIARIES                                    System 21                                                                            <
                                                                                                                                                                                    -t Circulator C-2103 (C)                                                                                                                      ;
i                                                Bearing Water Flow                                                                    170 GPM Bearing Water Inlet Temperature                                                          7B 'F Main Orain AP                                                                          2.5 PSID                                    '
Buffer /Mid-Buffer 4P                                                                      B PSID Buffer Helium Flow                                                                  7.40 ACFM Buffer Helium Return Flow
                                                                                                                                      -3'.79 ACFM Circulator C-2104 (D)
Bearing Water Flow                                                                        0 GPM                                    '
Bearing Water Inlet Temperatura                                                          78 'F Main Drain AP                                                                            -4 PSID-                                'r Buffer /Mid-Buffer AP                                                                      O PSID Buffer Helium Flow                                                                        0 ACFM Buffer Helium Return Flow ~                                                                0 ACFM
                                ............n...............
BOARD 1 -0 3 " " * " " * * " " " " "" " " " "
* k i
REACTOR CORE                                        ' System'12.
All; Systems =                                                                              NORMAL
                                .............................BOARDl-05*""""""""""""""""        -
s i
HELIUM CIRCULATORS =                                  System 21_                                                                                  ,
j                                          tirculatorC-2103(C)
:                                                      Rotor Speed                                                                          2900 RPM Helium Flow (Low Range)                                                            0.020 PSID' Helium Flow (High Range)                                                                  0 %-
Circulator C-2104 (D).                                                                                                                    i Rotor Speed  .
O RPM L_                                                    Helium Flow (Low Range) ..
                                                                                                                                        -0.003 PSID Helium Flow (High-Range)'                                                                0%
MAIN TURBINE                                          System 51 NORMAL
                                                                                                                                                                . = _
~
r-.,    - , .,  s,~ v._-,    , . . , ,            -- =    4      . _ , , . .                . . , _ . . . , , . , - ~          %  -.m  ,.        .4r        - v.,. #.. v
 
                                                                                                                                                                      'I 4
FOSAVEX-90
:                                                                                                                                              PAGE 4                      1
                                                                                                                          -              .                              .1
:                                                                                                                SCENARIO TIME: 7. ot.cc CLOCK TIME:
l            ,                                                                                                                            _
                                                                                                                                                                              ]
  !                                                                            PRIMARY-AUXILIARIES i
                          ...............n...******" BOARD I-06 """ * """" a """"" * """
MISCELLANEOUS-                                                                                                                                    ,
c                                Bypass Flash Tank Pressure                                                                  O PSIG' Syst9m 92 PLANT ELECTRICAL Essential                                                            Bus 1        Bus 2      Bus.3            N/I Bus                  t
>                                          480- VAC                                                    485        485        485 120 VAC                                                    118        118        118              118 120 VDC                                                    125        125 4A" .              "B" Standby Otesel Generator                                                          NORMAL._ PAILED                                !
ACM Diesel Generator                                                              CLEARED OUT Non-Essential                                                                                                                              !
Switchyard                                                                        NORMAL Bus.1      Bus 2              Bus:3                      ,
4160 VAC                                                                4160        4160              4160~
i                                          480 VAC                                                                          NORMAL                                        (
MAIN TOWER                                                      System 41                        LDRAINED SERVICE WATER TOWER                                              System 42                          NORMAL FIRE WATER                                                      System 45                          NORMAL.                                      ?
INSTRUMENT AIR                                                  System 82                          "A" HOR              "B"-HOR-93                  93-SERVICE AIR                                                      System 82                          95 P5!G
                          . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BO A R D . 1 - 10 " " " " "'* " " " " " ' " " " " "
PLANT PROTECTIVE-SYSTEM REACTOR-BUILDING TEMPERATURE - HIGH                            -
Bay 100                                                                                      80.*F Bay-200                                                                                      80' ' F            -
Bay 303                                                                                      '80 'F REHEAT ACT!VITY MONITORS-                                                                          005
                        . BUFFER SEAL MALFUNCTION                                                                            WORMAL 0
1                                                                                                            ) l
                                                                                                                                                                          ..p
                  .g
                                                                                                                    /                        1
                  - - ,          -.,.~.--,,,.,,-..,.-:,-~...,-....,w.                                                            .-.,-,-.,,,.e,.          ,. . , . . . ,
 
                                                                ' :>$AVEX
                                                                  *-          W -
PAGE-5 SCENARIO TIME: WsceeC CLOCK TIME:
PRIMARY AUX' LIARIES
                          .......................******BOARDl-13""*"""""*"""**"**""
PENETRATION INTIR$ PACE AP                                              0 PSID REACTOR BUILDD!G $ UMP 015 CHARGE FLOW                                    D GPM                                      .
HELIUM CI'4CULATOR$                    System 21                        UORMAL
                          ........................***** BOARD I-1$ **************************"*****                                            .
REACTOR BUILDING STACK FLOW                    ,
29.9 KCFM REACTOR BUILDING AVOIENT AP                                              -0,25 inches H2O CONTR01, ROOM TEMPERATURE-                                                    75 'F m.........................."            BO ARD l-7 507X * " " * """ * "" " "" * * " *
* i 480V ROOM TEMPERA 7URE                                        ,
75 'F f
l I
1 l
1
* g 1
          -. .                            .                                                      -              ..o.
 
FOSAVEX-90 SCENARIO TIME:            7,0 s t #
CLOCK TIME:
RADIATION MONITORS:
NUMBER                    VALUE                      nLARMING      SENSITIVITY R'-6212            5.0 X 10' CPM                          Y                    2.2E-8                  ;
If-6213            5.0 X 10' CPM                          #
2,2E-8 di-7312                  005              CPM                                N/A iT ,~3t4-1        6.3 X 108 CPM                          N                      1.57E-8 h' 7324-2          2.2 X 105 CPM                          N                    4.36E-7
              ?1 7325-1          1.0 X 10' CPM                          N                      1.49E-5 RT i.125-2        1 1 X 108 mr/hr                        N                    N/A RT <>417-1        1.5 X 10' CDM                          N                      2.51E-10
,              k '34S? 2          4.0 X 105 CPM                          N                      2.73E-10 R)' 301                  005              CPM                                  N/A At J3252-12        1.5 X 108 mr/hr                        Y  ,
N/A
:4    '
AREA MON!iOR$
RT-93250-1        2.0 X 10' mt/hr                        Y RT-93250-2        3.0 X 108 mr/hr                        Y                                              ;
(, 91250-3        5.0 X 10' mr/hr                        N                                              4 RT 'C''0-4        3.0 X 108 mr/hr                        Y
              <' T-3R +5        1.0 X 10' mr/hr                        Y if-9321 8          6.0 X 10' mr/hr                        Y Al-032K 13        1.4 X 108 mr/hr                        Y I
RT-932!I = 14      2.5 X 10' mr/hr                        N RT-9325.-1        7.0 X 108 mr/hr                        N RT 93?61-3        8.0 X 10' mr/hr                        N                    '
1        Rb91251-4          2.0 X 108 mr/hr                        Y I    RT-93251-5        1.0 X 108 mr/hr                        Y
              &T-93251-6        1.0 X 10' mr/hr                        Y RT-93251-7        CFF SCALE                              Y R'-93251-8        5.0 K 108 mr/hr                        Y s'-93251-9        CFF "' ALE                              Y 9 ^3232-1          3.0      l.0 8 mr/hr                  Y Rf-9f52-2          3.5 X 105 mr/hr                        Y
  ! .l        RT-932v'-4        5.5 X 10' mr/hr                        Y i    RT-9325F 5        4.0 X 108 mr/hr                        Y RT-93252 7        3.0 X 108 mr/hr                        Y 4
EQUIPMENT MONI M S 1  RT-6314-2          1.' X 105 CPM                            N t
ET-46211          L      X 10' CPM                        Y RT-86212            1 ( X 10' CPM                          Y METE 0hfA0GICAL DATA Wind Speev                                                    2.5 MPH Wind Direction                                        s om 315 Degrecs Plume Deviation / Sigma Theta                                4.0 Degrees Differential Temperature                                      2.4 'F
 
                                                                            ~ _ _-
1
                                                                                      -FOSAVEX-90 PAGE:li SCENARIO,TIMEi "s s ec c                  o CLOCK TIME:-
od? ALL PARAMETERS Reactor Shutdown.                                                            .YES Decay Heat Power-.                                                            0,05'MW'
                                                                                                                                                        }
l PRIMARY-COOLANT                                                  >
                                                                                                                                                        ]
Pressure.                      +                                    11/ PSIA E                      j Temperature              ..
Circulator Inlet                                          ' 95 ' FJ Core Inlet                                                    105 *F                              >
Core Outlet-                      . . -                      125''F-Calculated Bulk Core':(CBCT)-
                                                                                                                      .N/A:
Maximum Region'0ifferential (AT).                              28. 'F-
                                                -Helium-Flow Circulator C--                                              :10: X110''
Circulator D-                                                ? 01X:"10 8 .-:
TOTAL                                                        10iX=10' Circulator Speed -
Circulator C-                            ''  " ''
2900LRPM-Circulator.D  -
0 RPM j
Moisture-(Oew Point)-                                                  .    .
l
                                                          -ME-9306'                                                    .341 *F5 ME-9307                                                      39 'F:                              1 SECONDARY COOLANT.-
Emergency Condensate-Header:                              -
i
                                                          ' Flow-Loop;l--    '
                                                                                                                                      = 0 : 1b/hr!-
Loop 2_                                                2'.-0 X 10':lb/hr EES'InletLTemperature:
                                                                                                                                    '851'F              :q EES Outlet Temperature--                                              -100.*F-            9 Pressure.                                                            ; 350: PSI A 1 PCRVLINERCOOLANTl(Inservice)
LoopEl-                                                      N0; Loop'2                                                        YES
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ . .                                                                                                                  21
 
[O g ,
l                                                                                      FOSAVEX-90 PAGE 2'
                                                                                                                                      )
SCENARIO TIME: r# # oor CLOCK TIME:
PRIMARY AUXILIARIES
    ............................. BOARD I-01 ********************************
GAS WASTE                                                                          System 63 l        Inlet Pressure                                                                                          10 PSIA Vacuum Tank Pressure                                                                                        8 PSIA.
Surge Tank "A" Pressure                                                                                205 PSIG Surge Tank "B" Pressure                                                                                    O PSIG l
LIQUID WASTE                                                                      System 62                NORMAL REACTOR PLANT COOLING WATER                                                        System 46 Loop 1 P-4601                                                                                          CLEARED OUT P-4601S                                                                                          CLEARED OUT Header Inlet Temperature                                                                        CLEARED OUT Barrel and Top Head Outlet Temperature                                                          CLEARED OUT Top Penetration Inlet Temperature                                                                CLEARED OUT Loop 2 P-4602                                                                                            ON P-46025                                                                                          CLEARED OUT Header Inlet Temperature                                                                          115 *F Barrel and Top Head Outiet Temperature                                                            115 'F            -
Top Penetration Inlet Temperature                                                    '
115 F Surge Tank Level "A"                                                                                      0 INCHES Surge Tank Level "B"                                                                                    45 INCHES
 
1  'F05AVEX-90
                                                                                                      ~PAGE~3-SCENARIO TIME: r -e .eco-CLOLM TIME-i PRIMARY /JXIllARIES:
                ...........****************** BOARD I-02 ********************************
HELIUM STORAGE'                  System-24                    -
Low Pressure Bottles                                          270 PSIG
* High Pressure Bottles                                        575 PSIG HELIUM. CIRCULATOR AUXILIARIES          System 21-                                                    <
Circulator C-2103 (C)
Bearing' Water-Flow                                        170 GPM Bearing Water Inlet Tempera *.ure                              78 'F Main-Drain AP_                                              2,5 PSID-Buffer /Mid-Buffer'AP                                            8 PSID-Buffer Helium Flow.                                      7.40 ACFM Buffer Helium-Return Flow                                13,79 ACFM CirculatorC-2104(D)
Bearing Water Flow                                                0 GPM Bearing Water Inlet Temperature                                78 *F                            ,
Main Drain AP                                                    4 PSID Buffer /Mid-Buffer AP'                                            O PSID-                ,
Buffer Helium Flow:                                              0 ACFM-Buffer Helium. Return-Flow -                                      0.ACFM
              ............................. BOARD I-03 ********************************
REACTOR CORE                      System 12-All Systems-                                                  NORMAL-l
              .......................****** BOARD I-05 *********************************
l HELIUM CIRCULATORS                System 21 CirculatorC-2103(C)-
Rotor Speed                                                -2900 RPM Helium Flow (Low Range)                                    0,020 PSID Helium Flow (High. Range)-                                              0%
i CirculatorC-2104(D)
Rotor Speed                                                              0 RPM Helium Flow (Low Range)-                                -0.003 PSIO Helium Flow (High Range).                                                O%
l l_            MAIN TURBINE.                      System 51                        NORMAL
 
  -. - .          _            _      _.m          _ _ - . . _ -              ._        _    ._                      ._.        _ ._ _._ _
FOSAVEX                                                                                                                                                PAGE- 4'-
                                                                                                                -SCENARIO TIME: n + cC45' CLOCK TIME:
l PRIMARY' AUXILIARIES                                                                            ,
                        ........................*****BOAROI-06""""**""*""**""*"****
i MISCELLANEOUS                                                                                                                                '
Bypass Flash Tank Pressure                                                          -
0 PSIG PLANT ELECTRICAL-                                        System 92; Essential __                                              Bus--I                Bus 2      Bus'3'        N/I Bus 3' 480 VAC;                                            485':
                                                                                                                      '485          485 120 VAC                                            118                    118          118          118 125-
                                          .120 VDC                                              125-
                                                                                                                                    "A"-          "B" -
Standby Diesel __ Generator-                                                          NORMAL-        FAILE0 ACM Diesel Generator.                                                                TCLEARED OUT Non-Essential Switchyard-                                                                      .
NORMAL ~
Bus 1    -Bus 2          Bus :3              -;
1
                                        - 4160 VAC                                                                    4160-      -4160-        4160 480 V/C                                                                              NORMAL'                              <
u '
MAIN TOWER                                          _ System 41                                        -0 RAINED SERVICE WATER TOWER                                      System 42                                        NORMAL-FIRE WATER.                                              System 45                                    1 NORMAL' INSTRUMENT AIR'                                          System 82                                      '"A"'HDR        "B"LHDR=            .
l                                                                                                                                      93;            93 1
SERVICE AIR:                                              System 82-                                      95 PSIG I
                        ......................*****"* BOARC I-101********************************
                                                                                                                                                            ~
1
                                                                  ' PLANT PROTECTIVELSYSTEM REACTOR BUILDING TEMPERATURE - HIGH Bay 100                                                                                          80 *F Bay 200-                                                                                        'F Bay 300                                                                                          80 'F-3 g                        REHEAT ACTIVITY MONITORS-                                                                                  005                              3~
i BUFFER SEAL MALFUNCTION                                                                                    NORMAL                          .l
_,_,y. _ _  ,+ ,        --v-<                          ,,y., ,        ,__,.4            , . . . . . ,                ,                        , , .
 
      ..        .._ . _ ... _ . _ . .__ .                              _ _ _ _ . . _ ._. _ . . _ . _ . _ . _ . - - - . _ . ~ . . . _ . - . _ _ _ . _ _ . _ _ _ , . _ , .
                                                                                                                                                                                                  ~(
FOSAVEX-90.
                                                                                                                                                            .PAGE 5=
t
                                                                                                                        - SCENARIO-TIME:                  mooy                                    i CLOCK TIME:                                                              r
                                                                                      - PRIMARY AUXILIARIES ~                                                                                      i
                                . . . . . . . . . . . . . . . . * * * * * * * * * * * *
* B O A R D I .- 1 3 ' * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * '
PENETRATION: INTERSPACE AP-                                                                                -0 PSID REACTOR BUILDING SUMP DISCHARGE FLOW'            -
                                                                                                                                              -0 GPM-HELIUM CIRCULATORS                                                System 21=                                  NORMAL                                                j
                                . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B O A R D 11 - 1 5 * " * " " " " * " * " " " " " " " "                                                  a REACTOR-BUILDING STACK FLOW                                                                                    29.9-KCFM'                                        4 REACTOR BUILDING AMBIENT AP-                                                                                  -0,25 cinches H2O CONTROL: ROOM TEMPERATURE                                                                                          75  *F-
                                ............................"BOARDI-7507X""*"""""*"""*"""'
480V ROOM TEMPERATURE 75 'F:-                  s 9
1 l
t1                                                                                                                                                                                                  4 F
f L
vu      4 -+.-i                .-e,.w-r  ,,--e-      er-+> - . ,e,--  --
                                                                                              -%.              +v                  - - - - ,      *e  .-  e,. ,---,-e4,-*  ra - <-v- ,,w+ -. -
 
            .                                                                                            1 d
FOSAVEX-90 SCENARIO TIME:    TB9130 CLOCK TIME:
i RADIATION MONITORS:                                                                                    !
NUMBER                                          VALUE            ALARMING        SENSITIVITY:
RT-6212                                  5.0 X 10'' CPM            '( :          ~2.2E-8            .!
RT-6213                                  5.0 X 10' CPM              Y            2.2E-8              i RT-7312                                        005 - CPM                          N/A RT-7324-1                                5.7 X 108 CPM              N              1.57E-8            .
RT-7324-2                                  1.9 X 108 CPM              N              4.36E-7 RT-7325-1                                  1.0 X 108 CPM-            N            -1.49E-5 RT-7325                                1.0 X 108'mr/hr            N              N/A-              :i RT-73437-1                                1.5 X 108 CPM              N              2.'51E-10 RT-73437-2                                4.0 X=105 CPM'              N              2,73E-10 RT-9301                                        005    CPM                          N/A RT-93252-12                                1.6 X 108 mr/hr            Y              N/A AREA MONITORS RT-93250-1                                2.0 X-108 mr/hr            Y RT-93250-2                                3.0 X-10''mr/hr            Y RT-93250-3                                5.0 X 10' mr/hr            N RT-93250-4                                3.0 X 101 mr/hr-            Y:
RT-93250-5                                1.0 X-108 mr/hr            Y-RT-93250-8                                6.0'X 108 mr/hr              Y RT-93250-13                              1.5 X 108 mr/hr-            Y RT-93250-14                              2.5-X 108 mr/hr              N RT-93251-1                                7.0 X 105 mr/br          -N' RT-93251-3                                8.0 X-108 mr/hr-            N RT-93251                              2.0 X 108- mr/hr            Y-          '
  'RT-93251                                1.0.X 10' mr/hr            Y RT-93251-6                                1.-0 X 108 mr/hr            Y RT-93251-7                                0FF SCALE                  =Y-RT-93251-8                                5.0 X:108 mr/hr-            Y
  -RT-93251-9                                0FF SCALE                    Y RT-93252-1                                3.0 X 108 mr/hr            Y RT-93252-2                                3.5 X 108 mr/hr            Y-RT-93252-4~                                5.5 X 108 mr/hr-            Y RT-93252-6                                4.0-X 108 .mr/hr          =Y RT-93252-7                                3.0 X 108 'mr/hr            Y EQUIPMENT MONITORS RT-6314-2                                  1.5 X 108 CPM                N;
:RT-46211 -                                -1,0-X 10' CPM                Y RT-46212                                  1.0 X-10' CPM                Y METEOROLOGICAL DATA-Wind Speed                                                                  2.7 MPH Wind Direction- .                                                    From 315 Degrees Plume Deviation / Sigma Theta                                                4.0 Degrees-Differential Temperature                                                    2.2 *F
 
J j
FOSAVEXb90~ > .                                                                      !
PAGE 1-SCENARIO TIME: 7 o s c oSo                            4
                                                                                                              - CLOCK TIME:
                                                                            .0VERALL PARAMETERS-i Reactor. Shutdown.                                                                      . YES-.
                                                        ~
Decay Heat Power                                                                          0.05 MW:
PRIMARY COOLANT Pressure                                                                        11 PSIA Temperature                                            *:
Circulator Inlet-                                                    195 :
* F1 Core Inlet-                                                          105?*F Core Outlet-                    .
                                                                                                  .                        125 *F.                      .'
                                                    -Calculated Bulk Core..(CBCT) .                                        N/A Maximum Region Otfferential-(AT)                                        28 'F                              -
Helium Flow Circulator-C                                                          10 X'108 Circulator D                                                            OLXL108-                              3
                                                    -TOTAL                                                                10 X 108                                  ,
Circulator Speed                                    ,
!-                                                    Circulator C-                        T                  <:            2900 RPM .
Circulator D                                                                0: RPM.
Moisture-(Dew Point)                                                                  ,
ME-9306'                                                            :41 *F.
ME-9307-                                                      -
39 'F-
:                              SECONDARY COOL NT-
                                          ' Emergency? Condensate Header 1                    1
                                                    -Flow.                                                                                                          !
Loop 1                                                                            0 lb/hr.        ,. ;
2.0 XL10' lb/hr Loop 2.  .
EES1InletxTemperature?                                                            :85 'F                    '
                                                    .EES Outlet Temperature l
                                                                        ~
100 *F1              -
                                                    -Pressure ~                                                                        350 PSIAL IPCRV LINERLC00LANT~ (In Service)i-Loop 1                                                              LNO -
,                                                    . Loop 2                                                              YES.                                    ,
e
                                          . :.      _ . u .- -. . . - .          .                                                .
 
  - . t y.  + .    .m...    .        .            .  ....m.          - - . . .          -              - ~ - . .                          . x . . -.~.          .  -
t=-
4 EOSAVEX-90
      +
PAGE-2' SCENARIO TIME: -rgs mm CLOCK TIME:'                                                                    ,
                                                                                            ~'
PRIMARY AUXILIARIES-
              ...........n....************ BOARD I-O lt """ * """""" * """ * " * " -                                                                                          ;
l GAS WASTE'                                      System 63-                                                                                                      :
1 Inlet Pressure                                                                            .- 10'. P SI A Vacuum Tank Pressure-                                                                        -8. PSIA'                                                    i Surge Tank "A". Pressure                                                                205 PSIG                                                      ' '
                    -Surge Tank "B"_ Pressure-                                                                      0 PSIG.
o LIQUID WASTE                                  - System 62                                  . NORMAL REACTOR PLANT-COOLING WATER                      System 46
                                                                                +
Loop 1 .
P-4601'                                                                '
                                                                                                            ' CLEARED'0VT                                                      _
P-46015                                                                        CLEARED =0VT Header. Inlet Temperature                                                      CLEARED OUT.
Barrel and-Top Head Outlet Temperature                                          CLEARED:0UT-Top Penetration Inlet Temperature                                                CLEARED OUT--
Loop 2 4
P-4602'                                                                  _      0N.
P-46025                                                                      . CLEARED OUT.
Header. Inlet Temperature                                                        115 'F-l                            . Barrel and Top. Head Outlet Temperature-                                        115-*F-                                -                      .
Top Penetration: Inlet Temperature ''-                                        -115 'F-Surge Tank Level'"A"                                                                        .0JINCHES'
;                    Surge Tank Level'"B"                                                                      45 INCHES;                                                    }
5 4
1 a
e 1
d I'
3 s                                                                                                                                                                              >
                                            , , . . .          . . , - . .          . . -      _..    .,-,....1.      , - . . . , , . - . . . -            - - . . _ _ _
 
FOSAVEX-90 PAGE:3 i
SCENARIO TIME: -ra omo                    1 1
CLOCK TIME:                              j PRIMARY AUXILIARIES
          ..........******************* BOARD l-02 ********************************                                .
HELIUM STORAGE                            System 24' Low Pressure Bottles                                              ~ 270 PSIG-                      '
High Pressure Bottles                                              575 PSIG HELIUM CIRCULATOR AUXILIARIES                      System-21                                              ,
Circulator-C-2103 (C)
Bearing Water Flow-                                              170 GPM Bearing Water Inlet Temperature                                      78""F Main Drain AP                                                    ~2.5 PSID Buffer /Mid-Buffer AP-
* 8 PSID Buffer Helium Flow            .
7.40 ACFM Buffer. Helium Return Flow                                    3.79 ACFM Circulator C-2104 (0)                                                                              >
Bearing Water Flow -                  .
O GPM.
Bearing Water Inlet Temperature                                      78; F Main Drain'AP'                                                        -4 PS10 Buffer /Mid-Buffer AP                                                    0 PS10 Buffer Helium Flow                                                      0 ACFM Buffer Helium Return- Flow                                              0 ACFM
          ...........................** BOARD I-03 ********************************
REACTOR CORE                              System 12
                - All Systems:                                                      NORMAL
          ....r......................**            BOARD I-05 *********************************                  1 HELIUM CIRCULATORS                        System 21 CirculatorC-2103(C).
Rotor Speed                                                        2900 RPM Helium Flow (Low Range)                                          0.020 PSID -
Helium Flow (High Range)                                                0%
1
                -CirculaterC-2104(D)
Rotor Speed                                                            0 RPM'            ..
Helium Flow -(Low P.ange)                                      -0.003 PSID-Helium Flow (High Range)                                                0%
MAIN TURBINES                            System 51                          NORMAL-
                                                                                                                  ]
i
(                                                                                                                  a, 1
 
_ . . _  _    . . . -        . . _ . _ - _ _ _ .        . _ _ . _ . . _ . . . . _ _ _ .~                          _ . _ _ . . . _ . . _ - _ _
FOSAVEX-90~
PAGE 4 SCENARIO TIME:- r# + ec*c--
CLOCK TIME:
PRIMARY AUXILIARIES                                                                                                              ,
i
                    .un....................,...-BOARD-!*06"*"*"""*""**"""**"*"                                                                                                                .
MISCELLANEOUS                      .
t Bypass Flash = Tank Pressure                                                            O PSIG-PLANT ELECTRICAL'                                      . System 92-Essential                                                  - Bus"1          ' Bus 2-Bus 3 -                - N/I-Bus 3 480 VAC                                                  485-            485        485 120 VAC                                                  118'          .1181    :118-                      118-120- VOC                                              :125--
125L
                                                                                                                            . n'A"                  "B"                                      i Standby Diesel Generator                                                          NORMAL' - FAILED-ACM Diesel Generator-                                                            CLEARED OUT.
t Non-Essential Switchyard                                                                        NORMAL Bus'1-    Bus'2    -
Bus 3                  ,
4160 VAC                                                              -4160        4160                    4160 480 VAC-                                                                          NORMAL.
MAIN TOWER                                                System 41                                  ' DRAINED' SERVICE WATER TOWER                                      System 42'                                  NORMAL' FIRE WATER                                                System 45                                  -NORMAL-INSTRUMENT AIR-                                        . System 82-                                '"A"2HDR                      "B" HDR-93                          93 i                  SERVICE AIR                                                System 82                                  -95 PSIG:
                    ............................. BOARD:1-10 ********************************-
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE SHIGH
                              ' Bay 100'                                                                                    80 *F' Bay-200                                                                                    80:'F-Bay 300                                                                                    80 'F.~
REHEAT ACTIVITY MONITORS '                                                                              005 BUFFER SEAL MALFUNCTION                                                                                  NORMAL k
                -        -.d.-                      &                  r#    3,-r      y        v ,4-*                y      ,                  ,,9<- -
                                                                                                                                                                ,w+w,,--'e  9 ,-v4m--*-y - +
 
FOSAVEXi 90 t-              -
                                                                                                                                        -PAGE 5~
SCENARIO TIME: r-@ + oeso-CLOCK TIME:                                                      .
{
PRIMARY AUXILIARIES                                                                      7
                                ..................*********** B O A R D I - 13 * * * * * * * * * * * * * * * * * * * * * * * * * * * "" '
* PENETRATION INTERSPACE AP.
O PSID-0 GPM REACTOR BUILDING SUMP OISCHARGE . FLOW-HELIUM CIRCULATORS                                    System 21                    NORMAL
                                .....................******** BOARD I-15 ********************************
                                                                                                                      -29,9 KCFM-REACTOR BUILDING STACK FLOW REACTOR BUILDING AMBIENT 6P-                                                          _0.25[lachesH20''
CONTROL ROOM TEMPERATURE                                                                    75 'F
                                  ............................. BOARD-I-7507X *****************************
480V ROOM TEMPERATURE-                                                                      75;*F                      .s                .
a l
L l
o,    ,.
                              .,    .r,      ,                    - -
e    r    +                  4-                          ---,~___r      --+--- --s-
 
FOSAVEX                                                          SCENARIO TIME:L    -Te P s : M CLOCK TIME:-                    {
e                                                                                        .
RADIATION MON! TORS:                                                                -l NUMBER                  VALUE            ALARMING-      SENSITIVITY-RT-6212            5.0 X 10' CPM                Y            2.2E-8.                  ,
RT-6213            5.0 X 10' CPM                Y            2.2E-8                  ^!
RT-7312                005' CPM                            N/A RT-7324-1          1,9 X 10' CPM                N              1.57E-8                1 RT-7324-2          6.4 X 108 CPM                N.          4.36E-7                  l RT-7325-1          1.0 X 108 CPM                N              1.49E-5              Li RT-7325-2          1.0 X 105 mr/hr              N            N/A-                  'l RT-73437        1.5 X 108 . CPM-            N            2.51E-10                  i RT-73437        4.0 X-108 CPM                N-            2.73E      RT-9301                005' ' CPM                          N/A-RT-93252      1.6 X 108 mr/hr              Y,          N/A :-                  d AREA MONITORS                                                                          i RT-93250-1          2.0-X 108 mr/hr              Y RT-93250-2          3.0 X 105 mr/hr              Y                                      i RT-93250-3          5.0 X 10'nmr/hr              N RT-93250-4          3.0 X 105 mr/hr              Y-RT-93250-5          1.0 X 10' mr/hr              Y RT-93250-8          6.0 X 102 mr/hr              Y RT-93250-13        1.5 X-108-mr/hr              Y                                      1 RT-93250        2.5 X-108 mr/hr              N RT-93251-1          7. X 108 mr/hr              N-                                    i RT-93251-3          8;0 X 10' mr/hr-            N          ,
RT-93251-4          2.0 X 108Tmr/hr          -- Y .
RT-93251-5          1.0 X 108:mr/hr              Y                                    1 RT-93251-6          1.0 X 108 mr/hr            : Y-RT-93251-7          0FF SCALE                    Y-a RT-93251-8          5.0 X 102 mr/ht-            Y'                                    4 RT-93251-9          0FF SCALE'                  Y--
RT-93252-1          3.0 X'102 mr/hr              Y RT-93252-2          3.5 X 102 mr/hr-            Y RT-93252-4          5.5 X 102 mr/hr-            Y RT-93252        4.0 X 102-mr/hr            .Y                                      !
RT-93252-7          3.0 X 102 mr/hr            LY EQUIPMENT MONITORS RT-6314-2.          1.5 X 108 CPM ~          ~ N-RT-46211        '1.0 X 10* CPM-Y RT-46212            1.0 X 10' CPM-
                                                    -Y                                      j METEOROLOGICAL. DATA Wind Speed                                          2.7 MPH.                        ,
Wind Direction                            ' From 315 Degrees Plume Deviation / Sigma Theta                        4.0 Degrees 01fferential Temperature-                            3. 6 ''F-
 
i F05AVEX-?O PAGE 1 SCENARIO TIME: "a + cces-CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                                    YES Decay Heat Power                                                    0.05 MW PRIMARY COOLANT Pressure                                                        11 PSIA Temperature
* Circulator Inlet                                            95 'F Core Inlet                                                  105 'F Core Outlet                                                125 'F                i Calculated Bulk Core (CBCT)                                N/A Maximum Region Differential (AT)                            28 F Helium Flow Circulator C                                              10 X 102 Circulator 0                                                0 X 103 TOTAL                                                      10 X 103 Circulator Speed Circulator C                      '
2900 RPM Circulator 0                                                  0 RPM Moisture (Dew Point)
ME-9306                                                    41 *F ME-9307                                                    39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                            0 lb/hr.
Loop 2                                                  2.0 X 10' lb/hr:
EES Inlet Temperature                                              85 *F EES Outlet Temperature                                            100    F-Pressure                                                          350 PSIA PCRV LINER'C00LANT (In Service)
Loop 1                                                    NO Loop 2                                                    YES
(
____-_-_ _- _                          \
 
FOSAVEX-90                                .
PAGE:2--    -3
                                                                                                          '                        1
                                                                                          -SCENARIO TIME:          ra + oot CLOCK TIME:-
PRIMARY-AUXILIARIES-
            .......................******BOARDI-01-"*"""""*"""""**"""                                                              l GAS WASTE                                                    System 63:-                                              'l i
Inlet Pressure                                                  10 PSIA Vacuum Tank Pressure                                              8 PSIA:              .s l
                                    -Surge Tank "A" Pressure                                        ' 205 PSIG Surge Tank "B"-Pressure                                          0'PSIG
                                                                                                                                    ]
LIQUID WASTE                                                System 62"                      NORMAL                      j REACTOR PLANT COOLING WATER'                                System-46 Loop 1 P-4601                                                CLEARED OUT' P-46015        .
CLEARED OUT                  i Header Inlet Temperature                                CLEARED'0VT.
Parrel and Top. Head Outlet' Temperature                CLEARED 00TL        ,
                                                  ,vp Penetration Inlet Temperature                      CLEARED OUT-Loop 2 P-4602-                                              -ON-P-46025                                                CLEARED-OUT-Header Inlet. Temperature            _.
115 'F:
Barrel and Top Head Outlet Temperature                -115:*F-Top Penetration Inlet Temperature        '
:115:'F~                  a Surge Tank-. Level "A"                                          0-INCHES-Surge Tank Level "B"                                      -45 :- INCHES -            R i
_{  .
t
                                                                                          '+..
 
FOSAVEX-90 PAGE 3 I
SCENARIO TIME:    _
3 p + oc.&,
CLOCK TIME:
PRIMARY AUXILIARIES
      ............................* BOARD I-02 ********************************
HELIUM STORAGE                      System            Low Pressure Bottles 270 PSIG High Pressure Bottles                                      575 PSIG HELIUM CIRCULATOR AUXILIARIES              System 21-Circulator C-2103-(C)
Bearing Water Flow                                      170 GPM Bearing-Water Inlet Temperature                          78 'F Main Drain-4P                                          2.5 PSID-Buffer /Mid-Buffer AP
* B PSIO Buffer Helium Flow                                    '7-40 ACFM-Buffer Helium Return Flow                            '3,79.ACFM
          . Circulator C-2104 (0)
Bearing Water Flow                                          0 GPM Bearing Water Inlet Temperature 7B 'F Main Orain AP                                              4 PSID Buffer /Mid-Buf fer AP -                                    0-PSID Buffer Helium Flow                                          0 ACFM Buffer Helium Return Flow                                -:0 ACFM
      ............................. BOARD I-OS ********************************
REACTOR CORE                        System 12      ''
All Systems                                                NORMAL
      .............................BOARDI-05*********"**********************
HELIUM CIRCULATORS                  System 21 CirculatorC-2103(C)
Rotor. Speed                                          -2900 RPM Helium Flow (Low Range)-                              0.020 PS10 Helium Flow-(High Range)                                      0 %.          ;
Circulator C-2104 (0)-
Rotor Speed.                                                  O RPM Helium Flow (Low Range)                        -
                                                                        -0.003.PSID Helium-Flow (High-Range)                                      0%
MAIN TURBINE-                          SystemiS1                -NORMAL
 
i q
FOSAVEX-90--                                                          'i t                                                                                  PAGE'4-l-                                                                                            -
i I
SCENARIO-TIME:: Ta + cok -
CLOCK TIME:                                          1 PRIMARY AUXILIARIES
      .......................****** BOARD I-06 ********************************
MISCELLANEOUS            -                                                                                !
Bypass Flash Tank Pressure                              O'PSIO
                                                                                                              ]
    -PLANT ELECTRICAL                System-92 Essential-                        Bus'l      Bus 2-    Bus 3          'N/I Bus!3 480: VAC-                    485        485        485 120 VAC                      118        118          118            118
                '120.-VOC:                  :125        -125 A"-    .  -  "B" Standby Diesel Generator                          NORMAL            F AILED, ACM Diesel Generator                              CLEARED OUT Non-Essential Switchyard.                                        NORMAL Bus 1      Bus 2            Bus.3 -
4160 VAC                                -416d      --4 160-          4160'                    i 480 VAC                                            NORMAL                                    q MAIN TOWER                        System 41                    DRAINED s
SERVICE WATER TOWER            LSystem 42    -'
                                                                    ' NORMAL FIRE WATER'                      System 45 -                    NORMAL =
1 INSTRUMENT AIR                  System 82                      "A'! HDR:
                                                                                          "B" HDR--
                                                                          --            93 SERVICE AIR                      System 82                      95 PSIG
      ......................n....*
BO ARD = I - 10 ' " '"" " * " "" * " " " " " " * "
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGH
          ~ Bay 100                                                .~80 'F LBay 200                                                    80 'F
          ' Bay-300.                                                080 'F REHEAT ACTIVITY MONITORS                                        005
: BUFFER-SEAL. MALFUNCTION                                        NORMAL
                                                                                                                      \
__._-._.  'I
 
  . . ..    . .        - . ...    - ~ .      _ . , .  . . .  .
                                                                          . .- , - .                  .. .    ~ ~.      .- .              -              ...- .
                                                                                          -f FO$AVEX                                                                                                    1 [
PAGE 5-
                                                                                                -SCENARIO TIMEi rA 4 obM CLOCK: TIME:
1 PRIMARY AUXILIARIES'
                    .........n............******          BOARD I - 13 " * "" * " " " " " " ' " " " " * "
PENETRATION INTERSPACE AP                                                                O PSID REACTOR BUILDING. SUMP O!$ CHARGE-FLOW                                                    0'GPM HELIUM CIRCULATORS                    System 21                                          NORMAL
                    ..........................*** BOARD'I-15 ********************************
REACTOR: BUILDING.. STACK FLOW'                                                              29.9 KCFM REACTOR BUILDING AMBIENT 6P'                                                              -0.25 Inches H2O CONTROL ROOM TEMPERATURE                                                                        75 'F
                    .............................BOARDI-7507X""*""*"*"*"""*"*"*'
i 4BOV ROOM TEMPERATURE                                                                            75.
* F' 1
I
          -    4e--    m    y w+ d                        ..w--    , ,          ,-m'y    3,    y e-9,3,y--      -+        -'mi+  --,--  4- y v ra r*y        w, --+ t
 
FOSAVEX-90$                                                    I.
r
                                                                    -SCENARIO TIME:      -roanos            *
: CLOCK TIME:                              i RADIATION-MONITORS:
NUMBER                          VALUE~            ALARMING          SENSITIVITY RT-6212                  5.0~X 10* CPM                    Y            2.2E-8 RT-6213                  5.0 X.10' CPM                    Y            2-2E-B RT-7312                          005    CPM.                            H/A                                j RT-7324-1                3,8 X 106 CPM                    Y              1.57E-8 RT-7324-2                1.3 X 10'? CPM                  Y            4.36E-7 RT-7325-1                1.0 X1108 CPM                    N              1.49E-5 RT-7325                1.0'X-10 mr/hr                  N            N/AL                              4 RT-73437-1                1.5 X 102 CPM                    N            2.51E-10                          i RT-73437-2                4.0 X 108' CPM                  N            2.73E-10 RT-9301                          005    CPM'                            N/A-*                              i RT-93252-12              1.6 X 108 mr/hr                  Y,            N/A                              Jj AREA MONITORS RT-93250-1              2.0 X 108 mr/hr                  Y RT-93250-2                3.0 X 105 mr/hr              -Y RT-93250-3                5.0 X 10' mr/hr                N RT-93250-4                3.0 X 10 mr/hr                    Y RT-93250-5                1.0 X 10' mr/hr Y
RT-93250              6.0 X 108 mr/hr                  Y-RT-93250-13                1.5 X 108 mr/hr                  Y                                                ,
RT-93250-14              2.5 X 108 mr/hr~                N RT-93251-1                7.0 X 105 mr/hr-                N                                                1 RT-93251-3              -8.0 X-10' mr/hr'              -N.
. RT-93251-4                2.0 X'108 mr/hr                  Y                                                i RT-93251-5                1.0 X 10' mr/hr                  Y                                                l RT-93251-6                1.0 X 10' mr/hr                  Y' RT-93251-7                0FF! SCALE                        Y RT-93251-8                5.0 X 102 mr/hr                  LY RT-93251-9                0FF SCALE                      l'                                                  '
RT-93252-1                3.0 X 108 mr/hr-                  Y                                                  '
    -RT-93252-2                3 5 X 108 mr/hr
                                  .                              Y' RT-93252-4                5.5 X 108 mr/hr                  Y RT-93252-6              -4,0 X 108 mr/hr                -Y-RT-93252-7                3.0 X 108 mr/hr                  Y-
    -EQUIPMENT MONITORS RT-6314-2                1.5 X 10' CPM                    N RT-46211                  1.0 X 10' CPM'                    Y RT-46212                  1.0 X 10' CPM                    Y METEOROLOGICAL DATA 1
Wind Speed                                                  2.5 MPH                                l Wind Direction-                                    From 315 Degrees Plume Deviation / Sigma Theta                                4.0 Degrees:
Differential Temperature                                    3.6 F I                                                                                                                    i l
L L-r:                                                                                                - - -
 
1 F SAVEX-90'
                                                                    ~]                                                    PAGE II
  ,                                                                                  SCENARID T!_ME: ryised
: CLOCK. TIME:-
OVERALL PARAMETERS-Reactor Shutdown                                                          YES Decay Heat Power                                                          0.05 MW                                                    r
                                                                                                                                                      ,i M
                    ' PRIMARY COOLANT                                                                                                                ..j Pressure                                                              11 PSIA ~*                                  -
                                                                                                                                                      .-  i
: Tempera ture                                                                                                              :)
Circulator Inlet                                            95 - 'F-                                              .
                                        -Core Inlet- '                                              105 *F-                                                I Core Outlet-                                      ,  1125''FL                                              q Calculated Bulk Core (CBCT)                              N/A                                                      j Maximum Regi.on Differential (AT)                          -28 *F                                                  !
:i Helium Flow L.              .
                                      - Ci rcul a tor _ ' C..                                  -10: X 10'                                                -i
                                        ~ Circulator 0                                              -OLX.108                                              l
                                      ~ TOTAL                                                      10 X.-100
                                                                                                                                                      .q Circulator' Speed-                                                                                            -
i Circulator C                                          -2900 RPM                                                  i Circulator 0                                                      0. RPM Moisturei(Dew Point)                                                  ..
i ME-9306                                                . 41t* F:
                                      .ME-9307_                                                ~39 'F                                            -
SECONDARY COOLANT:                                                                        4 Emergency Condensate Header Flow'                                                                                                            ,
!                                            Loop 1                                            .-                      0 -. i b/ h r -.
Loop.2' 2,0 X 10'ilb/hr.
EES: Inlet Temperature:                                                      85 *F
,                                      -EES Outlet Temperature                                                      100 'F Pre s sure-:                                                              :
350-PSIA 1
:1
                            .PCRVLINERCOOLANT-(-liService)''                                                                                              <
Loop'l'-
N0 '-
Loop 2                                                      YES-l
    '    ?
l!                                                                                                                                  >
9
 
FOSAVEX-90i PAGE 2 SCENARIO TIME: Y#ro/cc            i
                                                                        . CLOCK TIME:
PRIMARY AUXILIARIES                                  1 ti BOARD-1-01L********************************'    H GAS WASTE                                            System 63 i
Inlet 1Pressure                                                            10 PSIA:
Vacuum Tank-Pressure--                                                      8 PSIA Surge Tank "A" Pressure                                                  205 PSIG
          - Surge Tank:"B" Pressure            -
0 PSIG LIQUID WASTE                                          System'62:                NORMAL-REACTOR PLANT ; COOLING WATER                  -
System 46-
          -Loop 1                                                                                            l P-4601                                                            CLEARED OUT              i
        ,        P-46015                                                          CLEARED'0VT              i Header Inlet Temperature'                                        = CLEARED OUT!
Barrel- arid Top Head OutletLTemperature                          CLEARED OUT-Top Penetration Inlet Temperature                                  CLEAREDLOUT-            1 Loop 2
                -P-4602                                                              ON P-46025-                                                          CLEARED OUT            3 Header Inlet Temperature                      .
                                                                                    =115 'F
                ' Barrel and Top Head Outlet Temperature                            115,*F'          -
Top _ Penetration: Inlet, Temperature:''                          115 'F-              -j o.
          -Surge Tank Level "A";                                                  . 011NCHES            1 Surge' Tank Level "B"                                                    45' INCHES
{
i
 
FOSAVEX-90                                                                  .
_ PAGE 3-SCENARIO TIME: n
* o <co CLOCK-TIME:
PRIMARY AUXILIARIES
            .........................**** BOARD                      I-02-********************************-
HEllUM STORAGEL                      1 System 24-Low Pressure Bottles                                                            270 PSIO:
High Pressure _ Bottles                                                        575 PSIG HELIUM CIRCULATOR AUXIL'IARIES-                          System 21                                                                          :
Circulator C-2103 (C)
Bearing Water Flow                                                          170 GPM Bearing Water; Inlet Temperature                                              '78 'F-Main Drain AP-                                                              2;5 PSID Buffer /Mid-Buffer AP                            +                            :B'PSID Buffer Helium Flow                                                        7.40 ACFM-Buffer Helium Return Flow                                                . 3.79 ACFM Circulator C-2104 (0)
Bearing Water Flow-                                                              0 GPM Bearing Water.. Inlet Temperature                                              7B 'Fi Main Drain AP                                                                    4 PSID Buffer /Mid-Buffer AP                                                          -0 PSID Buffer Helium Flow                                                              0 ACFM_
Buffer He'lium Return Flow                                                      'O ACFM
            .............................BOARDI-03*********"*"******************
l System 12;              d l
REACTOR CORE L                All Systems                                                                      NORMAL
                                                                            ~
            .............................*        - BOARD            I-05.*******'*************************
HELIUM _ CIRCULATORS                      System 21 Circulator C-2103 (C)
                      . Rotor Speed                                                                  2900 RPM
                      -Helium Flow (Low Range)-                                                    0.020'PSID Helium Flow"(High; Range)~                                                                0%
Circulator C-2104-(0)_                                                                                                                i Rotor Speed.-                                                                            0 RPM-Helium Flow -(Low Range)-                                                  -0,003 PSIO Helium Flow-(High= Range)                                                                0%
MAINsTURBINE                              System 51                                  NORMAL ~
                                                        .--,.--&      ,y                              . , - . -                        ,,...-,,.4., ,
 
                                                                                                                                  .s. _
FOSAVEk-90'.                                              -
PAGE 4 SCENARIO TIME: 74 4040 CLOCK TIME:
PRIMARY ' A'UXILI ARI ES-u...u....n....***"**""" - BOARD : 1 - 0_6 . " * " " " * " " " " * " " " " * " "
4  '
MISCELLANEOUS                                                                                                                      '
Bypass Flash Tank Pressure                                                  O PSIG.
PLANT ELECTRICAL'-                                System 92 Essential                _.
Bus =1        Bus 2 -  Bus 3              -N/I Bus =3-480 VAC                                        485;          485        485-120 VAC                                        118          118-      -118:              118'
,                        -120. VOC                                        125--        '125 "A"                "B"                      ,
                          -Standby Diesel Generator                                              NORMAL              FAILE0 ACM Diesel Generator                                                  CLEARED OUT-Non-Essential
>                          Switchyard                                                            NORMAL Bus 1    . Bus 2-              Bus 2 3-'    ,
4160 VAC                                                      4160        4160              4160-4801%C                                                                NORMAL                                        ,
MAIN TOWER                                        -System 41                        0 RAINED-SERVICE WATER TOWER                                System 42                        NORMAL.
FIRE WATER                                          System 45                      ' NORMAL                                        ;
;            INSTRUMENT AIR'                                    System 82-                        "A"' HOR            "B" HOR 93                  -93            .
3 SERVICE AIR                                        < System 82                        95 PSIG-                                    =l
.-          .  .n.n.....n......n..****
                                                                - BOARD 1 - 10 " " " * " * " "" * " " "" " " " "
PLANT PROTECTIVE SYSTEM-                                                                  ,
                                                                                                                                              .i'
            ' REACTOR BUILDING TEMPERATURE - HIGH-                                                    . -_
Bay 100                                                                        80L*F                                      ,
                                                                                                                                                ~
Bay'200                                                                        80 'F i                  Bay ~300.-                                                                      80 'F~
REHEAT ACTIVITY MONITORS'                                                              005
: l.          - BUFFER SEAL _ MALFUNCTION                                                          ! NORMAL i                                                                                                                                              ,
J
 
i FOSAVEX              . -
PAGE 5
                                                                                                  -SCENARIO TIME: r#*o co
                                                                                                                                                          "~
i
                                                                                                -CLOCK TIME:        ,
PRIMARY AUXILIARIES
                  . . . . . . . . . . . . . . . . . . . . . * " " * " B O A R D I - 13 " " " " * " * " " " " " * " " " "
* PENETRATION-INTERSP' ACE-AP                                                                  0 PSID
                                                                                                                    ~
REACTOR BUILOING' SUMP DISCHARGE FLOW--                                                        0 GPM-                                        I HELIUM CIRCULATORS-                                    System 21..                            NORMAL
                . . . . . . . . . . . . . . . . . * * " * * * * * * *
* B O A R D - I - 1 5 '" * " * " " " * " " " " " " " * " "                            ,
t REACTOR _ BUILDING STACK ~ FLOW.                                                                  29,9 KCFM-                                ,
REACTOR. BUILDING-AMBIENT AP                                                                  -0,25 Inches H20.
CONTROL ROOM TEMPERATURE                                                                              75 'F              ,
                . . . . . . ~. . . . . . . . . . . . . * * * * * * *
* B O A R D I - 7 5 0 7 X " " a
* 4 * " * * " * " " * " " " "
* 480V ROOM' TEMPERATURE                                                                                75 'F
                                                                                                                                                          .6 1
a i:
i i
: e.  +                            -                                                    -~        ...,n                  ,    e , v-        .w,'.
 
l 4
FOSAVEX-90--
SCENARIO TIMEi V a i /v r -
CLOCK TIME: _
RADIATION MONITORS:
  . NUMBER                                      VALVE-                ' ALAR 41NG                          .SENSITIVITYx RT-6212                        5,0 X 10'' CPM                          Y                                  2.2E-8            .i
    -RT-6213                        5.0 X=10' CPM                            Y                                  2.2E-8 RT-7312-                                  -005        CPM-                                                  N/A RT-7324-1                      4.5 X 10' CPM.        -
Y .--                              1.57E            ;'
RT-7324-2=                      1,4 X-106-CPM                            Y-                                4.36E-7' RT-7325                      1.0 X~108 CPM-                            N-                                l'.49E-5 RT-7325-2                        1.0 X'101-mr/hr-                          N                                N/A-
    -RT-73437-1                      1.5.X 108 CPM                            N                                2.51E      RT-73437-2            -4.0 X 101 CPM                                      N                                2.73E          i RT-9301                                    005- CPM                                                        N/A-RT-93252-12                -1.6 X 108~mr/hr--                          -Y-                                  N/A' 4
AREA MONITORS RT-93250-1              -2.0 X 108 mr/hr                              'Y                                                        1 RT-93250-2                      3.0 X 105 mr/hr                          Y                                                      >
RT-93250-3                      5.0 X 108 mr/hr:-                        N RT-93250-4                      3.0-X 101 mr/hr                          Y RT-93250-5                        1.0 X 108 mr/hr
                                                  -                            Y-                                            .
RT-93250-8                -6.0 X-108 mr/hr :-                          -Y-RT-93250-13                        1.5 X:108 mr/hr-                        Y-RT-93250            =2.5 X--108:mr/hr.        -
:N-RT-93251-1                    -7.0 X 101 mr/hr.                        -N
    -RT-93251-3                    '8.0 X~10' mr/hr:                            N                              '
RT-93251-4.                        2.0 X 108 mr/hr                      -Y RT-93251-5                          1.0 X 108 mr/hr                    ,Y-RT-93251-6                  :- 1. 0 - X - 10 8 mr/hr                        Y                                                      >
RT-93251-7                        0FF SCALE                                Y
    -RT-93251-8                          5 . 0 X --- 10 8 mr/hr                  Y RT-93251-9                        0FF SCALE-            .
Y                                                -
RT-93252-1                      -3.0 X:102 mr/hr                            Y RT-93252-2                          3.5 X 108 mr/hr:                          Y                                                    j RT-93252-4 5.5 X.108-mr/hr                          Y RT-93252-6                          4.0 X 108 mr/hr.-                        Y-RT-93252-7                          3.0 X 108 mr/hr                          Y EQUIPMENT MONITORS RT-6314  :                -1.5 X 108 CPM                              .N RT-46211                              1.0 X 10* CPM'  -
Y RT-46212                                1.0 X 10' CPM                            Y METEOROLOGICAL DATA Wind Speed: .                                                                                    2.2 MPH
        ' Wind Direction                                                                From 315 Degrees Plume Deviation / Sigma Theta                                                                    4.'O Degrees Differential Temperature                                                                          1.9-*F 1
 
                                                                                      ._7_.__.
                                                                                                                                                                    }
e FOSAVEX-90 PAGE-1 SCENARIO TIME:- T # s o w 5'1                                          :
CLOLX TIMEi OVERALL PARAMETERS                                                                          _
Reactor Shutdown                                                                      YES-Decay Heat Power                                                                      0.05 MW.
l PRIMARY COOLANT                                                                                                                                    ;
                                                                                                      .- PSIAL-Pressure                                                                    '11 Temperature-                  _
Circulator--Inlet                                                      95 *F .
Core Inlet                                                          105 _* F:
Core Outlet                                .
125 *F-Calculated Bulk Core .(CBCT)                                        N /A-                                                      -
Maximum Region Differential-(AT)                                        28.*F Helium Flow-Circulator C                                                      X 10' Circulator 0                                                            0 X 10' TOTAL                                                                10 X 10' Circulator Speed-_                                                                            .
                                  ~ Circulator C                                          '
2900 RPM Circulator D                                                                  -0 RPM Moisture (Dew Poi.nt)                                                                      ..
ME-9306                                                              411*F-ME-9307                                                          -139
* F _-
              - SECONDARY COOLANT l
L                        Emergency Condensate Header Flow Loop l'                                                                            :; O ~ lb/hr j                                          Loop 2                                                      '2.0<X~10''lb/hr-2                                    EES Inlet Temperature.-                                                                    85 *F
                                  .EES Outlet Temperature:-'
                                                                                                                              -100 *F-
                                  -Pressure-                                                                                -350 PSIA-PCRVILINER COOLANT (In Service)-
L
                                  . Loop 1                                                                NO l                                    Loop 2                                                                YES l
: l.      ,
_                  , + ,                                _    -            ,    , _ , , , . .                                . , , .    -
 
1 ?
F05AVEXe901                                        ..
PAGE 2' SCENARIO-TIME: 72;r mtty
                                                                                        -CLOCK T.lME:
PRIMARY AUXILIARIESr
    * * * * * * * " * * * * * * * * * * * * * * * * * * *
* B O A R G I - 01 " " " " " * * " " * " " " " " * * " a GAS WASTE                                                        System 6'
                                                                                                                                            'l Inlet Pressure:                                                                              10 PSIA                              'f Vacuum Tank Pressure-                                                                    - B PSIAL                                ;
Surge Tank."A" Pressure                                                                  205 PSIG.                                i Surge Tank              '_'B"            Pressure -                                              0 PSIG '                        o LIQUID WASTE:                                                    System,62-              3 NORKAL~          <
REACTOR PLANT COOLING. WATER                                      System L46 --
4 Loop-1                                                                                          _
P-4601                                                                        CLEARED OUT-P-4601S                                                                      CLEARED OUT
                      ' Header Inlet. Temperature'                                                    CLEARED OUT Barrel and Top Head Outlet Temperature                                        CLEARED 0UT' Top Penetration Inlet Temperature                                              CLEARED OUT-Loop                                                                                    -
P-4602-                                                                        ON P-46025;. .                                                                  - CLEARED OUT-Header Inlet Temperature                                .                      115 *F'                -              . !.
Barrel and Top Head Outlet Temperatures                                      :115 'F Top Penetration Inlet Temperature i                                            1).5 -L
* F L Surge Tank-level "A"                                                                          011NCHES
                                                                                                                                            ~
Surge-Tank Level "B"                                                                        45l INCHES i
                                                                                                    ' \
(                                                l
:s>
__._.____.__E_E _    _ _ _ - - _ _        - - _ - -
 
FOSAVEX-90:
                                                                                                                    - SCENARIO TIME:to w ogr                                                  i-
                                                                                                                    -CLOCK:TIMEi                                                                              ,
t
                                                                      ' PRIMARY AUXILIARIES
                          . . . . . ,, . . . w . . . . . . . . . . . . . n o . . . . B 0 A R D I - 0 2 " " " " * " * " " ' " " *
* L " " * " "                                                    -
HELIUM STORAGE-                                        ' System 24                                                        - .                      ..
                                -Low Pressure Bottles l                                        <
                                                                                                .                                            270 P313--                        3 i
,                                tiigh Prusure Bottiss                          3                                                            575 PSIG HELIUMsCIRCULATOR AUXILIARIES                                          Systein 21                          ,
i I
Circulator C-2103 (C)-                                                                                                    -
Bearing Mater Flow-                                                                        i          lUO GPM-Bearing Vater Inlet Temperature ~                                                                        -18 aF-                                                  )
Main Orain: AP            .                                .
                                                                                                                                              -2.5 PSID=                                        '
* 8;PSID
                                      -Buffer /Mid-Buffer AP Buffer kelium Flew                                                                                -'7.40'ACFN Buf fer Helium -Return' Flow                                                                          3.79 ACFM Ci reula terz C-2104 ,(D): '                                                  !
8 earing Water Flow                                                                                          0 GPM' Bearing Water Inlet Temperature-                                                                            78 'F Main-Orein AP-                                                                                              4 PSID Buffer /Mid. Buffer AP                                                                                      -0 PSID' Buffer Helium Flow.                                                                                        10-ACFM Buf fe- Helium Return Flow-                                                                                  0 ACFM 1
                        ...............*************                              BOARD-I-03"*""*"*""""""""""*
REACTOR CORE                                              ' System-12                    '
i                                                                                                                                                                                                          -
All Systems                                                                                                  NORMKJ
                        ...n......u              ...n    n.........
BOAft D - I - 0 5 ' "" " " " " ' " " " " " " " " " "
HELIUM CIRCULATORS-                                        System 21                                                    .q                :<
J Circulator C-2103-(C).
Rotor Speed                                                                                            2900 RPM-Helium Flow (Low.i'ange)                                                                            0,'020 PSI)
Helium- Flow (High'hange)                                                                                        D fi;                        y-      4 Circulator;C-2104 (D)                        '
Rotor Speed-                ~ .                ,
                                                                                                        .                                    . ._ 0 RPMa Helium Flow (Low Range) .-                                                                      =-0.003 PSID                            -
Helium Flow -(High4Ra'nge)                              .
O T.
* MAIN-TURBINE                                              System 51                                                ' NORMAL                                  q 4
k
                                                                                                                                !                            \
                                                                                                                                                                                                        -j
                                                                                                                                                                                                          ~
  .. -                -                . - .          ._.                      --. __-                        ~            _ , , _ .            . m ...          .m    , ,          ._
 
F05AVEX-90 PAGE 4 SCENARIO TIME: r,c r oa5-CLOCK TIME:
PRIMARY A'lXILIARIES
          . . . . . . . . . . . . . . . . . . . * * * * * * * * *
* B O AR U I - 0 6 " * * " " * * " " " " " ' " * * " " "
MISCELLANEDUS                                                                                                                                                                    1 Bypass Flash Tank Prnssure                                                                                                                    O PSIG PLANT ELECTRICAL                                    System 92 Essential                                            Bus 1                                              Bus 2                                Bus ?      K,I Bus 3 480 VAC                                            485                                                4RE                              485 120 VAC                                            A18                                              ((0                              118        118 12U VDC                                            125                                                125 nn a          ngn Standoy Diesel Generator                                                                                                            h0RMA'l      F ^ 1 L'.5 ACM Diesel Generator                                                                                                                  CLEARED OU1                .\
Non-Essential Switchyard                                                                                                                          NORMAL Bas 1                              Bus 2        Bus 3 4160 VAC                                                                                              4160                            4160        4160 480 VAC                                                                                                                              NORMAL MAIN TOWER                                          System 41                                                                                          DRAINED SERVICE WATER TOWER                                System 42                                                                                          NORMAL FIRE WATER                                          System 4'5                                                                                        NORMAL
            'Itl3iRUNENT AIR                                    System 82                                                                                        "A" HOR        "B"    HDR 93            93 SERVICL AIR                                        System 82                                                                                          95 PSIG
            ,, . . , . . . . . . . . . . . . . . . . . . . . ., . . . .
* B O A R D I - 1 0 " " " " " " * * " " " " " " " " "
PLANT PROTECTIVE SYSTEM REACTOR 'dVIt0ING TEMPERATURE - HIGH Bay 100                                                                                                                                        80 F Bay 2JO                                                                                                                                        80 F l                Bay 305                                                                                                                                        80 'F                    '
l          REMEAT ACTIVITY MONITORS                                                                                                                              005 BUFFER SEAL MALFUNCTION                                                                                                                                NORMAL 6
    -" eNr          'MN.
i                  .MN              -_            _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _          -
 
4 FOSAVEX-90 PAGE 5 SCENAt:0 TIME: -n.s
* car
: CLOCK 11ME:-
PRIMARY AUXILIARIES
            ............................' BOARD l-13 ********************************
PENETRATION INTERSPACE-AP                                        0 PS10 '
REACTOR BUILO!NG $ UMP 0!$ CHARGE FLOW                            0 GPM HEL10M CIRCULA!0R$                    Sys' tem - 21              NORMAL                      .
            ............................* BOARD            I-15-********************************
REAC10R BUILDING $ TACK FLOW                                      -29,9 KCFM REACTOR BUILDING AMBIENT AP                                      -0.7, Inches H2O 4
CONTROL ROOM TEMPERATURE                                                75 'F
            ............................. BOARD.1-7507X *****************************
i 480V ROOM TEMPERATURE                                                    75 'F      ,
I i
j 2
 
    . --- . . ~ .                                    . - - - - - - _ . - . . - .                                                  _ -                . ~ .  . . -          . - - . . . - -
;                                                                                                                                                                                              .1 j                                                                                      FOSAVEX 90                                                                                                  ,
!'                                                                                                                  SCENARIO TIME:                  tr?? - /.6C)
CLOCK TIME:
RADIATION MONITOR $;
NUMBER                                      VALUE                                ALARMING              SENSITIVITY                                                    j RT-6212                          5.0 X 10' CPM                                    Y                          2.2E-8 RT-6213                          5.0 x 106 CPM                                    Y                          2.2E-8                                                    q RT-7312 _                                  U05            CPM                                                - N/A .                                                      !
RT-7324-1                        6.3 X 10' CPM                                    Y                            1.57E-8 RT-7324-2                        2.1 X 108 CPM                                    Y                            4.36E-7
.                        RT-7325-1                          1.0 X 108 CPM                                    N                            1.49E-5                                                    ,
l RT-7325-2                          1.0 X 108 mr/hr                                  N                            N/A RT-73437-1                        1,5 X.108 CPM                                    N                            2.516-10 RT-73437-2                        4.0 X 108 CPM                                    N                            2.73E-10' RT-9301                                    00$          CPM                                                    N/A RT-93252                      1.6 X 108 mr/hr.                                Y,                          N/A AREA MONITORS b                          RT-93250-1                        2.0 X 108 mr/hr-                                  Y RT-93250-2                        3.0 X-108 mr/hr                                  Y RT-93250-5                        5.0 X 108 mr/hr                                  N.
RT-93250-4                        3.0 X 108 mr/hr                                  Y RT-93250-5                        1.0 X 108 mr/hr                                  Y RT-93250-8                        6.0 X 108 mr/hr                                  Y                                                                                .,
RT-93250-13                      1.5 x 108 mr/hr                                  Y
;                          RT-93250-14                      2.5 X 108 mr/hr                                  N RT-93251-1                        7.0 X 105 mr/hr                                    N RT-93251-3                        8.0 X-108 mr/hr                                  .N                          '
RT-93251-4                        2.0 X 108 mr/hr                                    Y RT-93251-5                      - 1.0 X 108 mr/hr                                    Y.
RT-93251-6                        1.0-X 108 mr/hr                                    Y-RT-93251-7                        0FF SCALE                                        .Y RT-93251-8                        5.0 X 108 mr/hr-                                -Y RT-93251-9                        0FF SCALE                                          Y
                        - RT-93252-1                        3.0 X 108 mr/hr                                    Y r                          RT-93252                      3.5 X=108 mr/hr:                                -Y i                          RT-93252-4                        5.5 X 108 mr/hr                                    Y RT-93252-6                        4.0 X 108 mr/hr                                    Y                                                                                .
RT-93252-7                      - 3.0 X 108 mr/hr                                  .Y EOUIPMENT MONITORS-RT-6314-2                          1.5 X 108. CPM                                      N RT-46211                          1.0'X 106 CPM                                    =Y l-                        - RT-46212-                        1.0 X 10' CPd                                      Y-METEOROLOGICAL DATA f
Wino $ peed                                                                                    2.0 MPH-Wind Direction .                                                                  From 315 Degrees-Plume Deviation / Sigma Theta                                                                  4.0 Degrees Differential Temperature                                                                      -1.9 'F P
          -, , .. y-s.,      . . , , , . . _ ._m., ..,y , ,      ,.,.,,.,,-.v..,-    ,v,,m..,.y,-.e..--          , , , .    ,,_-,.,,,..,.4..._          -
                                                                                                                                                                , , , , - , - . . , ~ r._,%,_n  .
 
F0$AVEX-90                                              q PAGE 1          l SCENARIO TIME: Tw + oeo CLOCK TIME:
OVERALL PARAMETERS r
Reactor $hutdown                                            YES Oecay Heat Power                                            0,05 MW PRIMARY COOLANT Pressure                                                11 PSIA Temperature
* Cire.ulator 1.ilet                                    95 'F'                      l Core Inlet                                          105 'F_                        !
Core Outlet                                          125 'F                    '',
Calculated Bulk Core (CBCT)                        N/A Maximum Region Differential (AT) ,                    28 'F Helium Flow
* Circulator.C                                        10 X 108 Circulator 0                                          0 X 10' TOTAL                                                10 X;108                        t Circulator $ peed                                                              .          j Circulator C                          '
2900 RPM Circulator 0                                              0 RPM                    i Moisture (Dew Point)                                    ._    _
ME-9306                                              41 'F L            ME-9307                                              39- 'F -                ,
SECONDARY COOLANT-Emergency Condensate Header Flow Loop 1                                                      0 lb/hr Loop 2                                            2.0 X.10' lb/hr                  i EES Inlet Temperature                                        -85 *F2          1 EES Outlet Temperature-                                      100 'F Pressures                                                    350 PSIA PCRV LINER: COOLANT (In Service)
              -Loop'1                                              1NO                        -I Loop 2:                              1            ;YES:
_4:          -
m_  m_. ___.                                                -
 
FOSAVEX-90
                                                                                      ~~
PAGE 2 SCENARIO TIME: T *edo CLOCK TIME:
PRIMARY AUXILIARIES
          ............................* BOARD I-01 ********************************
GAS WASTE                                                                    System 63 Inlet Pressure                                                                      10 PSIA Vacuum Tank Pressure                                                                  8 PSIA Surge Tank "A" Pressure                                                              205 PSIG Surge Tank "B" Pressure                                                                O PSIG LIQUID WASTE                                                                System 62                              NORMAL REACTOR PLANT COOLING WATER                                                  System 46 Loop 1 P-4601                                                      CLEARED OUT P-46015                                                      CLEARED OUT Header Inlet Temperature                                    CLEARED OUT Barrel and Top Head Outlet Temperature                      CLEARED OUT Top Penetration Inlet Temperature                            CLEARED OUT Loop 2 P-4602                                                      ON P-4602S                                                      CLEARED 0)T Header Inlet Temperature                                    115 'F Barrel and Top Head Outlet Temperature                      115 'F-Top Penetration Inlet Temperature  '
115 *i-Surge Tank Level "A"                                                                  0 .*4cdES Surge Tank Level "B"                                                                4: . ,,JH E S 4
 
I FOSAVEX-90 PAGE 3 SCENARIO TIME:_ v
* odo -
CLOCK TIME:
PRIMARY AUXILIARIES
          ............................' BOARD I-02 ********************************
HELIUM STORAGE                                    System 24 Low Pressure Bottles                                                                              270 PSIG High Pressure Bottles                                                                            575 PS!G HELIUM CIRCULATOR AUXILIARIES                                                      System 21 Circulator C-2103 (C)
Bearing Water Flow                                                                              170 GPM Bearing Water Inlet Temperature                                                                  78 'F Main Drain AP-                                                                                  2.5 PSID Buffer /Mid-Buffer AP
* 8 PSID Buffer Helium Flow                                                                            7,40 ACFM Buf fer Helium Return Flow                                                                  -3.79 ACFM Circulato- C-2104 (D)
Bearing Water Flow                                                                                0 GPM Bearing Water. Inlet Temperature
                                                ~
78 'F Main Drain AP                                                                                      4 PSID Buffer /Mid-Buffer AP                                                                              0 PSID Buffer Helium rlow                                                                                0 ACFM Buffer Helium. Return Flow-                                                                      -0 ACFM
          ............................. BOARD-I-03 ***********************'********                                                        !
REACTOR CORE                                        System 12                              '
j All Systems                                                                                        NORMAL-
          ............................. BOARD I-05 *********************************
HELIUM CIRCULATORS                                    System 21 Circulator C-2103 (C)
Rotor Speed.                                                                                    2900 RPM Helium- Flow (Low Range) 0.020 PS!D Helium Flow (High Range)                                                                            0%
Circulator C-2104'(0)                                                                                                      !
Rotor Speed                                                                                        0 RPM.          1 Helium Flow (Low Range)-                                                                      -0.003 PSID Helium Flow (High Range)                                                                            0%              l l
MAIN TURBINE                                            System 51                                          NORMAL' l
l.
_ . x. _      :          _                                                                                                _
d
 
FOSAVEX-90 PAGE 4 SCENARIO TIME: m
* c Jo CLOCK TIME:                    _
PRIMARY A'JXILI ARIES
    ..........................*** BOARD I-06 ********************************
MISCELLANEOUS Bypass Flash Tank Pressure                              O PSIG PLANT ELECTRICAL                System 92 Essential              '
Bus 1      Bus 2      Bus 3-        N/I Bus 3 480 VAC                        455        485        485 120 VAC                        118        118        118          118 120 VOC                        125        125-
                                                                      "A"'        "B" Standby Diesel Generator                          ' NORMAL        FAILEO.
ACM Diesel Generator                                CLEARED.0VT
                                                                                                                -. {
Non-Essential Swi ;hyard                                          NORMAL Bus 1    ' Bus 2        Bus 3 4160 VAC                                  4160        4160        4160 480 VAC                                            NORMAL MAIN TOWER                      System.41                      ORAINED-                                    j SERVICE WATER TOWER              System 42                    -NORMAL FIRE WATER                      System 45                      NORMAL                                    1 INSTRUMENT AIR                  System 82                      "A" HDR "B" HOR 93          -93 SERVICE AIR                    System 82                      95 PSIG
      .........................**** BOARD I-10 ********************************
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGH' Bay 100                                                  l 80 '.' F .
Bay 200                                                  - 80 'F'-
Bay 300                                                    .80.'F REHEAT ACTIVITY MONITORS                                        005
    -BUFFER SEAL MALFUNCTION                                          NORMAL-1
 
__._m__      _-. _ _ . _ _ _._._._. _ _ _ _ _ __... - ._ .. _ _ _ _._ _ _. _ _ _.__ . _ _ _ . ~ _ .
)                                                                                                                                                !
F05AVEx-90                                  -
                                                                                                                              -PAGE 5            :
1 i
SCENARIO TIME: f/ *cc*o                  <
-                                                                                                        CLOCK TIME:
PRIMARY AUXILIARIES
/
i u.............**********""                              BOARD - I - 13 " " " " * " " " * " "" " " " " "          j 0 PS10 PENETRATION !NTERSPACE 6P-0 GPM                        l REACTOR BUILDING SUMP DISCHARGE FLOW HELIUM CIRCULATORS:                                      System 21                -NORMAL
                              . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* B O A R D I - 15 " " " " " " " " * * " " " * * " " "
REACTOR BUILDING STACK FLOW 29.9 KCFM
                                                                                                                    -0,,2'3 Inches H2O REACTOR BUILDING AMBIENT 69
:                              CONTROL ROOM TEMPERATURE                                                                75 'F i
                              . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BO ARD I - 7 5 0 7 X " " " " " " " " " " * " * * " "
4 75,'F 480V ROOM TEMPERATURE                                                    ,
o
                                                                                                                                                )
i l
l l
i.
4 e+                                                                                            ,                  '#:              '
 
F0$AVEX-90 SCENARIO TIME:          # +e-CLOCK TIME:      ,
RADIATION MONITORS:
VALUE                  ALARMING      SENSITfyITY NUMBER RT-6212          5.0 X 10' CPM                    Y              2.2E-8 RT-6213          5.0 X 10' CPM                    Y            2.2E-8 RT-7312                OOS    CPM                                N/A RT-7324-1        3.2 X 10' CPM                    N              1.57E-8 RT-7324-2        1.0 X 10' CPM                    N              4.36E-7 RT-7325-1        1.0 X 108 CPM                    N              1.49E-5 RT-7325-2        1.0 X 10$ mr/hr                  N              N/A RT-73437-1        1.5 x 108 CPM                    N              2.51E-10 RT-73437-2        4.0 X 10 CPM                    N              2.73E-10 RT-9301                00$    CPM                                N/A RT-93252-12      1.6 X 108 mr/hr                  Y,            N/A AREA MONITORS RT-93250-1        2.0 X 108 mr/hr                  Y RT-93250-2        3.0 X 108 mr/hr                  Y RT-93250-3        5.0 X 10' mr/hr                  N RT-93250-4        3.0 X 101 mr/hr                  Y RT-93250-5        1.0 X 108 mr/hr                Y                                        .
RT-93250-8        6.0 X 108 mr/hr                  Y RT-93250-13        1.5 X 108 mr/hr                  Y RT-93250-14        2.5 x 108 mr/hr                  N RT-93251 1        7.0 X 105 mr/hr                  N RT-93251-3        8.0 X 10' mr/hr                  N          '
RT-93251-4        2.0 X 108 mr/hr                  Y RT-93251-5        1.0 X 108 mr/hr                  Y RT-93251-6        1.0 X 108 mr/hr                  Y RT-93251-7        0FF SCALE                        Y RT-93251-8        5.0 A 1C8 mr/hr                  Y RT-93251-9        0FF SCALE                        Y RT-93252-1        3.0 X 108 mr/hr                  Y RT-93252-2        3.5 x 108 mr/hr                  Y RT-93252-4        5.5 X 108 mr/hr                  Y RT-93252-6        4.0 X 108 mr/hr                  Y RT-93252-7        -3.0 X 108 mr/hr                  Y EQUIPMENT MONITORS RT-6314-2          1.5 X 10' CPM                    N RT-46211            1.0 X 10' CPM                    Y RT-46212'          1.0 X 10' CPM                    Y METEOROLOGICAL DATA Wind Speed                                              1.9 MPH Wind Direction                                    From 315 Degrees-Plume Deviation / Sigma Theta                          4.0 Degrees Differential Temperature                                3.9 *F l
 
  . , _ . _ . _ _ . . . . _ _ _ _ _ _ .                                      -  . - - -        _  _ . . . . _ _ . _ _ _ . - - _ _ _ . . . ~ . . . . _ . _ _ .
i
)                                                                                                - FOSAVEX-90 PAGE 1 i
SCENARIO TIME: 74
* o/W                                                !
i
'                                                                                                                                                                                                          l CLOCK TIME:
l I'                                                                                      OVERALL PARAMETERS Reactor Shutdown                                                                                            YES                                                  j 4
                                                                                                                                                                                                        '; =
09eay Heat Power                                                                                            0. ''S MW t
:                                                                                                                                                                                                          i PRIMARY COOLANT -
Pressure                                                                                              11 PSIA-r Temperature Circulator Inlet                                                                                95 'F                                            ;
Core' Inlet                                                                                  105 *F-
-                                                        Core Outlet                                                                                  125 'F Calculated Bulk Core _ (CBCT)                                      _
N/A-Maximum Region Differential (AT)                                                                28 ?F                                            ,
Helium Flow                                                                                                                                              !'
Circulator C                                                                                  10 X_108 Circulator 0                                                                                  0 X 10'                                          ,
                                                                                                                                                                                                          ~
TOTAL                                                                                        10 X1108 Circulator Speed                                                                                                                                          1 Circulator C                                                          '
2900 RPM                                          /
Circulator 0                                                                                        0 RPM' Moisture-(Oew Point)
ME-9306 _                                                                                    41''F                                            ,
ME-9307-                                                                                    139 'F-                                            +
SECONDARY. COOLANT.
                                              -Emergency condensate Header-Flow.                                                                                                        .
                                                                  ' Loop 1                                                                                              0-lb/hr                          t' Loop 2                                                                              2.0 X 10'1lb/hr1 EES Inlet Temperature.                                                                                      85 ''F-EES' Outlet Temperature                                                                                  -100 'F:                              ,
Pressure                                                                                                  350 PSIA-
                                                                                                                                                                                                          ?
:PCRV'LINERCOOLANT (In Service)_                                                      .
Loop;1.                                                                                        NO Loop:2..                                                                                    -YES-                                            ;
w j ..-
        %?
                      ^
            +.. . ' , , - . . . I..,_._ -;,,,,.,_,.m y. ;  . . . _ . _ , . _ ,            .,_,,;,.~,...,,,m,._,
                                                                                                                                .    .__,L,,____<...is,_...,      ,,-..    ,, -,
                                                                                                                                                                                      ,J... 4 ,0-~,.,~
 
F05AVEX-90 PAGE 3-SCENARIO TIME: Ts e o/&
l CLOCK TIME:
PRIMARY AUXILIARIES
    ......,...................... BOARD l-01 ********************************
GA$ WASTE                          System 63 Inlet Pressure                                                          10 PS!A Vacuum Tank Pressure                                                      8 PSIA Surge Tank "A" Pressure                                                205 PSIG Surge Tant "B" Pressure                                                    O PSIG-LIQUID WASTE                        System 62                                NORMAL-REACTOR PLANT COOLING WATER        System 46
        ' Loop 1 P-4601                                                        CLEARED OUT                  l P-46015                                                        CLEARED OUT Hender Inlet Temperature                                      CLEARED OUT Barrel and Top Head Outlet.Temperatare                        CLEARED OUT Top Penetration Inlet Temperature                              CLEARED OUT I
Loop 2 P-4602                                                        ON-P-46025                                                        CLEt, RED OUT Header Inlet Temperature                                        115 'F Barrel and Top Head Outlet Temperature                          115 'F          ,
Top Penetration Inlet Temperature '                            115 'F:
Surge Tank Level "A"                                                  0 INCHES Surge Tank Level "B"                                                45 INCHES 1
l
 
FOSAVEX-90 PAGE 3 SCENARIO TIME: 7 - c/VS" CLOCK TIME:                    .
1 PRIMARY AUXILIARIES
                            ............................. BOARD I-02 ********************************
HELIUM STORAGE                      System 24                                                  .
Low Pressure Bottles                                      270 PSIG                        i High Pressure Bottles                                      $75 PSIG:
HELIUM CIRCULATOR AUXILIARIES                System 21
'                                Circulator C-2103 (C)
Bearing Water Flow                                      170-GPM Bearing Water Inlet Temperature                            78 'F -
Main Drain AP                                            2,5 PSID Buffer /Mid-Buffer AP                                      8 PSID Buffer Helium Flow                                    7.40 ACFM Buffer Helium Return Flow                              3.79-ACFM-                      j CirculatorC-2104(0)
Bearing Water Flow                                          0 GPM Bearing Water Inlet' Temperature                          78 'F -
Main Orain AP                                                4 PSID Buffer /Mid-Buffer AP                                        O P$10 Buffer Helium Flow                                          0 ACFM-Buffer Heis;m Return Flow                                    0 ACFM
                            ...........................** BOARD 1-03 ********************************
REACTOR CORE                          System 12 All Systems-                                                NORMAL
                            ............................. gagno 3.o3 .................................                        j HELIUM CIRCULATORS                    System 21 Circulator-C-2103(C)                                                    .-
Rotor Speed                                              2900 RPM Helium Flow (Low Range)                                0,020 PSID Helium Flow (High Range)                                      - 0 %'
Circulator C-2104 (D)'                                                                      i' Rotor. Speed ~                                                  O RPM-Helium Flow (Low Range)'.
                                                                                              -0.003'PSID                      l Helium Flow (High Range).                                    ' O.%
MAIN TURBINE-                          System 51                  NORMAL-
                =__-__  _  _                _ _ _ . . _ _      ___.: _                            _                  _
J
 
!                                                                                                                                                    i F0$AVEX-90 PAGE 4 SCENARIO TIME: re
* o/W                      s CLOCK TIME:
PRIMARY AUXILIARIES
                                          ............................. BOARD 1 03 - - - -.-.- - - -.- -.- - -
i                                        MISCELLANEOUS                                                                                              -
Bypass Flash Tank Pressure                                    O PSIG                            t PLANT ELECTRICAL                            System 92
                                                -Essential                                  Bus 1-    Bus 2    - Bus 3    N/l Bus 3 480 VAC                        485        485-      485-120 VAC                        118        118        118      118<
120 VOC                        125        125-
                                                                                                                    "A"      "B" Standby Oiesel Generator -                          NORMAL    FAILED ACM Diesel Generator                                CLEARED 0UT Non-Essential Switchyard                                        NORMAL Bus 1    Bus 2      Bus 3 4160 VAC                                    4160      4160    4160 480 VAC                                            NORMAL-MAIN TOWER                                  System 41                  ORAINED-SERVICE WATER TOWER-                        System 42:    '
NORMAL FIRE WATER                                  System 45                    NORMAL INSTRUMENT AIR                              System 82                    "A". HOR    ''B" HOR 93            93-SERVICE AIR                                  System 82=                :95 PSIG
                                          ............................. BOARD l-10 ********************************                                  '
PLANT PROTECTIVE SYSTEM                                              .
REACTOR BUILDING TEMPERATURE - HIGH L                                                  Bay'100                                                          80 *F-Bay 200                                                        .80 'F                            :
Bay 300                                                          80 'F                          ,
REHEAT ACTIVITY MONITORS                                                  005 BUFFER SEAL MALFUNCTION.                                                  NORMAL' L
4 i
h i
L
 
l FOSAVEX-90 PAGE 5 S
SCENARIO TIME: * *c M.T" CLOCK TIME:-
1 PRIMARY AUXILIARIES
                                            . . . . . . . . . . . . . . . . . . . . . . . . . * * " B O AR D I - 13 ' " " " " * " " " " " " " * " " "
* PENETRATION INTERSPACE AP                                                                              0 PSIO                                                    ;
;                                          REACTOR BUILDING SUMP DISCHARGE FLOW                                                                    0 GPM                                                  ]
HELIUM CIRCULATMS                                            System 21                                NORMAL
                                            . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* B O A R D I - 15 " " " " " " " ' * " " " " " " " "
                                          - REACTOR BUILDING $ TACK FLOW                                                                              29;9 KCFM i
REACTOR BUILDING AMBIENT AP-                                                                          - -0225 Inches H2O
;                                          CONTROL' ROOM TEMPERATURE                                                                                      75 'F i
                                            . . . . . . . . . . . . . . . . . . . . . . . . . * * *
* BO AR D l - 7 5 0 7 X " " " " " " " " " " " " " * "
i 480V ROOM TEMPERATURE                                                                                          75 'F I
I l.
l r
                                                                                                                                                                                                            ~L s
5
                                                                                                                                                                                                          ~
t l.
i..
                                                                                                                                                                                                            ?
li
'; .        g.                                                                                                                                                                                              .F
_.4-u--..,      4 . , . - - ,          ,.,,.-,,s..+,    ,..w,'+ n._,.m#,.,,m.:,,,        -.1,.,.y.w..m.        .    ,:,yy,  ,y,,,  ,      ..<,-,>.-,.,,,,r,
                                                                                                                                                                                  ,,,.-..,-..,r.,,,,a.<
 
l F0$AVEX-90 l
SCENARIO TIME:      7 - e.et?
CLOCK TIME:
RA0!ATION MONITOR $:                                                            !
i NUMBER                VALUE            ALARMING      SENSITIVITY              '
RT-6212          5.0 X 10' CPM              V            2.2E-8 RT-6213          5.0 x 10' CPM              Y            2.2E-8 RT-7312              005    CPM                          N/A RT-7324-1        3.2 X 10' CPM              N            1.57E-B RT-7324-2        9.6 X 108 CPM              N            4.36E-7 RT-7325-1        1.0 X 108 CPM              N            1.49E-5 RT-7325-2        1.0 X 108 mr/hr            N            N/A RT-73437-1      1.5 X 108 CPM              N            2.51E-10 RT-73437-2      4.0 X 108 CPM              N            2.73E-10 RT-9301              005    CPM                          N/A RT-93252-12      1.6 X 108 mr/hr            Y,            N/A AREA MONITORS RT-93250-1      2.0 X 108 mr/hr            Y AT-93250-2      3.0 X 108 mr/hr            Y RT-93250-3      5.0 X 10' mr/hr            N RT-93250-4      3.0 X 108 mr/hr            Y RT-93250-5        1.0 X 10' mr/hr          Y RT-93250-8      6.0 X 108 mr/hr            Y RT-93250 13      1.5 X 108 mr/hr          Y RT-93250-14      2.5 X 108 mr/hr            N RT-93251-1      7.0 X 102 mr/hr            N RT-93251-3      8.0 X 108 mr/hr            N 2.0 X 108 mr/hr RT-93251-4                                  Y RT-93251-5        1.0 X 108 mr/hr            Y RT-93251-6        1.0 X 108 mr/hr            Y RT-93251-7      0FF SCALE                  Y RT-93251-8        5.0 X 108 mr/hr            Y RT-93251-9        0FF SCALE                  Y RT-93252-1        3.0 X 108 mr/hr            Y RT-93252-2        3.5 X 108 mr/hr            Y RT-93252-4        5.5 X 108 mr/hr            Y RT-93252-6        4.0 X 108 mr/hr            Y RT-93252-7        3.0 X 108-mr/hr            Y EQUIPMENT MONITORS RT-6314-2        1.5 X 108 CPM              N RT-46211          1.0 X 10' CPM              Y RT-46212          1.0 X 10' CPM              Y METEOROLOGICAL DATA Wind Speed                                        2.3 MPH Wind Direction                              From 315 Degrees Plume Deviation / Sigma Theta                    4.0 Degrees Differential Temperature                          4.0 'F I
i
 
F05AVEX-90 PAGE 1 SCENARIO TIME: %'soago CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                              YES Decay Heat Power                                              0.05 MW PRIMARY COOLANT Pressure                                              11 PS!A Temperature
* Circulator Inlet                                    95 'F Core Inlet                                        105 'F Core Outlet                                        125 'F Calculated Bulk Core (CBCT)                      N/A Maximum Region Differential (AT)                    28 'F Helium Flow Circulator C                                      10 X 10' Circulator 0                                        0 X 10' TOTAL                                              10 X 10' Circulator' Speed-Circulator C                          '
2900 RPM Circulator 0                                          0 RPM Moisture (Dew Point) l                              ME-9306                                          41 'F ME-9307                                          39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                      0 lb/hr Loop 2                                          2.0 X 10' lb/hr EES Inlet Temperature                                        85 'F EES Outlet Temperature                                      100 *F Pressure                                                    350-PSIA PCRV LINER COOLANT (In Service)
Loop 1                                              NO Loop 2'                                            YES
 
FO$AVEX-90 PAGE 2 SCENARIO TIME: 79 - cace CLOCK TIME:
PRIMARY AUXILIARIE$
  ..........................*** BOARD I-01 ********************************
GAS WA$TE                                                              System 63 Inlet Pressure                                                                                10 PSIA Vacuum Tank Pressure                                                                            B PSIA Surge Tank "A" Pressure                          -
205 PSIG Surge Tank "B" Pressure                                                                        0 PS!G LIQUID WA$TE                                                            System 62                NORMAL REACTOR PLANT COOLING WATER                                            System 46 p
Loop 1                                                                                                          !
P 4601                                                                                CLEARED OUT P-46015                                                                              CLEARED OUT Header Inlet lemperature-                                                            CLEARED OUT Barrel and Top Head Outlet Temperature                                                CLEARED OUT Top Penetration Inlet Temperature                                                    CLEARED OUT Loop 2 P-4602                                                                              ON P-46025                                                                              CLEARED OUT Header Inlet Temperature                                                              115 'F Barrel and Top Head Outlet Temperature                                                115 'F Top Penetration Inlet Temperature 115 'F Surge Tank Level "A"                                                                          0 INCHES Surge Tank Level "B"                                                                        45 INCHES 6
 
F0$AVEX                                                                                                                          PAGE 3 SCENARIO TIME:                      :.t* caco
  ,                                                                              CLOCK TIME:
PRIMARY AUXILIARIES
          ............................* BOARD Ir02 ''''****************************
HEllUM STORAGE                                        System 24 Low Pressure Bottles                                                                        270 P$1G High Presture Bottles                                                                        575 PS!G HELIUM CIRCULATOR AUXILIARIES                                $> stem 21 Circulator C-2103 (C)
Bearing Water Flow-                                                                        170 GPM Bearing Water Inlet Temperature                                                            78 'F Main Drain AP                                                                              2.5 PS10--
Buffer /Mid Buffer AP
* 8 PSID Buffer Helium Flow                                                                      7.40 ACFM Buffer Helium Return Flow
                                                                                                            -3.79 ACFM CirculatorC-2104(D)
Bearing Water Flow                                                                            0 GPM Bearing Water Inlet Temperature                                                            78 'F Main Drain AP                                                                                - 4 PS10-Buffer /Mid-Buffer AP                                                                          0 PSID Buffer Helium Flow O'ACFM Buffer Helium' Return Flow                                                                    0 ACFM
          ............................. BOARD I-03 ********************************
REACTOR CORE                                          System 12      '
All Systems                                                                                  NORMAL                                                                l
          ............................'BOARDI-05**********************"*******"                                                                                                    !
i HELIUM CIRCULATORS                                    System 21:
CirculatorC-2103(C)
Rotor Speed                                                                                2900 RPM =
Helium Flow (Low Range)                                                                  0.020 P510 Helium F_ low (High Range)                                                                    OA Circulator C-2104 (D)
Rotor Speed                            .    .
0 RPM' Helium Fiow (Low Range)                                                                -0.003 PSID-Helium Flow (Hign Range)                                                                      0%
MAIN TURBINE                                        : System 51                                    NORMAL:
                                                                                                                                                                                    'q
 
F05AVEX                                                                                                              PASE 4 SCENARIO TIME:TJ *occo CLOCK TIME:                      _
PRIMARY AUXILIARIES
        .........................**** BOARD I-06 ********************************
1 MISCELLANEOUS-                          .                                                  -
Bypass-Flash Tank Pressure                                                    O PSIG PLANT ELECTRICAL                                  System 92 Essentt:1          -                                Bus 1      - Bus 2    i Bus- 3          N/l Bus 3 480 -VAC                                  485          485          485
                      -120 VAC                                        118-        118i        ^118-          118:
120 VOC                                  125          125
                                                                    -+                          ogn            iign Standby Diesel Generator                                          NORMAL-        FAILED-ACM Diesel Generator
                                                                                            -- CLEARED- OUT -
q Non-Essential                                                                                                        '
Switchyard                                                        NORMAL                ..
1 1
Bus 1-      Bus 2.          Bus 3        .-
4160 VAC                                              4160        '4160            4160 480 VAC                                                          _ NORMAL.
MAIN TOWER                                          System 41=                        ORAINE04                                W SERVICE WATER TOWER                              -System 42                          NORMAL FIRE WATER                                      -System 45                            NORMAL.
INSTRUMENT AIR                                      System 82-                        "A" HOR          "B" HOR 93-            <93            .
SERVICE' AIR                                        System 82                          95' PSIG''
        . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* B O A R D .1 - 10 : " " " " " " " " " " " " " " " "
PLANT; PROTECTIVE SYSTEM REACTOR BUILDING ~ TEMPERATURE - HIGH'
              -Bay'100                                                                          80 'F .
Bay 200                                                                          80 'F-Bay 300                                                                          80 'F.
REHEAT-ACTIVITY MONITORS                                                              '005
_ BUFFER SEAL MALFUNCTION'                              _
NORMAL
. . - -                        u                                            -_r                                          _
                                                                        .4
 
, . -    . . - . - ~ - . . ~ . - .        . _ . . _ .        . .    - -          . - ..-.-.-..- -.                    .-    -.--..
i 1                                                                          F0$AVEX-90 PABE 5 i
;                                                                                                        SCENARIO TIME: 7 e
* caco CLOCK TIME:
PRIMARY AUXILIARIES
                        . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B O A R D 1 - 13 " " " " " " * " " " " " " " " * "
PENETRATION INTER $ PACE AP                                                              0 P$10 REACTOR BUILDING SUMP DISCHARGE FLOW'                                                    O GPM HELIVM CIRCULATORS                                System 21                            NORMAL
                        . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* B O A R D 1 - 15 * " " " " " " * " " " " " " " " "
REACTOR BUILDING STACK FLOW                                                                29,9 KCFM REACTOR BUILDING AMBIENT AP                                                              -0.25 Inches H2O CONTROL ROOM TEMPERATURE                                                                    75 'F.            ,
                        ..........................*** BOARD l-7507X *****************************
480V ROOM TEMPERATURE                                                                        75 'F l
l v
l l
l 4
5
                                                                                                                      -=.
I"
 
F05AVEX-90 SCENARIO TIME:    -7v - Je t~
CLOCK TIME:
RADIATION MONITORS:
NUMBER                VALUE                  ALARMING    SENSITIy!TY RT-6212          5.0 X 10' CPM                    Y            2.2E-8 RT-6213          5.0 X 10' CPM                    Y            2.2E-8 RT-7312                005  CPM                                N/A RT-7324-1        2.0 X 108 CPM                    N            1.57E-8 RT-7324-2          2.0 X 108 CPM                    N            4.36E-7 RT-7325-1          1.0 X 108 CPM                    N            1.49E-5 RT-7325-2          1.0 X 10 mr/hr                  N            N/A RT-73437-1        1.5 X 108 CPM                    N            2.51E-10 RT-73437-2        4.0 X 10 CPM                    N            2.73E-10 RT-9301                005  CPM                                N/A RT-93252-12        1.5 X 108 mr/hr                  Y,          N/A AREA MONITORS RT-93250-1        2,0 X 108 mr/hr                  Y RT-93250-2        3.0 X 108 mr/hr                  Y RT-93250-3        5.0 X 10' mr/hr                  N RT-93250-4        3.0 X 108 mr/hr                  Y RT-93250-5        1.0 X 10' mr/hr                  Y RT-93250-8        6.0 X 108 mr/hr                  Y RT-93250-13        1.4 X 108 mr/hr                  Y RT-93250 14        2.5 X 108 mr/hr                  N RT-93251-1        7.0 X 108 mr/hr                  N RT-93251-3        8.0 X 10' mr/hr                  N RT-93251-4        2.0 X 108 mr/hr                  Y RT-93251-5        1.0 X 108 mr/hr                  Y RT-93251-6        1,0 X 10$ mr/hr                  Y RT-93251-7        0FF SCALE                        Y RT-93251-8        5.0 X 108 mr/hr                  Y RT-93251-9        0FF SCALE                        Y RT-93252-1        3.0 X 108 mr/hr                  Y RT-93252-2        3.5 X 108 mr/hr                  Y RT-93252-4        5.5 X 108 mr/hr                  Y RT-93252-6        4.0 X 108 mr/hr                  Y RT-93252-7        3.0 X 108 mr/hr                  Y EQU1PMENT MONITORS RT-6314-2          1,5 X 108 CPM                    N RT-46211          1,0 X 10' CPM                    Y RT-46212          1.0 X 10' CPM                    Y METEOROLOGICAL DATA Wind Speed                                              2.1 MPH Wind Direction
* From 315 Degrees Plume Deviation /S19ma Theta                          4.0 Degrees Differential Temperature                              2.2 'F
 
r FOSAVEX-90 PAGE 1 SCENARIO TIME: Ya + oc/C CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                                  YES Decay Heat Power                                                  0.05 MW PRIMARY COOLANT Pressure                                                      11 PSIA Temperature Circulator Inlet                                          95 *F Core Inlet                                              105 'F Core Outlet                                              125 'F Calculated Bulk Core (CBCT)-                            N/A Maximum Region Differential (AT)                          28.*F Helium Flow Circulator C                                            10 X 108 Circulator 0                                    '
0 X 10' TOTAL                                                    10 X 10' Circulator Speed                                  '
Circulator C                                            2900 RPM Circulator D                                                  0 RPM Moisture (Oew Point)
ME-9306                                                  41 'F ME-9307                                                  39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                        0 lb/hr Loop 1                                            2.0 X 10' lb/hr EES Inlet Temperature                                              85 'F EES Outlet Temperature                                            100 'F Pressure                                                          350 PSIA PCRV LINER COOLANT    (In Service)
Loop 1                                                    NO Loop 2                                                    YES
.3:                    - _ .                                              .
 
m _
FOSAVEX-90 PAGE 2 SCENARIO TIME: rO f R c-CLOCK TIME:
PRIMARY AUXILIARIES
    ..........................*** BOARD l-01 ********************************
GAS WASTE                                                    System 63 Inlet Pressure.                                                                    10 PSIA Vacuum Tank Pressure                                                                  8 PSIA Surge Tank "A" Pressure                                                            205 PSIG                  l Surge Tank "B" Pressure                                                              O PSIG LIQUID WASTE                                                System 62                NORHAL REACTOR PLANT COOLING WATER                                  System ,46 Loop 1 P-4601                                                              CLEARED OUT P-46015                                                              CLEARED OUT Header Inlet Temperature                                              CLEARED OUT Barrel and Top Head Outlet Temperature                                CLEARED OUT Top Penetration Inlet Temperature                                    CLEARED OUT Loop 2 P-4602                                                                ON P-46025                                                              CLEARED OUT Header Inlet Temperature                                              115 'F Barrel and Top Head Outlet Temperature                                115 'F Top Penetration Inlet Temperature '                                    115 'F Surge Tank Level "A"                                                                0 INCHES Surge Tank Level "B"                                                              45 INCHES
 
F0$AVEX-90                                                                                  !
PAGE 3-                                !'
1 c ; A f
.,                                                                                                              SCENARIO TIME:_-- w i                                                                                                                                                                            ,
t CLOCK TIME:
PRIMARY AUXILIARIES i
                      . . . . . r . . . . . . . . . . . . . . . . . . . . . .
* B OA R D I - 0 2 ' " " " " " * " * " " * " * * * " " "
* System 24
                                                                                              ~
i                    HELIUM STORAGE                                                                                                      -
Low Pressure Bottles                                                        .          '270 PSIG                                            >
High Pressure Bottles                                                                    575 PS!G HELIUM CIRCULATOR AUXILIARIES                                          System 21-Circulator C 216 20)
,                                      Bearing Watn fiow                                                                  170 GPM                                            ;
;                                      Bearing Wawr Inlet Temperature-                                                      '78 'F                                            ;
Main Drain AP.                                                                      2.5 PSIO                                        '
Buffer /Mid-Buffer AP
* 8 PSIO.                                        4 Buffer Helium Flow                                                                7.40 ACFM Buffer Helium Return Flow                                                          3,79 ACFM                                          +
Circulator C-2104 (0)
Bearing Water Flow 0'GPM Bearing _ Water Inlet Temperature                                                      78 'F.
Main Orain AP-                                                                          4 PSID        >
Buffer /Mid-Buffer AP                                                                  O PSID Buffer Helium Flow                                                                      0 ACFM Buffer Helium Return Flow                                                              0 ACFM
                      ...........................** BOARD I-03 ********************************                                                                              s REACTOR CORE                                                System 12                    '
All Systems                                                                              ! NORMAL                                              !
l                    . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 0 4, o I . 0 3 - - - - - - - - - - - - - - - . _
l HELIUM CIRCULATORS                                          System 21 CirculatorC-2103(C)
Rotor-Speed.                                                                      2900 RPM'                                        ;
Helium Flow (Low Range) .                                                      -:0,020 PSID Helium Flow (High Range)                                                    ~
0 *4 Circulator C-2104 (0)'
Rotor Speed                .              _
0 RPM Helium Flow (Low Range)' ..                                                    -0,003:PSID--
Helium Flow'(High Range)                                                              0%
MAIN 3 TURBINE.                                            System 51                                NORMALL l
i l
1                                                                                  -- . :
 
I v
i                                                                              -FOSAVEX-90 PAGE 4 l
3                                                                                                      SCENARIO TIME: -7 6 c o S~
CLOCK TIME:
i PRIMARY AUXILIARIES
;                          ............................. BOAR 0 1 0, ................................
MISCELLANEOUS Bypass Flash Tank Pressure                                                          . 0 PSIG._
PLANT ELECTRICAL                                    System 92 Essential                                                    Bus 1    Bus 2.      ' Bus 3        _N/!_ Bus:3_
!                                      480 -VAC                                              485    485            -485-120 VAC                                                118      118.          -
118              118.                                        :
120 VOC-                                              125      125-
                                                                                                                        "A"-            "B" -                                  ,
Standby Olesel Generator.-                                                    NORMAL-        FAILE0                                          -
ACM Diesel Generator                                                          CLEAREO.0UT                                                -
Non-Essential                                                                                                                                        ,
Switchyard'                                                    .
_      NORMAL Bus'll        -Bus.2          Bus 3                      4 -
4160 VAC                                                      4160            4160-.          4160 480.VAC                                                                      NORMAL-MAIN TOWER                                          System 41                              DRAINEO
                                                                                                    ~'
SERVICE WATER TOWER                                  System 42                              NORMAL-System 45 FIRE WATER                                                                              ' NORMAL INSTRUMENT AIR                                    -System 82_                              "A" HOR            "B" HOR                                11 93                93                      -
l l
                          . SERVICE AIR                                        System 82                              95 PSIG; 4
                          ............................. B m 0 1 10 ................................
PLANT PROTECTIVE SYSTEM.                                                                                                -
RFACTOR BUILDING TEMPERATURE - HIGH' Bay 100                                                                                80 'F Bay 200                                                                                80 'F-Bay 300-                                                                              80 'F REHEAT-ACT!VITY MONITORS                                                                  !00$-
* BUFFER SEAL MALFUNCTION                                                                      NORMAL T
4 g
                                                                                      .,                  s
    -          ,.E,, -,        ,.# .- ,' ,      _ . . _ . ,                                                                              _ . . _ . . _              . . _ r
 
_ . _ . _ _ _ . _ _ _ _ _ _ _ . _ . - _ . _ . _ . . _ . _ - - . _ . . _ - _ .. _.__ _ .. ._ .. _ _ .~.__.. _ . .._.. _ ,.
i F0$AVEX 4 SCENARIO TIME: r#
* M / r I
CLOCK TIME:
PRIMARY AUXILIARIES                                                                    ;
                                                  . . . . . . . . . . . . . . . . . . . . . . . . . . * *
* B O A R D I - 13 " " " " " " " " " * " * " " " " "                                                  .
I d
* PENETRATION !NTERSPACE AP                                                                                                    . . .0. PSID -
t REACTOR BUILDING $ UMP 0!$ CHARGE FLOW                                                                                          0 GPM System 21                                    NORMAL                        t
,                                                HELIUM CIRCULATORS
                                                  . . . . . . . . . . . . . . . . . . . . . . . . . . * *
* B O A R D l - 15 ' " " " " " * " " " " " " " " " "
* REACTOR BUILDING STACK FLOW                                                                                                        29.9 KCFM i
REACTOR BUILOING AMBIENT $P                                                                                                    ' -0.25 In'ches H20-          '
4 CONTROL ROOM TEMPERATURE-                                                                                                              75 'F                  ,
                                                  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B O A R O . I '- 7 5 0 7 X * " " " " " " " " " " " " " "                                            f 480V ROOM TEMPERATURE                                                                                  ,
75 'F-
                                                                                                                                                                                                                ?
                                                                                                                                                                                                                ?
F l
u 0 1                                                    .u
          ,c..                ..      .,,4          .-- ,    ,-,4_+,        ~ -,..- ,.                      ,            , _ , ,    - _ , _ . .        ,    , . , , . . .                , - . - , , .
 
    -        . - - .            - . . -            - . . , .                        - - , - . . . -                            - - ~ ~ . -            . . - --        .
r F05AVEX-90                                                                                                      I f
SCENARIO TIME; 'vJ sefo                                                            i CLOCK TIME.'    , , , _ _ _                                                ;
I RADIAT10N MON! TORS:
NUMBER                        VALUE                                    ALARMING                $ENSITIVITY RT-6212.              5.0 X 10' CPM                                          Y-                    2.2E-8                                                              :
RT-6213              5.0- X: 106 CPM                                        Y                    2.2E-8                                                              )
RT-7312                      005            CPM                                                  ,N/A                                                                  l RT-7324-1            2.0 X 108 . CPM'                                      N                    1.57E-8                                                              .
RT-7324-2              2.0 X 108 CPM                                          N                    4.36E-7                                                              ,
RT-7325-1              1.0 X 108 CPM                                          N                    1.492-5                                                              ->
RT-7325-2              1.0 X 108 mr/hr                                        N                    N/A'                                                                :
RT-73437-1~            1.5 X 108 CPM                                          N                  '2.51E                                                            i RT-73437-2            4.0 X 105 CPM                                          N                    2.73E-10 RT-9301                      005            CPM                                                    N/A                                                                  ,
RT-93252-12            1.5 X.108 mr/hr                                          Y,                  N/A AREA MONIT0F.5:
RT-93250-1            2.0 X 108 mr/hr                                          Y-RT-93250-2            3.0 X 108 mr/hr                                          Y RT-93250-3            5.0 X 109 mr/hr                                          N RT-93250-4            3.0 X 105 mr/hr                                          Y RT-93250-5            1.0 X 10' ar/hr                                      .Y' RT-93250-8            6.0 X 108. mr/hr' Y
RT-93250-13            1.4 X=108'mr/hr                                          Y T
RT-93250-14            2.5 X 108'mr/hr                                      'N                                                                                          ,
RT-93251-1            7.0 X 102 mr/hr-                                          N RT-93251-3            -8.0 X 108 mr/hr                                          N                ,
RT-93251-4            2.0 X 108 mr/hr                                          Y RT-93251-5            1.0 X 108 mr/hr                                          Y RT-93251-6            1.0 X 108 mr/hr                                        -Y ~
RT-93251-7            0FF SCALE                                                Y                                                                                      t RT-93251-8            5.0 X 108 mr/hr.                                          Y
,                  RT-93251-9            0FF SCALE                      .
Y L                  RT-93252-1            3.0 X 108 inr/hr                                          Y                                                                                      ,
RT-93252-2            3.5 X 108 mr/hr-                                          Y
                  -RT-93252            5.5 X:-108 my/hr-                                        Y-RT-93252            4.0 X-108 mr/hr                                          Y RT-93252-7            3,0 X 10' ar/hr                                          'Y EQUIPMENT MONITORS i
RT-6314-2              .1.5 X 108 CPM                                            N-RT-46211.            '1.0 X 106 CPM                                          'Y RT-46212                1.0-'X 1D* CPM                                            Y '.                                                                                  .
METEOROLOGICAL DATA:
i ..                    Wind Speed-                                                                              c2.1 MPH l
Wind Direction-                                                        ' Frcm 315' Degrees _
                                                                                                  ~
Plume Deviation / Sigma _ Theta _                                                          4.0 Degrees Otfferential Temperature                                                                  2-.2 ' F_                                                                ,
      .w . . _ . ~            -          ,    --,<.m.        _ , _ . . . . , . , . .        .-          . . .                        ,    . . . , . , -        - _ . _  , , . . . . -
 
r
                                                            '0$AVEX-90 PAGE 1          f 1
SCENARIO TIME:2 c:33                    H CLOCK. TIME:
OyERALLPARAMETER$
Reactor Shutdown                                                            fES.
Oecay Heat Power-                                                            0.05 MW PRIMARY COOLANT Pressure                                                                11 PSIA Temperature
* Circulaisr Inlet                                                    95t*F Core Inlet                                                          105 'F
            ,      Core Outlet                                                        125 'F                      ';
Calculated Bulk Core (CBCT)                                        N/A                            !
Maximum Region Differential (AT)-                                  -28 'F Helium Flow Circulator C                                                        10 X.102 Circulator D                                                          0 X 30' TOTAL                                                              10LX 10' Circulator. Speed-                                                                            s Circulator C                                          '
2900 RPM-                          .
Circulator 0                                                          10; RPM Noisture'(Dewpoint)
ME-9306                                                            411af-ME-9307                                                            39 *F SECONDARY COOLANT-Emergency. Condensate Header                                                                              ;
Flow.
Loop 1                                                                -    0 lb/hr
                        " Loop;2,                                        '
2.0 X:10'.lb/hr-            --
EES-Inlet Temperature                                                          85 'FE                !
EES Outlet Temperature =
Pressure
                                                                                                  '100z *FL            l 350 PSIA.          1 1
PCRV LINER'C00LANT< (In Service)-                                                  ,
Loop:1                                                              NO-Loop ~2                                                              YES
        ~
a rf                                                                          _
1    . -
                                                                                                                    .1
 
    . _ . .  .        ._  ~. _ . _ - . . _.          .-      . . _ _      _  .                .. _ -.
FOSAVEnt2fl PAGE 2 i
SCENARIO TIAEs p e c. 30 CLOCK TIME:
PRIMARY AUXILIARIES
                ................************* BOARD I-01 ****'*******"*******************
GAS WASTE                                    !ystem 63                                          i
,                    Inlet Pressure                                                      IC PS!A                  ,
VaiJum Tank Pressure                                                  8 ^SI A -
Surge Tank "A" Pressure                                            205 PSIG Surge Tank "B" Pressure                                              O PSIG LIQUID WASTE                                System 62                  NORMAL REACTOR PLANT COOLING WATER                  System 46 Loop 1                                                                  -
P-4601                                                      CLEARED OUT P-46015                                                    CLEARED OUT Header Inlet Temperature                                    CLEARED-0UT              -
Barrel and Top Head Outlet Temperature-                    CLEARED OUT Top Penetration Inlet Temperature                          CLEARED 007 Loop 2 P-4602                                                      ON                      .
P-46025 .                                                  CLEARED OUT Header *.nlet Temperature                                  115 F Barrel and Top Head Outlet Temperature                      115 SF Top Penetration Inlet Temperature                <
115 SF Surge Tark Level "A"                                                O INCHES Surge Tans Level "B"                                              45 INCHES-L l
l' I
l
  .)
 
4 1
F05AVEX-90 s
PAGE 3            ,
SCENARIO TIME:~ v.p
* M 501            i CLOCK TIMEi PRIMARY AUXILIARIES
    ...........................** BOARD I-02 *******"************************-
HELIUM STORAGE              .
System 24                                              u Low Pressure Bottles                                        270 PSIG' High Prassure Bustles                                      .575 PSIG HELIUM CIRCULATOR AUXILIARIES                System 21_                                          !
CirculatorC-2103(C)                                                                        '
Bearing Water Flow                                      170 GPM
            ' Bearing Water. Inlet Temperature:                          78 'F-Main Drain AP                        '
2.5 PSID-Buffer /Mid-Buffer AP-                                      8'PSID
            ~ Buffer-Helium. Flow                                    7;40.ACFM-Buffer Helium Return Flow                              3'79 ACFM-Circulator C-2104 (D)
Bearing-Water Flov                                        . 0 GPM Bearing Water Inlet Temperature                            78 'F Main Orain AP                                                  4 PSID B'.''er/Mid-Buffer AP                                          0 PS10          ,
              -Bo Mer Helium Flow-                                            0 ACFM Buffer-Helium Return Flow                                  10 ACFM 6
    ........................***** BOARD I-03 **************"**************"**
REACTOR CORE                            System 12 All Systems                                                  NORMALT
    ............................" BOARD            !-05-*********************************
HELIUM CIRCULATORS                    . System 21 Circulator C-2103 (C)
Rotor Speed                                              .2900 RPM' Helium-Flow (Low Range)-                                0.020.PSID-Helium Flow (High Range)                                      - 0%
Circulator C-2104-(D)
Rotor Speed                .                            _
0-RPP Helium Flow (Low Range)                              -0.003'PSit Helium Flow (High Range)                                        0 %.
MAIN TURBINE                            System 51                  NORMAL i    .
I                                                              %
 
a                                                                                                          -# d FOSAVE6901                                            _          _
                                                                                                    ~ PAGE-4 3
                                                                    -SCENARIO TIME: 7:0 + C M b CLOCK TIME:                                                  ,
                                                                                                                                .\
                                          -PRIMARY AUXILIARIES                                                                  1
                .....u..u..........********      - BOARD I -06 """"" "" * """ * " """ " ;
MISCELLANEOUS                                                                                                    1 Bypass Flash Tank Press.re                                      . 0 PSIGi FLANT ELECTRICAL                  System:92f Essential                            Bus 1-    - Bus 2 Bus 3-            N/IiBus-3L 480 VAC-                      >485        1485-            -485 120 -VAC          a            118-        -118-            -.118 118--                  l 120 'VDC--
125        .125~                                                          '
V
                                                                                            " A'? -    -    "B" Standby Diesel. Generator-                          ,.
                                                                                      =
NORMAL          -FAILED-CLEARED OUT-ACMDieselGenerato{
Non-Essential                                                                    ,
Swttchyard                                                  -NORMAb Bus 1-            Bus-2'          Bus 3                      !
                          -4160 VAC-                                    :4160-            -4160              4160-
                          -480 VAC                                                        NORMAL MAIN TOWER                        System 41-                            LORAINED:-
              -SERVICE WATER TOWER              ~ System 42-l                          LNORM Li                                        i FIRE WATER                        System.45                              NORMAL-                                        .
INSTRUMENT ~ AIR'                -System 82-_                      <
                                                                                          "A";HDRl          ="B" HDR:-
93:              93; SERVICE AIR-                      System 82N                          <
95 PSIG?
                ............................. BOARD I-10'********************************
                                        -PLANTLPROTECTIVE SYSTEM f
REACTOR BUILDING' TEMPERATURE - HIGH Bays 100                                                            -80 *F:
                    -Bay'200                                                            ' 80 : .* F -;                                    '
Bay,300                                                                80 -
* F.
              ' REHEAT ACTIVITY MONITORS'                                                '005
              -BUFFER SEAL MALFUNCTION                                        ,
NORMAL I
                                                                          +u' L__-__--__----2-------:-L-
 
i.
FO$AVEX-90 PAGE-5'
                                                                                                                                                    ;)
                                                                                                                                                    -l SCENARIO TIME: 7.P + caSo' CLOCK TIME:                        -=
PRIMARY AUXILIARIES-                                                    *
              . . . . . . . . . . . . . . . . . . . . . . . . . . . " B O A R D l - 13 ~ " * " * " " " " " " " " " " " " "
PENETRATION-INTERSPACE AP-                                                              :D P51D-REACTOR BUILDING-SUMP DISCHARGE FLOW:                                                    0-GPM
: HELIUM CIRCULATORS                                              System 21                NORMAL
              . . . . . . . . . . . . . . . . . . . * * * * * * * * *
* B O A R D I - 15 * " " " " * " " " " " * " " " " " " -
1
              -REACTOR' BUILDING STACK FLOW-                                                              29.9 KCFM REACTOR BUILDING AMBIENT-AP                                                              -0.25 Inches H2O:
CONTROL ROOM TEMPERATURE                                                                      75 'F                                    a 1-7507x " " " " " " " " " " " " " "'
              .............................-BOARD                                                                                                        ,
480V ROOM TEMPERATURE
                                                                                                            -75 'F-                    --
t A'.
                                                                                                                                'I
( f,              i                                                                                                s
(. ' .-                                                                  .
l i
 
FOSAVEX-90 SCENARIO TIME:
CLOCK TIME:
O Meh RADIATION MONITORS:
NUMBER                    VALUE                              ALARMING        SENSITIVITY RT-6212          5.0 v 10' CPM                                  Y                2.2E-8 RT-6213          5.0 x 10' CPM                                  Y                2.2E-8 RT-7312                  005              CPM                                    N/A RT-7324-1        2.0 s 102 CPM                                  N                  1.57E-8 RT-7324-2        2.0 X 108 CPM                                  N                4.36E-7 RT-7325-1        1.0 X 103 CPM                                  N                  1.49E-5 RT-7325-2        1.0 X 102 mr/hr                                N                N/A RT-73437-1        1.5 X 108 CPM                                  N                  2.51E-10 RT-73437-2        4.0 X 101 CPM                                  N                  2.73E-10 RT-9301                  005              CPM                                      N/A <
RT-93252-12      1.5 X 108 mr/hr                                Y    ,            N/A AREA MONITORS Ri-93250-1        2.0 X 108 mr/hr                                Y RT-93250-2        3.0 X 102 mr/hr                                Y RT-93250-3        5.0 X 10' mr/hr                                N RT-93250-4        3.0 X 10' mr/hr                                Y RT-93250-5        1.0 X 10' mr/hr                                Y                                      .
RT-93250-8        6.0 X 108 mr/hr                                Y RT-93250-13        1.4 X 108 mr/hr                              Y RT-93250-14        2.5 X 108 mr/hr                                N RT-93251-1        7.0 X 102 mr/hr                                N RT-93251-3        8.0 X 10' mr/hr                                N              ,
RT-93251-4        2.0 X 102 mr/hr                                Y RT-93251-5          1.0 X 108 mr/hr                              Y RT-93251-6          1.0 X 108 mr/hr                              Y RT-93251-7          0FF SCALE                                    Y RT-93251-8          5.0 X 108 mr/hr                              Y RT-93251-9          0FF SCALE                                      Y RT-93252-1          3.0 X 108 mr/hr                              Y RT-93252-2          3.5 X 108 mr/hr                              Y RT-93252-4          5.5 X 108 mr/hr                              Y RT-93252-6          4.0 X 108 mr/hr                              _Y RT-93252-7          3.0 X 108 mr/hr                              Y EQUIPMENT MONITORS RT-6314-2            1.5 X 10' CPM                              N RT-46211              1.0 X 10' CPM                                Y RT-46212              1.0 X 10' CPM                                Y METEOROLOGICAL DATA Wind Speed                                                              1.9 Wind Direction                                                  From 315 Oegrees Plume Deviation / Sigma Theta                                            4.0 Degrees Differential Temperature                                                2.3 *F I
 
3 FOSAVEX-90 PAGE 1 SCENARIO TIME: ra + o;.9 CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                        YES Decay Heat Power                                        0.05 MW PRIMARY COOLANT Pressure                                              11 PSIA Temperature Circulator Inlet                                  95 *F Core Inlet                                      105 *F Core Outlet                                      125 *F Calculated Bulk Core (CBCT)                      N/A Paximum Region Differential (AT)                  28 *F Helium Flow Circulator C                                    10 X 10' Circulator D                                      0 X 102 TOTAL                                          10 X 102 Circulator Speed Circulator C                                    2900 RPM Circulator 0                                        0 RPM Moisture (Dew Point)
ME-9306                                        41    F ME-9307                                          39    F SECONDARY COOLANT Emergency Condensata Header Flow Loop 1                                                  0 lb/hr Loop 2                                      12.0 X-10' lb/hr EES Inlet Temperature.                                    85 *F EES Outlet Temperature                                  100 *F Pressure                                                350 PSIA PCRV LINER COOLANT  (In Service)
Loop 1                                          NO Loop 2                                          YES
 
      ,                                          s                                                  -
FOSAVEX-90 PAGE 2 SCENARIO TIME: ra edt CLOCK TIME:
PRIMARY AUXILIARIES.
          ...............************** BOARD l-01 ********************************
GAS WASTE                          System 63 Inlet Pressure                                            10 PSIA Vacuum Tank Pressure                                      8 PSIA Surge Tank "A" Pressure                                205 PSIG Surge Tank "E" Pressure                                    O PSIG LIQUID WASTE                      System'62                  NORMAL REACTOR PLANT COOLING WATER        System 46 Loop 1 P-4601                                          CLEARED OUT P-46015                                          CLEARED OUT Header Inlet Temperature                        CLEARED OUT Barrel and Top Head Outlet Temperature          CLEARED OUT Top Penetration Inlet Temperature                CLEARED OUT Loop 2 P-4602                                          ON P-4602S                              '
CLEARED OUT Header Inlet Temperature                          115 'F Barrel and Top Head Outlet Temperature-          115 F Top Penetration Inlet Temperature                115 'F Surge Tank Level "A"                                      0 INCHES Surge Tank Level "B"                                    45 INCHES r      .
4
 
_.. . _ . .. _. -  . _ _      . ~ _    . . _ _    -    ..        . _      _          ._ _.            . _. . _
1 FOSAVEX-90 PAGE 3 SCENARIO TIME: n +o w                    :
                                                                                ; CLOCK; TIME:                              c PRIMARY AUXILIARIES-                                                i
                      ...... ....................** BOARD I-02 ********************************
HELIUM STORAGE                          System 24-Low Pressure Bottles                                              270 PSIG High Pressure Bottles                                              575 PSIG HELIUM CIRCULATOR AUXILIARIES                System 21              -
Circulator C-2103 (C)                                                                          i Bearing Water: Flow . _                                          170 GPM                  i Bearing Water Inlet Temperature                                    78 'F Main Drain AP
* 2.5 PSID.
Buffer /Mid-Buffer AP                                              '8 PSID Buffer Helium Flow                                          = 7,40-ACFM Buf fer Helium Return- Flow                                  .3.79 ACFM Circulator C-2104 -(D)
Bearing Water Flow                                                  0 GPM Bearing Water Inlet Temperature                                    78 'F                    .
Main Drain AP.
4 PSID Buffer /Mid-Buffer AP                                              -0 PSID Buffer Helium Flow =                                                0 ACFM Buffer Helium Return Flow                                            0 ACFM
                      ...........................** BOARD-I-03 *****************************?**
4 REACTOR CORE                            System 12-All Systems                                                        NORMAL
                      .........................****BOARDI-05*********"**********************
HELIUM CIRCULATORS                      System 21-CirculatorC-2103(C)
                                    -Rotor. Speed                                                  -2900 RPM.
Helium Flow (Low Range) .                                    0.020 PSID Helium Flow (High Range)                                            0%
Circulator C-2104 (D)
Rotor Speed                                                        0 RPM Helium Flow (Low Range)
                                                                                                -0.003 PSID' Helium Flow (High Range)-                                          0%
e MAIN TURBINE                            System'51                          NORMAL v
a
                                      -,              ,                          4.  - -e,,,        -    ,    -
 
                                                    ~
                                                    ' *E          ,                                    ,
                                                                                                                          -:t y
FOSAVEX                                                                  d SCENARIC TIME: w - s k                                      j CLOCK ~ TIME:
PRIMARY AUXILIARIES
    ..........................*** BOARD I-06 ********************************
                                                                                                    \
MISCELLANEOUS Bypass Flash Tank Pressure                                              .O PSIGi PLANT ELECTRICAL                            System 92 Essential                                      Bus l'      Bus-2                        N/I Bust 3i 4
Bus 13-
:480 VAC                                    485          485--            485 120 VAC                                    118          118'            118.          118--
120 VOC                                    '125-        3125
                                                                                                                              .- 4 upu        -- u g n j
Standby Diesel Generator =                                          NNMAL            FAILED ACM: Diesel Generator                                              'LEARED OUT Non-Essential j
Switchyard.                                                          NORMAL Bus li        Bus <2        = Bus!3 4160 VAC                                                  4160-      --  4160'      ?4160e 480 VAC                                                              NORMAL                                      j 1
MAIN TOWER                                  System 41        0 0RAINE0~
SERVICE WATER TOWER                        , System 42-                    ' NORMAL FIRE WATER                                  System 45:            .        l NORMAL-INSTRUMENT AIR                              System 82                            "A" HOR          "B". HOR l' 93:            93:                  i 1
: SERVICE AIR                                System 82    ,                        95.PSIG,                                    I
    ............................* BOARD 1-10 ********************************-
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE'- HIGH:                                                        .
Bay 100-                                                                    -80 'F.
Bay:200                                                                        80 'F-Bay 300-                                                                    --80 'F' REHEAT ACTIVITY 1 MONITORS                                                      2005 BUFFER SEAL MALFUNCTION                                                            NORMAL
 
. . ~ .    ~ . . = _ ~        -        ...-.        .~ ..-                , . ~ . .                  . , -    . . . _ - . . . - . . . - .                            . . .                  - . -.- -.
                                                                                      ,      ' I                                                                            ,
F05AVEX-90J PAGE 5 SCENARI0 TIME: 79 + o .ds" CLOCK TIME:                                                                                !
t PRIMARY AUXILIARIES                                                                                                                          ;
                          . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* B O A R D ; ' I - 13 i " " " " " " " " " " * " " * " " "..                                                                      a PENETRATION INTERSPACE AP                                                                                                      O PSID.
REACTOR-BUI'LDING SUMP-DISCHARGE FLOW.                                                                                        t0-GPMI a
HELIUM CIRCULATORS                                      System 21-                                                              NORMAL
                          . . . . . . . . . . . . . . . . . . . . . * * * * * * *
* B O A R D I : 15 ; " " " " " " " " " " " " " * * " " ;
t
                                                                                                                                                                                                                        ~
REACTOR BUILDING STACK FLOW:                                                                                                    i29.9 KCFM                                                    ,
REACTOR. BUILDING AMBIENT AP                                                                                                    -0,25 Inches H2O                                            i t
                        - CONTROL ROOM TEMPERATURE--                                                                                                            75 *F:                                              -
                          . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BO A R D - I - 7 5 0 7 X " " * " " * " " " " " " * " " "
                                                                                                                                                                                                                    . t 480V ROOM TEMPERATURE.                                                                                                                75 *F-I
                                                                                                                                                                                                                        )
r
                                                                                                                                                                                                                    'i ll 4      ,                  # -.                _    - . . _. -,            . . . . . _ , ,          ,    , - . . . . . , . - . , _ . . . . , - . .                  - _, . , . . . .          ~ . _
 
i FOSAVEX-90~
SCENARIO TIME: 1 rap 43:CC; LCLOCK TIME:-
RADIATION MONITORS:
NUMBER 1                        :VALUE.            JALARMING.                SENSITIVITY:                                              4 RT-6212                5,0 X 10' CPM;1            ,        Y.                    ;2.2E-8;
        -RT-6213                5.0: X 10' CPM-                      Y                        2.2E          -RT-7312'                          005- CPM::                  .
N/A
        -RT-7324-1              2.0 X 103 CPML                      N'                    :1.57E-BL RT-7324-2l            2.0 X 101 CPM-                      N                    t4;36E-7 RT-7325-1              1.0 X 108 CPMf_                      N-                    :1.49E          RT-7325-2                                                                        ;N/A
                                '1.0 X 101 mr/hr_ -                  N RT-73437-1            1.5 X 108-CPM                        N.                    _2,51E-10:
RT-73437-2'-          4.0 X 105 CPM _                    _N                        2.73E-104 RT-9301                        ~
                                          '005- CPM                                            N/A RT-93252-12            1.5 X 102 .mr/hr                    Y; _                    N/AL                                    ,
        -AREA MONITORS                                                                                      1 4
RT-93250-1            2-0 X 108 mr'/hr
                                  .                                  Y RT-93250-2            3.0 X 105 mr/hr-                    Y.
RT-93250            5.0 X:10'smr/hr:                    N RT-93250-4            3.0 X 105 mr/hr                      Y RT-93250-5            1.0 X 10' mr/hr                      Y                                                                  .
RT-93250            6.0 X-108 mr/hr
:Y RT-93250-13          ~1.4 X 108:mr/hr                    LY
        -RT-93250-14          '2.5 XE108'mr/hr                      N RT-93251            7.0-X 101 mr/hr-                    N RT-93251            8.0 XJ10' mr/hr                    ~N
        -RT-93251-4            -2.0 X 108 mr/hr LY; RT-93251-5            1.0 X-108 mr/hr
                                    . -                              Y=
RT-93251-6            1.0 X 108 -mr/hr-                  EYJ                                                                      :
a' RT-93251-7            OFF SCALE-                            Y1 RT-93251-8            2.0 X-108 -mr/hr                    -Y; RT-93251-9            0FF SCALE        __                  Y        =
RT-93252-1            3.0 XL108 .mr/hr'                    Y                                                                                "
        'RT-93252-2            ?3.5;X 108 mr/hr                      Y RT-93252-4            5.5 X'108'mr/hr=                      Y RT-93252-6            4 '.0 :X = 108 : mr/hr                Y RT-93252-7            3.-0 X 108-mr/hr                      Y
                                                                                                        ~
EQUIPMENTEMONITORS
        -RT-6314-2'            L1.5 X 102-CPM                        N                                                                                  '
RT-46211                1.0 X 10' CPM                      l'-
RT-46212                1.0EX 10' CPM                      ~Y METEOR 0 LOC'.AL" DATA Wind Speed                                                      - -I '. 9        .
ldind-Direction-                                    -_From L315' Degrees Plume-Deviation / Sigma Theta                                    ~4.0 Degrees Differential Temperature                                        '2.3=*F:
5 . -
i--
                                                                                                                                            ~
 
.                                                                                                                                                        1 FOSAVEX-90 PAGE 1 SCENARIO TIME: -c + caoo CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdow.,                                                                                          YES Decay Heat Power                                                                                            0.05 MW 4
PRIMARY COOLANT Pressure                                                                                                  11 PSIA -
Temperature                        ''
Circulator Inlet 95 'F Core Inlet                                                                                            105 *F Core Outlet                                                                                          125 *F Calculated Bulk Core (CBCT)                                                                          N/A Maximum Region Differential (AT)                                                                              28 'F Helium Flow Circulator C                                                                                            10 X 102 Circulator 0 0 X 10' TOTAL                                                                                                  10 X 108 Circulator Speed Circulator C                        '
                                                                                                                    -2900-RPM Circulator 0                                                                                                        0 RPM Moisture (Dew Point)
ME-9306                                                                                                  41          F ME-9307                                                                                                  39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                                                                                0 lb/hr Loop 2                                                                                                  2.0 X 10' lb/hr EES Inlet Temperature                                                                                                  85 "F              :
EES' Outlet Temperature                                                                                                100 'F Pressure                                                                                                              350 PSIA PCRV LINER COOLANT (In Service)
Loop 1                                                                                                          NO Loop 2                                                                                                          YES I
- '4M ..                                                  _ _ - - _ - _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . _ _ _ _ _ . - . _ _ . _ _ _ _              -
 
                                                      - F05AVEX-90;-                                              -                      -.
PAGE 2-SCENARIO lTIMElTa+oace:
  ,                                                                              : CLOCK; TIME:
PRIMARY AUXILIARIES
      . . . . . . . . . . . . . . . . . . . . . . . . . . . *
* BO A R D I - 0 1 " " " " " " " " " " " " " " * " "
l GAS WASTE-                                        _ System 63 .
Inlet Pressure                                                                          '10' PSIA:-
Vacuum Tank Pressure                                                                    . 8 PSIA:'_
Surge Tank "A" Pressure.                                                          .
                                                                                                  .205 PSIG4                                    l Surge Tank "8'' Pressure-0 PSIG=_
LIQUID WASTE                                      - System _62_                          i NORMAL =
REACTOR-PLANT-COOLING. WATER                        System 46-v-
            ~ Loop 1                                                                                                                      lj P-4601 -                                                                      CLEARED 0UT                            ~.
P-46015                            _
CLEARED OUT-Header Inlet Temperature                                                    " CLEARED OUT Barrel and-Top Head Outlet Temperature                                        CLEARED.0UT                            .o Top Penetration Inlet Temperature                                              CLEARED OUT.--
            -Loop 2 P-4602                                                                        ON:                                          .
P-46025                                                                        CLEARED OUT-
: Header Inlet Temperature                                                    : 115 'F?
Barrel and. Top Head Outlet Temperature                                      -,115 *F
                    -_ Top-- Penetration Inlet Temperature '
                                                                                                    ~115  'F.-
p '          Surge Tank-Level "A"                                                                    0 INCHES-Surge Tank Level "B" 45l INCHES-o i
1 i
9 4
0                  1
 
  ~
F05AVEX                                                                                                            PAGE 3 4
SCENARIOLTIME: -w -esoo CLOCK TIME:                                                    !
PRIMARY AUXILIARIES
    .............................BOARDI-02'"""""""""***""*"*"
HELIUM STORAGE-                      System 24' Low Pressure Bottles
                                                                                  ~
                                                                                    ~ 270'PSIG High Pressure Bottles.                                                    575 PSIG                                          !
HELIUM CIRCULATOR AUXILIARIES                System 21 Circulator C-2103-(C)'-
Bearing Water-Flow    .
170 GPM Bearing Water; Inlet Temperature                                          78 'F'-
Main Drain AP-                                                          2=.5 PSID Buffer /Mid-Buffer AP                                                    . 8 PSID Buffer Helium Flow =                                                27.-40 ACFM Buffer Helium Return Flow                                            '3.79 ACFM Circulator C-2104 (D)-
Bearing Water Flow =                                                        0 GPM Bearing Water Inlet Temperature-                                          78 'F Main Orain AP                                                                4 PSID Buff;r/Mid-Buffer AP.                                                        O PSID Buffer Ne M um Flow?                                                        0 ACFM
              ' Buffer Hel M Return Flow                                                  ;0 AC;M
      ............c.....ovo...... BOARD I-03 L "" * "" "" * """"" "" * ""
REACTOR CORE                          System 12-l All Systems                                                              ' NORMAL
      ..........s....n..n o......
BOAR D I .- 0 5 * " " " " " " " " " " " " " " " "
    . HELIUM CIRCU'LATORS                  System 21-Circulator C-2103 (C)                                                                ..
Rotor Speed- -                                                            2900 RPM Helium Flow (Low . Range)
                                .                                                        0.020 PSID Helium Flowi(HighLRange)=                                            ,
OT Circulator C-2104 (D)
Rotor _ Speed-                                                                      0. RPM Helium Flow (Low Range)
                                                                                        -0.003 PSID Helium Flow (High Range)
_                                                                    01 :.
MAIN TURBINE                          System 51-                                  = NORMAL-4 2
                                                                            ' '                      ~
___..._j:_.--.._l.- -_
 
FOSAVEX-90
                                                                                                                -PAGE 4-'
: SCENARIO TIME: re + cace CLOCK TIME:
PRIMARY AUXIllARIES-
      ..................... ******* BOARD                            I-06.********************************
MISCELLANEOUS Bypass Flash Tank Pressure                                                      O PSIG PLANT ELECTRICAL                                      System 92 Essential                                              Bus 1        Bus 2        Bus 3            .N/I Bus 3 480 VAC                                        485          485-              485                .
120 VAC-                                        118          118              118'        118 120- VDC                                        125;        125'-
A"-    .  "B" Standby Diesel Generator                                              -NORMAL            FAILED ACM Diesel Generator                                                      CLEARED OUT                      -
Non-Essential Switchyard                                                        .        NORMAL-Bus 1            Bus,2        Bus 3-4160 VAC                                                    4160--            4160        4160 480 VAC                                                                    NORMAL' MAIN TOWER-                                              System 41                            DRAINED
.      SERVICE WATER TOWER                                      System 42                      -NORMAL                                          )
FIRE WATER                                            . System 451                    , NORMAL'-
INSTRUMENT AIR                                          System 82                            "A" HDR        "B"'HDR -
93            93 SERVICE-AIR                                              System 82-                            95-'PSIG
        . . . . . . . . . . . . . . . . . . . . . . . . . . . . " B O A R D 1 1 - 10 ~ - " " * " " " " * " " " " " " " " "
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGH                      -
Bay ~100                                                                              - 80 'F .
Bay 200-                                                                              80 *F Bay 300                                                                                80:'F REHEAT ACTIVITY. MONITORS                                                                      005
      ' BUFFER: SEAL. MALFUNCTION                                                                      NORMAL'
 
4 FOSAVEX-900
                                                                                                          .PAGE15                                  :
SCENARIO TIMEi -ra -cres                                            .
CLOCK TIME:                    ,
PRIMARY AUXILIARIES                                                                              i
  .............................-BOARD                          I-13 **********"*********************
a PENETRATION INTERSPACE AP' O PSID)                                        .i REACTOR BUILDING' SUMP OISCHARGE FLOW                                                      0 GPM                                        'I
                                                                                                                                                ~
HELIUM CIRCULATORS                                  . System.21                            NORMAL-q
  .........................****                        BOARD-I-15""*"""*""""""""""                                                              !
i REACTOR BUILDING STACK FLOW                                                                  :29.9 KCFM                                    .i l
REACTOR BUILDING AMBIENT AP-                                                                -0.'25 Inches H20-                          ^!
                                                                                                                                            ;I CONTROL RVOM-TEMPERATURE                                                                          75:'F                                      I
  . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* l B O AR D I - 7 5 0 7 X " " " " " " " " " " * " " " " '
480V ROOM TEMPERATURE-                                                                            75 'F            ,
                                                                                                                                              -t i
6
                                                                                                                                          -I
                                                                                                                                            -l
 
                                                'FOSAVEX-90=
SCENARIO TIME:        -ra -+.si/5 -
                                                                    ' CLOCK' TIME:=
RADIATION. MONITORS:
NUMBER                  VALUE.            ALARMING        SENSITIVITY RT-6212          '5.0 X 10' CPM              -Y-            2.2E                                  !
RT-6213-          5.0 X 10' CPM                Y            2.2E-8 RT-7312                005    CPM                            N/A.
            -RT-7324-1          2.0 X'10'EcPM;                N:  >
1.57E-8                                -
RT-7324-2.        2.0 X110 CPM                .N              4.36E-7f RT-7325-F          1.0 X.108 CPM                N.          ,1.49E-5 RT-7325        1.0 X:108 mr/hr              N            ~ N/A-    .
RT-73437-1        1.5 X: 108 CPM:            'N-              2.51E                                l RT-73437      4.0 X 108-CPM                N            -2.73E-10                                b RT-9301-                005    CPM                            N/A RT-93252-12        1.5 X 108 mr/hr            fY 1            N/A-AREA MONITORS RT-93250-1        2.0 X 108 mr/hr              Y RT-93250-2        3.0-X'105 mr/hr'            Y RT-93250-3        5.0 X 10' mr/hr              N                                                      I RT-93250-4        3.0 X.105'mr/hr              Y RT-93250-5        1.0 X 10' mr/hr:              Y RT-93250-8        6.0-X-108 -mr/hr-          :Y RT-93250-13        1.4 X 108 mr/hr            -Y.                                                        !
RT-93250-14        2.5 X 108:mr/hr              +1                                                      4
            -RT-93251        7.0 X 108 mr/hr              N:
RT-93251-3        8.0,X 108 mr/hr-            11 -
RT-93251-4        2.0 X 108 mr/hr-              Y RT-93251-5        1.0:X(108 mr/hr                Y:
RT-93251-6        1.0 X 108 mr/hr-              Y RT-93251-7        0FF SCALE                    'Y RT-93251-8        5.0-X 108 mr/hr                YJ RT-93251-9        0FF SCALE        -
Y RT-93252-1        3.0 X 108 .mr/hr              Y
            .RT-93252-2        3.5 X 108 mr/hrf            10 RT-93252-4        5'.5'X 108 mr/hr              Y RT-93252-6        -4.0 X'108 mr/hr-              YL RT-93252        3.0 X 108 mr/hr                Y EQUIPMENT MONITORS                                                                                      j
            .RT-6314-2'        .1.5 X 10' CPM                  N RT-46211            1.0-X:10' CPM                  Y RT-46212-          ~1.0 X 10' CPM                  Y METEOROLOGICAL DATA Wind Speed                                            2.'1 MPH Wind Direction                                From 315 Degrees Plume Deviation / Sigma Theta                        4.0 Degrees Differential Temperature-                            2.2 *F i
                                                                                                      .. - _________O
 
FOSAVEX-90 PAGE 1-SCENARIO TIME:rge + c 345- -
CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                        YES Decay Heat Power                                        0.05 MW PRIMARY COOLANT Pressure                                            11 PSIA Temperature
* Circulator Inlet                                  95 'F Core Inlet                                      105 'F              ,
Core Outlet                                    125 'F Calculated Bulk Core (CBCT)                    N/A Maximum Region Differential (aT)                  28 F Helium Flow Circulator C                                    10 X 10' Circulator 0                                      0 X 10' TOTAL                                          10 X 105 Circulator Speed Circulator C                        '
2900 RPM Circulator 0                                        0 RPM Moisture (Oew Point)
ME-9306                                        41    F ME-9307                                        39 'F SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                0 lb/hr Loop 2                                      2.0 X 10' lb/hr EES Inlet Temperature                                    85 *F EES Outlet Temperature                                  100 *F Pressure                                                350 PSIA PCRV LINER COOLANT (In Service)
Loop 1                                          NO Loop 2                                          YES
 
m FOSAVEX-90
                                                                                                                                                    .PAGE 2 SCENARIO TIME: r + o b r CLOCK TIME:
PRIMARY AUXILIARIES
                        ..........................*** BOARD I-01 "*******************************
GAS WASTE                                  System 63 Inlet Pressure                                                                                10 PSIA Vacuum Tank Pressure                                                                          8 PSIA Surge Tank "A" Pressure                                                                      205 PSIG Surge Tank "B" Pressure                                                                        O PSIG LIQUID WASTE                              System 62                                                      NORMAL                          i REACTOR PLANT COOLING WATER                System 46 Loop 1 P-4601                                                                                CLEARED OUT P-46015                                                                                CLEARED OUT Header Inlet Temperature                                                              CLEARED OUT Barrel and Top Head Outlet Temperature-                                                CLEARED OUT Top Penetration Inlet Temperature                                                      CLEARED OUT Loop 2                                                                                                                  '
P-4602                                                                                ON P-46025-                                                                              CLEARED OUT Header Inlet Temperature                                                                115 "F Barrel and Top Head' Outlet Temperature                                                115 'F Top Penetration Inlet Temperature c                                                    115 'F Surge Tank Level "A"                                                                          O INCHES Surge Tank Level "B"                                                                        45 INCHES
, _ _ _ _ _ , , , , , ,                              ._a,-                      - - - - - - - - - - - - - - - - - - - - -                - - - - ' '
 
_~ . _ _ . _ . - - . .          - . _ , _              .                .      .    .                        . _ _ . _ . _ .
                                                                                                                                    ; ~
FOSAVEX-90 PAGE 3 u
SCENARIO TIME: Ta-oarr CLOCK TIME:
PRIMARY AUXILTARIES
                  .......................****** BOARD:!-02 ********************************                                          ,
                -HELIUM STORAGE                                System'24'                          -.
Low Pressure Bottles-                                          270'PSIG-High Pressure Bottles                                          57E PSIG=                              4)
HELIUM CIRCULATOR. AUXILI ARIES                    System 21-                                                    ,
Circulator C-2103 (C)-
Bearing Water Flow                                          1 170 GPM
                              . Bearing Water Inlet Temperature                              78,*F:
Main Orainz aP                                              -2.5 PSID Buffer /Mid-Buffer AP              -s-                        8 PSIDS Buf fer Helium Flow                                        7.40 ACFM-Buffer Helium Return Flow                          .
3.79:ACFM Circulator C-2104 (D)
Bearing Water Flow                                              0 GPM' Bearing Water Inlet Temperature                                78 *F:
Main Drain AP .                                                4 PSID Buffer /Mid-Buffer AP.                                          0:PSID                              .
Buffer Helium Flow                                              0 ACFM
                              -Buffer Helium Return Flow                                      0'ACFM
                                                                                                                                  -1
                ....************************* BOARD I-03~********************************                                        .i n
REACTOR-CORE                                System 12      <-
All Systems                                                    NORMAL
                ............................. BOARD I-05 *********************************
              ' HELIUM CIRCULATORS                          ' System 21 Circulator C-2103 (C)
Rotor Speed                .                              2900 RPM                              i Helium Flow (Low Range)                                  02020:PSID                            ,
Helium Flow (High' Range)                                    .0 %.                              ;
Circulator,C-2104 (D)
Rotor Speed                                                    RPM-
: Helium Flow-(Low Range)'                                -0.003 PSID Helium Flow-(High Range)                                        0%
MAIN 1 TURBINE                                System 51                  -NORMAL 4
 
F05AVEX-90 PAGE 4'
                                                                                                                                                .i
                                                                                                - SCENARIO TIME: re 6evs -                      i CLOCK TIME:
PRIMARY AUXILIARIES
                          . . . . . . . . . . . . . . . . . . . . . . . . * * * *
* B O A R O I ,- 0 6 t " * " " " " " " " " " " " " * " "
MISCELLANEOUS-Bypass Flash _ Tank Pressure                                                0 PSIG PLANT ELECTRICAL                                    System 92 Essential                                            Bus 1-  ' Bus 2 ~    Bus 3-        N/I' Bus 3-    .-
480 VAC                                      -485      -485:      :485                            H 120 :VAC                                      118        118-      118          118              -I
                                          .120 VOC                                      125-        125~
                                                                                                                "A"          "B" Standby Diese) Generator                                          NORMAL-        FAILED                ,
ACM Diesel Generator                                              CLEARED OUT.
                              ' Non-Essential Switchyard                                                .  -  NORMAL-Bus 1      Bus:2-        Bus.3 4160 VAC                                                :4160-      4160        4160 480 VAC                                                            NORMAL:
1 MAIN TOWER                                          System 41                      DRAINED'                          --n SERVICE WATER TOWER                                System 42        <
NORMAL
: -4 FIRE WATER                                          System 45-                      NJRMAL                            :j
                          - INSTRUMENT AIR-                                    System 82                      " A" HDR =--    "B" HDR
: 93-          .93 SERVICE AIR-                                        System 82                      -95 PSIG'-
                          ............................* BOARD l-10 ********************************
PLANT PROTECTIVE SYSTEM REACTOR BUILDING TEMPERATURE - HIGH                                                                                    -l
                                . Bay 100-                                                                    80 'F Bay 200                                                                      80 *F-Bay-.300                                                                      80 'F                                i REHEAT ACTIVITY MONITORS                                                            005                                  '
BUFFER SEAL MALFUNCTION                                                            NORMAL
 
F05AVEX    -
PAGE 51 SCENARIO TIME: ve . n t e LCLOCK TIME: _
PRIMA'RY- AUXILI ARIES f
    ...................********** BOARD I-13 ********************************
PENETRATION INTERSPACE-AP                                            0 PSID:
REACTOR BUILDING $ UMP DISCHARGE FLOW-                            30 GPM HELIUM CIRCULATORS                    System 21                  ! NORMAL
    ............................. BOARD I-15 ********************************
REACTOR-BUILDING;STACKrFLOW-                                          129.9.KCFM-REACTOR BUILDING AMBIENT AP-                                        --Oi25-Inches H20-CONTROL ROOM TEMPERATURE                                                ~7 5' ' F -
    ............................. BOARD-I-7507X *****************************
480V ROOM TEMPERATURE 75 *F            -
A f
 
FOSAVEX-90 SCENARIO TIME:  W M GO CLOCK TIME:
RA01ATION MONITORS:
NUMBER                VALUE            ALARMING      SENSITIVITY RT-6212          5.0 X 10' CPM              Y            2.2E-8 RT-6213          5.0 X 10' CPM              Y            2.2E-8 RT-7312                005    CPM                        N/A RT-7324-1        2.0 X 102 CPM              N            1.57E-8 RT-7324-2        2.0 X 108 CPM              N            4.36E-7 RT-7325-1        1.0 X 108 CPM              N            1.49E-5 RT-7325-2        1.0 X 108 mr/hr            N            N/A RT-73437-1        1.5 X 102 CPM              N            2.51E-10 RT-73437-2        4.0 X 105 CPM              N            2.73E-10 RT-9301                005    CPM                        N/A -
RT-93252-12      1.5 X 108 mr/hr            Y            N/A s
AREA MONITORS RT-93250-1        2.0 X 102 mr/hr            Y RT-93250-2        3.0 X 10' mr/hr            Y RT-93250-3        5.0 X 10' mr/hr            N RT-93250-4        3.0 X 108 mr/hr            Y RT-93250-5        1.0 X 10' mr/hr            Y RT-93250-8        6.0 X 102 mr/hr            Y RT-93250-13      1.4 X 108 mr/hr            Y RT-93250-14      2.5 X 102 mr/hr            N RT-93251-1        7.0 X 105 mr/hr            N RT-93251-3        8.0 X 10' mr/hr-            N RT-93251-4        2.0 X 102 mr/hr            Y        '
RT-93251-5        1.0 X 102 mr/hr            Y RT-93251-6        1.0 X 103 mr/hr            Y RT-93251-7        0FF SCALE                  Y RT-93251-8        5.0 X 102 mr/hr            Y RT-93251-9        0FF SCALE                  Y RT-93252-1        3.0 X 102 mr/hr            Y RT-93252-2        3.5 X 108 mr/hr            Y RT-93252-4        5.5 X 102 mr/hr            Y RT-93252-6        4.0 X 102 mr/hr              Y RT-93252-7        3.0 X 102 mr/hr            Y EQUIPMENT MONITORS RT-6314-2          1.5 X 102 CPM              N RT-46211          1.0 X 10' CPM              Y RT-46212          1.0 X 10' CPM              Y METEOROLOGICAL DATA Wind Speed                                        1.9 Wind Direction                              From 315 Degrees Plume Deviation / Sigma Theta                    4.0 Degrees Differential Temperature                          2.3 F
 
FOSAVEX-90 PAGE 1 SCENARIO TIME: 74 + c 3 ?.o    j CLOCK TIME:
OVERALL PARAMETERS Reactor Shutdown                                        YES Decay Heat Power                                        0.05 MW PRIMARY COOLANT Pressure                                            11 PSIA Temperature
* Circulator Inlet                                95 'F Core Inlet'                                    105 *F Core Outlet                                    125 *F Calculated Bulk Core (CBCT)                    N/A Maximum Region Differential (AT)                28 *F Helium Flow Circulator C                                    10 X 108 Circulator D                                    0 X 10' TOTAL                                          '10 X 108 Circulator Speed Circulator C                        '
2900 RPM Circulator D                                        0 RPM Moisture (Dew Point)
ME-9306                                        41    F 3
39 'F-ME-9307
      . SECONDARY COOLANT Emergency Condensate Header Flow Loop 1                                                'O lb/hr Loop 2                                      2.0 X 10' lb/hr EES Inlet Temperature                                      85 *F EES Outlet Temperature                                  -100 'F-Pressure                                                350 PSIA PCRV LINER COOLANT (In Service)
Loop 1                                          NO Loop 2                                          YES i
 
FOSAVEX-905                                          ..
                                                                                                                                .PAGE!2 :
SCENARIO TIME: rip r e8W y
CLOCK ~ TIME:-
                                                                          ~
PRIMARY AUXILI ARIES-
                        . . . . . . . . . . . . . . . . . . * * * * * * * " " BO A R D :- I - 012 * " * " " " " * " * " * " " " " " " * :
i H                      GAS-WASTE                                          System 63-                                                                    ''I a
Inlet Pressure                                                                  l'0 PSIA 1                                      ,
Vacuum Tank Pressure-                                                            :8 PSIAl                                      a Surge Tank "A" Pressure                                                      '205-PSIG'                                    ?f Surge Tank "B" Pressurc                                                              0_ P SIG --                              1 LIQUID WASTE                                        System 62                        -NORMAli                                  +
p REACTOR ~ PLANT COOLING: WATER                      System 46                                                                            <
Loop 1-                                                                            -
P-4601                                                                CLEAREO OUT                                      1
                                      -P-46015                                                              : CLEARED OUT-                                      l Header Inlet' Temperature                        .
                                                                                                              -CLEARED OUT                                    g Barrel and Top Head Outlet-Temperature                              ' CLEARED OUT                                    l Top Penetration Inlet Ter.rature CLEARED.0VTL                                    j
                              -Loop 2 P-4602                                                              . ON '' .        .
P-46025-                                                              CLEARED.00T-Header.Inle . Temperature                                            115 *FJ                                          ;
Barrel and Top .-Head Outlet Temperature -                            115 'F-                    -                  1 Top Penetration Inlet Temperature '''                                  115 .
* F-                                      i Surge = Tank Level-"A"                                                            0-INCHES:
Surge Tank Level "B"'                                                          45 INCHES
* i 4
l 4
1 1
L_
 
F05AVEX-90'                _                                    _
iPAGE 3                                  ,
                                                                                      - SCENARIO--TIME: rc eosw      -
CLOCK TIME:
PRIMARY AUXILIARIES.
                  ............................* BOARO I-02:'*******************************'
HELIUM STORAGE                              System 24'                                .
                                                                                                              ~
Los Pressure-Bottles                                                          270 PSIG:
High Pressure Bottles-                                                      l575 PSIG1 HELIUM CIRCULATOR AUXILIARIES                        ' System 21:
                        ' Circulator C-2103 (C)_
Bearing Water Flow-                                                        -170 GPM Bearing Water-Inlet Temperature'                                              78 'F >
Main'0 rain AP                                                                2.5 PSID Buffer /Mid-Buffer AP
* 8 PSIO Buffer Helium Flow                                                        7.40 ACFM Buffer Helium Return Flow                                                  3.79 ACFM Circulator C-2104 (0)
Bearing Water Flow' O.GPM Bearing Water Inlet Temperature-                                              78 *F                                                  .
Main.Orain AP                                                                  4 PSIO-Buffer /Mid-Buffer 6P                                                          0 PSID Buffer Helium Flow                                                              0 ACFM Buffer Helium Return Flow                                                      .0 ACFM:
                  .............................BOARDI-03****"****************"''"*"***
REACTOR CORE                                System 12            '
                        -All Systems:                                                                    NORMAL
                  ............................. BOARD I-05 *********************************
1                                                                                                                                                                  <
l                HELIUM CIRCULATORS'                        System 21 Circulator C-2103-(C)      '
Rotor Speed                                                                  2900 RPM.
LHelium Flow (Low Range) .                                                  0.020 PSID' Helium Flow (High Range)                                                              0 .%
Circulator.C-2104 (0)                                                                              .-
3 Rotor Speed-                                                                      :0 RPM                              -
Helium: Flow'(Low Range) _                                              -0.003 PSIO Helium' Flow (High Range:                                                              0 %-
l                MAIN TURBINE                                System 51-                                ~NORMAL                                                  U
                                      . . ,~                    .. --.          -          .-              ..                                  - - . .
 
f g                                                                                                          JFOSAVEXi90:
                                                                                                            ~
                                                                                                                                                  =-
L PAGE 4 y 1                        ;
SCENARIO-TIMEf - A s e v e                                  d
                                                                                                                                        ~
C'.0CK TI IMEi                            _____                ,
1 PRIMARY / AUXILIARIES-                                                                  .
zi
                                                        . . . . . . . . . . . . . . . . . * * * * * * * * * * * * - B OA R D I - 0 6 " " * " " * " "
* L * " * " * " " * " " 4                  y
                                                                                                                                            ~
MISCELLANEOUS Bypass Flash Tank Pressure                                                            0 PSIO:
PLANT' ELECTRICAL -                                  System 921                      '
                                                                                                                                                                              ,  ,7 Essential.                                              Bus 1      . Bus 2      ;BusL3'            -N/I; Bus'3-480 VAC                                      ,48SJ        485-.            485            ?  ~
120 VAC.                                      :118c      118D            '118'                118        .
120 VOC                                      l125=        1251 ^                                                      q "A".            "B"-
Standby Diesel Generator                                              ;RCRMALE_ FAILED
                                                                        'ACM Diesel Generator                                                  JCLEARED 0UT y Non-Essential                                                                                                                          ,
i Switchyard                                                                NORMAL Bus .1?        -Bus-2^            Bus'3~                        ;
4160-VAC                                                  4160                4160'          -4160t
                                                                        '480 VAC                                                                    NORMAL:
MAIN TOWER                                          -System 41                            -DRAINEO>                                          !
SERVICE-WATER TOWER-                                    System 42                            (10RMAL -                            '      y FIRE WATER-                                            System 45;                          3 NORMAL--
INSTRUMENT AIR                                          System 82                            '' A'.' H D R -:
                                                                                                                                                                            "B".HDR' 193                  93.                    3
                                                        . SERVICE = AIR                                          System _82l                        JPS PSIG~
y BOARD'I-10"""*""*""*"""""*""
PLANT-. PROTECTIVE SYSTEM                                    .
REACTOR BUILDING TEMPERATURE - HIGHD Bay 100-                                                                                80 '* Fg
                                                              -Bay'200                                                                                  80'*F7 Bay 300                                                                                  80 *F-4~
REHEATLACTIVITY-MONITORS                                                                        C05
                                                        -BUFFER' SEAL MALFUNCTION                                                                        NORMAL 1
                            . _ _ _ _ _ _ _ _ _ _ _ _ .                        ___..m._    _ _
 
i w                    1  m      8              ~
r FOSAVEX-90                                  ,
PAGE 5.
                                                                                                          $CENARIO TIMEfThes}D
      -s                                                                                                          .            .
o Ct.0CK TIME:--                                                  :
j PRIMARY AUXILIARIES
              ............................. s o A Ro . l .13 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                j 7
FENETRATION IN7EAS.' ACE AP                                                                                . 0.PSID
                                                                                                                                  ..                                          i REACTOR BUILDING TU.MP DISCHARGo FLOW                                                                        0 GPHL HEL;UM CIRCUI.AT0kS                                              System-211                                                                                  "
3
                                                                                                                          - NORMAL'
            - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - B O A R 0 _ I - 1 5 : * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * --
REACTOR BUILDING-STACK FLOW                                                                                    -29.-9 KCFM:
REACTOR BUILDING ~ AMBIENT AP                                                                                - -0.25 Inches 5H20:
CONTROL ROOM TEMPERATURE                                                                                          175 aF-
              ........................***** BOARD                                        I-7507X_*****************************-
i.
  \ .
4            480V ROOM TEMPERATURE.                                                                                              75MF                                  <
J Y
                                                                                                                                                                                  .1 l
 
l FOSAVEX-90<                                                                            i SCENARIO TINE: he a s h CLOCK TIME: 7-RADIATION MONITORS:L NUMBER                    VALVE                ALARMINGL -SENSITIVITY' RT-6212          5.0'X 10' CPM-                  ;Y L              2.25-8 RT-6213-          5.0 X:10' CPM'                  Y-                2. 2 E- 3 --
RT-7312                  ~005-      CPM                .            N/A RT-7324-1        2.0 X 108 CPM                    N-                  1.57E-8;                                                  l QT-7324 2:        2.0 X.108 CPM                  N                  4;36E-7.:
RT-7325-1          1.0 X-108 CPM-                  N-            -1.49E-5' RT-7325        1.0 X 108 mr/hr.              ;N            ~N/A RT-73437-1        1. 5 .. X - 10 8 CPM            N;                2.51E-10                                                    4,    '
RT-73437-2        4.0 X 108: CPM)                -N                  2.73E-10:                                                  '
RT-9301                    005- CPM                  .          iN/A"                                                              i
,        RT-93232-12        1.5 X1108 mr/hr                  Y,          - N/A ;-
i AREA MONITORS
        -RT-93250,-1        2.0 X.108 mr/hr                  Y RT-93250-2        3.0 X 108 mr/hr-                Y RT-93250-3        5.0 X 10' mr/hr                -N                                                                  ,
RT-93250-4        3.0 X 10' mr/hr-                Y
        -RT-93250-5          1.0 X'10' mr/hr-              Y; RT-93250-8        6.0 v.108 mr/hr-                Y RT-93250-13          1.4 X 108 mr/hr                Y RT-93250-14          2.5 X 102 mr/h r -            .N d''
RT-93251-1          7.0 X-108 mr/hr                N-                                                                                '
RT-93251-3          8.0 X 10' mr/hr=              =N.          . - -
RT-93251-4          2.0 X.108 mr/hr=.              Y!
RT-93251-5.-        1.0 X 108 - mr/h_r .            Y                                                                          ll RT-93251-6          1.0 X 108 mr/hr'                YJ                                                                        o RT-93251-7          0FF SCALE.                      Y'
* RT-93251-8          5.0 X 108 mr/hr              "Y RT-93251-9          0FF SCALE                    :Y RT-93252      -3.0 X--108 mr/hr-
                                                            -Y-RT-93252-2        =3.5 X;108 mr/hr-                  Y-                                                                          o RT-93252-4          5.5 X 108=mr/hr.                Y RT-93252-6i          4.0 X 108 mr/hr                Y-RT-93252-7          3.0 X-102 mr/hr-              .Y EQUIPMENT MONITORS RT-6314-2            1.5 K-108 . CPM-                N-y RT-46211            1.0 X 10' CPM'                  Y RT-46212            1.0 X 10' CPM                  Y
      ,  METEOROLOGICAL DATA Wind-Speect                                                1.9 Wind Direction                                      From''315 Degrees Plume : Deviation / Sigma Theta                            4.0 Degrees Differential' Temperature                                  2.3 'F-
_-__-_______-_______x--                        - --- ._ _ Y
 
                                        .                                                                                                                                                              I a
F05AVEX-90.                                                                                        l 4
PAGE 1                            1 SCENARIO TIME: --s + otV5                                              ;
i                                                                                                                                                                                                      t
:                                                                                                                              CLOCK TIME:
1 i
OVERALL PARAHETERS i
Reactor $hutdown                                                                                            YES l
Decay Heat Power                                                                                              0.05 MW-                                        .)
                                                                                                                                                                                                      ]
PRIMARY COOLANT Pretsure                                                                                              11 PSIA Temperature, Circulator Inlet                                                                              95 'F -
Core Inlet-                                                                                  105 'F 4                                                    tore Outlet                                            .
125 eF                                              .
Calculated Bull Core (CBCT)                                                                  N/A Maximum Regi.4, " fferential (AT)    .                                                        28 *F Helium Flow                                                                                                                                        ,
Circulator C                                                                                -10 X 108 i
Circulator 0                                                                                  -0 X 108                                        '
TOTAL                                                                                        10 X 108 Circulator Speed.
Circulator C                                                          '
2900 RPM Circulator D                                                                                        0 RPM Moisture (Dew Point)                                                                                                                                      '
ME-9306                                                                                  .41 *F ME 9307                                                                            .        39 'F                                          -
a i                                                                                                                                                      4 SECONDARY COOLANT                                                                                                                                                  t Emergency Condensate Header-                                                                                                                              .
Flow-Loop l'                                                                                                0 lb/hr                        .
Loop 2-                                                                              2',0 X 10' lb/hr EES Inlet Temperature'                                                                                        85 'F EES Outlet Temperature                                                                                        100 'F                            -
Pressure                                                                                                      350 PSIA i                                                                                                                                                                                                    .i
                                                                                                          . ..                                                                                        +
I PCRV LINER COOLANT' (In~ Service).
;                                                      loop 11                                                                                      LN0' .
Loop /2                                                                                      YES
                        -[                                                                                                                                                                            >
              , , ~ .    - . . , .      ..            . . - . . . . _ . , . ~ . , . . . -
                                                                                                . ~ . _ .          ;.....        ,_,4,.        .      ,.,-~.,,,,%      . ,....., .. ..,~., . .
 
  . . . - -                        _ . .          . .    . _ ~ . _ . - - - - . . _ - .                                    . .            _ - ..- -                        . _ = _            - . - - . .          .
l l
!                                                                                                  FOSAVFb90-PAGE-2 SCENARIO TIME: To + ovic CLOCK TIME:
PRIMARY AUXILIARIES                                                                                                              ;
                                  ..........................."BOARDI-01""""*""*"*"*"*""**""
GA; WASTE                                                        System 63 i
I                                          Inlet Pressure                                                                                                          10 PSIA Vacuum Tank Pressure                                                                                                    8 PS1AJ Surge Tank "A" Pressure                                                                                            205 PSIG' Surge Tank "B" Pressure                                                                                                  O PSIG LIQUID WASTE                                                    Sy5 tem.62'                                              NORMAL REACTOR PLANT COOLING WATER                                      System 46
                                                                                                                      +
Loop 1 P-4601                                                                                                  CLEARED OUT                                            ;
P-46015                                                                                                  CLEARED OUT Header Inlet Temperature                                                                                CLEARED OUT Barrel and Top Head. Outlet Temperature                                                                  CLEARED OUT -                            .
Top Penetration Inlet Temperature--                                                                      CLEARED OUT                                            q Loop 2                                                    _
P-4602:                                        v-                                                        ON P-46025                                                                                                  CLEARED OUT Header Inlet Temperature                                      _
115 'F Barrel and Top; Head Outlet Temperature                                                                115 'F Top Penetration Inlet Temperature                                                  '
115''F-                                              ,
Surge Tank Level "A"                                                                                                    0 INCHES                                            .
Surge Tank Level "B"                                                                                                  45 INCHES 3                                          .
i
                                                                                                                                                                                                                    't l
l                                                                                                                                                                                                                      \
l.
I i
l
      , _ . ~.  - ,  ,..c .i..-            - - _ -              ..., , ,    - + , . . . . , . , , , . . , - , , _ - , . , , , , , , ,    ,,    . _ . . , , . .    - , , , , , ,      -,    .J.        , ,, .
 
__..._m._.._._._.-._.._                                  _ . _ . _ - . . _. _ _ _ _ - _ _ _ _ . . _ . _ _ . _ _ _ . . .
i
:                                                                                  . FOSAVEX                                                                                                  I I
PAGE 3                                  l SCENARIO TIMEt c.s + c14r CLOCK TIME:                                                            i
;                                                                      PRIMARY AUXILIARIES                                                                                                      l
                              .......................******BOARDle02""""*""""*"""""""                                                                                                            )
L HELIUM STORAGE                                        System 24                                                                                                  i Low Pressure Bottles                                                                          270 PSIG                                              1 High Pressure Bottles                                                                          575 PSIG j'
HELIUM CIRCULATOR AUXILIARIES                                            System 21
                                    ~ Circulator C-2103 (C)'                                                                                                                                  I Bearing Water Flow                                                                            170 GPM Bearing Water Inlet Temperature                                                                78 'F                                              .
Main Orain AP                                                                                2.5 PSID
                                          -Buffer /Mid-Buffer AP                                                                                8 Pbt0                                        l Buffer Helium Flow                                                                        7.40 ACFM Suffer Helium Return Flow                                                                3.79 ACFM Circulator C-2104-(D)
Bearing Water Flow -                                                                                0 GPM                                          .
,                                          Bearing-Water-Inlet Temperature                                                                78.'F
"                                                                                                                                                                                              [
Main Drain AP                    -
                                                                                                                                            ' 4-PSID                                          $
Buffer /Mid-Buffer AP                ,
1  0 PSID'                      ,
Buffer H611um Flow                                                                              - 0 ACFM
                                          . Buffer Helium Return Flow                                                                        - 0 ACFM                                          <
l
                            ............................' BOARD l-03 ********************************
i REACTOR CORE                                        - System 12                                                                                                  ,
d                                                                                                                                                        .
All Systems                                                                                      NORMAL-
                            .............................BOARDl-05*********"**********************
HELIUM CIRCULATORS                                    System 21 Circulator C-2103-(C)                                                                                                                                      y Rotor Speed                  -
                                                                                                                                          -2900 RPM-                                          I Helium Flow (Low Range)                                                                    10.020 PSID Helium Flow (High Range)                                                                                0%
c                                    Circulator C-2104 (D)-                                                                                                                                    !
Rotor Speed                                                                                            0 RPM Helium Flow (Low Range).                                                                ' -0 003.PSID; Helium Flow (High Range)                                                                                0%
MAIN. TURBINE                                          System 51                                          NORMAL                                                i l
                                                                                                                              ,                                                              0
:  b t
    .  ~      ._        .      ,    ,      , . .  ,_..# . . _ . __        c      .,,,.m_,      -,    __.,-,,m,__,-,.              ...,r,__    , . . ,..,,,v......-~,... .
                                                                                                                                                                                  . ~ . . , ~
 
I
)                                                                                                F0$AVEX-90                                                                                                          -
i                                                                                                                                                                PABE 4
;                                                                                                                            $CENAR10 TIME: -r a + csW CLOCK TIME:                                                                            :
r PRIMARY AUX!L! ARIES
                                          ....................n....."                          BO ARD l -06 * """ * * " * " * * * " * " """ " "
3                                                                                                                                                                                                                  >
l                                          MTSCELLANEOUS                                                                                                                                                            :
i                                                  Bypass Flash Tank Pressure                                                            - 0 P$1G-                                                                  l PLANT ELECTRICAL                                      System 92                                                                                                          -
l                                                  Essential.                                                    Bus 1      Bus 2        Bus.3-                  N/I BusL3
!                                                                4.80 .VAC                                          485      4B5            485                                                        '
4 120 VAC                                              118-    118            118                    118                                            -
;,                                                              120 VOC-                                            125    125 r                        "A"                    "B"                                            >
i
!                                                                $tandby Diesel Generator                                                  NORMAL                  FA! LED ACM Diesel Generator                                                      CLEARED OUT                                                  ,
Non-Essential l
Switchyard                                                            e NORMAL bus 1        Bus 2                    Bus 3
* 4160 VAC                                                    4160            4160                  4160
,                                                                480 VAC                                                                  NORMAL-MAIN TOWER                                            $ystem 41                                DRAINED 4
SERVICE WATER TOWER                                  System 42                                NORMAL FIRE WATER                                            System 45                                NORMAL T
IN$TRUMENT AIR                                        System 82                                "A" HDR.                  "B" HDR                                    u' 93                      93 System 82                                  95 PSIG                                                              -!
SERVICE AIR
                                          ...............n.........."                            BO ARD l- 10 " "" """ "" "" " " " " " " -
PLANT PROTECTIVE SYSTEM-i REACTOR BUILDING TEMPERATURE - HIGH:                                                                .
Bay 100                                                                                180 'F Bay 200                                                                                  80 'F-1 -                                                Bay 300'                                                                                  80 *F REHEAT' ACTIVITY MONITOR $                                                                        005.
i BUFFER SEAL MALFUNCTION--                                                                          NORMAL' I
l is l
                                                                                                                                                                                                                  'l L
        +          --                  -                    -.                        ,.,,m ,  - , , . , . . , . .,          , _,                  . . , , . , ,      , , , , _ , , , _ _ . . _ , . , , , .      'l
 
F05AVEX-90 PAGE-5    .
SCENARIO TIME: vs + e%W CLOCK TIME:
PRIMARY AUXILIARIES
        ............................* BOAP.0 1-13 ********************************
PENETRATION INTERSPACE AP                                      O PS10 REACTOR BUILDING SUMP 0!$ CHARGE FLOW                          0 GPM HELIUM CIRCULATORS-                System 21                  NORMAL-
        ......................******* BOARD I-15 ********************************
REACTOR BUILDING STACK FLOW                ,
29.9 KCFM REACTOR BUILDING AMBIENT AP                                    -0.25 Inches H2O
        - CONTROL' ROOM TEMPERATURE                                          75 'F                  ,
          ............................* BOAR 0'l-7507X *****************************
F            u 480V ROOM TEMPERATURE 75 'F 1
      .                                                                                                  l b
t
                                                              - - _ . =        - - . . . -
 
                            ._.. -. .- .              -        _ . . - . . - . ~ . - _ . . --            . - _ - - .
b 7.0-1 J
t SECTION 7,0 ONSITE RADIOLOGICAL DATA.
e Section 7.1                Plant Monitoring Data                                  Page 7.1-1 7.2                Radiation / Chemistry Data                            Page 7.2-1                ,
7.3                  Plant Area Radiation Levels                            Page 7.3-1 l
l
                          '                                    4 i
i
 
v v        o SECTION 7.1 00SAVEX-90 Plant Monitoring Data                                                                                '
0800            T2+15                  T2-30                T2          T2-100 T2            T2-29                    T2-44              T2-59                    T2-114 Stack - PING:
RT-4801    1.0 E      1  1.0 E -1              1.0 E -1              1.0 E -1        1.3 E -1 i
RT-4802    1.0 E      1  1.0 E -1              1.0 E -1              1.0 E -1        1.0 E            !
RT-4803    1.0 E -1        8.2 E -4              7.5 E -5                2.$ E -6        5.0 E 6 Liquid:                RT-6212 , 7.0 E -1        5.0.E -4            +5.0 0 -4                5.0 E -4          5.0 E            l RT-6213    8.0 E -1        5.0 E - 1            5.0 E -4              5.0 t -4          5.0 E -4 Stack Noble Gas:
RT-7324-1    2.0 E -1      6.3 E -2              5.7 E 3                1.9 E -4        3.8.E -4 RT-7324-2    2.0 E -1      2.2 E -1              1.9 E +2              6.4 E -2          1,1 E -3 Stack Iodine:
RT-73437-1  -1. 5 E - 2      1.5 E -2              1.5 E ,-2              1.5 E -2 1.5 E            2-PCRV Relief Valve:
1.0 E -1      1.5 E -2 RT-93252-12                                          1. 6 E + 2            1.6 E -2          1.6 E -2 mr/hr        - mr/hr                      mr/hr.            mr/hr            nir/hr                            L f
ALL READING IN CPM UNLESS SPECIFIED OTHERVICE I
                                                                                                                                                                  ?
s r
7 .1 - L
 
SECTION 7.1 EOSAVEX-90 Plant Monitoring-Data T2-115          T2 130        T2-145      T2-200        12+215          i T2+129            T2+144        T2 159          T2-214      END        1 l
Stack - PINO:
RT-4801  1.0 E -1        1.0 E 1        1.0 E 1    1.0 E 1      1.0 E    1      l RT-4802  1.0 E -1        1.0 E -1      1.0 E *1    1.0 E *1      1.0 E -1        ),
RT 4803  5.8 E -7        8.3 E -6      4.2 E -6    4.2 E +6      1.0 E -1 1.i q u i d :            PT-6212  5.0 E -4        5.0 E -4
* 5.0 E -4    h . ('  E -4  5.0 E -4 RT-6213  5.0 E -4        5.0 E 4        5.0 E -4    5.0 E -4      5.0 E -4 Stack Noble Gas.
RT-7324-1  4.5 E -5        6.3 E -4        3.2 E -4    3.2 E 4      2.0 E -1 RT-7324-2  1. 4 E + 4      2.1 E +1      1.0 E 3      9.6 E -2      2.0 E +1 Stack Iodine:
RT-73437-1      1.5 E -2        1. 5 E -2      1.5 E ,-2    1.5 E +2      1.5 E -2" PCRV Relief Valve:
RT-93252-12          1. 6 E -2      1. 6 E + 2    1.6 E -2    1.6 E -2      1.5 E -2 mr/hr            mr/hr          mr/hr      mr/hr-        mr/hr ALL READING IN CPM UNLESS SPECIEIED OTHERWISE f
7.1-2
 
                                                                                      \
i SECTION ?.2 FOSAVEX-90                                ,
Radiochemistry Data                          j PRIMARY COOLANT RADIOACTIVITY LEVELS L
t If a primary coolarit grab sample 1:5 reqtiented, let necessary          ,
personnel perform an actual graib sample test and use actual-resultn olta?.n-d.
e e.
7,2-1 l-s.
l L__.__.___.___.-_________________._.. -
 
I SECTION 7.3 TOSAVEX-90 AREA RADIATION MONITOR 0 Channel        'ocation R1-93250-1    Ref ueling Machine Control Rooni -                                Rx (el. 4881')
RT-93252-1    Refueling rioor Northeast                            -
Rs (el. 1881')
RT-93251-l*    keactor Plant Exhaust filter Rooni                                -
Tb (cl. 4864')
RT-93250-2    East Walkway Outside HST                                ,Rx (el. 4849')
R"-93252 2    Ocuth Stairvell                          -
kN (el. 4864')
R1-93250 .1    Hut Oervice facility Platform                                -
kN (el. 1849')
kT-93251-3    Hot Cervice racility Blower Suction                                  -
Rx (el. 4849')
RT-93250 4    Last Walkway HST Entrance                            -
Rx (el. 4339')
KT-93251-4    General O!!1ce Area                          -
Tb (el. 4811')
RT-93252-4    Analytic Instrument kooni                          -
Rx (el. 4829')
i    RT-93250-5    Main Cont rol Rooni - Tb (el, 4829')
,    RT-93251-5    cas Kaste filters                          -
Rx (el. 4781')
RT-93251-6    Reactor Building Truck Bay                              -
Rx (el. 4791')
RT-93252-6    Couth Stairvell                          - RN (el. 4791')
RT-93251-7    Core Support floor Filter                            -
RN (el. 4781')
RT-93252-7    East Walkway                  -
Rx (el. 4781')
RT 93250-8    Northeast Walkvay -                            Rx (el. 4771')
RT-93251-B    Health Physics Room Laundry                                -
Rx (el. 4771')
RT-93251-9    Buffer Helium Dryer Loop 1                              -
Rx (el. 4740')
RT-93250-13    Condensate Deraineralizers                            -
Tb lel. 4791')
RT-93250-14'  East Wall Refueling Floot                              -
RN (el. 4881')
Rx = Reactor Building                                                                                    I Tb - Turbine Building t High range nionitot 7.3 1
 
a  ar..      s a e.. ma  sa    s      n. a.a-            s      um--w    n--m-,_s.,        a            -      .-.--a.,u....ut-.              -na-s    ,s>  -.-    n.-  an  -a,--. x-na  s2  . .a s  -,uu d
                                    .m M
s.
9                                                                  l M
M l
                                                                  ,.J                                                                                      Lu 5                                                                                                                      -.
                                  +      "                                                                                                      +
g                        .
                                                                                                                                                  "3
                                                                                                                                              ~
                                    "                                                                                                                                                                                i
                                    ~
po 4                                                                                            __    w o.
EJ M                                                  i                                                  -
                                                                % :Z: C u. W                                  Q V                  CQ <
                                                                                                                                            =~                                                                      \
i 1
l N                                                                                                                                  *
                                                                                                                  =                ~
                                                                                                              $.  .                k                                                        r                      !
                                                                                                              +  t                  +                                                          g q
i tu g                                                                                                              $'      '
3                                          L.                                                    5            6
                                                                                ?m                                                          :                                                  a gi hbhh ~#
c{                                              "
3 d
g6                -
                                                                                )9        ,      s          p o
dg 4                                  I s
tu R          $                    f$
                                                          ~
i s'                                        NL                                      ed                ,.
e o
                                                                              =              t SD                  .
s N
                                                                                                                                        *    ,  m        4
                                                                                                                                                    \
                                                            )-                                                      _                                      %
N                                                                                                            N o                    tu
                                                                                          +      kg 0 $ E,,it!,a],.3,4,T,N,
                                                                                                              . .          -            .,    -        <3 i::
                                      ,                                    *              *                                                      , %~?,
7 W
6 I    .          _                  . . .            - .            .-    .
 
  ,,_.-s            s.A2.  --  2 4,n--      -,_- - - -      a        n-,    -"a    r    --        m-                        -                  *--4--  -' " - "
O
                          ......; gnnnm aua, T
qs    -            fp                            ,
Y              h                    v                                                g
                                                                              #                                                                    d r-                        -
                ',                                      "      -          a Q                                              _.    -
g '.
                                                        ~      -          -
n          _
si m;                  -
                                                        -      ,          -            U      2 aw eee..                                                .  .      .
( :
O                                        -      (t3                                    o                        %F O                                          u
                                                                  \
g .....
                                  %, A                                                          4                          :
                                                                                                                                            /                @
h u
2 U/~      v k
6
          &                                                            f W                                                    /                                                                      .....
::::dD o
4
                                                                                                                                                  ='
l S
\
I V                                  V                            N C. '.
i                i h
t
                                                                                                                , . ~ . _ .
 
k L                          /                x                                                  -
5                  /                                          N                    .s          !
jQ s $,
ii:      /O            O O                                                                  5 g
o:
i              O O O                                      ia                        .        e OO O                                      IM O
                                                                      =
e 1                                      A                      .
M _." L5                      d
      )S                3-          l %QA                    .
                                                                    !O r
        *                !~~-      Zfm2- y                        :            ,
psa                  e            ix    x                                3
      ..\.___z                _ . .                                              J r        \
n              M                  e              i
                                                                                                          +
x                                                                            i t
m 5                                                        .
F U-
            .s                                  O                                                  '
sg O    )o g O 09 20980 l
Ok      8  bk0                                  );
l o
0 l
i_                                                                      /
_            ?
z                    _                              _
                -      e                              . , - -                -    v.
 
                      ^ - - - - . -  %--  J  -.hs            ..1    _e. .-.g,  .. ___.,2              g                          ._ ,,      ___, __
r4
* hm i                                                                ms
_, s t
9 l@    Lg s: ~        e            x              H-5 h, d*                                                                              C                L      y
                                                                                      .                      O! .      r'                    d
                                                                                      %g rW T
                                / O O OO  O
                                          's              v m.
o,            g!
s d
0y-b                        .
u                    .m 2                          ~
y f
9            p'g        s T                :      c      o    e ope go                          e            ,
                                                                                                                  <r    @        7
                                                          \f.-4-A
_  =
u 7
y;>(=9                                        { {%-==
QI                                    l peu
:                                                                                                              .                      Wi l                                                                                                                                      T)
[l R
I e
                        %                                                                                            /
                                                                                                      )
i I
4                                                            i
        !                                                                                                                        4
                                                                                                                                  ]
i OC                                                                              I
 
A 6-_    .mm _ _            A- 4    _ia-    _.                  Er                    -,hau      ---J<  - - - - , - - - - - -
                                                                                            .                                                                                      <1
                                                                                                                                                                                  ,l
                                                                                                                                                                                      \
                                                                                                                                                          ~
n . f                                                                              t                l k
                                                                                                        ~
L                                              -
e,o                                              Q ts                                                  o                                    N*-                                                          i e ooo w
A,
                                                                                                                                                          <          e is E_
t s      o      (a7  V
                                                                    ^
l[
                                                                                                              .I .
l
                                                                                                                                                    *44 e
g                .9 t'
s            -
                                                                                                                    -_    T.a. t
            >                                                                                                , -qsj
                                        - :--        _            N u,-                                    .m                                                .
                        ;_ ;a                      x                      x                      -                              ,
y'                        .
                *f , ,  ,                          ;      y    b/                      ~)        '
L li 3( b
!.  -                    F-
                                                                  \                    /            <
                                                                                                                                  ;, J. _
es                                          ,            tj                                                                                -
I a  ,
I        to i
1
 
4.2J.am---,_.--*.W_e.              .._h.~e    ed.E%,%s-              44ua _,,J 2_m.4 m .--___.1,%
__w-,4          .aa  mim.u.4  -  _      --v  ,  s_            %
                                                                                                                                                                                  -. 4 .,m.m, a.42va O
l
                                  ,g                                                                                                      g                                  .;
I
                                  ==-                        -
C                                        s  3 r    e
                                                                                                        ,                g L
I' OOO                                        !
is              g'
                                                                                                                                                  -t
                    ~
A                                h
* I_.h        C                :E.
                          'f                            (
:    s f        f                    f          &            -
M 5h                                                          TE llj                            la                                                          -
u-d                    .                                            [            lI l.
7 2,
                        ;                                                  y                                                              ,>                            u j \050                                                      N/                                                                    j    .
i A                                            A                                                  ,
7 m
                                                                                  '                                                                                                    N-N 1):
o
[                                        x
                                                                  /                                                  '
j i                                                                                                \
                          ;                                                            +                                                                        i
                                                                \                                                      !                                          '
i                                      \                                                  /
I i
N ._                    /                                                              i
                                                                                                                                                                .i 9
                                                                                                                                                                    ,        I
 
W4-- A.m-hJ-J.4 & W                MJ.B*h--        h,. _,*4_e 4 4+._h.6    --m4.444-had.---u.-.          ,,-.Mus.--                      Ja -e  h----m.a            4.e  -wa.he-m                    m      a-M+. de--d*4    e        a.4mg__-a--  r      - - - - ---
                                                                                                                .                          O i            IL                                                                                                                                                                                                          g 4                                            g                                                  Q              %
e
                                                                    -                                                  ,                                      s                                                                                            .
w      ,
Xa                                                                      x          ~
W
                                                                              =                                                                      "**'
e-.
                        "                                                                                      -                              _-                                            1 A                                                                                  1                  __
N                                                                                                                        L                                l4 5#                                                      '
s'M PT                                                        G            L$                                    ~T                                  -
r' L                                                          i csn
                                                                                                      \J                                                          M
:l                                                                                                                                                                                                  1 l"                                                                                                                                                                                                    '
A                                                ,
A                                                                                          '
l
                                                                \                                                                                                  '_
g
                                                                                                                                                                                                                                                                    \
!                                                                                                                              i i
I M
l N
                                                ,e /
: a.                                                                                                      t
                                                                                                                                                                                                                                              \                                              '
lI                                                                                %                                                                                                '8                                    i
                                                                                                                                                                              ,                                      t,  i i
i i                      ,
f I
i                      I              =,- .
t k
                  , ---                                                  , -        - , - - - , , - , , ,                . , , - , , , , .                        ~ - . . -
                                                                                                                                                                                          -- ,-- - . , . . , , , ,                              ,-,.~,w          .-,-,,,c              , - -
 
  -,4. J  .---i.A.ane-..      sm    .ma+-    we,    m  _ m----.a.                                            ...u .m              .-s.      m                                ah.#      A -    .m.. s. J. 4 l
3                                                                          s M
                                              .com a                                                                                                                                                                ,
                                              =
                                      =a M
m W
: e.                                                                                                              -
                                                                                                    '                        8                      A              R ff                                    .I t
                                                                                                    -                        -        s            :              :                              "
g
                                                                                                                                                                                                                    =d j                          1                    -
f                                1                                  N X                              J                        g I
                                                                /                I      I                                                  1    I
                                                                                                                                                              \
i A                        <
e t
[_                                                                                                                                                            O b                                            I                  9                g        u
                  -        a                                      ,,,,
                                                                                                                                    -[ p~l c-
_ (,. a ;
_b                                    l u [
                            .LAJ                                                                  [                    \                              .
q .S                                                                                                                                      SM 35
                                                      ;e                                    [ g----                          li .            u                -
Ei l ;                                                                                                                                                                                      V b                                                                                                  "                  o 'f                      -
dL,
:n 9o e4                                    0
                                                                                                              -                  u                  -                                a.__                    -
rev                                          L----__/
                                                                                            $Q
                                                                                                                                                                                                              ~
Y fl                                                                                                                                                                                      L
                                                                                                                                                                        /                      a
{                                          l      /\                                  !                                        }          lg 0,.- ,
                                                                                                                                                            /.4                                --
q-l-C                                                                                  ,
* r()
s                                                      - .
                                                                                              /                                      N e
o
                                                                                                                                                                                                                              \\.
o 5
I l                                                        \                                        a W
T                                                                                    ;
                                                                                                                    '                                                                                                  e k                                                              ,/                                                                    8 x                              !                                                                                                      J
                                                                                      \
c o                          x%-            i u
IrkW        Q                                                                                                                                                      O i                                  ,l V                                  l              V                                'Y -          ~
                                                                                                                                                                                                  -I r~
i d          I_.-            ..
l'
 
                                                --*                                                  +    - -
e y                                        I                              tJ I
* 74              ,,,
4,.c                -
tf      _J 3-            W              5
              .T. E. n. .
c:A  T      a-                                              a r                                                      w rn                                                  I          R                                  'I
                                                                  ,5
                          -Yc.C      __    _
m m                      k M                                      Xi                      1 e
x                            .t
        \,i3/i        ..L                        .
j 7
5      j          5                      !          --
                      '.ry              '        '      ~
h' 5
                                                                                        'k''-Al          u s                f                          -x                      ..
s                    o            ~
(;f.
(IN5                                  s$5=W l
            .              w ~
l h _ ___ _'y
                                                          %l A                      Q.: fr          :.. .Jj i
h)f                __
I l  0 A                                    A                                      -
T v)
F m
pLe v
Q          '
v0 90 0                                                              ,
:                                        0O u O  9                                                              ~
s@:                              V                          l          Y
    =g                                                          .
f
                                                                                            /
r-
 
Wa-1--                    - - - - - -                ,a-            4      w,L-s uA5        .-.----..rA.-        s            -~e,A      u  ,--                      ,1  ._                  4      wm      -                          a        -
)
1 7                                                                                                                                                                            1 .
U s
J gg I                            I                          " '  ~
lh
                      = =
i      11            i
                                                                                                                        -                        (J                                                _q 3
                                                                                                                                                                                                        =
CC W t'7 "-                                                                                                                                            cc I' D I                                                i 8
l r, ! l                                                      /                                                              I                  a 3
L_                                            f,                      -
l                                                      J                                        *
                                              's--                          '                                                                                                                                            ,
i                            0                          e              '
I        ,
r,>                                            v                      v                                          i L=                  (                                                                                                                        8 r-                          ,
                                                                                                                                                                                                                            #a" n
1 i                      ::
                                                  . .          i, i
                                                                                                                                                                      \
i
                          !                                    J                                                        T                                                                                            3 __
                                                                                                                                            ~                c                                                  2-1      ~~,                                                                      g ~W 5 n_.
2
_ n. .D. '' '
l                  .
y
                                                                    .--                    .    ' @y,f - ')a                            ,
mm
                                                                . g          __
eb
                                                                                                      - q NJ                                              %
                                                    \g                                          U                                                            i N          .                                    iM u;1mf                        xD"    i r';                      -
t a-- AW,                                                                                                                                                                        .'
a      ."                        3 -
                                                                  /                                                        w,                                                                                                    I                          N h                                  j                                                                                                                  s on          . v
                                                                                                                                                ,                    y
                                                                                                                                                                                          .\
s t
l                            /                                                    -
0m                                                      ,
b)                I
                                                                                                                                                                                                                                                }
                                                                                                                                                                                                                                                \
l s                                                      C                            O' 1-
                                            .                                                                                                                                              '> ,                                    c.
i
                                                                                                                                                                                    /                                                      )
              "=*                                                                                                                                                    ,/'                                                                  '
h      "' " "                                                                                                                                                                                                                    t z                        m
(/[
                                                                                                                                                                                          ,u j
                        =o.                      u n
b 7                                                            in                                                                          rL                                                                        ":                .
I
 
  ----s.a 1-~+-J--J=-4        .&  M              s,3-  --w--%.G-w    ~-==aan.44    W 6-Ak--L+44n-      x                            m+Gk. k-. Awe---<J      K      ' 44 4      emL 6 &    e+M-'      +5-A    - 44 A4    A    a.4--  m dk-    3      G I
a                                                                    u                                                                '
f
: u.              -
m                        g 3
                                      =            a                                      7                        i            J                      LJ          .
0-                          -
a re                                  o l
                                                                          /                                                                                              ,
i.'                                          ,4 r.                                        -                    e I.i        <
i\/                                        ' n' l
lI                !!
l 1
g/h'");yl A
                                                                                                                                                                      .v _t l,
g-v c
I
                          --,io.u 2
[er [
ETEl
                                                                                                                                    /9; ' I              br    Q                -me
                                                                                                                                                                                          =
4 es
                                                                                                                                                                                                      =1 4k i      t 6L m
                                                                                                                                                                                                                                                                  =
                                                                                                                                                                                                                '4 g i
                              ^
Z_ sl$                                      f. ma s                                                    M,                    i i
68        -
                                                                                                                                                                                                                  ~
1 5\
                                                                                                                                                                                                                                                      ~
v                                                        /                                          j                <!
                                      .                    7-
                                                                                                                                                =
x                      X) g-                                                                                                                    '
                                                                                                                                                                                                                                      -                          o s
                                                                                                                                                                                            \,                                                ,                    {
                                                                                                                  ^
l                                      s
                                        \
tF Cfl
* i v'
                                                                                            'm        f
                                                                                                        \
g                ,.
i
                                                                                                          ~                                                                                                                              .
I
                                                          \                                                  t..
I                                              \
                                                                                                                                                                                          /
e
[
I                                                                                i LY                                                                                                                                                                  ,  X~                                                      i
                        =                1 F
i 9 i
 
,                                                                                                                                    .                                                                                                                  r 1
r" O                                                                                u                                  -.
* 6
                                                                                                                                                          .'''N' (_Jo a
s_
y t~                                                                                                                                  ,1
                                                                                                                                                                                  '1'                                    \
: . .:, -                                        ;                                                                                                                                            =
i                                                                                                                                                            /
i                                                                                                              -                                                  L s            --                                                              g r                      r
                                                                                                                                                                      ,c  .  .,
a s,
kt l
i
                                                        /                                                    -
Li d 4
av          l
__ T .                                      5    y' )
j                  -        - - -
                                                                                                                                                                                                                                                -h^-l l
w                      f.                    -                                                                .8
                                                                                                                          .. s -}g, l;-                      Q.                  ,
e                --
w g_                      g
                                                                                  -          f%1  j- j
                                                                                                                          -7 o
                                                                                                                                                ,                cr-                        ~N, y!
g-~
                                                                                                  "-                      dl!g        !jl                      0                                %C
                                                                                            %j 1
                                                                                                                                                                                                            'N v>.
g%                                              ,
Mil 2
                                                                                                                                                                    )            A j                                                  1
.                                  s                                                                      e                                                                                            .          .
h- .
00*                                                                                                                          j-4 o            Q.                                                                                                                                            -
                                                                                                                                //8%                                                                                1_
                                                                                                                                                                                                                                                ~
i "f ~
                                                              ,'                                                                %d                                                j .u )
r                                                                                                                        ,
                                                                                                                                                                            '                                                                      m O                                                                                                      l
                                                                                                                                                                                      , n_
                                                                                                                                                                                                                            'y r
s
                  . . . ci                                .-                                                                                                                                                                                        i
                  -- - m                                  V                                                                ,.            3                    ,    s
                                                                                                                                                                                      ~;.
                                                                                                                                                                                        .                                            g
[3                                                                                            f ~sl        l lgs -
rs                                                                                  5              0      '
A                ,N
                                                                                                                                                            )                                      .
li1 r g
b.
i                  ..
,              (s.3                                                                                        N                    l    I'Ys                    )
                                                                                                                                                                                                    ! * *t i
l y , r.          -                                                                      l            ;                          l                                                x                -                                    :
                                                                                                                                                    \j                    L
.                  ++    .        ,
s-f
                                                                                                            /'
                                                                                                                                  -!                  FT g                  l
                    - .:                                                lO                                            j I.          )
r i%m W
                  -                                                                                      1                  i l
a.
                          .g                                                                                      I i%/                                        7/y\ s,;
l L[bs,p%}I      t                        1
                -            Q.                                                                                                  (                  ,,, /                                    1 t *;'
L
                -m-W      r                                                                                              % ,A ,/-                                                            E.,d      .
w.v s                                                                          -
IMI i
c                                                                          -o                                                                                                                                                                              r i
P^
m                                          ;a}
                                                                              -i                                                                                                                                                                          -!
1
                                                                            .l'Q                                    ooo                    o:        h' N-@ ;q/ ,'d 1
 
        'm      **
                    ..H  m2st s <
Es
                                                                                  % 315o* ln                  Aux at actnic
                    ~M          %
                                                                                  % St%\*s\
lllll!1Hli    \
                        \      s.3 z .
sns
                                                            ~-        -
                                                                                    "5 ' ' ' '                      ""
ggg          -f                      '                            - -
                                      %                          ..  ; ...                                                3y x              _ _        :                  4                                                          :
  \_                                                                  n_
l    e        t m J-        a
          \                -
                                                                                                                          ~
                                                                                                                                  -I. 2.zz. 3
                  \                                            cot 40s NSE R v        v          ,
h p
                                                                                                                      - m[f
* I      I                                                                                  -
                                                  ~
                                                    ~ %
                                                                                      ~
                                                                                              , cSl& J                            _
a an i p -
s                                                                                                  -                l 1
T 31410
                                                                                                              ~                  -
b.
osmanatom                        g[hi
                                                      -      -                      7
                                                                                      -              x n
                                                                                                                                ,n I        Taios                                                                                                      -
a        a llllll =
                                                                =
a ,e tRlhc o MEZZANINE FLOOR E L.4811' 0" i
l
{
 
    . _ _ _                  _            _ _ . _ . . _ _ _ . . ~ _ _ . _ _
e t
i e        cs me sui                                                                                                                                5315o.5 o
l                                  l LOCKER                                                        H9
                                                                                                                                          ~
[
                                      \"                    ROOW I                I                      '#'                                        CONTROL E                                                                    3
                                                                                                                              "~                                      RooW 73 i a.
                                                                                                                                                    ~              .
MI@                                                                                                                                                                        J
                                                            -                                                          .ce R. y                                  g.
1.N t L u*dC H                      , l$1%
I oou                                                                                                                                                  OUTulOE N
Otcr TUme NE OENERATOR
              ,                .. . . . L T.
snoe x                                              -A -                                                                          y g
IO K
T ases
* Tsioi
                                                                                                                      '111111 5 l
                                                                                                                                              . o\ & r
                                                                                                                      .                                OPERATING FLOOR
                                                                                                                                                        . E L 4829' 0"
 
                                                                                        .                                                                            I i
l I
, neQ n3n                                l
'                                        I                                                                                                    l                    l i
                          -          . ..'                                                                                                                            1 I
l l
l                    ,
4 I
m      On E1
                                          \                            gl l            -      -              -:-                8 C
c-                          , ,  ,                                          U                      _      _
q                          ,l :    :::                                  .                    esovnoou                /                        ,
                            --                      t            .
: 2. R / y "c[i E D %
TU. SINE
* J LUM OIL                                                                  n                    ..
a            _
                                      \              a=                                                          3
                                                                                                                                              . amo- o
                                                                            .u, u
o is o 4    l o                                              3                        o o                              ~
O O                                    ,                4O o              o g                              -
O O
K' E ,                ,.
8
                                                                                                                  $                        0 Aux
                                                                            . o g)*                              --                    saO G                                    ]l          ~            -                                -.          .E sou. 83                        3 I,
x                    O o
i 1
L, I              3 b3 E/nc
_                      _              o o    .o I                      1
                                                                                                                                                                      )
GPADE FLOOR                                                <
I E L.4791' 0"
 
Fwm tClm e ahG 00              , og    hf    --
0 HP    ,,                                              =                              '
s..
i OOO                                                                  {c,$u,oir;ON Ai, y                                              ,                                      Units
_e._              l O EL. 4844'4"                              .
q37.5 \- \                                                                                          1 4GbM SulLDINO      ~~
E MH4>uS T
                                                                          , elo    <
000 AtACTOM SLOO.
pggi g gg                          I AI A CONDirlONE M                                              N F L AS H T AN K .-            -      -
_                                                                              A      8      C 3                        -          -
5
                                          =                                                          ,                  _      _
vNirs l
N                                                ___ <                                                                  h, EL4864' 0" q 3 2.5 3 t'A o a., o x o.wx o.n
\
m1.
wA
::=
iiii c:
L_          1 EL 4836' 0" l-                                                                                                          .
 
                                    +.                                                          #,              .
3 43 M(CJ      *l) L @%
                              %MS1%.                    e \ {L/'n r 1
T q      Cs.aio. HEATER $d)                      f                3
* FimE WATem
                                                                                                )
M                                T 4401 p                      s
                            "
* TANK 1
EL492P s" 1
I f
03 sehr a                                                      x HEAfgm $4 stonAosTAng E                            .
                                                                                                        <                g
.                          s.                    ,-                    0 E L.4904'.r*
TURSINE SVILDING F
    ..-,                                                                      ,.,c_m        ..                        . . . . _ . .
 
1 EgCTION 7.3 FOSAVEX-90                *
      ,                              Plant Area Radiation Levelo INPLANT CONTAMINATION LEVELS Prior to T2:      51DA for all non-HPCA aredo.
After T2:    (llorfzontal Surfaces) f or non HPCA arects.
Level 1:    3000 dpm/100 cm'            f MDA A Level 2:    2000 dpm/100 cin
                                                          $T
                              < MDA d Leve1 3:    1000 dpm/100 cm# p
                              < MDA d Level 4*:    300 dpm/100 cn/ $9
                              < MDA A Level 5:    200 dpm/100 cm# Si
                              < MDA d Level 6-1]:          < MDA $Y
                                      < MDA J
 
i 8.0-1 SECTION 8.0 0FFSITE RADIOLOGICAL DATA                            P Section                                                                ,
8.1    Meteorological. Data                          Page 8.1-1 8.2    Release Rate / Dose Assessment                Page 8'.2-1 4
8.3    Field Monitoring Data                        .Page 8.3-1 8.4    Maps                                          ";ge 8.4-1
*                                            /
N E
 
                                          =                          .                                      ..        -                        .    - .-
                                                                                                +
                                                                                                                ,                                            ' cv t
:[
i
                                                ,SECTION 8.1'                                                                                                    ,
FOSAVEX                                                                                                          l
                                              -Meterological Data                                                                                                  'I
                                                                                                                                                                  .}
0800  T2+15-.      T2+30        -T2445~    -T2+100'    T2+115        T2+130          T2+145                .T3-200
                              .T2  T2+29        T2+44        T2+59      >T2+114~    T2+129      LT2+144L-      -T2+159                      T2+214-WZND SPEED              3.0-  2. 5 -      ~2 7 -
                                                  .          2.7          2.5      !2. 2.-        2.0              li9'-                  ; 2 .~ 3 L              Ji (mph)                                                                                                                                                        ,
WIND DIRECTION          315  315.        315          =315-        L315-      315          315              315-                    ':315i (degrees)                                                        .,,_
                                                                                                                                                                      =
PLU.NE uGIATION/
4.0  4.0                                                                                                                        7' SIGMA THETA                                4.0          4 . 4.0.      4.0          4. 0..          4.01                    ,4.0L (degrees)
DIFFERENTIAL                                                                                                                                                    ;
    ":MPERATURE              2.2  2.4          2.2          3.6-        3.6        1~ 9        :1.9              -- 3 . 9 :                  4.0 (deg F)                                                                                                                                                        ,
                                                                                  /
u 4
8.1-1
                                                                                                                                                                      ?
D s
                                  .                  . . . .          ..        .          -._          . ... ...            - , - . . .            . ~ , .
 
4 e
SEcliest 8.2 FOSAVEX-90 Ptmoet _ocArseen vs. raw 38K gpg        ..
SNNI
                        .      Va (NF80)        EA8  8.5        1.0    1.5      2.0 ois>> ce . u >
2.5  3.0      4.o    5.6      7.5      se.e TD t.fr 7p- p:p q A5              kk 1
v,rt:so b i.g            8        27              8 8 A M  '
r2+:s9        C        A7              C  c          84                                                                              ..
hhk D
                                                                                                                        ^
  ~fy //:if                ,[          hh                                                                                  e
                                                                                                                                              +
f,'l,']                                ggpeeBg                                                                                        -
K.        p.x
  -rs u so                                                              C.        C      0
[ Q.O                        [                b
      ,,_.Q                              };
[l';            C,      13            GffEDbC1
                                                    -8.2-1                      -
                                                .-    -        -                                __      _ _ __ __L __ _ __ __ _      ___f.
 
                                  +
                                          .O 4
e h
O.
2 4
O
                          %            G g
d      o        O Q                      _
a .
S ten ' @
N                                                    i d
w      g t    w                    -
    ~Rd "A
a k                    M
    !s!                      (        w =
ee"n 4                                          4
                              %-      g    y It      e a
                                      %    =                          4 3-Q        t xw                .              !
            !E.I      Q                D D,.,      z
                .E
                !.!. W                                    -
D f
                =    M  $ 4          4  a1    1
                  ! .D  B
                          @)          $ @ @S s      .                  ---
 
                                                                                          . ?Q -^
t j
i SECTION 8.2                                                    '
FOSAVEX-90                                                      l Release' Rate / Dose-Assessment                                            ;
Plume Segment:-  A-                              From T2+:15-            To T2+:29 Release Rate:
Noble Gas:      1.4 E -4 C1/sec Iodine (Total).:      O C1/sec PROJECTE  DL,'S:                        ,
D%ST-    DILUTION    WHOLf;30DYLCHLD THY-ANCE        FACTOR    308E' RATE    DOSE l RATE
                    . (41 LEE) (SEC/MS)      (REM /HRF    (REM /HR)-
                        -EAB    3.254E- 4 '3.660E--5 -0.000E+ 0 1.0  8.947E 1-062E- 5 0.000E+ 0                                      i 2.0    4.162E -5    4.938E- 6    0.000E+ 0.              '
                                                -/
3.0    2.696E- 5 '3.199E- 6        0.000E+ 0-4.0    1.983E 2.352E-16        0.000E+ 0 5.0    1.559E- 5    1.850E- 6 LO.000E+ 0 6.0    1-.083E- 5'  1.522E  _6-  0.0_00E+ 0 7.0    1.090E  1.293E-    6- 0.000E+ 0:    -
8.0    9.478E-'6    1.1'25E    6  'O .' 0 0 0 E + 0-9.0    8.385E- 6    9.949E- 7    0.000E+~0                                  '
10.0    '7.518E- 6: 8.920E- 7        0.000E+EO 20.0    3.620E- o    4.296E- 7: 0.000E+ 0 -
30.0      2.375E- 6    2.818E- 7 0.000E+ 0 2
40.0      1.755E- 6    2.083E- 7f .0.000E+ 0 50.0      1.386E    o  1.e45E    7  0.000E+ 0 8.2-3
 
  --  , ~    n....  - . . . . - . . - --                .-        -    -      -      .- .- - -..                  .    . . - . -
t
                                                                                                                                        =-;
SECTION - 8. 2 --                                                            ;
FOSAVEX-90 Release Rate / Dose AsseLsment Plume Segment:              B                                          From.T2+:30-                    To T2+:44 Release Rate:                                                                                                          -
Noble Gas:                1.3 E Ci/sec                              -
j Iodine'(Total):- 0 Ci/sec PROJECTED DOSES:                                            s lyrsr.-
3rLOTION ?WHOLE BODYLCHLDLTHY                                                      I AWCE FACTORz ~ DOS E ' RATE - DOSE LRA TE (MIL E G)    (SEC /M3)            '(REM /HR)      g(REM /HR)
EAB      3.013E :4            3.234E- 4        -O'.000E+ 0' 1.0      8.285E- 5            8.894E 0.000E+ 0-                                        j 2.0      3.854E- 5            4.137E--5
                                                                                /
J0.000E+-0 5.0      2.496E- S' 2.680E 5-    O . 0 0 0 E + -~                                            4.0      1.836E- 5 1.971E- 5 -0.000E+s0-5.0      1.444E- 5              1.550E-15 :0.000E+                  0-.
6.'O      1.18SE- 5            '1.275E .5- 0.000E+ O 7.0      1.009E- 5              1.083E- 5' O.000E+'0-          -
8.0      8'.776E        '6 9.422E- 6: 10.000E+ 0-9.0    =7.764E :6                                                                            -i 8.335E- 6      0.000E+ 0' a
10.0      ~6.'961E- 6
                                                                          -7.473E                                                                                                                                              <
0.000E+ 0-20.0      3'.352E-.6            3.599E- 6' O.000E+ 0;-
30.0      2.199E- 6              2.361E-'6: _O.-000E+ 0' 40.0        1.625E- 6. 1.745E-;6 .0.000E+ 0 50.0        1.283E        --6    1.378E      6' O.000E+ 0 i
8.2-4 1
 
-      . . ~                                                                            .          .
                                                                                                          . . . . . , . - . ~ . - - .      .-    , ..  . . ,
4 I
                                                                                                                                                            '?
                                                                        'SECTION 8.2_                                                                      _;
              '                                                          FOSAVEX-90 Release-Rate / Dose Assessm'nt-                          e j
Plume Segment:                  C                                                    From T2+:45                  To T2+1':00-        -- -
                                                                                                                                                          -t Release Rate:
Noble Gas:          '4.2 E Ci/sec                                                                      ;
Iodine . (Total)-:                  O C1/se'c 5.
PROJECTED DOSES:
DIST-            ~ DILUTION                WHOLE-BODY CHLDEThY
                                                                                                                                          ~
ANCE                FACT 6R                  DOSE RATE = DOSE RATE (MILES) (SEC/M3) .                            (REM / HR)          -(REM /HR)                          .
EAB          4.872E--4                    1.744E _0.000E+ 0
: 1. 0-        1.359E-J4. -4.861E 0.000E+LO-
                                                        -2. 0        6.401E                .5    2.2,90E        4  .0.000E+-~0 3.0        -4.130E                  -1.478E-        4'    O.000E+ 0 4.0        3.019E--5                      1.-080E---4          01000E+L0 5.0          2;372E- 5                    8 . 4 8 7 E - : -0.000E+10-6.0          1.953E- 5'                  6.989E .5            0.000E+ 0-                          ;
7.0          ti.661E- 5                  5.945E-.5 f0,000E+-O                                      l 8.0          1.447E- 5                '5.176E--5              0 000E+[0' 9.0          1.283E              .5      '4.592E--5            0.000E+<0 10 . 0 --    1.155E                    4.131E          5 -0.-000E+DO 20.0          5.919E              .6    '2.118E 0.000E+-0 0.000E+ O'
                                                                                                ~
30.0-          4.107E- 6 -1.470E -5                                              -
l I
40.0          :3 ~.'15 9 2 -' 6              1.130E            0.000E+ 0                          ]
50.0        '2.574E- 6                      9.".09E--'6          0.000E+ 0-
                                                                                          ^
8.2-5
_ _ _._ -                            -                      .        . _ _ - . _ . .                  .m    -        _.    - - , ,        ,  .. __.I
 
i a                                                                                                    i I-1 FECTION 8.2 FOSAVEX-90 Release Rate / Dose Assessment Plume segment:        D                              From T2+1:00          To T2+1:14 Release Rate:
Noble Gas:    8.4 E -3 C1/sec Iodine (Total):      O C1/sec PROJECTED DOSES:
DIET-      D1LUT10N      WHGLE E:0 D Y CHLD THY ANCE        FACTOR        DOSE RATE    DOSE RATE (MILES)  (SECIM ? > -    MEM/ hR)      (REM /HR)
EAE;  5.162E- 4        3.766E- 3    0.000E+ 0 1.0  1.467E- 4        1.050E- 3    0.0i E+ 0 2.0    6.913E- S 4.94,7E-  4-  0.000E+ 0 3.0    4.460E- 5        3.192E- 4    0.000E+ 0 4.0    3.2e.1E- 5      2.334E- 4    0.000E+ 0 5.0    2.561E- 5        1.833E- 4    0.000E+ 0 6.0    2.100E- 5        1.510E- 4    0.000E+ 0 7.0    1.794E- 5        1.284E- 4    0.000E+ 0 8.0    1.562E- 5        1.118E- 4    0.000E+ 0 9.0    1.386E- 5        9.919E- S    0.000E+ 0 10.0    1.247E- 5        8.924E- 5    0.000E+ 0 20.0    6.391E      o    4.574E-'S    0.000E+ t 30.0    4.436E- 6        3.175E- 5    0.000E+.O-40.0    3.412E- 6        2.442E- 5    0.000E+ 0 50.0    2.779E- 6        1.989E- 5    0.000E+ 0 i
8.2-6
 
                                                                                                                                                                                . .t.    <
:\
SECTION 8.2 FOSAVEX-90                                                                                                        :
Releare Rate / Dose Assessment
{
Plume Segment:. E                                                                                      1From T2+1:15                    To-T2+1:29-                        ,
Release Rate:                                                                                                                                                              s t
Noble Gas:                    9.9'_E -2 Ci/sec_                                                                                                .,
lodine.(Total):                                  O C1/sec-PROJECTED DOSES:
D!ST-          DIL UT 10_N                          : WHOLE-BODY CHLD THY ANCE.              FACTOR                              DOSE RATE: DOSE ~-_R A TE                              _
(ii! L Ei n    (SEC/m3h                                    ( RE M / hR)-              (REM /HR)
EAB      3.e.97E-_4_ ?3.'133E--2. :0.000E+ A-                            -
t
                                                                                                                                                ~
1.0      1.017E- 4 -8.617E.3            -
                                                                                                                                    'O.000E+ 0 2.0    '4.729E --5--4.008E                                      /_
                                                                                                                        ' ''3: ' 0 . 0 0 0 E + : 0 .-
3.0      3.064E-- 5                                :-2. 597 E                3    0.000E+io 4.0      2.253E--5                                  1.909E                  3' O .'00 0E+ : 0' S.O      1.772E- 5                                  1.502E---3'-0.000E+'O                                                            >
: 6. 0 -  _1.454E'=5                                  1.235E- 3'                    O.000E+ 0 7.0'    1.23GE- 5                                  1.050E--3                    0.000E+:0 5.0      -.1 '. 0 7 7 E - 5                          9.129E              -4        0.000E+-0-'
9.0      9,5I9E                                  3.076E 0.000E+ 0 10.0'      4l.543E- 6                                  7.240E-                  4-  -0.000E+ 0                                          1 20.0        4.114E -6                                  3. 417 E- 4 10.000E+ 0i f
30.0        2 . :. ; ; E - - : -
2.227E- 4                    0.000E+='O 40.0        1. M SE ~ 6                                1.690E- 4                    0.-000E+ 0
?
                                              $0.0        1.57!I- 4                                  1.335E- 4                    0.000E+ 0
(                                                                                      8.2-71                                                                                          :
l
                                                                                                                                  .  ,.        .    . _ . .      - ~ . _ .      .. a
 
l l
i SECTION 8.2 FOSAVEX-90 Release Rate / Dose Assessment-Plume Segment:                    F                                  From T2+1:30            To T2+1:44 Release Rate:
Noble Gas:      1.4 E Ci/sec l
Iodine (Total):        O C1/sec PROJECTED DOSES:
    .                                        DIST-      DILUTION      WHOLE BODY CHLD THY A N C. E    FACTOR      DOSE RATE      DOSE RATE (MILES)    (SEC/M3)        (REM /HR)      (REM /HR)
(
                                              -EAB    4.067E- 4      4.826E- 3      0.000E+ 0 1.0    1.118E- 4      1.327E- 3      0.000E+ 0 2.0    5.202E- 5      6.17CE- 4      0.000F+ 0-3.0      3.370E                                                                        3.999E- 4. 0.000E+ 0 4.0-2.478E- 5 -2.941E -4            0.000E+'O 5.0      1.949E- 5 2.313E- 4          0.000E+'O'                    ,
6.0      1.603E- 5      1.902E-    4- O '. 00 0E + 10 7.0    1.362E-15      1.616E- 4      0.000E+ 0 8.0    1.185E- 5      1.406E-    4- 0.000E+ 0 9.0      1.048E- 5      1.244E- 4      0.000Et 0 10.0      9.397E- 6      1.115E- 4      0.000E+ 0 20.0      4.526E- 6      5.370E- 5      0.000E+ 0 30.0      2.969E- 6      3.522E- 5      0.000E4 0 40.0      2.194E- 6      2.603E- 5      0.000E+ 0 50,o        .7aat- 6              24*~o e    .
: 2.      51. ;1 1 400E+ 0 8.2-8
 
9
                                                                                                                    .)
:}
SECTION 8.2 FOSAVEX-90 Release Rate / Dose Assessment Plume Segment:  G                                From.T2+1:45- 'To T2+1:59
                                                                                                              ~
                                                                                                                      -J Release Rate:
Noble Gas:      7.1 E Ci/sec-Iodine (Total):      O Ci/sec PROJECTED DOSES:                        y DIST-DILUTION- WHOLE BODY CHLD THY
          .            ANCE      FACTOR
                                              ' DOSE RATE- DOSE RATE (MILES)  (SEC/M3)        (REM /HR)                                  (REM /HR)
EAB    6.924E- 4      4.173E- 3                                0.000E+ 0 1.0  1.931E- 4      1.164E- 3 -0.000E+ 0 2.0-  9.096E- 5      5.482E- 4 0.000E+ 0
                                                    /
3.0    5.86BE- 5      3.537E- 4                              0.000E+ 0-4.0    4.291E- 5      2.586E- 4                              0.000E+ 0 5.0    3.370E- 5      2.031E-                        4.      0.000E+ 0-6.0  2.775E- 5      1.673E--4                              0.000E+ 0 7.0  2.361E- 5      1.423E- 4                              0.000E+ 0 8.0    2.056E 1.239E- 4                    '
0.000E+ 0 9.0    1.824E- 5      1.099E- 4                              0.000E+ 0 10.0    1.641E- 5      9.888E- 5                              0.000E+ 0              .
20.0    8.410E- 6      5.068E- 5                            0.000E+ 0 30.0    5.836E- 6      3.517E- 5* 0.000E+ 0 40.0    4.499E- 6      2.706E 0.000E+ 0 30.0    3.66?E- 6      1.104E- 5                            0.000E+-0 8.2-9
 
e, SECTION 8.2 FOSAVEX-90 Release Rare / Dose Assessment Plume Segment:  H                                            From T2+2:00              To T2+2:14 Release Rate:
Noble Gas:          7.1 E -3 Ci/sec Iodine (Total):            O C1/sec PROJECTED DOSES:                              ,
DIST-      DILUTION        WHOLE BODY CHLD THY-ANCE.          FACTOR        DOSE-RATE-' DOSE RATE (MILES)    (SEC/M3)          (REM /HR)                    (REM /HR)
EAB    5.720E- 4          3.447E- 3                    0.000E+'O          -
1.0  1.595E      .4    9.612E- 4                    0.000E+.0 2.0  7.514E- 5          4.528E            -4        - 0.000E+ 0 3.0  4.8'48E- 5' 2.922E-                  4          0.000E+ 0 4.0    3.545E- 5          2.136E- 4                      0.000E+-0 5.0  2.784E- 5            1.678E              4        0.000E+ 0 6.0  2.293E- 5          1.382E 0.000E+ 0 7.0    1.950E        1.175E- 4                  -0.000E+ 0 8.0    1.698E- 5          1.023E- 4                    0.000E+ 0 9.0'  1.506E- 5          9.079E- 5 ' 0'.000E+-0
                                  -10. 0 -  1.355E- 5          8.168E            5-        0.000E+ 0 20.0      6.947E- 6          4.187E- 5                    0.000E+ 0-30.0      4.821E- 6 '2.906E                            0.000E+ 0 40.0      3.709E- 6          2.135E- 5= 0.000E+ 0 50.0-    31 21E- 6          1.821E 0.-000E+ 0 8.2-10
            .a  .                                  -    ,            --,<w.,-        -,r        -
 
L SECTION 8.3 FOSAVEX-90 Field Monitoring Data-                                                                                                            ;
Time:- - From 0000-                      To T2+:29' IN FIELD SAMPLING RESULTS                                                                                                          -j Ambient-Radiation Levels                                  Particul' ate                                                    I-131' (mr/hr)                                  Activity-                                                    Activity-Concentra--                          Net                    .Concentra- Net' Dista--*          Window                  Window                                            Count Rate'              - tion-                Count Rate                              I (milea.        fClosed                  Open h- tion( Ci/cc)                              (cpm)                  -
                                                                                                                                          '( Ci/cc)              (cpm)-
EAB                Bkgd*-                  Bkgd*              MDA                                0                        MDA                      0 0.5 -              Bkgd*                  Bkgd*                MDA                              0                          MDA                      0 1.0                Bkgd*                  Bkgd*              MDA                                0:                        MDA.                    0 1.5                Bkgd*                  Bkgd*                MDA                              0                          MDA                      0-  4 2.0                Bkgd*~              --
Bkgd*          ~MDA                                  0 MDA                      0                              i m 2.5                Bkgd*                - Bkgd*                MDA                              0                          MDA                      0                            ti 3.0                Bkgd*                  - Bko4*          'MDA                                  0-                      -MDA'                      0 4.0                Bkgd*'                  Bkgd*-            'MDA'                                0                        .MDA~                    .0 5.0              _Bkgd*                  Bkgd*                MDA                              0                          MDA-                    0-6.0                Bkgd*                  Bkgd*            -MDA                              -0                          MDA.                    0 7.0                Bkgd*~                  Bkgd*            -MDA                                ~0                      =MDA:                      0-8.0                Bkgd*                - Skgt
* MDA                              0                          MDA                      0
                - 9.0                Bkgd*-                  Bkgd*-              MDA                              0                          MDA'                      O 10.0              _Bkgd*                  _Bkgd*              MDA                              0-                        MDA.                    .0 -
l
* Actual' Met'er Reading
                - Note: True          reading = 5(hY-k )
8.3-1
      - .~-  m  . n -- .                        ,--#                    ,,, , , ,        -.....,n+w--,--r--n            - wr w , -
ars +  .v      r        ,      e
 
        - - . . _ . - . .                    -- . - . .            - ~ . . . . . .                      . -            . _-      -.            -          - -        - . . . . . - . . -
                                                                                                                                                                                                  ~
                                                                                                  ~-                                                      .
  .                                                                                      ELCTION 8.3 FOSAVEX-90                                                                                                    .
field Monitoring Data-                                                                                                          l Time:          From T2+:30- To T2+144' s
IN FIELD' S AMPLING - RESULTS Ambient-Radiation                                                                                                                                                  '!
Levels                                      Particulate                                            .I-131                                                i (mr/hr)                                      . Activity-                                          Activity                                              -L
                                                                          -Concentra ''NetL          -
Concentra - Net tion                                                tion- _
                                                                                                                                                                                        ~
Distance                    Window          Window                                  .
Count Rate-                                            Count Rate:                          ;
(miles) 3 Closed-                            _Open@d-- ( Ci/cc)                              (cpm)                    ( Ci/cc)-
(cpm)7 EAB                            0.2            4.2                      MDA                          0'                        MDA                          0 0,5                        Bkgd*              2.9_                      MDA                          0                        MDA                          0                          -3 i
1.0                    :Bkgd*                1.6                      MDA                        -0                          MDA'                        .0-1.5                        Bkgd*            Bkgd*                    'MDA                          0                      - MDA                            0_                          gI 7
2 . 0 --                    Bkgd*            Bkgda-                    MDA                          0-                    - MDA _-                    --
05                            i 2.5                      .Bkgd*              Bkgd*                      MDA                          0-                        MDA                        .0                              3 3.0                        Bk;d*            Bkgd*                    .MDA>                          0                    - MDA-                      -0 4.0                        Bkgd*'            Bkgd*                    _MDA                          0                      - MDA                            0 l
5.0                          Bkada            Bkgd*                      MDA                          0-                        MDA                      -- 0 --
6.0                      .Bkgd*                Bkgd*                      MDA                          0                        MDA'                          O 7.0                        Bkgd*              Bkgd*                      MDA-                        -0                        MDA.                          0 8.0-                        Bkgd*'            Bkgd*                      MDA                          0'                    - MDA                        -0 9.0                        Bkgd*              Bkgd*                  .. MD A                        0                      - MDA-                        --  O                            j 10 ~. 0 -                    Bkgd*            Bkgd*                      MDA                          0                        MDA                        ~'O i
l
* Actual Meter Reading
      ' Note: True                      reading =        5pd-k) 8.3                                                                                                                                                                                                        ,
                        ,        - , - -                        , .              ,.grrr,e
                                                                                                    ,    y-,-..    -.--y      r -
                                                                                                                                    -$ n ~ ~ ,      -,e--        ~m,m.,e            -
 
. _ _ . -                  _ - . . _ .      ..-._._.__m..
4 r
i SECTION 8.3-                                                                                      1 FOSAVEX-90  ~
Field Monitor 1ng Data Time:        From T2+:45 70-T2+:59
                                                                                                                                                                                          .i
                                                                    -IN~ FIELD SAMPLING RESdLTS Ambient                                                                                                                              -!
Radiation                                      -
l Levels                            Particulate:                                                  I-151                                  '
                                                  .(mr/hr)                            . Activity.)                                              Activity Concentra- *.Not                                      .Concentra                    Net Distance-            Window          Window        tion.                      Count ~ Rate                Lion'                      Count 1 Rate (miles)          TClosed              Openg$        ( Ci/cc)                    (cpm)                      :( Ci/cc)                    (cpm)
EAB                      1.6            33.0            'MDA                              0                      -MDA-                          0 0.5                      1.0          20.7                MDA-                          0:                        MDA-                    " 0 --      -
1,0                      0.4'          -8.3                MDA                          Os                    -MDA>                          0~
1.5                      0.3            6.2                MDA                          'O                        MDA                        'O=
2.0                    -0.2-            4.0                MDA                          0                        MDA                          0 2.5                  Bkgd*-            1.9                MDA-                      .0                          MDA=                      : 0~
3.0                    Bkgd*            Bkgd*                MDA                          0                        MDAi                        0                  -
4.0                    Bkgd*            Bkgd*                MDA                                                MDA                        'O-
                  -5.0                    Bkgd*            .Bkgda~            -
MDA.                        -.0 -                      MDA                          0 6.0                    Bkgd*            Bkgd*                MDA                        '0-                        MDA .-                      0 :-
7.0-                  Bkgd*            .Bkgd*                MDA'                          O                        MDA                          0                  .
: 8 .~ 0              LBkgd*              Bkgd*                MDA                        'O-                      -MDA~                          .0-9 . 0 - ..            Bkgd*              Bkgd*              MDA                            0'                        MDA                          0-10.0                .Bkgd*              Bkgd*              .MDA -                        0-                    ,MDA-                          -0 Actual: Meter Reading
                  ' Note:          True greading .= 5(hk-i) -
8.3-3
 
_._    . . _ _      .    - _ . _ . _ -                              .. _ . - . . . _ - _ -                    . ~ . ,            . _ . _ . . _ . -      _ .._ _.
ffCTION 8.3' FOSAVEX-90                                                                                                                i Field-Monitoring Data'                                                                                                            l Time: From.T2+1:00 To T2+1:14 1
                                                                                                                                                                                                    .1
                                                                  ~IN FIELD SAMPLING RESULTS                                                                                                            l Ambient Radiation Levels                                  Particulate'                                                        I-131 (mr/hr)                                  Activity                                                        Activity, Concentra-                    Net                    Concentra T Net.
Distance      Window                Windov            tion                          Count Rate              tion:                          Count-Rate (mile s)    TClosed                Open%9    -
( Ci/cc)                      (cpm)                  i( Ci/ce)                        -(cpm)-
EAB            3.5                  73.0                  MDA                            0'                        MDA-                            0:      -
0.5            2.3                  46.5                  MDA.                            O                    ;MDA-                                0 1.0            1.0                  20.0                  MDA                            0:                        MDA~                            0-1.5            0.7                  13.5                'MDA
                                                                                                        ~0'                      'MDA-                              0,
                                                                                                              't 2.0            0.4                  7.0                  MDA-                            0'                  .MDA
                                                                                                                                ;                                    0.
2.5            0.4                  6.5                  MDA                            0                    lMDA                                0 3,0            0.3                  6.0                  MDA                          -0.                    i.MDA                                0 4.0            0.2                  4. 0 =.              MD A '.                      '0-                      'MDA                                0 t
5.0            Bkgd*              Bkgd*                  -MDA:                            0                    -MDA                                0' 6.0            Bkgd*-              Bkgda MDA                          -                  --MDA                              - O '-
7.0            Ekgda              Bkgd*                    MDA-                            0                        MDA.                            0 8.0            Bkgd*              Bkgd*                    MDA.                          'O                          MDA                              0-r              9.0            Bkgd*              Bkgd*                    MDA'                          -0                          MDA                              0 10.0            Bkgd*              Bkgd*                    MDA                          -b                          MDA                              0 h      *
              ' Note:ActualMeterReadingh-S-):
Truepreading=5(
t r
6.3-4
                                                              '                                                                                                                                    ;I t
                                                                      .                        .              . . . , .            . . . , . ,              -    +        ,L.  - - - - - . , .
 
r l
j SECTION 8.3:
                                                                            'FOSAVEX-90 Field Monitoring Data'                                                                                                ;
i
                                                                                                                                                                                      -j Time: From T2+1:15 -To T2+1:29!
:l IN FIELD SAMPLING RESULTS                                                                                                    l Ambient                                                                                                                                      ?
Radiation                                                                                                                                        5 Levels                          Particulate-                                          I-131-(mr/hr)                        -Activity ~
                                                                                                                                ., Activity-Concentra ' Net:                                    Concentra = Net =
Distance        Window          Window tion                        Count Rate-            tion!      -
_ Count Rate
            ,      -(miles)        IClosed-          Open$N          ( Ci/ce)
(cpm)                  .( .Ci/ce)          (cpm)
                                                                                                                                                                                      'i EAB              30.0.            625              -MDA~                              0                  MDA-                  -O 0.5              19.1            .395                  MDA                            O_'-              :MDAi
                                                                                                                              .                          0 .-
1.0                8.2            165                  MDA                          ~- 0 :              :MDA.                      0 1,5                6.0            122                  MDA-                          _ 0.-                MDA                      0,
                                                                                                                /
2.0                3.8            79.0'            - MDA-                              0-                lMDA=                      0                            Li 2.5                3.0            60.5                MDA                          _0.                    MDA                      0 3.0                2.1            42.0                MDA~                            0-                  MDA.                  '0-          <
4.0                1.5            31.0              -MDA-                              0                  MDA                  00l 5.0                1.3            27.0              ~MDA                              0-                  MDA:                                      6.0                1.0            21.0                MDA                            0                  MDA                      0                          1 7.0                0.9            18.5                MDA:-                        =0L                    MDA:                      0-                            i 8.0                0.8'            16.5                MDA-                            0-                  MDA                      :0-                          -)
9.0                0.7            14.b                MDA'                        :. 0 -                MDA-                      Oi                          -- -;
10.0              - 0.6,          12.5                MDA' .                          0-                  MDA-                  1  0_ -
* Actual Meter Reading.                                      '
Note: True        reading = 5(            ~f) e                                                                                                                                                                                        o p                                                                                  8.3-5                                                                                                  ;
i                                                                                                                                                                                          ,
                ,-r    --
                                                                                                                      --,-.-,J.L              >--,n              .-          - .. -
 
                                                                                              '                            'i 4..        ..
q SECTION 8.3:                                                            lj FOSAVEX                                                          '
Tield Monitoring Data.                                                              .i Time: From T2+1:30- To=T2+1:44-                    .
                                                                                                                              \
IN' FIELD SAMPLING:RESULTS                                                                i Ambient l'
i Radiation Levels                      Particulate                                I-131'-                            (j (mr/hr) .                      Activity'                              -Activity-Concentra-          Ne t--          -~Concentra--- Net Distance      Window        Window        tion                Count Rate-      tioni              Count Ratei (miles)    jClosed -        Open$i      .( Ci/ce)            (cpm)-          ( C1/ce)            (cpm);              '
                                                                                                                            ,i i
EAD            4.5          95.0                                                                                              Il MDA                  0                  MDA--          ~0-          -1 0.5            2.9          58.0-          -- MD A                0-              -MDA-0-    .            N 1.0            1.2          21.0            -- M D A >          10                  MD A -~          0=
1.5            0 =. 9        16.5              MDA                0'                MDA-              0-        >
2.0            0.6          12.0              MDA                0                  MDA              0:                bg 2.5            0.5            9.0              MDA-                0                  MDA:              0                  j 3.0            0.3            6.0              MDA-                0        .
_MDA-              0 --
4.0            0.2            4.0              MDA                0:                MDA-              0-5.0            Bkgd*          Bkgd*              MDA                0.                MD A -=          0-6.0            Bkgd*          Bkgd*            LMDA                  0                  MDA;            O                        I 7.0            Bkgd*          Bkgd*              MDA'              (0-                  MDA              0-8.0            Bkgd*          Bkgda              MDA-                0                  MDA            'O' 9.0          'Bkgd*          Bkgd*              MDA                  0,                MDA-            -0                    ~  ,-
10.0          Bkgd*          BLgd*          <MDA.                                                                                                    '
MD A .'        =0" Actual Meter Reading Note:  True g reading = 5(h-              )
8.3-6                                                  -              1
  .                                                                        1 0
                                                                                                                  >        \'
 
        .__        ,    -          _ _ . . . ~ . _ _ ,            -              __
                                                                                                                                                              -    s i
SECTION-8.3                                                                              f FOSAVEX-90                                                                              i
                                                            . Field Monitoring Data                                                                                i 1
Time: From T2+1:45 To T2+1:59 IN FIELD SAMPLING RESULTS i                                                                                                                                                                  !
Ambient      '
Radiation'.                              ..
Levels                                Particulate                                    _I-131' (mr/hr)                                  Activity                                - Activity--
Concentra- ' Net                                Concentra-~ Net'    -
l Distance      Window        Window          t                                              tion-                  Count-Rate                  j i              (miles)    jClosed        .Open h            (ion.. Ci/cc)          , (cpm)
Count: Rate' 4( Ci/cc)                    (cpm)'                    A EAB              4.0          84.0                      MDA                  .0-                  MDA-                    0                  1 1
:              0.5              2.5          52.5                      MDA                    0:                  MDA;                    O            "
                                                                                                                                                                }
1.0              1.0          21.0                'MDA 0                    MDA-                  'O'                    l 1.5              0.8-        15.5                      MDA                    0.                  MDA'                    .0                    :
                                                                                                  /                                                              f 2.0 0.5          10.0                -MDA-                        0'-                  MDA          _          0 .-
:-                                                                                                                                                              o l              2.5            0.4              8.0                    MDA                  'O                  -MDA-                    0-                  -i 3.0              0.3            6.0              'MDA-                        0                ;MDA-                      0.
l            4.0              0.2-          '4.0                      MDA                    0                  -- MD A                  ~0-l            5.0            Bkgd*          Bkgd*                      MDA                  [0                    MDA                      0
[
6.0            .Bkgd*          Bkgd*                      MDA-                  0                    MDAL                    0-7.0-            Bkgd*          Bkgd*                      MDA                    0                  '.MDA                      0 8.0            'Bkgd*          Bkgda                      MDA                    0                    MDA~                    0:                    r
,            9.0            .Bkgd*        -Bkgd*                      MDA                    0                  -MDA:                      0 10.0            Bkgd*          Bkgd*                      MDA                    0                    MDA                      0 a    Actual Meter Reading                    )
Note: True g reading = 5(pi T)                                                                                                                        i 8.3-7                                                                                ;
_                m.        _.                .                      . _._                _.                  _    _                        _ .
 
cj s
                                                                .SECTION 8.3' FOSAVEX.90' TieldLMonitoring Data-r Time: From-T2+2:00 .To T2+2:15 IN FIELD SAMPLING RESULTS' Ambient                                                                                                          i Radiation Levels                  Particulate                                      I-131
                                        -(mr/hr)                  -Activity                                    Activity.
Concentra-          Net-                    Concentra-- Net-        -
Distance              Window          Windo                          Count = Rate            tion                    - Count-Rate-          it (miles)        IClosed                Openhw.(-C1/cc) tion              (cpm)                -( Ci/cc).                  (cpm):                i EAB                        3.0          63.0            MDA                  0                    -MDA                        0 0.5                        1.9          39.5-          MDA                  0                      MDA                        0 1.0                      0.8          16,0            MDA-                  0                      MDA-                      10" 1.5                    -0.6            12.3          .MDA-                  'O .                    MDA.                        0-              .
                                                                                          /                .
2.0                      0.4            8.5            MDA                  0                      MDA-                      O.
2.5                        0.3          6.3            MDA-                  0,                    MDA.                        Oc 3.0                      0.2-          -4.0            MDA:                  0-                    MDA~                        0 4.0                    Bkgda-          Bkgd*        _MDA                    0                      MDA                      -0 5.0                    Bkgd*.          Bkgd*        -MDA                    0                      MDAL                        0 6.0                    Bkgd*            Bkgd*          MDA                  0-                    MDAL                          0-I 7.0'                  Bkgd*            Ekgd*          MDA                                      MDA                          0-8.0                    Bkgd*            Bkgd*          MDA                  0-                    MDA                        :0 -
9.0                    Bkgd*            Bkgda          MDA                  0-                    MDA                          0 10.0                  Bkgd*            Bkgd*          MDA                  0                      MDA                          0
        -*      Actual Meter Reading Note: True                reading = 5(fY-        )
                                                                      -8.3-8 J
 
i SECTION 8.3                                                                    i
        ,                                                  FOSAVEX-90                                                                    1 Field Monitoring Data i
Time:L From T2+2:15l            To End IN FIELD SAMPLING RESULTS                                                          -i Ambient                                                                                                  >
Radiation Levels                      Particelate                              I-131 (mr/hr)                      Activit,yy                              Activity                          j Concentra-      . Net-            Con' centra        Net.
Distance      Window      Window          t                Count Rate      tion'              Count Rate (miles)    jClosed      Open k          (ion' Ci/cc)        (cpm)            ( Ci/cc)          (cpm) 9 EAB          Bkgd*      Bkgd*              MDA                0                MDA                ^0 0.5          Bkgd*      Bkgd*-            MDA                0                MDA                  0                5 1.0          Bkgd*      Bkgd*              MDA                0                MDA-                0 1.5          Bkgd*      Bkgd*              MDA                0/              MDA:        ,
O.
i, 2.0          Bkgda      Bkgd*              MDA                0            'MDA-                    0 2.5          Bkgd*      Bkgd*            'MDA                0                MDA-                0 3.0            Bkgd*      Bkgd*              MDA                0              MDA>                  0 -'              -l 4.0            Bkgd*      Bkgda              MDA                0                MDA.                0-4 5.0            Bkgd*      Bkgd * --          MDA-                0-              MDA'                O'              ,)
6.0          -Bkgd*      Bkgd*              MDA                0                MDA-              'O 7.0            Bkgd*-      Bkgd*              MDA              '0
                                                                                          -MDA-                    0 8.0-          Bkgd*      Bkgd*              MDA                0                MDA                  0; 9.0            Bkgd*      Bkgd*              MDA              .0                MDA                  0 10.0          Bkgda-      Bkgd*              MDA                0                MDA                  0 Note:Actual'  Meter Reading True$Qreading=.5(            k- )                                                                              -i 8.3-9
                                                                                                                                    . i.
                      .            .,                                              +      -,-. ,-,
 
-=s<.w ---a..=v.wmm--ma        a  w    -ew-w  w-    4.ms s en .aesa-.amaw            ---------wo,
                                                                                                  .            . w-  w usa,e--.-w---v--rr------m          ~=---+--------,.-,a..--=a                  ,n  m    m. r- e----, v----n--  =-n; e
e*
m.
p
                                                                                                                                                                                                                  .                            g M                          .
s                                                                                  Y 8=# em M CATEl3 em                                                                              A A su mu,                                                                                                                                  caess 8"                                                  E    E eu m.
M          IET..
14 set bY                                                                                            C
[ au3ru. se. .aI>.
                                                                                                                                    '          ^
                                                                                                                                                                                      "a"
                                                                                                                                                  ^^                            "
g I
MF                    co o                          .
                                                                                                                                                                                                    -l
                                                                                                          ~                ,      e-        c                                                        : Y t      C*ttle
                                                                                                              %                                  C                                          WS& 4
* C                            CCoi    .
M Mu
                                                                                                                                                                                                      -    -tiger pump
                                                                                                                                          =
i e
t,il
[_(      -
l u                '
Y
                                                                                                                          =RJ  -
W0  -
er                                ,
o i
ed =                              -
n u ,,;;-
s eM3 g    W                                                                          11h please
'                                                                                                                              s        J          .
R&sur pump e
                                                                                                                                                  =                                                        tumma and i o Y
n
.                                                        c                                                                  L    n l                                                                                                                                                                                                6 f      W o.olQ c
                                                                                                              &O in                _
ws
                                                                                                                                                          'N
                                                                                                                                                          \ u
\                                                                    %                                                                                    j                                                =.
w                    \
A '' >a                      n                                                  &.
!                                                                        "=                                                                              =
l a                      ca.i.% s                                                                            g                                    Y
                                                                                                                                                                                                                          =
                                                                        ~ Cease
                                                                                                      . O 34-                                      @ 34 tre m e u or 1/tist
* h e.ol Q. _
 
                            ..F h
                                                        +e            -i I
IIl:
n isp giillt s
15 d                                1 R
                                , y                              -
                                                                                                          /                        g'
                          /
                                          )    .
T%
x N                          ,              -
m.
(z/
                          ,      ['      f ~
8'' a -
[            2-      -
m d            u.
t                                \,!                      ,
                                                                            ~
i                                                    _
                                                                                                )w.      {  ...
y        ,
u-,              .
r      y      yq        ,            ..
s                      ..                      ,
j). 8 q). )9 1 k                                                  (
(g':                                                                                    g-5
                                  }                                  /-
l$                (, \                                                  '
s          /    .
                                                                                                        )'                      F        '
n                      p                  .      x.                                c ,,,
                    \kM b [, / y y'        ,
                                          *p n N
                                                                          $1 /-
8 gn g.
 
A Ol
                                                                                                                                                          .C
                                                                                        .                                                    j twnnnm                                                                                                                              /
o.I(,
o.ug
                                                                                                                                      ///
      .-                                                                  == v r          _
                                                                                            ..e.                                      -
W/
y, pr
                                                                                            ~
2    _        gg                                                          --
O''                                                              ' " "
m                                                > IW u
M CDCJNC Test L.
SECURITY anunNE MM                                                  . q CITY -
                                                                                  +N          y 170'
 
9 . 0 -
SECTION
 
==9.0 REFERENCES==
 
1 Section i
,    9.1      Procedure Index                          Page 9.1-1 9.2      Key Documents                            Page 9'.2-1 4
4 4
J n
4
                                                  ,                      ~    wy e
 
_ ._~ . _ _  _                __            .                    ._ _      ..        .
9.2-1 SECTION 9.1 l
PROCEDURE INDEX l
Tables 9-1 and 9-2 identify the FSV RERP Implementing Procedur9s and Suoporting Procedures respectively.        Controllers / Observers should' become familiar with those ' procedures which directly affect the portion of the emergency organization they are _ responsible-. for evaluating, s
e 4
                                                                /
O
                                                                                            =*
 
_ . _ _ . _ . . _ . . ~ __              . - . _ _ . . . . _ , ~ .              .. _          . . _ - ,      _
i 9.1-2
                                                                                                                                                          ~
4
                                                                                                                                                            ~
TABLE'9-1 RADIOLOGICAL EMERGENCY RESPONSE PLAN.
IMPLEMENTING PROCEDURES:
j N0,                                            SUBJECT-                                                                              .
i l
Emernency Procedures EP-CLASS                                    Classification Guidance                                                                        ,
Book No. 1 of-RERP ImplementingiProcedures-                                                                    1 RERP-Alert                                  -Action:        5,umma ry .      .for=          ; Alert iClassification                                                                              ;
RERP-Site Area                              Action : Summary .for l Site : Area-Eaergency Classification                                        <
RERP-GE                                      ActionlSummary for General Emergency:
Classification
                                                                                                                        ~'
t RERP-NOTIFICATION                            Prctedure for making-notifications' outside;of the-Control Room' l
RERP-CED                                    Procedure . for- :the                  . Corpo' rate j Emergency Director,-                                                                  ;l RERP-CR                                      Control Room procedure                                                                    -!
REkP-ECP-                                    Executive-CommandPost; procedure'                                                            i RERP-FCP                                    Activation of the Forward Command l                                                                          ~ Post RERP-PCC                                    Activation: of the Personnel Control?
Center-RERP-SEOC                                    State Emergency, Operations -Center.                                                        !
: procedure RERP-TSC                                      Activation -of the-Technical Support
                                                                            -Center                                                                                  f;
                            -RERP_-RECOVERY 1                              Recovery Operations procedure                                                            1 q
                                                                                                                                                                    -i
                                                                                                          +
                                                                                                      'I
_*    y,..
 
    . ._  ._.m.._-                  _
_ . _ _ _ . . - -              _ _ . . . _                            .-          _~ _        . _      _ . .
q
        '                                                  ~
953_
1
                                                          .        . TABLE'9-1 '                                                                                                    l RADIOLOGICAL: EMERGENCY RESPONSE PLAN:          -
IMPLEMENTING PROCEDURES                                                                                                      a
                              !NO.                                              SUBJECT                                              .
                                                                                                                                                ..                                      t 1
Book No.-2 of RERP Implementino Procedures J*
                - RERP-CORE
                -                                                    ~ Core Damage Evaluation-RERP-DECON                                          Emergency Decontamination Practi.ces-;
RERP-DOSE-                                          Off-31te                    Do s e --        Calcul.ation                                                    .;
Methulology,-                                                                                              .,
                                                                                                                                  -                                                    1
                - RERP-ENVIRON.                                        Long Term Environmental Monitoring                                                                              ,
l
                  ~RERP-EVAC                                            Evacuation of Site procedure                                                                                  -3 i
.                  RERP-EXP                                            EmergencyExposureLGuidelines                                                    s                                ;
                                                                                                                                                                                      ;r RERP-FIELD                                        -Field Monitoring procedure-                                                          -
RERP-MET'                                            Meteorologicali                  Data iAcquisition-procedure
                  .RERP-PAR                                              Protective              Action Recommendations"
                                                                          - procedure -'                                                                                              9 L
RERP-SURVEY ~                                        Inplant/Onsite-                    -
                                                                                                                    . Radiological
                                                                        -Monitoringfprocedure;
                                                                                                                                        ~
LFormation' 'and-RERP-TEAMS-                                          Emergency              . Team'                                                                              4 .
Direction p)ocedure-Thyroid'_                _ Blocking-                    Agent-!                                            j RERP-THYROIDT Administration'_ procedure-                      ,                                                        j q
f
                                                                                                                                                                                      .li i
L r
if
: t.                                                                                                ."
                                                                                                                \c                                                                  .i I -.          m    . . . . .      .-    . - . . -                    . - - . .                                ,4.,    _ . . , ,-..,.,,-/,,              -  . . , . . , . . , _ .
 
9,1-4            1 I
l l
l TABLE 9-2                                            i FSV SUPPORTING PROCEDURES                                      i Procedure Designation                                        l and litle FSV Administrative Procedures G-2              FSV Procedure Systems G-3            Action Request - Preparation and Processing G-4              Physical Security and Access Control Personnel Emergency Response G-S G-7              Personnel Training and Qualification Programs G-9            Controlled Work Prr 'edures G-10            Data Management P-1              Piant Operations P-7              Station Service Request Processing P-8              Fire righting and Prevention <
P-10            Industrial Safety Q-1              FSV Organization and Responsibilities 0-2            Quality Assurance Program Q-3            Design Control System Q-16            Corrective Action System Q-18            QA Audit and Monitoring Program 4
 
9.1-5 Procedure Designation and Title 4
Health Physics Procedures                                                                ,
HPP-30          Shipment of Radioactive Materials HPP-105        Operation of Portable Survey Instrumentation                          ,
HPP-110          Routine Survey Intervals and' Survey Documentation HPP-115          Radiation Surveys HPP-120        Surface Radioactive Coptamination Surveys HPP-125        Establishing and-Posting Controlled Areas HPP-130        Portable Air Sample Collection and Analysis HPP-135        Calibration and Operation Procedure for the Eberline SAM-2 Stabilized Assay Metar HPP-140        Continuous Air Monitors                                              F HPP-145        Continuous Air Monitors Filter.and Cartridge Change Out HPP-155        Operating the Harshaw TASC-12rA6 Automatic Alpha / Beta Count;ng System HPP-170        Air Activity Analysis Using the RM 14/15 with HP-210 Probe HPP-185        Personnel Decontamination i
i h
 
9.1-6 Orocedure Designation and Title q
t HPP-19')  Area and Equipment Decor.tamination i
HPP-195    Radioactive Material Spill HPP-205 Calibration of Radiation Detectior. Instruments HPP-305    Bioassay Program HPP-310    Personnel Dosimetry                                      .
HPP-410 Quantitative Respirator Fit Testing l1 HPP-425 SelectionandUseofkespiratoryProtectionEquipment HPP-430 Routine Maintenance, Inspection, and Cleaning of Respiratnry Equipment HPP-435 Breathirig Air System Sampling Procedure HPP-525 Fast Gas and Iodine Sampling HPP-605 Radioactive Liquia (Sys"62) Effluent Sampling and Release Determination HPP-615 Radioactive Gas Waste Release' Rate Calculations HPP-620 Reactor Building Exhaust Stack Discharge Activity Calculation HPP-625 RT 7325 and RT 7343hEmergency Filter and Cartridge Removal HPP-630 Radioactive Material Control and Handling HPP-915    RERP Inventory List t
I e
9
 
i, l                                                                                                                                                            9.2-7 2
i i                                                                                        - .
j                                                                        Procedure Designation                                                                                                            ,
and Title i
4                                                                                                                                                                                                      -!
l j                                    Radinchemistry Procedures                                                                                                                                          -
!                                                  RCP-9          Sample Preparation For Gamme: Spectral Analysis                                                                                    z; 1
l                                                  RCP-24          Analysis for Vent Particulate and Iodine Monitor                                                                                      '
j;                                                                F iter for Surveillance. Requirement E3R 8.1.lef-W:
RCP-36          Radioactivity Calculations-a
;                                                RCP-38          Operation and Calibration of Computer Based-Beta L                                                                Gamma Analysis System.
i RCP-40          Operation and Calibration of;the Whole Body Counting; System-l                                  Procedure Manuals and Plant 4
Training Procedure - Radiological Emergency                                                                                              '
Response Plan                                                                                                                                        !
Fire Suppression and Prevention Manual.                                                                                                              l Sections 1, 2, 8-
                                                                                                                                                                                                      -i
,                                                  Abnorma' Operating Procedures - ( AOP) 4 All Sections                                    a                                                                                    '
;                                                Emergency Operating Procedures ManualL(EOPs)
All-Sections-3                                                Station RERP Implementing Procedures                                                                                                                  -
All Procedures                                                                                                                        .
;                                                  Medical Emergency Plan-FSV
                                                ~ Security Administrative Procedures                                                                                                                    ,
i j'                                                Station Manager's Administrative Procedures-                                                                                                        c
                                                                                                                                                                                                        ?
t 1
p                                                                                                                                                                                                      <
v b
P-A 4                                                                                                                                                                                                      t 4
I
                                                                                                                                                                        .                              4 L                                                                                                  ,
t
    . - - + . . . . -                ...-...m,,e=    - e  - - m    ,      ,,s,__  _.,s  . - . - . - . . . , + -        ..,e.    - - . , -            ~ ~ . - .      ---,.-+,,.-,~.m.    -, .---
 
9.1-8 Procedure Designation eid Title Technical / Administrative Services Manager's Administrative Procedures Public Service Company RERP Public Information Manual State of Colorado Fert St. Vrain Radiological Emergency Response Plan (State RERP)                                    .
Weld County Radiological Emergency Response Plan
* SG-05
      ' (Personnel Accountability .*or Station Emergencies)
Operations Order Book i
a
 
9.2-1 SECTION 9.2 KEY OOCUMENTS Provided below is a list of those documents which govern the FSV Emergency Preparedness Program,
: 1. Fort St. Vrain Radiological Emergency Response Plan.                  .
: 2. Fort St, Vrain System Operating Procedures.
: 3. Fort St. Vrair Emergency Procedures.
l 4    Fort St. Vrain Technical Specifications.                                l 1
: 5. Fort St. Vrain Updated Final Lafety Analysis Report.
: 6. Title 10,        Code of Federal      Regulations Part. 50.47 and Appendix E.                                                              I
: 7. NUREG - 0654/FEHA - REP - 1 Revision 1.
: 8. NUREG - 0696.
l I
I
                                              $4 e}}

Latest revision as of 10:07, 16 December 2024

Exercise Manual Fort St Vrain Nuclear Generating Station NRC Graded Exercise
ML20070A894
Person / Time
Site: Fort Saint Vrain 
Issue date: 11/07/1990
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20070A890 List:
References
NUDOCS 9101290158
Download: ML20070A894 (312)


Text