ML20070A888
| ML20070A888 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/07/1990 |
| From: | Crawford A PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20070A890 | List: |
| References | |
| P-90272, NUDOCS 9101290148 | |
| Download: ML20070A888 (2) | |
Text
-
/
0 Public Service' 20';'a,.o.
P.O. Box 840 Denver CO 80201 0840 A. Clegg Crawford Septuber 7, 1990
%'jlJ'f',l,b, f
Fort St. Vrain Unit No. 1 P-90272 NOTE:
This transmittai contains Emerger.cy Preparedness exercise information that should not he released to the Public Document Room before November 12, 1990;
~
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
F05AVEX-90 SCENARIO SUBMITTAL
REFERENCE:
NRC Letter, Collins to Lee, dated 2/9/84 (G-04049)
Gentlemen, Enclosed please find one copy of the detailed scenario for the 1990 Fort St. Vrain Radiological Emergency Response Plan (RERP) exercise, entitled F05AVEX-90. This scenario is being submitted in accordance with the schedule set forth in G-84049 (referenced letter) and the Federal Emergency Management Agency (FEMA) guidelines of 60 days new prior to exercise date.
The exercise, scheduled for the week of November 5,1990, will not include participation by State and local. emergency agencies.
The exercise will be initiated during normal working hours (betweer 0700 and 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, MST) and conclude approximately four to six i.;. s after initiation.
l Abs
(
/y 5\\
f 9101290140 900907 PDR ADOCK 05000257 F
PDR M/
\\
J280057 l
l
k I
+
i P-90272
(
Page 2
- September 7,-11990-l
\\
Your prompt ; review cf the enclosed material is greatly' appreciated-.
- If you have any questionsuor comments regarding thistmateriali-please contact Mr; M.H. Holmes at (303) 480-6960.
Sincerely, OAhA.0.8:aa)62(
A._Clegg Crawford Vice President, Nuclear Operations:
Enclosure:
- FOSAVEX-90 Exercise Scenario-
-a cc:
Regional _ Administrator,-Region IV
~
ATTN: Mr. Robe:t D. Martin' Regione1 Administrator,. Region =IV-ATTN: 'Mr. J.B. Baird Technical Assistant Division of Reactor _ Projects-Regional Administretor, Region IV ATTN: Dr. D,B. Spitzberg Emergency Preparedness Analyst Security-and Emergency Preparedness ~Section
' Mr.
D.- Ga rri sen --
-Site Resident Inspector-Fort St. Vrain ACC/rm.
P
(
.L_
.