L-83-128, Informs That Discussion Topics for Evaluation of Control Room Habitability Per post-TMI Requirements Expected by 830831.Completion of Mods Expected by 830701: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P. O. BOX 14000, JUNO BE ACH, F L 33408 I
{{#Wiki_filter:P. O. BOX 14000, JUNO BE ACH, F L 33408 FLORIDA POWER & LIGHT COMPANY, March 7,1983 L-83-128 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch # l Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
FLORIDA POWER & LIGHT COMPANY, March 7,1983 L-83-128 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch # l Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555


==Dear Mr. Varga:==
==Dear Mr. Varga:==
 
Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 Post-TMI Requirements Control Room Habitability Your letter of January 6,1983 concerning Control Room Habitability stated that you were unable to determine the acceptability of our proposed control room design based on the information provided and re' uested additional information.
Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 Post-TMI Requirements Control Room Habitability Your letter of January 6,1983 concerning Control Room Habitability stated that you were unable to determine the acceptability of our proposed control room design based on the information provided and re' quested additional information.                   Our architect-engineer has been requested to evaluate your concerns as described in the enclosure to your letter, it is expected that this evaluation will be completed on a schedule consistent with a submittal to you on or before August 31, 1983. This submittal will consist of one of the following:
Our q
: 1. Justification for our control room as it :s currently designed;
architect-engineer has been requested to evaluate your concerns as described in the enclosure to your letter, it is expected that this evaluation will be completed on a schedule consistent with a submittal to you on or before August 31, 1983. This submittal will consist of one of the following:
: 2. Proposed design rnodification to resolve your concerns;
1.
: 3. A combination of I and 2 above.
Justification for our control room as it :s currently designed; 2.
Proposed design rnodification to resolve your concerns; 3.
A combination of I and 2 above.
Please note that we are expecting to complete the Control Room Habitability modifications previously committed to by July 1,1983.
Please note that we are expecting to complete the Control Room Habitability modifications previously committed to by July 1,1983.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems & Technology gAl>
Very truly yours, Robert E. Uhrig Vice President Advanced Systems & Technology gAl>
REU/PKG/ cab cc:   J. P. O'Reilly, Region 11 Harold F. Reis, Esquire PNS-LI-83-168-1 8303140204 830307 PDR ADOCK 05000250 P                 PDR                                                                 PEOPLE. . SERVING PEOPLE
REU/PKG/ cab cc:
_ -_    _ . . _ . . _ . . _ _ _}}
J. P. O'Reilly, Region 11 Harold F. Reis, Esquire PNS-LI-83-168-1 8303140204 830307 PDR ADOCK 05000250 P
PDR PEOPLE.. SERVING PEOPLE
_}}

Latest revision as of 06:47, 15 December 2024

Informs That Discussion Topics for Evaluation of Control Room Habitability Per post-TMI Requirements Expected by 830831.Completion of Mods Expected by 830701
ML20071E377
Person / Time
Site: Turkey Point  
Issue date: 03/07/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
L-83-128, NUDOCS 8303140204
Download: ML20071E377 (1)


Text

P. O. BOX 14000, JUNO BE ACH, F L 33408 FLORIDA POWER & LIGHT COMPANY, March 7,1983 L-83-128 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch # l Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Varga:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 Post-TMI Requirements Control Room Habitability Your letter of January 6,1983 concerning Control Room Habitability stated that you were unable to determine the acceptability of our proposed control room design based on the information provided and re' uested additional information.

Our q

architect-engineer has been requested to evaluate your concerns as described in the enclosure to your letter, it is expected that this evaluation will be completed on a schedule consistent with a submittal to you on or before August 31, 1983. This submittal will consist of one of the following:

1.

Justification for our control room as it :s currently designed; 2.

Proposed design rnodification to resolve your concerns; 3.

A combination of I and 2 above.

Please note that we are expecting to complete the Control Room Habitability modifications previously committed to by July 1,1983.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems & Technology gAl>