ML20072H317: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE
{{#Wiki_filter:"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE
(                                                             WALTH AM. M ASSAOHUSETTS 02254 (617) 890s3350 TWX (710) 324 7508 June 22, 1983 5511-410 Mr. G.A. Maneatis, Senior Vice-President Facilities Development Pacific Gas & Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. J.B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit No. 1 O subsect:   iDve rINAt REe0a1 - eIrra tex 1 SUBMITTAL Gentlemen:
(
In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l   Manager provides the fif th text submittal of the IDVP Final Report.                   As j    indicated in IDVP-SM-March 1983, the IDVP has combined the two Phase Reports into a single final report.
WALTH AM. M ASSAOHUSETTS 02254 (617) 890s3350 TWX (710) 324 7508 June 22, 1983 5511-410 Mr. G.A. Maneatis, Senior Vice-President Facilities Development Pacific Gas & Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. J.B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit No. 1 O
subsect:
iDve rINAt REe0a1 - eIrra tex 1 SUBMITTAL Gentlemen:
In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l
Manager provides the fif th text submittal of the IDVP Final Report.
As indicated in IDVP-SM-March 1983, the IDVP has combined the two Phase j
Reports into a single final report.
l Enclosed is the following text:
l Enclosed is the following text:
Table of Contents         Revision 3 Subsection   4.2.4       Revision 0 Appendix     D.3         Revision 0 Appendix     E           Revision 0 Appendix     F.2         Revision 0 l         Appendix     G           Revision 0 The final submittal of text is scheduled for June 30, 1983.             It is anti-l   cipated that there will be another partial submittal before that date.
Table of Contents Revision 3 Subsection 4.2.4 Revision 0 Appendix D.3 Revision 0 Appendix E
8306290405 830622 l
Revision 0 Appendix F.2 Revision 0 l
bw [DRADOCK05000                                       t 7 J      -
Appendix G
l
Revision 0 The final submittal of text is scheduled for June 30, 1983.
It is anti-l cipated that there will be another partial submittal before that date.
8306290405 830622 bw
[DRADOCK05000 J
l t 7 l
(
(
ENGINEERS AND METALLURGISTS
ENGINEERS AND METALLURGISTS


                                                      'RTELEDYNE Pacific Gas & Electric Co.                             ENGNEERING SEFNICES 5511-510 June'22, 1983                           The text submitted by this letter is considered to be complete except as specifically indicated.
'RTELEDYNE ENGNEERING SEFNICES Pacific Gas & Electric Co.
Very truly yours, TELEDYNE ENGINEERING SERVICES
5511-510 June'22, 1983 The text submitted by this letter is considered to be complete except as specifically indicated.
: f.               v W.E. Cooper Project Manager-5511 WEC/ao Enclosures cc: H.E. Schierling (NRC) (85)
Very truly yours, TELEDYNE ENGINEERING SERVICES f.
v W.E. Cooper Project Manager-5511 WEC/ao Enclosures cc:
H.E. Schierling (NRC) (85)
R.R. Fray (PGandE) (30+220)
R.R. Fray (PGandE) (30+220)
E. Denison (RLCA) (6)
E. Denison (RLCA) (6)
Line 37: Line 49:
D.F Fleischaker, Esq.
D.F Fleischaker, Esq.
J. Reynolds, Esq./J.R. Phillips, Esq.
J. Reynolds, Esq./J.R. Phillips, Esq.
B. Norton, Esq.
O B. Norton, Esq.
O      A.C. Gehr, Esq.
A.C. Gehr, Esq.
R.B. Hubbard J. Roesset M.J. Strumwasser, Esq.
R.B. Hubbard J. Roesset M.J. Strumwasser, Esq.
l O
l O
        . __  __  -}}
-}}

Latest revision as of 05:11, 15 December 2024

Forwards Diablo Canyon Nuclear Power Plant Unit 1, Independent Design Verification Program Final Rept, Fifth Text Submittal.Final Text Submittal Scheduled for 830630
ML20072H317
Person / Time
Site: Diablo Canyon 
Issue date: 06/22/1983
From: Cooper W
TELEDYNE ENGINEERING SERVICES
To: Harold Denton, Maneatis G, Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20072H319 List:
References
5511-410, NUDOCS 8306290405
Download: ML20072H317 (2)


Text

"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE

(

WALTH AM. M ASSAOHUSETTS 02254 (617) 890s3350 TWX (710) 324 7508 June 22, 1983 5511-410 Mr. G.A. Maneatis, Senior Vice-President Facilities Development Pacific Gas & Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. J.B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit No. 1 O

subsect:

iDve rINAt REe0a1 - eIrra tex 1 SUBMITTAL Gentlemen:

In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l

Manager provides the fif th text submittal of the IDVP Final Report.

As indicated in IDVP-SM-March 1983, the IDVP has combined the two Phase j

Reports into a single final report.

l Enclosed is the following text:

Table of Contents Revision 3 Subsection 4.2.4 Revision 0 Appendix D.3 Revision 0 Appendix E

Revision 0 Appendix F.2 Revision 0 l

Appendix G

Revision 0 The final submittal of text is scheduled for June 30, 1983.

It is anti-l cipated that there will be another partial submittal before that date.

8306290405 830622 bw

[DRADOCK05000 J

l t 7 l

(

ENGINEERS AND METALLURGISTS

'RTELEDYNE ENGNEERING SEFNICES Pacific Gas & Electric Co.

5511-510 June'22, 1983 The text submitted by this letter is considered to be complete except as specifically indicated.

Very truly yours, TELEDYNE ENGINEERING SERVICES f.

v W.E. Cooper Project Manager-5511 WEC/ao Enclosures cc:

H.E. Schierling (NRC) (85)

R.R. Fray (PGandE) (30+220)

E. Denison (RLCA) (6)

R.F. Reedy (RFR)(6)

F. Sestak (SWEC) (10)

D.F Fleischaker, Esq.

J. Reynolds, Esq./J.R. Phillips, Esq.

O B. Norton, Esq.

A.C. Gehr, Esq.

R.B. Hubbard J. Roesset M.J. Strumwasser, Esq.

l O

-