TXX-4000, Interim Deficiency Rept SDAR-106 Re HVAC Hangers Fabricated at Variance W/Design Documents.Initially Reported on 830301. Evaluation Continuing W/Completion Expected by 830801: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TEXAS UTILITIES GENERATING COMPANY 2(M)I ItHYAN "I1)% EH D \tJ A%TELY4 752014kk'dl R. J. GARY | {{#Wiki_filter:TEXAS UTILITIES GENERATING COMPANY 2(M)I ItHYAN "I1)% EH D \\tJ A%TELY4 752014kk'dl R. J. GARY | ||
"? :'a02 ".!!!?' | "? :'a02 ".!!!?' | ||
J | J 4 1983 JUL I I 1983 Mr. G. L. Madsen, Chief | ||
.U y | |||
Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: | |||
50-445 Arlington, TX 76012 50-446 C0fiANCHE PEAK STEAM ELECTRIC STATION VEND 0R INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE N0.: 10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On March 1,1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. We have submitted interim reports logged TXX-3651 and TXX-3671, dated March 29, 1983 and May 11, 1983, respectively. | On March 1,1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. We have submitted interim reports logged TXX-3651 and TXX-3671, dated March 29, 1983 and May 11, 1983, respectively. | ||
We are continuing our evaluation and anticipate completion of our evaluation by August 1, 1983. | We are continuing our evaluation and anticipate completion of our evaluation by August 1, 1983. | ||
Very truly yours, RJG:ln cc: NRC Region IV - (0 + 1 copy) | Very truly yours, RJG:ln cc: NRC Region IV - (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U.S. Nuclear Regulatory Commission Washington, DC 20555 8307150100 830704 PDR ADOCK 05000445 S | U.S. Nuclear Regulatory Commission Washington, DC 20555 J&27 8307150100 830704 PDR ADOCK 05000445 S | ||
PDR}} | |||
Latest revision as of 05:50, 15 December 2024
| ML20072M810 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/04/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-83-06, CP-83-6, SDAR-106, TXX-4000, NUDOCS 8307150100 | |
| Download: ML20072M810 (1) | |
Text
TEXAS UTILITIES GENERATING COMPANY 2(M)I ItHYAN "I1)% EH D \\tJ A%TELY4 752014kk'dl R. J. GARY
"? :'a02 ".!!!?'
J 4 1983 JUL I I 1983 Mr. G. L. Madsen, Chief
.U y
Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, TX 76012 50-446 C0fiANCHE PEAK STEAM ELECTRIC STATION VEND 0R INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE N0.: 10110
Dear Mr. Madsen:
On March 1,1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. We have submitted interim reports logged TXX-3651 and TXX-3671, dated March 29, 1983 and May 11, 1983, respectively.
We are continuing our evaluation and anticipate completion of our evaluation by August 1, 1983.
Very truly yours, RJG:ln cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 J&27 8307150100 830704 PDR ADOCK 05000445 S