TXX-4000, Interim Deficiency Rept SDAR-106 Re HVAC Hangers Fabricated at Variance W/Design Documents.Initially Reported on 830301. Evaluation Continuing W/Completion Expected by 830801

From kanterella
(Redirected from TXX-4000)
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-106 Re HVAC Hangers Fabricated at Variance W/Design Documents.Initially Reported on 830301. Evaluation Continuing W/Completion Expected by 830801
ML20072M810
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/04/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-83-06, CP-83-6, SDAR-106, TXX-4000, NUDOCS 8307150100
Download: ML20072M810 (1)


Text

TEXAS UTILITIES GENERATING COMPANY 2(M)I ItHYAN "I1)% EH D \tJ A%TELY4 752014kk'dl R. J. GARY

"? :'a02 ".!!!?'

J 4 1983 JUL I I 1983 Mr. G. L. Madsen, Chief .U y Reactor Projects Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 C0fiANCHE PEAK STEAM ELECTRIC STATION VEND 0R INSTALLED HVAC SYSTEM SDAR-106 CP-83-06 FILE N0.: 10110

Dear Mr. Madsen:

On March 1,1983, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding HVAC hangers which were fabricated at variance with design documents. We have submitted interim reports logged TXX-3651 and TXX-3671, dated March 29, 1983 and May 11, 1983, respectively.

We are continuing our evaluation and anticipate completion of our evaluation by August 1, 1983.

Very truly yours, RJG:ln cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 8307150100 830704 PDR ADOCK 05000445 S PDR J&27